Subject: PlanCheck
Page Label: 1
Author: linzhid
Color:
File Name: 90.Interior Architectural Drwgs.2023.06.01.pdf
Can you confirm you will not be disturbing 32 sq ft
or more of drywall or other
potentially-asbestos-containing material.
If you are, please provide an asbestos test and
report
90.Interior Architectural Drwgs.2023.06.01.pdf (3)
Subject: PlanCheck
Page Label: 1
Author: linzhid
Color:
File Name: 90.Interior Architectural Drwgs.2023.06.01.pdf
Provide hearth dimensions per 2012 IBC 2111.11
and show that it has non-combustible support per
2111.10
Subject: PlanCheck
Page Label: 1
Author: linzhid
Color:
File Name: 90.Interior Architectural Drwgs.2023.06.01.pdf
Spec or note the u-value requirements for new
front door.
Can you confirm youwill not be disturbing32 sq ft or more ofdrywall or otherpotentially-asbestos-containing material.
If you are, pleaseprovide an asbestostest and report
Provide hearth
dimensions per 2012
IBC 2111.11 and show
that it has
non-combustible
support per 2111.10
Spec or note the
u-value requirements
for new front door.
Architect’s Reponses:
Item #1 (GWB Removal/Asbestos):
As shown on Sheet A.1, “Demolition & New Work Floor Plans”, we have
calculated that less than 32 sf of GWB shall be removed from the premises
in preparation for the proposed work scope, thus no asbestos testing &
report is required. If we discover otherwise, work shall be halted until an
asbestos test & report is obtained, and additional steps are informed by the
report.
Item #2 (Hearth Extension):
As shown on Sheet A.1, “Demolition & New Work Floor Plans”, we indicate
required dimensions for the hearth extension and list the procedure to
determine the appropriate installation requirements after the existing
substrate conditions are uncovered and determined. Final hearth extension
installation will be according to either the original Superior Fireplace Co.
Mdl. 1038 installation manual or 2021 IBC fireplace requirements.
Item #3 (Front Entry Door U-value Requirement):
Also shown on Sheet A.1, “Demolition & New Work Floor Plans”, and as noted
by the Building Reviewer, Linzhi Douglass, the opaque wood Front Door is
exempt from U-value rating per 2021 IECC R402.3.4 if the assembly is less
than 40 SF. As the door is 3’x8’ = 24 SF, it is exempt.
08/11/2023