Loading...
HomeMy WebLinkAboutFile Documents.800 Gibson Ave.0024-2023-BREP (4)SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen Municipal Code. Pursuant to Sec.26.104.050, any permit or approval issued in error or otherwise not in conformity with the requirements of this Title, shall be void. Similarly, any permit or approval issued in reliance upon or as a result of, a materially false statement or representation made in the process of obtaining the permit or development approval shall, likewise, be void. Any person having received a void or voidable permit or approval shall not be relieved from having to comply with all applicable terms and conditions of this Title and the City shall not be estopped from fully enforcing same. SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ'S All snowmelt systems shall meet the following: - Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. - R10 insulation shall be installed under the area to be snowmelted (2021 IBC R403.9.2 and C403.13.3.2) - Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2021 IECC R403.9 and C403.13.3) - Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2021 IECC R403.9 and C403.13.3) - Inspection by testing hydrostatically at 1.5 times max system design pressure, but not less than 100psi, for 15 minutes. (2021 IMC 1208.1) The repairs outlined herein are to include, but are not limited to, the following: 1.Balcony Topping and Waterproofing Replacement: Remove existing sandstone masonry pavers and xxxx [hot/cold] fluid-applied waterproofing membrane. Remove and replace plywood sheathing and prepare to receive new waterproofing. Install new hot, fluid-applied waterproofing, protection course, and drainage mat at areas marked on plan. Install new snowmelt system (to be designed by others). Install new masonry pavers to match existing - final pavers to be selected by Owner. 1.A.Sizing, layout, and configuration of hydronic snowmelt system to match existing. Installation of replacement snowmelt is a Delegated Design to be coordinated by others. Reference to general installation included in these Drawings, but should not be construed as a final design for this system. 2.Building Cladding Repairs: Remove and repair existing claddings, and provide access to Architect/Engineer for evaluation of existing substrates. Install new materials as necessary to allow for waterproofing to extend up behind existing building cladding. 3.Fascia Cladding Repairs: Remove existing stone masonry cladding at balcony sidewalls and provide access to Architect/Engineer for evaluation of existing plywood sheathing substrate. Remove and replace plywood sheathing as directed by Architect/Engineer. Install new water-resistive barrier and stone system, to match and tie-into existing. 4.Structural Repairs: Replace stud framing in-kind. SCOPE OF WORK 2'-0" 8'-8" 2 Scale: 3/4" = 1'-0" WEST ELEVATION DEMOLITION PLAN There must be R-10 insulation below the snowmelt where not above the insulated Garage roof. KEYED NOTES - DEMOLITION PLAN: Remove and discard all existing pavers, setting bed, concrete topping, hydronic snowmelt, waterproofing, and sheathing, down to structural framing. Ensure that existing snowmelt system has been disconnected and drained (as required) prior to demolition. Remove hydronic heat tubes back to manifold. Remove and salvage for reuse drain clamping ring. Remove all mineral deposits from clamping ring, drain bowl, and accessible portions of pipe. Clean, store, and prep for re-installation. Ensure all weeps are free from obstruction. Remove and salvage for reuse doors, frames, and thresholds. Remove and salvage for reuse existing guardrails and wood posts. Remove and discard existing stone cladding, setting bed, drainage mat, and OSB sheathing. Continue removal to south elevation (at west/left side of garage door). At existing weather resistive barrier to remain (if present), cut clean and square edges to allow for integration with new water-resistive barrier. Remove and salvage for reuse existing stone copings. Remove and salvage for reuse existing wood fascia elements. Remove and discard deteriorated stud and sill framing as marked on Elevation. Shore existing W12x beam prior to removal of any studs. 800 Gibson Ave. Proposed Waterproofing Details FLUID APPLIED COATING SYSTEMS Class A 1. Deck: NC Incline: 2 Fluid Coating: — "Monolithic Membrane 6125" applied as a hot fluid forming a minimum 1/8-inch thick membrane or 1/4-in. thick totally reinforced membrane when cooled or cold fluid "Liquid Membrane 6090" mixed at a rate of 50-lb base to 1-pt. activator (activator need not be labeled) applied as a cold fluid forming a minimum 1/16-inch thick membrane. Insulation: — Dow Chemical "Styrofoam" or any UL Classified EPS, any thickness, applied loose over one layer "Hydroflex Protection Sheet" (not Classified). Surfacing: — Crushed stone, applied loose at a minimum rate of 10-lb/ft over one layer of any of the following 2-oz/yd mats (not Classified): Phillips Fibers "P3B", Confil "D689H", or Fabrene "VIE", concrete paver blocks, poured in place, concrete slab or Styrofoam panels surfaced with minimum 3/8-inch concrete mortar butted together. 2 2 0024-2023-BREP Shorr Family Rev Trust 800 Gibson Ave. 273707335016 05/24/ 2 0 2 3 sami Amenity Energy Use Approved (2021 CODE) RREMP CREMP PERMIT #:_______________DATE:________ SNOWMELT:_____________________________ POOL: _____________________________ SPA: _____________________________ OFFSET:_______________________________ REMP SHEET(S): _______________________ REVIEWED BY: _________________________ MINIMUM BOILER AFUE: _________________ HEAT TAPE: _____________________________ HEAT MAT: _____________________________ Ex HEATERS: ____________________________ Ex FIREPLACES: _________________________ In FIREPLACES: _________________________ 0024-2023-BREP 6/5/2023 186 sq. ft - balcony above garage only 92% N/A REMP Calculator Sam Irmen 1000 watts - exempt TYPICAL WATERPROOFING TERMINATION @ NEW THRESHOLD 3" MIN 3" CAREFULLY REMOVE (E) DOOR AND THRESHOLD - PROTECT AND STORE FOR RE-USE (E) CURB - DO NOT DAMAGE 1/2" ISOLATION JOINT MATERIAL AT PERIMETER OF REINFORCED SETTING BED REINFORCED HOT FLUID-APPLIED WATERPROOFING w/ INTEGRAL CAP SHEET AND DRAINAGE MAT OVER SLOPED PLYWOOD SHEATHING PER 1/A5.0 UNCURED NEOPRENE FLASHING TO EXTEND 3" BEYOND ALL CHANGES-IN-PLANE TOPPING ASSEMBLY AND ANTI-FRACTURE MEMBRANE, NOT SHOWN IN FULL FOR CLARITY INSTALL REINFORCED PMMA SYSTEM AT ROUGH OPENING EXTEND ONTO BACK DAM AND UP JAMBS 3" MINIMUM. EXTEND PMMA OVER HOT, FLUID-APPLIED WATERPROOFING 3" MIN 3" MIN 3 REINFORCED HOT FLUID-APPLIED WATERPROOFING w/ INTEGRAL CAP SHEET AND DRAINAGE MAT OVER SLOPED PLYWOOD SHEATHING PER 1/A5.0 UNCURED NEOPRENE FLASHING TO EXTEND 3" BEYOND ALL CHANGES-IN-PLANE Tapered Insulation