Loading...
HomeMy WebLinkAboutFile Documents.931 Gibson Ave.0091-2022-BCHO (6) 0091 -2022-BCHO_931 Gibson_BuildingCommentl 30.REMP PV Tab.931GA.20221114.pdf(2) Subject: PlanCheck Page Label: 1 In the solar plan doc the 365W Author:justinh panel is circled,these values File Name: 30.REMP PV Tab.931GA.20221114.pdf seem to correspond to the 370W " �- Color: • panel option (22 panels on each ..,. - aspect x 370W). Confirm which w - .� panel option is to be installed "®"° --_ -- and revise this form or your EiliM—M—EM—MSee new REMP PV TAB for revised calculations specs as needed. m� ,ti,A ,„..,.o.�„� ,. Subject: PlanCheck "` "` Page Label: 1 4 In the solar plan doc the 290W s. _V E Author:justinh max continuous power __ �:_= File Name: 30.REMP PV Tab.931GA.20221114.pdf microinverter is speed,which -- -—=: Color: ■ would result in inverter capacity mEiiiii�iiiii� -—= of 6.38kW of inverter capacity for "' 'ID — each array(290W x 22 = -� See new REMP PV TAB for revised calculations inverters). Confirm your ,._.,„ __.- proposed equipment and either ._.-._...._....._._ — revise this form or spec new inverters. 90.Architectural Plans.931 GA.20221205.pdf(2) i 1 v Subject: PlanCheck L• -- Page Label: 7 �/ Spec the updated fireplaces 111ii proposed and update fireplace 1111� Author:justinh N„IImumm911111em `ga—1 registration form. r�' 1j1� ; File Name: 90.Architectural Plans.931GA.20221205.pdf �-' �� Color: ■ El IN O 1n. see updated fire registration form with specs attached 'Iti Neu 17- wII� l NIN ',NA is r'-wr iifir e fit■1I\ai 7 j J i I-_ o � I',iF—," •7 Subject: PlanCheck Page Label: 24 Confirm HPC is ok with Author:justinh �/ removing historic siding to install p File Name: 90.Architectural Plans.931 GA.20221205.pdf sheathing, WRB, etc. ,.... ...... 1! Color: ■ 4Chilimm ::::: -E.- 1 .1 au HPC gave us approval for historic wall assembly change via email 1/10/2022 90.Landscape Plan Set.931 GA.2022.12.02.pdf(1) ---„ Subject: PlanCheck Is the snowmelt in this location Page Label: 5 J Author:justinh the paver/pedestal assembly? File Name: 90.Landscape Plan Set.931GA.2022.12.02.pdf We will only approve the Color: ■ snowmelt pedestal systems y � s_. :-� where they are above • conditioned space, not on grade • Pedestal assemblies only used over conditioned space as they don't provide R10 under �L'� 1 I G 21 in Zones SMZ/A&B. the snowmelt typlcylly Clif �1 1_., -•. u- what snowmelt ass m lie f ���1 j _ All other snowmelt zones to comply with proposed where and revise if F5/A6.1 insulation requirements. See updated notes on needed. 0 5/0 8/2 0 2 3 A1.3. ASPEN BUILDING DEPARTMENT 90.Mechanical Plans.931 GA.20221012 (1).pdf(2) —,__ 1 Subject: PlanCheck 4Revise your design criteria to Page Label: [1] 931 GIBSON HVAC 9-15-22 Rev B-COVER JN TABLE: DESIGN CONDITIONS SHEET match our adopted IRC design .�a.�Ew. o�ooa�o Author:justinh parameters: summer outdoor °°°� — - File Name: 90.Mechanical Plans.931GA.20221012(1).pdf temp of 82 and winter outdoor a . Color: •■ temp of-15. Itzmroz- it1, revised on sheet MO.1 Subject: PlanCheck There is about 100 sq.ft. w_ Page Label: [3] 931 GIBSON HVAC 9-15-22 Rev B-COVER SHEET(3) discrepancy in total snowmelt mg between this schedule and the `,w Author:justinh a'- File Name: 90.Mechanical Plans.931GA.20221012(1).pdf architectural REMP plan/REMP Color: • worksheet. Coordinate _ - _ snowmelt quantities. revised on sheet MO.3 90.Spa Plans.931 GA.20220831.pdf(1) --u Subject: PlanCheck)14 j ., "�a"F Page Label: 1 V Have the spa designer fill out the Author:justinh attached APSP 15 compliance ®2 E7—"`"°'Es form to demonstrate energy File Name: 90.Spa Plans.931GA.20220831.pdf Color: • compliance for the custom spa. _ See new APSP 15 compliance form "' 30.APSP-15 Compliance-Custom Spa.931 GA.20230410 RECEIVED 05/08/2023 ASPEN BUILDING DEPARTMENT