HomeMy WebLinkAboutFile Documents.513 W Main St.0044-2023-BREP (11)SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
It should be known that this review shall
not relieve the applicant of their
responsibility to comply with the
requirements of the City of Aspen
Municipal Code. Pursuant to
Sec.26.104.050, any permit or approval
issued in error or otherwise not in
conformity with the requirements of this
Title, shall be void. Similarly, any permit
or approval issued in reliance upon or
as a result of, a materially false
statement or representation made in
the process of obtaining the permit or
development approval shall, likewise,
be void. Any person having received a
void or voidable permit or approval
shall not be relieved from having to
comply with all applicable terms and
conditions of this Title and the City shall
not be estopped from fully enforcing
same.
Concrete 3"-4"
Hot Tar Waterproofing
Flashing 2 Stage
Densglass
Taper System
Existing Structure
Scope of Work
513 W. Main St. #E201, Aspen, CO 81611
1. Demo existing concrete.
2. Remove existing waterproofing system.
3. Repair or replace damaged or rotten plywood if required.
4. Install new waterproofing deck system.
5. Install new Trex deck.
6. No structural work required.
Install concrete decking similar to what was removed.
10/26/202310/26/202310/26/2023
Top of deck to bottom of rail
less than 4"
10/18/2023
0044-2023-BREP
ROBERT E WENDT II
513 W MAIN ST E201
273512449030
11/08/
2
0
2
3
Sam I.
Hot Tar Waterproofing
has been changed to
a TPO covering.
05/09/
2
0
2
4
Sam I.