FIELD REPORT
To : Matt Jurmu ' t.
From: Jack Albright
Date : March 21, 2024
Re : 332 W Main
Ake E
Those Present:Matt Jurmu, Builder Construction Services
Jack Albright, Albright&Associates
As requested, I visited the site on March 13, 2024 to observe the framing revisions in the lower level. A 3-9 %z "
LVL beam had been added to an existing timber beam and a column had been removed. The two beams
appeared to be adequately attached to one another, but the new LVL beam did not have support at the ends. I
recommended that a pressure treated king and trimmer be added at each end to bear tight to the beam and
concrete slab below. Based on photographs that were received on March 14, 2024, it appears that the
recommended work has been completed. It is our opinion that the floor strength and performance has been
improved from the original condition.
The above represents our report of events noted and items discussed, and will be relied upon as true and correct by all parties
unless notified within 5 working days of receipt.