HomeMy WebLinkAboutFile Documents.931 Gibson Ave.0037-2019-BRES (10) Thursday,June 10, 2021 at 11:06:40 Mountain Daylight Time
Subject: 931 Gibson Framing inspection.
Date: Monday,June 7, 2021 at 4:48:14 PM Mountain Daylight Time
From: Hein Brutsaert
To: Flynn Stewart-Severy
Dear Flynn Stweart Severy
I was onsite this afternoon to verify the framing conditions at 931 Gibson.
Jose and Adam have installed all the beams and blocking according to structural plans. I was unable to view one of
the beams via facetime this morning.This afternoon, however, I was able to verify the beam in the existing floor
space.The installation actually includes an additional joist below it and an existing 2x wood joist.There are several
cases where more microllam plys are installed than my plan called for.This was somewhat anticipated since many of
these beams were used first as moving beams and then as permanent structure. It was easier,cheaper and stronger
to leave them in place after the move.
The beam bolting, hangers and elevations are also all according to plan.
There will need to be sheathing installed at the main level if the diagonal braces are removed.The existing walls with
sheathing in place can have the diagonals removed right now.
Hein Brutsaert P.E.
t-(970) 300 1003
hein@brutsaertengineering.com
Silver Town Structures
307 Aspen Airport Business Center
Suite N
Aspen, Co 81611
Page 1 of 1