HomeMy WebLinkAboutFile Documents.691 Pfister Dr.0023-2024-BROF (4) ROOF/RE-ROOF APPLICATION CHECKLIST
Changes for 2021 Codes in RED
PROJECT ADDRESS: 691 Pfister Drive,Aspen,CO DATE: 3/25/2024
NOTE:All re-roofing projects require a Roofing Permit.Roof work that changes height,slope,footprint,structural framing,or cavity insulation requires a
Building Permit.Patching less than 1 square(10'x10')does not require a permit.Reference 2021 Codes and Ordinance 1,2023 for code requirements.
THE FOLLOWING MUST BE INCLUDED WITH EACH ROOFING PERMIT SUBMISSION:
123 City of Aspen Re-Roofing Application Checklist-This form must be completed entirely.
® Permit Application Signatures Packet-All 6 pages must be completed and include owner or contractor signatures where applicable.
If you answered YES to the Asbestos Checklist in the Permit Application Signatures Packet,answer these questions:
YES/0 NO-Are all materials to be removed asphaltic,tar impregnated and non-friable(will not crumble by hand pressure when dry)?
1YES/D NO-Will you be removing the roofing materials by hand(no circular saws)?
.YES/S NO-Will you dispose asphaltic roof shingles and NOT recycle them?
If you answered YES to all the above,an asbestos test will not be required.
O YES/IRI NO-Is the address listed on the"Inventory of Historic Sites and Structures"or in a Historic District?
If you answered YES,HPCApproval is required for this project. Contact the Historic Preservation Officer at 970-429-2758.
1E1 Site Plan-The site plan may be hand drawn but MUST be legible.Site plans must show the entire roof and include the following:
Extent of proposed work
El Impervious Areas-You must illustrate and label all hardscape vs.landscaping
See ,Gutter I11 Downspout&Gutter locations-Draw and label each one and show if they drain to hardscape or landscaping See snow retackag plan
included in package.
An I 1S IZI Snowguards/stops-These are required on all roofs that shed onto neighboring properties or potentially occupied areas such as a walkway,
InGluytl stairway,alley,deck,pedestrian and vehicular exit from buildings or areas where there ispotential forpersonal injuryor property damage and
Y Y g P P Y g
areas directly above or in front of gas utility or electric utility meters.(Ordinance 1,2023)
®Heat Tape-Show location of all heat tape(including existing) Heat tape is located in all gutters and downspouts.
❑ YES/®NO-Will you have heat tape(existing or new)?-REMP worksheet/fees and controls required No existing heat tape will be touched
❑Existing or New Heat Tape watts/ft X Linear Feet: _ ;,„e,l,,ts or new heat tape added by roofing
company_
If greater than 1000W,REMP fees will be applied.
0 Controls(Provide Spec Sheets):0>40 deg F shut off plus one of the following:0 moisture sensor or 0 daylight sensor or
❑timer to shut off at night
NOTE:A sub-electrical permit is required for any roof with heat tape
i1 YES/0 NO-Are there trees on the property?-Parks has purview over all trees/forest
Note:City code 13.20.020 explains rules in and around trees.Contact City Forester or their designee @ 970-920-5120
121 Two Photographs of Existing Conditions-One photo must clearly show the structure involved and one must show a close-up of the existing roof.
❑ Construction Management Plan(CMP)
11) Site Plan-(information can also be included on the site plan from above)Show all construction staging areas(i.e.dumpster,trailer,portable
bathrooms,etc)and any other requirements per the CMP form
II Proposed Roof Assembly Drawing-Show all layers/components from the roof sheathing up.Each roof layer must be clearly labeled to include
product and manufacturer name and existing to remain components and number of layers.Show flashing and ice/water barrier.
® Existing roofing and number of layers: Wood shake 1 layer
O AYES/M€ O-Is there insulation currently installed above the roof deck/sheathing?
describe and list estimated average insulation R-value and thickness:
a If YES to the above,insulate per the below:
0 Commercial:R-40 above deck(or R-40 combo of above and below deck)
0 Residential:R-49 above deck(or R-49 combo of above and below deck)
0 Alternate design(must be approved by Building Department for a justified infeasibility)
❑ Letter of Structural Integrity from Structural Engineer-If adding insulation&building not constructed to current ground snow
load(100psf)
❑ YES/EI NO-Are you replacing damaged roof deck?Approximate sqft of roof deck to be replaced:No known decking issues.
UL or ICC-ES report for the listed Class A roof assembly specific to your roofing product and installation(required for all roofs per
Ordinance 1,2023)
❑ YES/I NO-Is the roof vented?If NO,changes to insulation must meet 2021 IBC 1202.3 or provide dew point calculations.
RECEIVED
Updated 9/25/23 0 4/1 9/2 0 2 4
ASPEN
BUILDING DEPARTMENT