Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.33 MINING STOCK PKWY.0093-2020-BRES (17)
DN C-1 C-2 C-5 C-6 C-7 C-8 C-9 C-B C-F C-H C-J C-LC-IC-GC-EC-DC-CC-A C-K C-4 C-10 C-M C-3 1" / 12" 3" / 12" 7" / 12" 7" / 12" 5" / 12"5" / 12" 7" / 12" 7" / 12" 5 1/2" / 12"5 1/2" / 12" 1/2" / 12" 1" / 12" 6" / 12"6" / 12"1 1/2" / 12" 1" / 12" 1 1/2" / 12" 1 1/2" / 12" 3" / 12" 3" / 12" G1-14-12 2 G1-14-121 1 B C G1-14-12 3 4 2 3 BLDG 12 - Level 1 C 100' - 0" BLDG 12 - Level 2 C 110' - 10 3/4" C-1C-2C-5C-7C-8C-9 BLDG 12 - Level 3 C 121' - 9 1/2" C-10 C-3 3 2 1 /2 "/1 2 " TO TOP MOST POINT 34' - 7 1/4"ROOF WITH MULTIPLE PITCHES 26.575.020.F.2 TOP OF BOX C 131' - 10 1/8" BLDG 12 - Level 1 C 100' - 0" BLDG 12 - Level 2 C 110' - 10 3/4" C-1 C-2 C-5 C-7 C-8 C-9 BLDG 12 - Level 3 C 121' - 9 1/2" C-10C-3 6" / 12"1 2 6" / 12" TOP OF BOX C 131' - 10 1/8" TO MIDPOINT 33' - 7" TO MIDPOINT 36' - 7 1/2" TOPOGRAPHY LEGEND EXISTING NATURAL GRADE FINISHED GRADE BLDG 12 - Level 1 C 100' - 0" BLDG 12 - Level 2 C 110' - 10 3/4" C-BC-FC-HC-JC-L C-I C-G C-E C-D C-C BLDG 12 - Level 3 C 121' - 9 1/2" C-M 41" / 1 2 " TO TOP MOST POINT 36' - 9 5/8" TOP OF BOX C 131' - 10 1/8" NOTE: GRAY HATCH INDICATES SYSTEMS BUILT SCOPE, TYP. PROJECT NUMBER ISSUE DATE 3630 OSAGE STREET DENVER, CO 80211 720.512.3437 REVISIONS SHEET TITLE ISSUE SHEET NO. TOWN STAMP DISCIPLINE STAMP G1-14-12 HEIGHT OVER TOPOGRAPHY-POD C 19024 BU I L D I N G 1 2 07/14/2021 FOR CONSTRUCTION BU R L I N G A M E R A N C H A S P E N , C O 3/32" = 1'-0"5 BLDG 12 - ROOF PLAN - HEIGHT OVER TOPO_C 3/32" = 1'-0"2 BUILDING 12 - NORTH ELEVATION C 3/32" = 1'-0"1 BUILDING 12 - SOUTH ELEVATION C 3/32" = 1'-0"3 BUILDING 12 - EAST ELEVATION C No. Description Date 2 Addendum 2 3/30/2020 6 Permit Response 1 12/11/2020 7 90% CD Addendum 2 12/16/2020 10 Permit Response 2 02/12/2021 7871.25 7871.32 7867.80 7867.33 7868.86 7870.42 7867.06 7868.86 N 7832.04 7842.50 7842.00 7843.01 7833.05 7833.02 7843.95 7842.92 9/29/23 DN D-1D-3D-4D-8 BLDG 12 - Level 1 D 101' - 0" BLDG 12 - Level 2 D 111' - 10 3/4" BLDG 12 - Level 3 D 122' - 9 1/2" D-9 5 TO TOP MOST POINT 37' - 4 7/8" 2 1 /2 "/1 2 " ROOF WITH MULTIPLE PITCHES 26.575.020.F.2 TOP OF BOX D 132' - 10 1/8" D-1 D-3 D-6 D-8 BLDG 12 - Level 1 D 101' - 0" BLDG 12 - Level 2 D 111' - 10 3/4" BLDG 12 - Level 3 D 122' - 9 1/2" D-9 TO TOP MOST PORTION 34' - 11 3/8" ROOF WITH MULTIPLE PITCHES 26.575.020.F.2 1"/12" 6 TOP OF BOX D 132' - 10 1/8" D-AD-CD-ED-GD-I D-H D-F D-D BLDG 12 - Level 1 D 101' - 0" BLDG 12 - Level 2 D 111' - 10 3/4" BLDG 12 - Level 3 D 122' - 9 1/2" 2" / 12" 8 7 TO MIDPOINT 35' - 0 1/8" TO MIDPOINT 35' - 9 5/8" TOP OF BOX D 132' - 10 1/8" 6 1/2" / 12" TOPOGRAPHY LEGEND EXISTING NATURAL GRADE FINISHED GRADE D-1 D-3 D-4 D-5 D-6 D-7 D-8 D-A D-C D-E D-G D-I D-H D-F D-D D-2 D-B D-J D-9 G1-15-12 1 G1-15-12 2 A B C 3 " / 1 2 " 2 " / 1 2 " 1 /2 " / 1 2 " 6 " / 1 2 " 6 " / 1 2 " 6 1 /2 " / 1 2 " 6 1 /2 " / 1 2 " 1 " / 1 2 " 1 " / 1 2 " 2 " / 1 2 " 3 " / 1 2 " 3 " / 1 2 " 5 6 G1-15-12 3 7 8 NOTE: GRAY HATCH INDICATES SYSTEMS BUILT SCOPE, TYP. PROJECT NUMBER ISSUE DATE 3630 OSAGE STREET DENVER, CO 80211 720.512.3437 REVISIONS SHEET TITLE ISSUE SHEET NO. TOWN STAMP DISCIPLINE STAMP G1-15-12 HEIGHT OVER TOPOGRAPHY-POD D 19024 BU I L D I N G 1 2 07/14/2021 FOR CONSTRUCTION BU R L I N G A M E R A N C H A S P E N , C O 3/32" = 1'-0"1 BUILDING 12 - NORTH ELEVATION D 3/32" = 1'-0"2 BUILDING 12 - SOUTH ELEVATION D 3/32" = 1'-0"3 BUILDING 12 - EAST ELEVATION D 3/32" = 1'-0"4 BLDG 12 - ROOF PLAN - HEIGHT OVER TOPO_D No. Description Date 6 Permit Response 1 12/11/2020 7 90% CD Addendum 2 12/16/2020 10 Permit Response 2 02/12/2021 7871.39 7871.32 7867.80 7867.33 7868.86 7870.40 7867.06 7868.86 N Natural 7843.01 7833.05 7833.02 7840.95 7832.04 7842.86 7842.86 7843.81 9/29/23 UP TOPOGRAPHY LEGEND EXISTING NATURAL GRADE FINISHED GRADE A-B A-E A-I A-4 A-5 A-6 A-7 A-8 A-G A-HA-FA-DA-C A2-03-13 3A-A A-3 A-J A-2 A-1 A-9 A2-03-134 A2-01-13 1 A2-01-134 6" / 1 2 " 6" / 12"6" / 12" 6" / 12"6" / 12" 2" / 12" 1/ 2 " / 1 2 " 1/2" / 12" 2" / 1 2 " 6" / 1 2 " 6" / 1 2 " 6" / 1 2 " 2" / 1 2 " G1-11-13 2 G1-11-1312 4 G1-11-13 3 1 3 1 2 1A BLDG 13 - Level 1 100' - 0" BLDG 13 - Level 2 110' - 10 3/4" BLDG 13 - Level 3 121' - 9 1/2" A-4 A-5A-3A-2A-1 A-9 1 ROOF WITH MULTIPLE PITCHES 26.575.020.F.2 3"/12" TO MIDPOINT 25' - 7 1/2" TOP OF BOX A AND B 131' - 10 1/8" 1A TO EAVE POINT 23' - 4 1/4" TO RIDGE 27' - 9 5/8" BLDG 13 - Level 1 100' - 0" BLDG 13 - Level 2 110' - 10 3/4" BLDG 13 - Level 3 121' - 9 1/2" A-4A-6A-8 A-3 A-2 A-1A-9 ROOF WITH MULTIPLE PITCHES 26.575.020.F.2 2 "/1 2 "2 TO TOP MOST PORTION 34' - 0 1/4" TOP OF BOX A AND B 131' - 10 1/8" BLDG 13 - Level 1 100' - 0" BLDG 13 - Level 2 110' - 10 3/4" BLDG 13 - Level 3 121' - 9 1/2" A-BA-EA-I A-GA-H A-F A-D A-C 2" / 12" 6 " / 1 2 " 3 4 TO TOP MOST PORTION 37' - 4 1/2" TO MIDPOINT 35' - 10 1/8" TOP OF BOX A AND B 131' - 10 1/8" NOTE: GRAY HATCH INDICATES SYSTEMS BUILT SCOPE, TYP. PROJECT NUMBER ISSUE DATE 3630 OSAGE STREET DENVER, CO 80211 720.512.3437 REVISIONS SHEET TITLE ISSUE SHEET NO. TOWN STAMP DISCIPLINE STAMP G1-11-13 HEIGHT OVER TOPOGRAPHY-POD A 19024 BU I L D I N G 1 3 07/21/2021 FOR CONSTRUCTION BU R L I N G A M E R A N C H , A S P E N C O 3/32" = 1'-0"4 BLDG 13 - Roof Plan - Height Over Topo-Pod A 1/8" = 1'-0"1 BUILDING 13 - WEST ELEVATION A 1/8" = 1'-0"2 BUILDING 13 - EAST ELEVATION A 1/8" = 1'-0"3 BUILDING 13 - SOUTH ELEVATION A No. Description Date 2 Addendum 2 3/30/2020 6 Permit Response 1 12/11/2020 7 90% CD Addendum 02 12/16/2020 10 Permit Response 2 02/12/2021 EAST ELEVATION SOUTH ELEVATION NORTH ELEVATION 7857.07 7866.92 7854.09 7865.23 7865.09 7868.13 7867.99 7865.90 N Finished 7829.04 7828.98 7836.51 7832.87 7839.62 7839.36 7829.02 7834.72 9/29/23 UP BLDG 13 - Level 1 100' - 0" BLDG 13 - Level 2 110' - 10 3/4" BLDG 13 - Level 3 121' - 9 1/2" B-4B-8 B-5 B-3 B-2 B-1B-9 ROOF WITH MULTIPLE PITCHES 26.575.020.F.2 2 1 /2 "/1 2 " 5 TO TOP MOST PORTION 31' - 8 5/8" DORMER EXCLUDED PER 26.575.020.F.2 TOP OF BOX A AND B 131' - 10 1/8" BLDG 13 - Level 1 100' - 0" BLDG 13 - Level 2 110' - 10 3/4" BLDG 13 - Level 3 121' - 9 1/2" B-4 B-6 B-7 B-8B-3B-1 B-9 6 ROOF WITH MULTIPLE PITCHES 26.575.020.F.2 2 1/2"/12" TO TOP MOST POINT 33' - 4 3/8" TOP OF BOX A AND B 131' - 10 1/8" BLDG 13 - Level 1 100' - 0" BLDG 13 - Level 2 110' - 10 3/4" BLDG 13 - Level 3 121' - 9 1/2" B-BB-CB-DB-EB-G B-F B-AB-H 7 2" / 12" TO TOP MOST PORTION 34' - 1 1/2" TOP OF BOX A AND B 131' - 10 1/8" B-B B-C B-D B-E B-GB-4 B-6 B-7 B-8 B-5 B-F B-3 B-A B-H B-2 B-1 B-9 G1-12-13 1 G1-12-13 2 6" / 12" 6" / 12" 1" / 12" 2" / 12" 6" / 12" 6" / 12" 6" / 12" 6" / 12" 2 1 G1-12-13 3 5 6 7 1 2 TOPOGRAPHY LEGEND EXISTING NATURAL GRADE FINISHED GRADE NOTE: GRAY HATCH INDICATES SYSTEMS BUILT SCOPE, TYP. PROJECT NUMBER ISSUE DATE 3630 OSAGE STREET DENVER, CO 80211 720.512.3437 REVISIONS SHEET TITLE ISSUE SHEET NO. TOWN STAMP DISCIPLINE STAMP G1-12-13 HEIGHT OVER TOPOGRAPHY-POD B 19024 BU I L D I N G 1 3 07/21/2021 FOR CONSTRUCTION BU R L I N G A M E R A N C H , A S P E N C O 1/8" = 1'-0"1 BUILDING 13 - NORTH ELEVATION B 1/8" = 1'-0"2 BUILDING 13 - SOUTH ELEVATION B 1/8" = 1'-0"3 BUILDING 13 - EAST ELEVATION B 3/32" = 1'-0"4 BLDG 13 - Roof Plan - Height Over Topo-Pod B No. Description Date 2 Addendum 2 3/30/2020 6 Permit Response 1 12/11/2020 7 90% CD Addendum 02 12/16/2020 10 Permit Response 2 02/12/2021 7857.07 7862.92 7854.09 7866.85 7864.80 7868.13 7867.99 7865.90 N 7828.98 7836.51 7832.87 7829.04 7839.62 7839.36 7829.02 7834.72 9/29/23 A2-03-14 4 B-2 B-3 B-4 B-5 B-7 B-B B-D B-E B-F B-GB-C B-6 B-A B-8 B-1 B-9 B-H 6" / 12"6" / 12" 2 1/4" / 12" 1" / 12" 3" / 12" 3" / 12" 1 1/2" / 12" 6" / 12" 6" / 12" 3/4" / 12" 3/4" / 12" 2" / 12" 6" / 12"6" / 12" 1 1/2" / 12" G1-11-142G1-11-14 1 3 1 2 G1-11-14 3 1" / 12" BLDG 14 - Level 1 100' - 0" BLDG 14 - Level 2 110' - 10 3/4" BLDG 14 - Level 3 121' - 9 1/2" B-2 B-3 B-4 B-7B-1 B-9 TO TOP MOST PORTION 30' - 1 1/2" 2 ROOF WITH MULTIPLE PITCHES 26.575.020.F.2 2 1 /2 "/1 2 " DORMER EXCLUDED PER 26.575.020.F.2 TOP OF BOX B 131' - 10 1/8" BLDG 14 - Level 1 100' - 0" BLDG 14 - Level 2 110' - 10 3/4" BLDG 14 - Level 3 121' - 9 1/2" B-2B-3B-4B-5B-7 B-1B-9 1 TO TOP MOST POINT 32' - 1 3/4" 1"/12" ROOF WITH MULTIPLE PITCHES 26.575.020.F.2 TOP OF BOX B 131' - 10 1/8" TOPOGRAPHY LEGEND EXISTING NATURAL GRADE FINISHED GRADE BLDG 14 - Level 1 100' - 0" BLDG 14 - Level 2 110' - 10 3/4" BLDG 14 - Level 3 121' - 9 1/2" B-B B-D B-E B-F B-GB-C B-H 3 TO TOP MOST PORTION 37' - 2 5/8" 1 1/2" / 12" TOP OF BOX B 131' - 10 1/8" NOTE: GRAY HATCH INDICATES SYSTEMS BUILT SCOPE, TYP. PROJECT NUMBER ISSUE DATE 3630 OSAGE STREET DENVER, CO 80211 720.512.3437 REVISIONS SHEET TITLE ISSUE SHEET NO. TOWN STAMP DISCIPLINE STAMP G1-11-14 HEIGHT OVER TOPOGRAPHY-POD B 19024 BU I L D I N G 1 4 09/23/2021 FOR CONSTRUCTION BU R L I N G A M E R A N C H , A S P E N C O 3/32" = 1'-0"4 BLDG 14 - ROOF PLAN - HEIGHT OVER TOPO_POD B 1/8" = 1'-0"2 BUILDING 14 - NORTH ELEVATION B 1/8" = 1'-0"1 BUILDING 14 - SOUTH ELEVATION B 1/8" = 1'-0"3 BUILDING 14 - EAST ELEVATION B No. Description Date 6 Permit Response 1 12/11/2020 7 90% CD Addendum 2 12/16/2020 10 Permit Response 2 02/12/2021 7870.34 7866.56 7870.35 7856.89 7865.86 7865.9 7867.78 N 7830.52 7842.14 7831.30 7831.30 7843.80 7841.60 7838.92 9/29/23 DN BLDG 14 - Level 1 F-1 100' - 7 7/8" BLDG 14 - Level 2 F-1 111' - 6 5/8" BLDG 14 - Level 3 F-1 122' - 5 3/8" BLDG 14 - Level 1 F-2 101' - 10" BLDG 14 - Level 2 F-2 112' - 8 3/4" F-1 F-8F-3 F-6F-4 3 3/4" / 12" 4 TO MIDPOINT 16' - 7 3/8" TOP OF BOX F-2 122' - 9 3/8" TOP OF BOX F-1 132' - 6" BLDG 14 - Level 1 F-1 100' - 7 7/8" BLDG 14 - Level 2 F-1 111' - 6 5/8" BLDG 14 - Level 3 F-1 122' - 5 3/8" BLDG 14 - Level 1 F-2 101' - 10" BLDG 14 - Level 2 F-2 112' - 8 3/4" F-1F-8 F-2F-3F-6 F-4 1 1/4" / 12"5 TO TOP MOST PORTION 24' - 5 1/8"TOP OF BOX F-2 122' - 9 3/8" TOP OF BOX F-1 132' - 6" TOPOGRAPHY LEGEND EXISTING NATURAL GRADE FINISHED GRADE F-1 F-A F-7 F-G F-8 F-2 F-3 F-6 F-B F-C F-D F-E F-F F-4 F-5 G1-12-141 G1-12-14 2 1 1/4" / 12" 2 1/4" / 12" 3" / 12" 3 3/4" / 12" 6" / 12" 6" / 12" 3" / 12" 2" / 12" 1 1/2" / 12" 3" / 12" 4 6 G1-12-14 3 5 7 BLDG 14 - Level 1 F-1 100' - 7 7/8" BLDG 14 - Level 2 F-1 111' - 6 5/8" BLDG 14 - Level 3 F-1 122' - 5 3/8" BLDG 14 - Level 1 F-2 101' - 10" BLDG 14 - Level 2 F-2 112' - 8 3/4" F-B F-C F-D F-E F-F 6 TO TOP MOST PORTION 35' - 0 1/2" 1 1 /4 " / 1 2 " 6 " / 1 2 " 7 TO MIDPOINT 37' - 3 3/4" TOP OF BOX F-2 122' - 9 3/8" TOP OF BOX F-1 132' - 6" NOTE: GRAY HATCH INDICATES SYSTEMS BUILT SCOPE, TYP. PROJECT NUMBER ISSUE DATE 3630 OSAGE STREET DENVER, CO 80211 720.512.3437 REVISIONS SHEET TITLE ISSUE SHEET NO. TOWN STAMP DISCIPLINE STAMP G1-12-14 HEIGHT OVER TOPOGRAPHY-POD F 19024 BU I L D I N G 1 4 09/23/2021 FOR CONSTRUCTION BU R L I N G A M E R A N C H , A S P E N C O 1/8" = 1'-0"1 BUILDING 14 - NORTH ELEVATION F 1/8" = 1'-0"2 BUILDING 14 - SOUTH ELEVATION F 3/32" = 1'-0"4 BLDG 14 - ROOF PLAN - HEIGHT OVER TOPO_POD F 1/8" = 1'-0"3 BUILDING 14 - EAST ELEVATION F No. Description Date 6 Permit Response 1 12/11/2020 7 90% CD Addendum 2 12/16/2020 10 Permit Response 2 02/12/2021 7856.89 7865.86 7865.90 7870.34 7866.56 7870.35 N 7842.14 7831.30 7831.30 7843.80 7830.52 7841.60 7838.92 7867.78 9/29/23 E-2 E-3 E-4 E-5 E-6 E-7 E-A E-E E-G E-KE-B E-C E-D E-F E-H E-I E-J C 1 E-8 E-1 8" / 1 2 " 8" / 12"8" / 12" 6" / 12"6" / 12" 8" / 1 2 " 5" / 12"6" / 12"6" / 12"6" / 12"6" / 12"5" / 12" 2 1/4" / 12" 3" / 1 2 " 8" / 1 2 " 8" / 1 2 " G1-11-15 2 G1-11-151 2 1 3 G1-11-15 3 1/ 4 " / 1 2 " 1/ 4 " / 1 2 " 1/4" / 12" 3" / 1 2 " 3" / 1 2 " BLDG 15 - Level 1 100' - 0" BLDG 15 - Level 2 110' - 10 3/4" E-2 E-4 E-6 E-7 BLDG 15 - Level 0 95' - 10" E-8E-1 1 1/ 3 U P F R O M E A V E 31 ' - 4 3 / 8 " 8 " / 1 2 " TOP OF BOX E 120' - 11 3/8" BLDG 15 - Level 1 100' - 0" BLDG 15 - Level 2 110' - 10 3/4" E-2E-6E-7 BLDG 15 - Level 0 95' - 10" E-8 E-1 2 4 1 /2 "/1 2 " ROOF WITH MULTIPLE PITCHES 26.575.020.F.2 TO MIDPOINT 28' - 0 1/2" TOP OF BOX E 120' - 11 3/8" TO RIDGE 32' - 6 1/4" TO EAVE POINT 23' - 0" 2A 2' - 0 1 / 2 " TOPOGRAPHY LEGEND EXISTING NATURAL GRADE FINISHED GRADE BLDG 15 - Level 1 100' - 0" BLDG 15 - Level 2 110' - 10 3/4" E-AE-EE-GE-K E-BE-CE-DE-FE-HE-IE-J BLDG 15 - Level 0 95' - 10" 3 8" / 12" 1/3 UP FROM EAVE 28' - 2" TOP OF BOX E 120' - 11 3/8" NOTE: GRAY HATCH INDICATES SYSTEMS BUILT SCOPE, TYP. PROJECT NUMBER ISSUE DATE 3630 OSAGE STREET DENVER, CO 80211 720.512.3437 REVISIONS SHEET TITLE ISSUE SHEET NO. TOWN STAMP DISCIPLINE STAMP G1-11-15 HEIGHT OVER TOPOGRAPHY 19024 BU I L D I N G 1 5 07/29/2021 FOR CONSTRUCTION BU R L I N G A M E R A N C H 3/32" = 1'-0"4 ROOF PLAN - HEIGHT OF TOPO 1/8" = 1'-0"1 BUILDING 15 - NORTH ELEVATION E 1/8" = 1'-0"2 BUILDING 15 - SOUTH ELEVATION E 1/8" = 1'-0"3 BUILDING 15 - WEST ELEVATION E No. Description Date 2 Addendum 2 3/30/2020 6 Permit Response 1 12/11/2020 7 90% CD Addendum 2 12/16/2020 10 Permit Response 2 02/12/2021 NORTH ELEVATION SOUTH ELEVATIONEAST ELEVATION 7847.43 7847.85 7851.83 7847.30 N 7821.41 7821.60 7821.25 7821.30 9/29/23