Loading...
HomeMy WebLinkAboutFile Documents.214 W Bleeker St.0025-2024-BRES (9)P.O. Box 8432 . Aspen, Colorado 81612 . P 970.845.5656 . F 970.845.7013 . www.ShaefferHyde.com CONSTRUCTION MANAGEMENT PLAN 214 West Bleeker Aspen, CO 81611 To: City of Aspen Building Department 427 Rio Grande Place Aspen, CO 81611 From: Bob Campbell, Project Director Shaeffer Hyde Construction P.O. Box 8432 Aspen, Colorado 970.763-8315 robertc@shaefferhyde.com Date: January 26, 2024 03/01/2024 P.O. Box 8432 . Aspen, Colorado 81612 . P 970.845.5656 . F 970.845.7013 . www.ShaefferHyde.com TABLE OF CONTENTS 1.0 General 1.1 Total SF Soil Disturbance/ SF of Building Demo 2.0 Project Introduction 2.1 Project Disturbance Area 2.2 Project Vicinity Map 2.3 Project Description 3.0 Project Documentation 3.1 Permits Types & Permit Numbers 3.2 Public Notification 3.3 Project Sign 3.4 Contact List 4.0 Project Implementation 4.1 Dates of Construction 4.2 Hours of Construction 4.3 Construction Schedule 4.4 Adjacent Properties 4.5 Project Fencing 4.6 Public Health & Welfare 4.7 Natural Environment 5.0 Project Management 5.1 Parking Management 5.2 Emergency Vehicle and Ordinance 35 5.3 Construction Parking Details 5.4 Staging Areas 5.5 Right of Way Limitations 5.6 Site Plan 5.7 Waste Management 6.0 Traffic Control 6.1 General 6.2 Project Haul Routes 6.3 Weight and Size Limitations of Vehicles 6.4 Delivery Requirements 6.5 Traffic Control Plan 7.0 Pedestrian Protection 7.1 General 8.0 Sediment and ErosionControl 8.1 Storm Water Pollution Prevention Plan 8.2 Smugglers Mountain Restrictions 03/01/2024 P.O. Box 8432 . Aspen, Colorado 81612 . P 970.845.5656 . F 970.845.7013 . www.ShaefferHyde.com 9.0 Fugitive Dust Control 9.1 Dust Control Plan 10.0 Emissions 10.1 General 10.2 Emissions from Diesel Powered Vehicle 11.0 Noise Suppression 11.1 General 11.2 Noise Suppression Plan 11.3 Equipment and Method ATTACMENTS A – Vicinity / Haul Route B – Project Sign C – Engine Idling Policy 1.0 GENERAL 1.1 Total SF of Soil Disturbance/ SF of Building Demo There will be NO soil disturbance or building demo. Interior finishes, upgrade ONLY. 2.0 PROJECT INTRODUCTION 2.1 Project Disturbance Area There will be NO areas disturbed. Interior finishes, upgrade ONLY. 2.2 Project Vicinity / Haul Route Map See Attachment A – Project Vicinity / Haul Route 2.3 Project Description Interior renovation of finishes. Replacing flooring throughout. Replacing fixtures in two of the bathrooms. Replacing light fixtures in existing locations. Replacing countertops and plumbing fixtures in kitchen, replacing in existing locations. 3.0 PROJECT DOCUMENTATION 3.1 Permits Types & Permit Numbers The construction management plan is being submitted as part of the application for permit # TBD. 03/01/2024 P.O. Box 8432 . Aspen, Colorado 81612 . P 970.845.5656 . F 970.845.7013 . www.ShaefferHyde.com 3.2 Public Notification A project update will be provided to the neighboring home and property owners prior to the start of construction (10 day minimum prior) and in accordance with the City of Aspen procedures. Neighboring property owners will be notified prior to any crane mobilizations or traffic/ pedestrian encroachments. If required, we will hold a preconstruction meeting prior to the start of construction. At the meeting, we will introduce the designated project representative. The purpose of the meeting is to discuss the project and summarize the project specific Construction Management Plan. Along with SHC, we will have the key subcontractors attend the meeting. Utility personnel, applicable City departments, the Roaring Fork Transit Authority, neighboring property owners, and the Aspen School District shall also be notified. 03/01/2024 P.O. Box 8432 . Aspen, Colorado 81612 . P 970.845.5656 . F 970.845.7013 . www.ShaefferHyde.com 3.3 Project Sign See Attachment B – Project Sign 3.4 Contact List Owner Representative Surfas Consulting Jodi Surfas 303-517-0827 Contractor: Shaeffer Hyde Construction (main) 970.845.5656 Site Supervisor: Zach Knebel 970-763-8545 Safety Officer: Zach Knebel 970-763-8545 Traffic Control: Your Way Traffic Control 970.263.4520 Erosion Control: Zach Knebel 970-763-8545 City of Aspen: 970.920.5000 Pitkin County: 970.920.5200 Fire Department (Non- Emergency): 970.925.5532 Roaring Fork Transit Authority: (970) 925-8484. Aspen School District: 970.925.3760 Aspen Water Department: 970.920.5110 Aspen Consolidated Sanitation Department: (Admin) 970.925.3601 (Treatment Facility) 970.925.7262 Aspen Electric Department: 970.920.5030 Century Link (Telephone Company): 970.315.4818 03/01/2024 P.O. Box 8432 . Aspen, Colorado 81612 . P 970.845.5656 . F 970.845.7013 . www.ShaefferHyde.com Comcast (Cable TV): 800.934.6489 Aspen Valley Hospital: 970.925.1120 *For Emergencies Call 911 4.0 PROJECT IMPLEMENTATION 4.1 Dates of Construction The current project start date is scheduled for early February 2024 pending receipt of the IFFR permit. The estimated project duration is 4 months, resulting in a projected completion of late May 2024. 4.2 Hours of Construction SHC intends to abide by construction hours which are 7:30 am to 5:30 pm, Monday through Friday and 9:00 am to 5:00 pm on Saturdays as well as the holiday restrictions associated. 4.3 Construction Schedule This project will run continuously for 4 months. 4.4 Adjacent Properties SHC understands and agrees that no person shall excavate on land close enough to a property line to endanger any adjacent public street, sidewalk, and other public or private property, or easement, without protecting the property from any damage that might result from construction operations. 4.5 Project Fencing No fencing is required as all work is limited to the interior spaces (finish upgrades only). 4.6 Public Health & Welfare This construction management plan was devised to protect and respect the public health and welfare. 4.7 Natural Environment / Tree Protection No tree protection is anticipated but if required will adhere to the requirements. 5.0 PROJECT MANAGEMENT 03/01/2024 P.O. Box 8432 . Aspen, Colorado 81612 . P 970.845.5656 . F 970.845.7013 . www.ShaefferHyde.com 5.1 Right of Way Parking Management No off-property parking will be necessary. All parking will be in the driveway. 5.2 Emergency Access and Ordinance 35 SHC will maintain continuous emergency vehicle access on and around the site, including but not limited to police, fire, and ambulance services. In addition, SHC will comply with Ordinance # 35. 5.3 Construction Parking Details All Parking is anticipated to be in the existing driveway / garage. In addition, we will implement the traffic demand management plan noted below. Traffic Demand Management Plan: 1. Carpool Program – SHC will require its employees and employees of its subcontractors to form carpool groups of two or more adults to reach the worksite. These carpools will originate no further up valley than the Brush Creek Intercept Lot. COVID restrictions may limit the number of carpool attendees. 2. One Company Vehicle per Subcontractor – SHC will include a provision in its subcontracts for this project requiring that each subcontractor bring only one company vehicle per day into the City of Aspen for work. 5.4 Staging Areas As this is an interior finishes project, we will store materials inside the garage or offsite. 5.5 Right of Way Limitations SHC understands the ROW Limitations for Encroachment Zones set forth in the CMP Requirements Manual. SHC will adhere to said limitations. 5.6 Site Plan As the scope of work is limited to minor finish upgrades, all work will be limited to the interior of the home. No temporary toilets are required as we will utilize existing facilities inside the home. All waste and recycling will be stored in the home with no dumpster on site. 5.7 Waste Management Construction Waste Management Plan SHC will: 1. Project must recycle co-mingled materials (plastics #1-#7, tin, aluminum, and glass). 03/01/2024 P.O. Box 8432 . Aspen, Colorado 81612 . P 970.845.5656 . F 970.845.7013 . www.ShaefferHyde.com 2. Project must recycle cardboard. 3. SHC shall provide containers or bins for recycling these materials. 4. Project must comply with Colorado and Aspen landfill bans, i.e., no disposal of electronic waste, fluorescent light bulbs, hazardous waste or yard waste and that said banned materials shall not be disposed of in the trash. 5. Any dumpster or other trash receptacle that is used for food refuse must be constructed in such a manner as to render it bear proof and that all such containers shall be adequately always covered until transferred to the landfill. 6. It is unlawful to permit accumulated debris, litter, or trash on any construction site to blow or scatter onto adjoining properties. 7. An onsite hazardous material spill cleanup kit is required, as specified by the City Engineer, that contains, at a minimum, a 25-pound bag of Floor- Dri (or equal), absorbent pads, and other spill kit materials. 6.0 TRAFFIC CONTROL 6.1 General As this is a minor interior finishes project, we are only anticipating periodic minor deliveries of materials. No cranes or road closures are anticipated. SHC understands that all traffic control operations shall be managed by the designated certified traffic control supervisor and that traffic control plans are to be submitted to and approved by the city prior to impacting auto or pedestrian traffic. 6.2 Project Haul Routes SHC will limit hauling to be efficient. The project is located adjacent to highway 82 and is a direct path to the Pitkin County solid waste center. 6.3 Weight and Size Limitations of Vehicles All vehicles bring workers, materials and equipment to the site will comply with State of Colorado weight restrictions, including, concrete trucks, drilling equipment for shoring, delivery trucks & cranes. 6.4 Delivery Requirements SHC understands and agrees that: 1. Traffic control required for deliveries must be fully coordinated with the City of Aspen Engineering Department. 2. Roads will not be closed under any circumstances, unless granted permission from the City of Aspen Engineering Department. 3. Deliveries times will be coordinated so that only one large truck will be on site at any given time. 4. Deliveries will only occur during permitted working hours which are 7:30 am – 5:30 pm Monday through Friday (Saturday 9 am to 5 pm ) . 5. Delivery and Heavy-Duty Vehicles must have a visible sign on the vehicle that specifies the project contractors name and phone number. 03/01/2024 P.O. Box 8432 . Aspen, Colorado 81612 . P 970.845.5656 . F 970.845.7013 . www.ShaefferHyde.com 6. Delivery vehicles and all other onsite vehicles are not allowed to idle for more than five (5) minutes, except for generators or PTO type operations. 7. SHC will adhere to the city’s idling policy. 6.5 Traffic Control Plan As this is a minor repair with a few trades, we will only have limited vehicles to and from the home. The project is not located in a school area and does not interfere with any school bus stops or school walk routes. 7.0 PEDESTRIAN PROTECTION 7.1 General SHC will comply with pedestrian safety per City code 21.04.060, MUTCD Chapter 6D, the Americans with Disability Act, and IBC Chapter 33. Pedestrians will be accommodated in the cul-de-sac as well as on the hiking trail above the site. 8.0 SEDIMENT AND EROSIONCONTROL 8.1 Storm Water Pollution Prevention Plan As this is a minor interior finishes project, there will be NO site disturbance. 8.2 Smuggler Mountain Restrictions The Smuggler Mountain Restrictions are not applicable to this project. 9.0 FUGITIVE DUST CONTROL 9.1 Dust Control Plan As this is an minor repair project, there will be limited dust control required and we will adhere to requirements. 10.0 EMISSIONS 10.1 General SHC understands that all vehicles and equipment used on site will be properly maintained such that the engines will function within the manufacture’s standards or parameters. 10.2 Emissions from Diesel Powered Vehicle SHC Understands that emissions from diesel engines operated within the City of Aspen shall be of a 03/01/2024 P.O. Box 8432 . Aspen, Colorado 81612 . P 970.845.5656 . F 970.845.7013 . www.ShaefferHyde.com shade or density no darker than 40% opacity, except for starting motion no longer than 10 seconds or for stationary operation not exceeding 10 seconds. 11.0 NOISE SUPPRESSION 11.1 General Any required delivery trucks will adhere to the 80 decibel limits and shall be adequately muffled and maintained to minimize noise. 11.2 Noise Suppression Plan See above. 11.3 Noise Limits and Suppression Requirements SHC acknowledges the Noise Limits and Suppression Requirement per the City of Aspen Construction Management Plan Requirements Manual. 03/01/2024 P.O. Box 8432 . Aspen, Colorado 81612 . P 970.845.5656 . F 970.845.7013 . www.ShaefferHyde.com Attachment A – Vicinity / Haul Route The haul route is efficient to Highway 82 as essentially turn off West Bleeker left on 5th street, right on Main Street directly to recycling / landfill in Pitkin County. 03/01/2024 Attachment B – Project Sign Main Office: 970.845.5656 24 Hour Emergency Contact, Bob Campbell: 970.763.8315 03/01/2024 P.O. Box 8432 . Aspen, Colorado 81612 . P 970.845.5656 . F 970.845.7013 . www.ShaefferHyde.com Aat ATTACHMENT C 03/01/2024 December 20, 2022 SITE PLAN 214 WEST BLEEKER 4 YARD RECYCLE BIN ON GARAGE ENTRY PAD NOT TO INTERERE WITH ROAD AND CAN BE IN GARAGE IF NEEDED. ----------------------------------------- NO FENCE, STAGING, TEMP. TOILETS, PARKING, FENCE OR TRAILERS ON SITE. INTERIOR WORK ONLY. SHAEFFER HYDE CONSTRUCTION SUPPLEMENT TO CMP PLAN. 2-16-24 03/01/2024