HomeMy WebLinkAboutFile Documents.820 E Hyman Ave.0085-2023-BRES (6) 1 Construction Mitigation Plan for Minor Projects Full Construction Management Plan (CMP) requirements can be found in the Construction Management Plan Requirements Manual available here. The following document can be utilized for interior remodels and/or soil disturbance less than 1,000 SF with no excavation stabilization. The “Construction Mitigation Plan for Medium Projects” document can be utilized for interior remodels and/or soil disturbance greater than 1,000 SF and less than 2,000 SF. For large projects or at the discretion of the CMP reviewer a full CMP written by the project contractor is required. The purpose of this form is for small projects to acknowledge the applicant is aware of all CMP requirements and will abide by all requirements. 1.0 General The project contractor has completed the City of Aspen online CMP certification class. The online training course is available at cmpaspen.com. A copy of the CMP certificate is provided with this submission. 2.0 Project Location Project Address: Project Disturbance Area: Project Description: Contact Information: Name: Phone: Email: 3.0 Project Documentation Prior to the start of permit activity, the contractor will properly notify all neighbors and the general public. Prior to the start of permit activity, a project sign will be posted at the site. 820 E. Hyman Avenue, Aspen, CO 81611 475 sf Like-for-like replacement of Kitchen & Laundry cabinets & appliances in similar location (reuse washer/dryer @Laundry). New wood flooring @Kitchen & Living Room. Revised lighting in affected areas. Cosmetic update of LR fireplace surround. No walls/ partitions will be altered. Less than 32 SF of drywall will be disturbed. Rea Coulter 970-379-9894 rea@sin-bad.com 06/30/2023 2 4.0 Project Implementation Hours of Construction: Construction hours shall be limited to 7:30am – 5:30pm Monday through Friday and 9:00am – 5:00pm on Saturday. No construction is permitted on Sundays or holidays as identified by the CMP Manual. Prior to the start of permit activity the project will provide fencing six feet (6') in height and constructed out of chain-link fence with mesh windscreens (visual barriers) for all exterior work. The contractor is aware of all trees within the work area and will provide tree protection in coordination with, and as directed by the City Parks Department. 5.0 Site and Right of Way Management By signing this document, the contractor ensures that there is adequate staging area onsite for all construction trailers, job materials storage, portable restrooms, waste management and recycling containers. If a portion of the ROW is needed the contractor will submit for a temporary encroachment permit. Loose job material storage is not allowed in ROW under any circumstances. The project will maintain continuous emergency vehicle access, on and around site, including but not limited to police, fire, and ambulance services. All required construction parking shall be provided onsite or the contractor will properly lease parking spaces from the COA Parking Department. Contractor will provide recycling onsite for both conventional and construction related materials. 6.0 Traffic Control By signing this document the contractor ensures that the project does not impact roadways or pedestrian walkways. No traffic control plan is needed. The project requires no special circumstances for deliveries. Traffic control required for deliveries must be fully coordinated with the City of Aspen Engineering Department. Roads will not be closed under any circumstances, unless granted permission from the City of Aspen Engineering Department. 7.0 Pedestrian Protection The project maintains all pedestrian walkways including all ADA requirements. 8.0 Sediment and Erosion Control Best Management Practices will be installed which will prevent any erosion and sediment transport offsite. 06/30/2023 3 If the project is located in the Smuggler Mountain Superfund Site a Superfund Site soil removal permit has been submitted. 9.0 FUGITIVE DUST CONTROL A Fugitive Dust Control Plan is in place if applicable. 10.0 EMISSIONS All vehicles and equipment used on site will be properly maintained such that the engines will function within manufacture’s standards or parameters. 11.0 NOISE SUPPRESSION The project will adhere to all noise requirements. Noise limits are 70 decibels (dB) at the property line during the summer on season. Projects located on the Mall will be limited to 70 decibels (dB) at the property line during the winter on season. All other times projects will be limited to 80 decibels (80dB) at the property line. If the project requires a sound fence to stay within the noise limits this form is not applicable and the project shall submit a full CMP with a Noise Suppression Plan. The minimum requirements for a non- modeled noise suppression plan are a 14-foot tall fence of noise dampening material surrounding the construction site. 12.0 ENFORCEMENT A City Construction Mitigation Officer will complete random site visits to determine if the project is following approved Plan and City requirements. SIGNATURE I acknowledge that all requirements listed above as well as within the COA Construction Management Plan Requirements Manual will be met on the project site. Contractor acknowledges that failure to abide by this affidavit will result in red tags on the project and loss of participation in the program Signature: Printed Name: Date: Rea Coulter 26 May 2023 06/30/2023 City of Aspen Engineering Construction Management Plan #0000000554 | On May 30, 2023 5:45 pm First Name Rea Coulter Last Name Sinclair Building Architecture Design Email rea@sin-bad.com Phone 970-379-9894 IP Address 71.24.135.25 Score Obtained 95.0 out of 105.0 (90.5%) Designation Passed You passed! Your CertiXcate is attached. Please print and submit with your CMP. Completion Time 5 minutes, 48 seconds Administrator Remarks Processing User Account Guest Link https://cmpaspen.com/submission-conXrmed/? id=e4550187e73a0371b9c7509f29cc3353 Section 1/4 Correct answers are worth 5 points. 06/30/2023 Once a CMP is approved, the site is exempt from any new or changed regulations added to the CMP True (Score 0) False (Score 5) Score Obtained/Total 5/5 The City requires a CMP in order to: a. Make contractors jump through hoops (Score 0) b. Have a document stating how the construction site will mitigate its effect on the neighborhood (Score 5) c. Make it more diecult to do construction (Score 0) d. Have a document that allows the contractor do whatever it takes to complete the construction (Score 0) Score Obtained/Total 5/5 The best description of the City’s enforcement policy for CMP issues is: a. The contractor must do what the City tells him, no matter what (Score 0) b. The City will always give a verbal warning and a correction notice before issuing a red tag (Score 0) c. The City will work with the contractor to <x any issues, but may issue a verbal warning, correction notice, or red tag when appropriate. (Score 5) d. The City will automatically side with neighbors in any dispute (Score 0)06/30/2023 Score Obtained/Total 5/5 Section 2/4 To Calculate disturbance area, you must: Add all square footage, interior and exterior, that will be physically disturbed by construction activities, even if it is to be revegetated after construction (Score 5) Add all square footage, interior and exterior, that will be Xnished with impervious materials (Score 0) Add all square footage within the footprint of the house (Score 0) Add all square footage of the neighborhood that will be disturbed by any parking, noise, or fumes from the construction site (Score 0) Score Obtained/Total 5/5 The Project Description should be: Be as short as possible (Score 0) Provide an overview of the construction project including background information, proposed development type and general information, the proposed effect on public utilities and the extent of excavation and method of stabilization employed. (Score 5) Include the contact information (Score 0) Be at least 600 words and detail the structural06/30/2023 engineering of the building (Score 0) Score Obtained/Total 5/5 Public NotiXcation includes: Notifying all neighbors within 300’ of the construction site no less than 10 days prior to the start of construction with a project description and schedule (Score 0) Updating the neighborhood on a monthly basis (Score 0) Posting a project sign in a visible location (Score 0) All of the above (Score 5) Score Obtained/Total 5/5 The Allowable Construction hours are: 7 AM – 5 PM Mon-Sat (Score 0) 7 AM – 5 PM Mon-Fri, 9-5 Sat (Score 0) 9-5 Mon-Sun (Score 0) 7:30 AM-5:30 PM Mon-Fri, 9-5 Sat (Score 5) Score Obtained/Total 5/5 The work hours are completely non- True (Score 0) 06/30/2023 jexible False (Score 5) Score Obtained/Total 0/5 Some holiday no work days are in effect throughout the entire City, while some depend on where the construction site is located True (Score 5) False (Score 0) Score Obtained/Total 5/5 When working near other businesses, a construction site: Must maintain site lines or provide signage showing that neighboring businesses are still open (Score 5) Is allowed to completely block access to neighboring businesses as long as access is open from the other side (Score 0) Can work 24 hrs/day without City approval if neighboring businesses are closed for offseason (Score 0) Should schedule large deliveries during the neighboring businesses’ large sale events (Score 0) Score Obtained/Total 5/5 Construction fence must be at least 6’ high chain link with a mesh windscreen. (Score 0) An approved sound fence can be used in lieu of chain link fence (Score 0)06/30/2023 Which sentence best describes construction fencing as required by the CMP?Depending on construction activities, a fence may not have to fully enclose the entire property (Score 0) All of the above (Score 5) Score Obtained/Total 5/5 Section 3/4 You must provide a copy of all necessary drawings with the CMP submittal even if the drawings are already in the main permit set. True (Score 5) False (Score 0) Score Obtained/Total 5/5 Which of these items is not necessary on a general site plan: Clearly marked property line (Score 0) Construction and/or sound fence line with access points (Score 0) All neighbors within 300’ names and addresses (Score 5) Delivery, material storage, and parking areas (Score 0) Score Obtained/Total 5/5 Turn in one site plan that shows the Xrst stage of the construction (Score 0) 06/30/2023 If you have a site where the location of key elements such as access points, storage areas, and site oeces will change throughout the construction process you should: Turn in a site plan for each week of the construction (Score 0) Turn in a site plan to cover each general phase of the construction (Score 5) Don’t turn in a site plan because it will always be changing (Score 0) Score Obtained/Total 5/5 When is a Temporary Right of Way Encroachment needed? Any time construction activity will block any part of a street, sidewalk, or alley (Score 0) Any time materials will be stored in City ROW (Score 0) Any time traec jow, vehicular or pedestrian, will be effected by construction activity (Score 0) All of the above (Score 5) Score Obtained/Total 5/5 When must you depict the extent of excavation and detail any method of stabilization to be employed in your CMP? Any time you will have any soil stabilization (e.g. micropiles, soil nails, layback etc…) as part of your construction process (Score 5) Any time you will have large piles of dirt onsite for more than 2 weeks (Score 0) Any time you will be re-vegetating over ½ an acre 06/30/2023 (Score 0) Any time you will be storing dirt in the Right of Way (Score 0) Score Obtained/Total 5/5 Section 4/4 All construction sites are required to have 24 hr noise monitoring. True (Score 0) False (Score 5) Score Obtained/Total 5/5 Which statement best describes the noise limits for construction in Aspen? 65 db all year long (Score 0) 70 db in the summer throughout the city, 70 db in the winter on the Mall, 80 db all other times (Score 5) 70 db in the summer, 80 db all other times (Score 0) 80 db all year long (Score 0) Score Obtained/Total 5/5 A construction site is required to Any neighbor within 300’ requests it (Score 0) Any type of reinforced earth stabilization will be performed (Score 5) 06/30/2023 have a sound engineer/consultant model the site and specify noise mitigation measures to keep the noise below the allowable limit when: There are 3 or more houses within 300’ of the site (Score 0) Over 400 square ft of the site will be disturbed (Score 0) Score Obtained/Total 5/5 Which statement about construction site noise measurement is not true: All measurements will be taken with a decibel reader on a “Slow” response using the “A” weighting scale (Score 0) All measurements are taken from the property line of the construction site (Score 0) At a project inside a multi-unit building, noise measurements will be taken from the wall, ceiling, or joor of neighboring units. (Score 0) All measurements are taken from the 2nd Toor of a neighboring house (Score 5) Score Obtained/Total 5/5 Which of the following statements about Manufacturing Onsite are true: Manufacturing activities that are in excess of 80 db require an Extended Impact Permit (Score 0) Cutting stone is an example of Manufacturing Onsite (Score 0) All manufacturing activities are limited to a 90 day duration (Score 0) 06/30/2023 All of the above (Score 5) Score Obtained/Total 0/5 CertiXcate Information Name Rea Coulter Company Name Sinclair Building Architecture Design Email Address rea@sin-bad.com Phone Number 970-379-9894 06/30/2023