HomeMy WebLinkAboutFile Documents.1116 Waters Ave.0015-2024-BROF (11)SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
It should be known that this review shall
not relieve the applicant of their
responsibility to comply with the
requirements of the City of Aspen
Municipal Code. Pursuant to
Sec.26.104.050, any permit or approval
issued in error or otherwise not in
conformity with the requirements of this
Title, shall be void. Similarly, any permit
or approval issued in reliance upon or
as a result of, a materially false
statement or representation made in
the process of obtaining the permit or
development approval shall, likewise,
be void. Any person having received a
void or voidable permit or approval
shall not be relieved from having to
comply with all applicable terms and
conditions of this Title and the City shall
not be estopped from fully enforcing
same.
04/03/2024
linzhid
0013-2024-BROF
UTE WATERS LLC
1116 WATERS AVE 1
273718266014
0015-2024-BROF
OBRIEN M ANN REV TRUST
1116 WATERS AVE 2
273718266010
0016-2024-BROF
RESNICK MIKE TRUST
1116 WATERS AVE 3
1116 WATERS AVE 1
SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
It should be known that this review shall
not relieve the applicant of their
responsibility to comply with the
requirements of the City of Aspen
Municipal Code. Pursuant to
Sec.26.104.050, any permit or approval
issued in error or otherwise not in
conformity with the requirements of this
Title, shall be void. Similarly, any permit
or approval issued in reliance upon or
as a result of, a materially false
statement or representation made in
the process of obtaining the permit or
development approval shall, likewise,
be void. Any person having received a
void or voidable permit or approval
shall not be relieved from having to
comply with all applicable terms and
conditions of this Title and the City shall
not be estopped from fully enforcing
same.
Pacific Sheet Metal
1116 Waters Ave
Scope of Work: TPO
Membrane Roof
Snow Retention
Landscape
Hardscape
Dumpster
Restroom
No Gutter or
Downspout
04/02/2024
1116 Waters Ave
Roof Assembly
New Carlise TPO Single Ply Membrane
New ½” HD Coverboard Class “A”
New 4” Poly-ISO Insula�on
Exis�ng Tongue and Groove Decking
Must be Securshield
polyiso per ESR 1463
to accomplish Class A
roof
ESR-1463 | Most Widely Accepted and Trusted Page 8 of 14
TABLE 2—FIRE CLASSIFICATION ASSEMBLIES—ADHERED ROOFING SYSTEMS2,5 (continued)
SYSTEM
NO.
ROOF
CLASS DECK MAX
SLOPE
BARRIER BOARD
OR SLIP SHEET INSULATION1 MEMBRANE
14
A
Combustible
min. 15/32-inch-
thick plywood or
min. 7/16-inch-
thick OSB.
1/4:12
Barrier board
(see Section 3.6) or
Slip sheet: 2 layers
(see Section 3.7)
Any of the following
insulations, 1-inch min.
thickness: Carlisle
“SecurShield Polyiso”,
”InsulBase”, Hunter Panels
“H-Shield” or “H-Shield-
CG”
Sure-Weld, Spectro-Weld
15 1/2:12
Sure-Seal FR, Sure-Tough, Sure-White,
Sure-Seal FleeceBACK, Sure-Weld HS,
Sure-Weld SAT-TPO, Sure-Weld
FleeceBACK, Spectro-Weld
FleeceBACK, Sure-White FleeceBACK
16 3/4:12
Sure-Flex PVC FleeceBACK,
Sure-Flex KEE HP FleeceBACK,
Sure-Flex PVC FRS FleeceBACK,
Sure-Flex KEE FRS FleeceBACK
17 2:12 Sure-Flex PVC, Sure-Flex PVC FRS,
Sure-Flex KEE HP
18 C
Noncombustible
or
Combustible
min. 15/32-inch-
thick plywood or
min. 7/16-inch-
thick OSB.
Unlimited —
Any of the following
insulations, min. 1- inch.
thickness: Carlisle
“InsulBase” or Hunter
Panels “H-Shield”
Any EPDM, PVC or TPO Membrane
specified in this report
19 A Combustible 1/2:12 —
Single layer of minimum
3.0" or double layer of
minimum 1.5" Carlisle
“SecurShield Polyiso” or
Hunter Panels
“H-Shield-CG”
Any EPDM, PVC or TPO Membrane
specified in this report
20 A Combustible 1/2:12 —
Single layer of minimum
1.9" Carlisle “SecurShield
Polyiso” or Hunter Panels
“H-Shield-CG”
Any EPDM, PVC or TPO Membrane
specified in this report
21 A Noncombustible 1:12 —
Min. 1/2- to 3-inch-thick
Carlisle HP Recovery
Board
Sure-White Reinforced EPDM
Membrane
22 A Combustible 11/2:12
1/2-inch-thick gypsum
board or 1/4-inch-
thick “DensDeck
Roofboard” or
“DensDeck Prime,”
Any of the following
insulations, 1-inch min.
thickness: Carlisle
“SecurShield Polyiso”,”
InsulBase”, Hunter Panels
“H-Shield” or “H-Shield-
CG”
Sure-White Reinforced EPDM
Membrane
For SI: 1 inch = 25.4 mm.
1All foam plastic insulation must be UL-classified foamed plastic for roofing systems, and must be limited to the maximum thickness in accordance with Section
5.4 of this report or the maximum thickness in accordance with this table, whichever is less.
2See Section 3.10 for adhesive application rate.
3UL Classified EPS may be installed below min. 1-inch-thick Carlisle or Hunter Panels polyisocyanurate insulations (max slope 1:12) or below min. 1/2-inch-thick
Carlisle SecurShield HD or Hunter Panels H-Shield HD (max slope 2:12) on noncombustible decks.
4Carlisle SecurShield HD or Hunter Panels H-Shield HD may replace fiberboard and may be used as a coverboard over any insulation. When these two boards
are used directly below the Sure-Weld membrane, the slope is limited to max. 1/2:12.
5When these systems are used for reroofing or recovering, installation must be in accordance with Sections 4.2.2 and 5.7 of this report, and 2021 IBC Section
1512, 2018 and 2015 IBC Section 1511 [2012 and 2009 IBC Section 1510], 2021, 2018 and 2015 IRC Section R908 [2012 and 2009 IRC Section R907], as
applicable.
04/02/2024
James Jackson Romeo, PE
Structural Design Consultant, LLC
246 Pinon Drive
Glenwood Springs, CO 81601
Phone/Fax: 970-945-4742
Email: jim@jjrstructural.com
March 20, 2024
Ute Creek Condominiums Re: Ute Creek Condominiums
1116 Waters Avenue Roof Capacity
Aspen, CO
Attn: Ann O’Brien Project No: 24007
Ann:
The existing roof of the condominium building at 1116 Waters Avenue in Aspen does not have the capacity to support
additional snow load. Improving roof insulation would require the roof to support 75 psf snow load.
The 15 ft long 6x12 roof beams at 6 ft on center over the Living/Dining Room only has the capacity to support 35 psf snow
load and the 16’-9” long 4x12 roof ridge beam over the Bedroom only has the capacity to support 10 psf snow load.
This tells me that the existing roof has only been performing adequately since 1969-1970 because the less than adequate
roof insulation is causing the roof snow to melt.
I recommend that no roof insulation improvements be performed on this building unless the roof snow load capacity and
roof framing is improved.
Please call if you have any questions.
James J. Romeo, P.E.
04/02/2024
Snow stops required at all locations
where roofs could shed snow onto
walkways, stairs, alleys, decks, exits,
utilities and meters, emergency escape
and rescue opening window wells, or
adjacent properties - Ordinance 1,
2023.
HEAT TAPE MANDATORY CONTROL REQ’S.
All heat tape systems shall meet the following per (Ordinance 1 Series 2023):
-Automatic controls configured for system shut off when air temperature is above
40°F and comply with one of the following:
-shut off in absence of moisture
-shut off at night (daylight sensor or timer)
SUB-ELECTRICAL PERMIT REQUIRED FOR HEAT
TAPE
A sub-electrical permit is required if a heat tape system is present, no matter the
total wattage. A licensed electrician must apply for the permit.
The sub-electrical permit must be applied for prior to the final roof inspection as
both final inspections will occur simultaneously.
MID-ROOF AND FINAL
ROOF INSPECTIONS
REQUIRED TO RECEIVE
A LETTER OF
COMPLETENESS
Mid-Roof Inspection
REQUIRED
After your roof permit is issued,
and you have started work, you
must request a mid-roof
inspection.
Inspectors will verify your Class
A assembly on site.
You will request inspection
directly on SalesForce.
Final Roof Inspection
REQUIRED
Once roof work is complete, you
must request a final roof
inspection.
Inspectors will inspect snow
guards and heat tape (if
applicable).
NOTE: If there is heat tape
present, a final roof inspection
cannot be requested until the
sub-electrical permit is applied
for as both final inspections will
occur simultaneously.
Amenity Energy Use Approved (2021 CODE)
RREMP CREMP
PERMIT #:0013-2024-BROF DATE:_4/3/24__
HEAT TAPE TOTAL WATTAGE:___1800______
WATTS/FT:__________6___________________
TOTAL LINEAR FT:____300________________
OFFSET: ___REMP PAYMENT_______________
*Note:
- The first 1000W are exempt from REMP.
- All roof permits will require a sub-electrical
permit applied for by a licensed electrician.
- A sub-electrical permit must be applied for
prior to the final roof inspection as both final
inspections will occur simultaneously.
X
Engineer Letter for Roof Insulation
04/03/2024
linzhid