HomeMy WebLinkAboutFile Documents.931 Gibson Ave.0091-2022-BCHO (10) 2015 IECC RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM
CITY OF ASPEN VERSION 11.3 UPDATED D,ECEMJBER 13, 2017
PROJECT ADDRESS: 931 Gibson Ave, Aspen, CO 81611
Parcel ID#: 273707400004 Permit Number: 0091-2022-BCHO
Master Permit 0037-2019-BRES
CONTACT INFORMATION :
Owner:
Name: BHM Investments City: Houston
Address: 1001 Fannin St#3850 State: TX
Email: hendrybrian@mac.com Zip Code: 77002
Phone: Cell Phone:
Owner's Representative:
Name: Flynn Stewart-Severy, AIA City: Snowmass
Address: 15 Kearns Rd, Ste D, PO Box 6762 State: CO
Email: flynn@fandmarchitects.com Zip Code: 81615
Phone: 970-987-2707 Cell Phone: 970-319-4407
A. RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM
Sheets showing snowmelt, pool,spa, and solar/GSHP information:I Al.3
Do you have snowmelt or a spa that has been exempted by the buiding official? 0 Yes(enter sqft below on the exempt ®i Nc
Hydro Snowmelt Electric Snowmelt Pool Spa
Existing 0.00 sqft
To be Demoed 0.00 sqft
Existing to Remain 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft
New(non-exempt) 3176.40 sqft 0.00 sqft 74.00 sqft
New(exempt)
Total New 3176.40 sqft 0.00 sqft 0.00 sqft 74.00 sqft
Total on site 3176.40 sqft 0.00 sqft 0.00 sqft 74.00 sqft
Total Snowmelt on site 3176.40 sqft
Boiler Efficiency 97.2% I 100% 75.0% 97.2%
Mitigation Payment $111,108.64 $ - $ 13,399.18
Total Payment for Mitigation: $ 124,507.82
B. ON-SITE RENEWABLE CREDITS
Supplemental System REMP Credit
Use PV Worksheet Photovoltaic System $ 75,540.49
Use Thermal Worksheet Hot Water Panels $Use GSHP Cert Ground Source Heat Pump $ -
Other Approved System $ -
Total Mitigation Credits: $ 75,540.49
Onsite Renewable Offsets: How many Kilo Watts of PV(solar electric)would I need? 18.14
or How many square feet of SHW(solar hot water)would I need? 554.23
R-REMP Payment: $ 48,967.33
Amount Previously Paid on This Permit: 55,645.47
TOTAL R-REMP PAYMENT: $ $0
Refund(includes minus$750): $ 5928.14 -
C. PREPARED BY: Date:
Print Name: Flynn Stewart-Severy, AIA
Signature: Date:
Phone&EMail: 970-987-2707
REVIEWED: JH 6/20/23 RErFII, ED)
05/08/2023
ASPEN
BUILDING DEPARTMENT
PV WORKSHEET
CITY OF ASPEN VERSION 11,3 UPDATED DECEMBE,R 13, 2017
PROJECT ADDRESS: 931 Gibson Ave, Aspen, CO 81611
Parcel ID#: 273707400004 Permit Number: 0091-2022-BCHO
Master Permit 0037-2019-BRES
Collector Solar
Aspect, Degrees Collector Tilt, Orientation
from True South Degrees From Adjustment DC side capacity Inverter capacity kW for kW Mitigation
Horizontal Factor (kW) (kW) credit Credit
Collector Group 1 63 45 89.60% 8.03 7.15 7.15, 6.41 kW
Collector Group 2 117 45 64.29% 8.03 7.15 7.151 4.60 kW
Collector Group 3 87.00% (44)x365W=16 06Kw (44)x325W=14.3Kw 0 0.00 kW
Collector Group 4 87.00% 0 0.00 kW
Collector Group 5 87.00% 0 0.00 kW
Collector Group 6 87.00% 0 0.00 kW
Collector Group 7 87.00% 0 0.00 kW
Collector Group 8 87.00% 0 0.00 kW
Collector Group 9 87.00% 0 0.00 kW
Collector Group 10 87.00% 0 0.00 kW
Collector Group 11 87.00% 0 0.00 kW
Collector Group 12 87.00% 0 0.00 kW
Collector Group 13 87.00% 0 0.00 kW
Collector Group 14 87.00% 0 0.00 kW
Collector Group 15 87.00% 0 0.00 kW
Collector Group 16 87.00% 0 0.00 kW
Collector Group 17 87.00% 0 0.00 kW
Collector Group 18 87.00% 0 0.00 kW
Collector Group 19 87.00% 0 0.00 kW
Collector Group 20 87.00% 0 0.00 kW
Total: 11.00 kW
$Mitigation Credit: $ 75,540.49
Instructions:
1) Determine how many collector groups you have. Groups are used to differentiate between collectors
(panels)with different tilts,aspects, sizing,or inverters. If all your collectors are installed similarily, you
might have just one group.
2) Enter the aspect and tilt for each group.The solar orientation adjustment factor is automatically calculated.
3) DC side capacity is the total labled panel output kW in a group.
4) Inverter capacity is the recommended input power in kW of your inverter(s).
5) You will be given credit for the lesser of the labeled panel output or the inverter.
6) The kW for credit is multiplied by the solar orientation adjustment factor to get kW mitigation credit.
7) The kW mitigation credit is totalled and multiplied by$6865.32/kW to get the$Mitigation Credit
8) The mitigation credit will be automatically entered into your RREMP or CREMP form. If your project has both RREMP and
CREMP, it will automatically divide the credits up,with priority given to mitigating the CREMP payment.
PREPARED BY: Date:
Print Name: Flynn Stewart-Severy, AIA
Signature:
Phone&EMail: 970-987-2707
REVIEWED: JH Date: 6/26/23
RECEIVED
05/08/2023
ASPEN
BUILDING DEPARTMENT