Loading...
HomeMy WebLinkAboutFile Documents.691 Pfister Dr.0023-2024-BROF (4) ROOF/RE-ROOF APPLICATION CHECKLIST Changes for 2021 Codes in RED PROJECT ADDRESS: 691 Pfister Drive,Aspen,CO DATE: 3/25/2024 NOTE:All re-roofing projects require a Roofing Permit.Roof work that changes height,slope,footprint,structural framing,or cavity insulation requires a Building Permit.Patching less than 1 square(10'x10')does not require a permit.Reference 2021 Codes and Ordinance 1,2023 for code requirements. THE FOLLOWING MUST BE INCLUDED WITH EACH ROOFING PERMIT SUBMISSION: 123 City of Aspen Re-Roofing Application Checklist-This form must be completed entirely. ® Permit Application Signatures Packet-All 6 pages must be completed and include owner or contractor signatures where applicable. If you answered YES to the Asbestos Checklist in the Permit Application Signatures Packet,answer these questions: YES/0 NO-Are all materials to be removed asphaltic,tar impregnated and non-friable(will not crumble by hand pressure when dry)? 1YES/D NO-Will you be removing the roofing materials by hand(no circular saws)? .YES/S NO-Will you dispose asphaltic roof shingles and NOT recycle them? If you answered YES to all the above,an asbestos test will not be required. O YES/IRI NO-Is the address listed on the"Inventory of Historic Sites and Structures"or in a Historic District? If you answered YES,HPCApproval is required for this project. Contact the Historic Preservation Officer at 970-429-2758. 1E1 Site Plan-The site plan may be hand drawn but MUST be legible.Site plans must show the entire roof and include the following: Extent of proposed work El Impervious Areas-You must illustrate and label all hardscape vs.landscaping See ,Gutter I11 Downspout&Gutter locations-Draw and label each one and show if they drain to hardscape or landscaping See snow retackag plan included in package. An I 1S IZI Snowguards/stops-These are required on all roofs that shed onto neighboring properties or potentially occupied areas such as a walkway, InGluytl stairway,alley,deck,pedestrian and vehicular exit from buildings or areas where there ispotential forpersonal injuryor property damage and Y Y g P P Y g areas directly above or in front of gas utility or electric utility meters.(Ordinance 1,2023) ®Heat Tape-Show location of all heat tape(including existing) Heat tape is located in all gutters and downspouts. ❑ YES/®NO-Will you have heat tape(existing or new)?-REMP worksheet/fees and controls required No existing heat tape will be touched ❑Existing or New Heat Tape watts/ft X Linear Feet: _ ;,„e,l,,ts or new heat tape added by roofing company_ If greater than 1000W,REMP fees will be applied. 0 Controls(Provide Spec Sheets):0>40 deg F shut off plus one of the following:0 moisture sensor or 0 daylight sensor or ❑timer to shut off at night NOTE:A sub-electrical permit is required for any roof with heat tape i1 YES/0 NO-Are there trees on the property?-Parks has purview over all trees/forest Note:City code 13.20.020 explains rules in and around trees.Contact City Forester or their designee @ 970-920-5120 121 Two Photographs of Existing Conditions-One photo must clearly show the structure involved and one must show a close-up of the existing roof. ❑ Construction Management Plan(CMP) 11) Site Plan-(information can also be included on the site plan from above)Show all construction staging areas(i.e.dumpster,trailer,portable bathrooms,etc)and any other requirements per the CMP form II Proposed Roof Assembly Drawing-Show all layers/components from the roof sheathing up.Each roof layer must be clearly labeled to include product and manufacturer name and existing to remain components and number of layers.Show flashing and ice/water barrier. ® Existing roofing and number of layers: Wood shake 1 layer O AYES/M€ O-Is there insulation currently installed above the roof deck/sheathing? describe and list estimated average insulation R-value and thickness: a If YES to the above,insulate per the below: 0 Commercial:R-40 above deck(or R-40 combo of above and below deck) 0 Residential:R-49 above deck(or R-49 combo of above and below deck) 0 Alternate design(must be approved by Building Department for a justified infeasibility) ❑ Letter of Structural Integrity from Structural Engineer-If adding insulation&building not constructed to current ground snow load(100psf) ❑ YES/EI NO-Are you replacing damaged roof deck?Approximate sqft of roof deck to be replaced:No known decking issues. UL or ICC-ES report for the listed Class A roof assembly specific to your roofing product and installation(required for all roofs per Ordinance 1,2023) ❑ YES/I NO-Is the roof vented?If NO,changes to insulation must meet 2021 IBC 1202.3 or provide dew point calculations. RECEIVED Updated 9/25/23 0 4/1 9/2 0 2 4 ASPEN BUILDING DEPARTMENT