Loading...
HomeMy WebLinkAboutFile Documents.332 W Main St.0031-2023-BCOM (7) 0 ; ALBRIGHT .\AS%OCIAI I STRUCTURAL ENGINEERS FIELD REPORT To : Matt Jurmu ' t. From: Jack Albright Date : March 21, 2024 Re : 332 W Main Ake E Those Present:Matt Jurmu, Builder Construction Services Jack Albright, Albright&Associates As requested, I visited the site on March 13, 2024 to observe the framing revisions in the lower level. A 3-9 %z " LVL beam had been added to an existing timber beam and a column had been removed. The two beams appeared to be adequately attached to one another, but the new LVL beam did not have support at the ends. I recommended that a pressure treated king and trimmer be added at each end to bear tight to the beam and concrete slab below. Based on photographs that were received on March 14, 2024, it appears that the recommended work has been completed. It is our opinion that the floor strength and performance has been improved from the original condition. The above represents our report of events noted and items discussed, and will be relied upon as true and correct by all parties unless notified within 5 working days of receipt. 23016FR1 RECEIVED 03/27/2024 ASPEN BUILDING DEPARTMENT 1: 970.921. 4363 I 1: 970.927.3039 I 17352 A Highway 82 I Carbondale, CO 81623 I alhright-associatcs.com