Loading...
HomeMy WebLinkAboutFile Documents.617 W Bleeker St.0052-2022-BCHO (7)0052-2022-BCHO_617 W Bleeker_BuildingComment1 Subject: PlanCheck Page Label: 1 Author: justinh File Name: 90. RREMP Plan.pdf Color: Update the architectural site plan (and any other relevant architectural sheets) to reflect the as-built adjustments to the site made in the updated civil set. 90. RREMP Plan.pdf (4) Subject: PlanCheck Page Label: 1 Author: justinh File Name: 90. RREMP Plan.pdf Color: Please remove the REMP worksheets from the plan set and provide them as separate pdf files. Enter the amount previously paid ($32,534.26) in the line for that amount towards the bottom of section B, so that the worksheet can properly calculate the additional REMP fee due. Spec your snowmelt boiler now that the snowmelt is going to be hydronic rather than electric. Confirm that the snowmelt and spa are using the same efficiency boiler (or same boiler) as you show on the worksheet. Subject: PlanCheck Page Label: 1 Author: justinh File Name: 90. RREMP Plan.pdf Color: Provide a spec on the proposed spa, or if it is truly custom fill out a APSP-15 Compliance information sheet (attached) to demonstrate it meets energy code requirements. Subject: PlanCheck Page Label: 1 Author: justinh File Name: 90. RREMP Plan.pdf Color: Provide detailing for the porch snowmelt assembly and deck snowmelt assembly as both these areas are new and the detailing for on grade snowmelt in the civil set does not pertain to them. Update the architectural site plan (and any other relevant architectural sheets) to reflect the as-built adjustments to the site made in the updated civil set. PROJECT ADDRESS: Parcel ID #: Permit Number: CONTACT INFORMATION :Owner:Name:City:Bloomfield Hilles Address:State:MI Email:Zip Code:48304 Phone: Cell Phone: Owner's Representative : Name:City:Boston Address:State:Ma Email:Zip Code:02116 Phone: Cell Phone:617-216-9232` A.RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAMSheets showing snowmelt, pool, spa, and solar/GSHP information: Do you have snowmelt or a spa that has been exempted by the buiding official? Hydro Snowmelt Electric Snowmelt Pool SpaExistingTo be DemoedExisting to Remain 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqftNew (non-exempt)1420.28 sqft 0.00 sqft 42.09 sqftNew (exempt)10.50 sqft 0.00 sqftTotal New 1430.78 sqft 0.00 sqft 0.00 sqft 42.09 sqftTotal on site 1430.78 sqft 0.00 sqft 0.00 sqft 42.09 sqftTotal Snowmelt on siteBoiler Efficiency 97.7%100%75.0%97.7%Mitigation Payment -$ 7,582.23$ Total Payment for Mitigation:57,008.56$ B.ON-SITE RENEWABLE CREDITS Supplemental System REMP CreditUse PV WorksheetPhotovoltaic System -$ Use Thermal WorksheetHot Water Panels -$ Use GSHP CertGround Source Heat Pump -$ Other Approved System -$ Total Mitigation Credits:-$ Onsite Renewable Offsets:How many KiloWatts of PV (solar electric) would I need? 8.30or How many square feet of SHW (solar hot water) would I need?253.77 R-REMP Payment:57,008.56$ Amount Previously Paid on This Permit:57,008.56$ Refund (includes minus $750):-$ C. PREPARED BY:Date:6/1/2022 Print Name: Signature: Phone & EMail: REVIEWED:Date: 734-369-8534 ACM $49,426.33 1061 Country Club Rd mark@mssphd.com 248-644-0271 734-369-8534 // acm@mpdlstudio.com TOTAL R-REMP PAYMENT: Monica Ponce de Leon / Austion Kaa 1430.78 sqft 29 Stanhope St, 3rd Floor Alexander Clay Montgomery 2015 IECC RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAMCity of Aspen Version 11.3 Updated March 18, 2021617 West Bleeker Street, Aspen CO 81611 273512444002 acm@mpdlstudio.com Schwartz, Rachel K & Mark Yes (enter sqft below on the exempt row)No 617 W Bleeker St Snow Melt 6/1/2022 ZONE Square Feet NotesDriveway558.95 Driveway length shortened in revisionSide Path 161.95Entry Walkway 174.26Entry Porch 71.97Ext. Basement Egress Stair 49.35Back Deck 403.8 Snow Melt Con�nues under spaEgress Window Well 10.5 Exempt TOTAL SNOW MELT 1430.78Boiler Efficiency 97.70% SPA 42.09Boiler Efficiency 97.70% 06/01/22 REVISED REMP CALC.R-REMP Est. Payment: $24,474.3006/19/20 PERMITTED R Please remove the REMP worksheets from the plan set and provide them as separate pdf files. Enter the amount previously paid($32,534.26) in the line for that amount towards the bottom of section B, so that theworksheet can properly calculate the additional REMP fee due. Spec your snowmelt boiler now that thesnowmelt is going to be hydronic rather than electric. Confirm that the snowmelt and spa are using the same efficiency boiler (or same boiler) as you show on the worksheet. Provide a spec on the proposed spa, or if it is truly custom fill out a APSP-15 Compliance information sheet (attached) to demonstrate it meets energy code requirements. Pool Spa 0.00 sqft 0.00 sqft42.09 sqft 0.00 sqft 42.09 sqft0.00 sqft 42.09 sqft 75.0%97.7%- 7,582.23$ nt for Mitigation:57,008.56$ ntal System REMP Creditic System -$ Panels -$ urce Heat Pump -$ oved System -$ itigation Credits:-$ ectric) would I need? 8.30 water) would I need?253.77 -REMP Payment:57,008.56$ id on This Permit:57,008.56$ des minus $750):-$ Date:6/1/2022 Date: CM cm@mpdlstudio.com REMP PAYMENT: ay Montgomery Yes (enter sqft below on the exempt row)No ength shortened in revision Con�nues under spa Provide detailing for the porch snowmelt assembly and deck snowmelt assembly as both these areas are new and the detailing for on grade snowmelt in the civil set does not pertain to them. The updated Architectural Site Plan has been uploaded. The previously uploaded RREMP plan already reflects the as built conditions. No other architectural drawings impacted by as built condition of shifted location. REMP worksheets have been uploaded as separate PDF files updated RREMP work sheet to include the previously paid amount. A: The specification sheet for the two Lochinvar Boilers in the house for heated floors and external snow melt has been uploaded. Also uploaded is the specification for the heat exchanger for the exterior snow melt. The completed APSP-15 compliance sheet has been uploaded. The requested snow melt details have been uploaded, and can be found on xx/A-xx. Upper Deck over wood framing 5/A7-02; Upper Deck over Metal Deck 4/A7-02; Entry Porch detail 1/A7-03 B: The shop drawings for the custom hot tub have been uploaded, (page 5 includes the equipment schedule). The heater for the hot tub is a remote 240V HydroQuip CS880A Heater, and the individual spec sheet has been uploaded separately. This is an electric immersion heater with 100% efficiency. The RREMP sheet has been updated to reflect this. 12/16/2022