Loading...
HomeMy WebLinkAboutFile Documents.513 W Main St.0044-2023-BREP (11)SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen Municipal Code. Pursuant to Sec.26.104.050, any permit or approval issued in error or otherwise not in conformity with the requirements of this Title, shall be void. Similarly, any permit or approval issued in reliance upon or as a result of, a materially false statement or representation made in the process of obtaining the permit or development approval shall, likewise, be void. Any person having received a void or voidable permit or approval shall not be relieved from having to comply with all applicable terms and conditions of this Title and the City shall not be estopped from fully enforcing same. Concrete 3"-4" Hot Tar Waterproofing Flashing 2 Stage Densglass Taper System Existing Structure Scope of Work 513 W. Main St. #E201, Aspen, CO 81611 1. Demo existing concrete. 2. Remove existing waterproofing system. 3. Repair or replace damaged or rotten plywood if required. 4. Install new waterproofing deck system. 5. Install new Trex deck. 6. No structural work required. Install concrete decking similar to what was removed. 10/26/202310/26/202310/26/2023 Top of deck to bottom of rail less than 4" 10/18/2023 0044-2023-BREP ROBERT E WENDT II 513 W MAIN ST E201 273512449030 11/08/ 2 0 2 3 Sam I. Hot Tar Waterproofing has been changed to a TPO covering. 05/09/ 2 0 2 4 Sam I.