File Documents.33 MINING STOCK PKWY.0093-2020-BRES (22)
Activity ID Activity Name Original Duration Start Finish BL Project Start BL Project Finish 11.18.211.18.2020 - Burlingame Phas 389 03/01/21 09/12/22 03/01/21 09/12/22 Pre-CoPre-Construction 158 04/21/21 12/06/21 04/21/21 12/06/21 MilestMilestones 158 04/21/21 12/06/21 04/21/21 12/06/21 A1910 Bldg. 8 Excavation 0 04/21/21 04/21/21 A1920 Bldg. 8 Foudation 0 06/30/21 06/30/21 A1930 Bldg. 8 Set Boxes 0 07/02/21 07/02/21 A1940 Bldg. 8 Dry-In 0 08/30/21 08/30/21 A1950 Bldg. 9 Excavation 0 05/05/21 05/05/21 A1960 Bldg. 9 Foundation 0 07/15/21 07/15/21 A1970 Bldg. 9 Set Boxes 0 07/23/21 07/23/21 A1980 Bldg. 9 Dry-In 0 09/20/21 09/20/21 A1990 Bldg. 10 Excavation 0 05/19/21 05/19/21 A2000 Bldg. 10 Foundation 0 07/29/21 07/29/21 A2010 Bldg. 10 Set Boxes 0 07/30/21 07/30/21 A2020 Bldg. 10 Dry-In 0 09/27/21 09/27/21 A2030 Bldg. 11 Excavation 0 06/03/21 06/03/21 A2040 Bldg. 11 Foundation 0 08/12/21 08/12/21 A2050 Bldg. 11 Set Boxes 0 08/13/21 08/13/21 A2060 Bldg. 11 Dry-In 0 10/07/21 10/07/21 A2070 Bldg. 12 Excavation 0 06/25/21 06/25/21 A2080 Bldg. 12 Foundation 0 09/03/21 09/03/21 A2090 Bldg. 12 Set Boxes 0 09/03/21 09/03/21 A2100 Bldg. 12 Dry-In 0 10/26/21 10/26/21 A2110 Bldg. 13 Excavation 0 07/16/21 07/16/21 A2120 Bldg. 13 Foundation 0 09/24/21 09/24/21 A2130 Bldg. 13 Set Boxes 0 09/27/21 09/27/21 A2140 Bldg. 13 Dry-In 0 11/22/21 11/22/21 A2150 Bldg. 14 Excavation 0 07/16/21 07/16/21 A2160 Bldg. 14 Foundation 0 09/24/21 09/24/21 A2170 Bldg. 14 Set Boxes 0 09/29/21 09/29/21 A2180 Bldg. 14 Dry-In 0 11/24/21 11/24/21 A2190 Bldg. 15 Excavation 0 08/10/21 08/10/21 A2195 Bldg. 15 Foundation 0 10/21/21 10/21/21 A2200 Bldg. 15 Set Boxes 0 10/22/21*10/22/21 A2210 Bldg. 15 Dry-In 0 12/06/21 12/06/21 Fab/DFab/Deliver of Modular Units 86 06/17/21 10/18/21 06/17/21 10/18/21 08100 Fab/Deliver Units for Building 8 29 06/17/21*07/15/21 06/17/21 07/15/21 09100 Fab/Deliver Units for Building 9 20 07/07/21*08/03/21 07/07/21 08/03/21 10100 Fab/Deliver Units for Building 10 15 07/15/21*08/04/21 07/15/21 08/04/21 11100 Fab/Deliver Units for Building 11 15 07/21/21*08/10/21 07/21/21 08/10/21 12100 Fab/Deliver Units for Building 12 21 08/23/21*09/12/21 08/23/21 09/12/21 13100 Fab/Deliver Units for Building 13 15 09/08/21*09/28/21 09/08/21 09/28/21 14100 Fab/Deliver Units for Building 14 15 09/20/21*10/08/21 09/20/21 10/08/21 15100 Fab/Deliver Units for Building 15 15 09/28/21*10/18/21 09/28/21 10/18/21 GenerGeneral Summary for Construc 387 03/01/21 09/09/22 03/01/21 09/09/22 GSUM10 Construction Start 0 03/01/21*03/01/21 GSUM11 Construction Duration 383 03/01/21 09/01/22 03/01/21 09/01/22 GSUM12 Construction Finish 0 09/01/22 09/01/22 GSUM12 Project Substantial Completion 0 09/09/22 09/09/22 09/09/22 09/09/22 MobiliMobilization and Initial Site Wo 52 03/01/21 05/11/21 03/01/21 05/11/21 M01100 Mobilization 10 03/01/21 03/12/21 03/01/21 03/12/21 M01110 Initial Survey 3 03/01/21 03/03/21 03/01/21 03/03/21 M02100 Strip Vegitation 5 03/10/21 03/16/21 03/10/21 03/16/21 M02110 Cut/Fill/Rough Grade Phase 1 10 03/17/21 03/30/21 03/17/21 03/30/21 M02130 Initial GESC 5 03/02/21 03/08/21 03/02/21 03/08/21 M02140 Storm Water Inspector Sign Off o 1 03/09/21 03/09/21 03/09/21 03/09/21 M02150 Cut/Fill/Rough Grade Phase 2 15 03/31/21 04/20/21 03/31/21 04/20/21 M02160 Cut/Fill Phase/Rough Grade 3&4 15 04/21/21 05/11/21 04/21/21 05/11/21 On-SitOn-Site - Horizontal Developm 254 08/10/21 08/11/22 08/10/21 08/11/22 ComoComon Area Hardscape / Land 62 05/16/22 08/11/22 05/16/22 08/11/22 08S031 Subgrade / Grade Sidewalks 5 05/31/22 06/06/22 05/31/22 06/06/22 08S031 Flatwork / FRP Sidewalks 10 06/07/22 06/20/22 06/07/22 06/20/22 08S031 Topsoil Respread 5 06/21/22 06/27/22 06/21/22 06/27/22 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 February March April May June July August S October November December January February March April May June July August S October ber 2021 2022 Bldg. 8 Excavation Bldg. 8 Foudation Bldg. 8 Set Boxes Bldg. 8 Dry-In Bldg. 9 Excavation Bldg. 9 Foundation Bldg. 9 Set Boxes Bldg. 9 Dry-In Bldg. 10 Excavation Bldg. 10 Foundation Bldg. 10 Set Boxes Bldg. 10 Dry-In Bldg. 11 Excavation Bldg. 11 Foundation Bldg. 11 Set Boxes Bldg. 11 Dry-In Bldg. 12 Excavation Bldg. 12 Foundation Bldg. 12 Set Boxes Bldg. 12 Dry-In Bldg. 13 Excavation Bldg. 13 Foundation Bldg. 13 Set Boxes Bldg. 13 Dry-In Bldg. 14 Excavation Bldg. 14 Foundation Bldg. 14 Set Boxes Bldg. 14 Dry-In Bldg. 15 Excavation Bldg. 15 Foundation Bldg. 15 Set Boxes Bldg. 15 Dry-In Fab/Deliver Units for Building 8 Fab/Deliver Units for Building 9 Fab/Deliver Units for Building 10 Fab/Deliver Units for Building 11 Fab/Deliver Units for Building 12 Fab/Deliver Units for Building 13 Fab/Deliver Units for Building 14 Fab/Deliver Units for Building 15 Construction Start Construction Duration Construction Finish Project Substantial Co Mobilization Initial Survey Strip Vegitation Cut/Fill/Rough Grade Phase 1 Initial GESC Storm Water Ins pector Sign Off on GESC Cut/Fill/Rough Grade Phase 2 Cut/Fill Phase/Rough Grade 3&4 Subgrade / Grade Sidewalks Flatwork / FRP Sidewalks To psoil Respread SHAW CONSTRUCTION 11.18.2020 - Burlingame Phase III - Guerden Schedule Burlingame Ranch Phase 3 Print Date: 11/18/20 Data Date: 11/18/20 TASK filter: All Activities Remaining Level of Effort Actual Level of Effort Project Baseline Bar Actual Work Remaining Work Critical Remainin... Page 1 of 11 Date Revision Checked Approved Activity ID Activity Name Original Duration Start Finish BL Project Start BL Project Finish 08S031 Landscape 25 06/28/22 08/02/22 06/28/22 08/02/22 08S031 Sitework Ins pections 7 08/03/22 08/11/22 08/03/22 08/11/22 08S031 Rain Gardern 10 05/16/22 05/27/22 05/16/22 05/27/22 Wet UWet Utilities 93 08/10/21 12/21/21 08/10/21 12/21/21 S02200 Water LInes Phase 1 3 08/10/21 08/12/21 08/10/21 08/12/21 S02210 Sanitar y Phase 1 3 08/13/21 08/17/21 08/13/21 08/17/21 S02220 Storm Mains Phase 1 5 08/18/21 08/24/21 08/18/21 08/24/21 S02230 Storm Branch Phase 1 3 08/25/21 08/27/21 08/25/21 08/27/21 S02280 Water Lines Phase 2 8 09/15/21 09/24/21 09/15/21 09/24/21 S02290 Water Lines Phase 3&4 8 11/02/21 11/11/21 11/02/21 11/11/21 S02300 Sanitar y Phase 2 8 09/27/21 10/06/21 09/27/21 10/06/21 S02310 Sanitar y Phase 3&4 8 11/12/21 11/23/21 11/12/21 11/23/21 S02320 Storm Mains Phase 2 10 10/07/21 10/20/21 10/07/21 10/20/21 S02330 Storm Mains Phase 3&4 10 11/24/21 12/09/21 11/24/21 12/09/21 S02340 Storm Branch Phase 2 8 10/21/21 11/01/21 10/21/21 11/01/21 S02350 Storm Branchs Phase 3&4 8 12/10/21 12/21/21 12/10/21 12/21/21 Dry UDry Utilities 166 10/11/21 06/08/22 10/11/21 06/08/22 S02240 Gas Phase 1 10 10/11/21 10/22/21 10/11/21 10/22/21 S02250 Pirmar y Power Phase 1 10 10/25/21 11/05/21 10/25/21 11/05/21 S02260 Set Transformer Phase 1 2 11/08/21 11/09/21 11/08/21 11/09/21 S02270 Permanent Power Phase 1 10 11/10/21 11/23/21 11/10/21 11/23/21 S02360 Gas Phase 2 15 04/01/22*04/21/22 04/01/22 04/21/22 S02370 Primar y Power Phase 2 15 04/22/22 05/12/22 04/22/22 05/12/22 S02380 Set Transformer Phase 2 3 05/13/22 05/17/22 05/13/22 05/17/22 S02390 Permanent Power Phase 2 15 05/18/22 06/08/22 05/18/22 06/08/22 Curb,Curb, Gutter & Paving - On-Si 55 05/02/22 07/19/22 05/02/22 07/19/22 PR0210 Rough Grade Roads 15 05/02/22*05/20/22 05/02/22 05/20/22 PR0212 Curb, Guttter and Crosspans 20 05/31/22 06/27/22 05/31/22 06/27/22 PR0213 First Lift Asphalt 10 06/28/22 07/12/22 06/28/22 07/12/22 PR0214 Final Lift Asphalt 5 07/13/22 07/19/22 07/13/22 07/19/22 BuildinBuilding 8 281 04/14/21 05/24/22 04/14/21 05/24/22 FoundFoundation 55 04/14/21 06/30/21 04/14/21 06/30/21 0815113 Excavate Foundation 5 04/15/21 04/21/21 04/15/21 04/21/21 0815114 Pin Footings 1 04/22/21 04/22/21 04/22/21 04/22/21 0815115 Form Footings 3 04/23/21 04/27/21 04/23/21 04/27/21 0815116 Install Re-bar for Footings 2 04/28/21 04/29/21 04/28/21 04/29/21 0815117 Inspection Footings 1 04/30/21 04/30/21 04/30/21 04/30/21 0815118 Pour Footings 1 05/03/21 05/03/21 05/03/21 05/03/21 0815119 Strip Footings 1 05/04/21 05/04/21 05/04/21 05/04/21 081512 Pin Walls 1 05/05/21 05/05/21 05/05/21 05/05/21 081512 Form Walls 5 05/06/21 05/12/21 05/06/21 05/12/21 081512 Install Re-bar for Walls 3 05/13/21 05/17/21 05/13/21 05/17/21 081512 Install MEP Sleeves 1 05/18/21 05/18/21 05/18/21 05/18/21 081512 Inspection of Walls 1 05/19/21 05/19/21 05/19/21 05/19/21 081512 Pour Walls 1 05/20/21 05/20/21 05/20/21 05/20/21 081512 Strip Walls 3 05/26/21 05/28/21 05/26/21 05/28/21 081512 Water Proof Foundation 1 06/01/21 06/01/21 06/01/21 06/01/21 081512 Prep grade of S.O.G.1 06/02/21 06/02/21 06/02/21 06/02/21 081512 Install Radon Piping 2 06/03/21 06/04/21 06/03/21 06/04/21 081512 Inspection of Radon 1 06/07/21 06/07/21 06/07/21 06/07/21 081513 Install Vapor barrier 2 06/08/21 06/09/21 06/08/21 06/09/21 081513 Pin Foundation for Excavation 1 04/14/21 04/14/21 04/14/21 04/14/21 081513 Form & Poor S.O.G.1 06/10/21 06/10/21 06/10/21 06/10/21 081513 Back Fill Foundation 3 06/11/21 06/15/21 06/11/21 06/15/21 081513 Install Foundation Drainage Syste 2 06/15/21 06/16/21 06/15/21 06/16/21 081513 Pin Grade Beams 1 06/17/21 06/17/21 06/17/21 06/17/21 081513 Excavate Grade Beams 2 06/18/21 06/21/21 06/18/21 06/21/21 081513 Form Grade Beams 2 06/22/21 06/23/21 06/22/21 06/23/21 081513 Install Re-bar for Grade Beams 1 06/24/21 06/24/21 06/24/21 06/24/21 081513 Inspection of Grade Beams 1 06/25/21 06/25/21 06/25/21 06/25/21 081514 Pour Grade Beams 1 06/28/21 06/28/21 06/28/21 06/28/21 081514 Back Fill Grade Beams 2 06/29/21 06/30/21 06/29/21 06/30/21 0816110 Ufer Install / Ins pection 1 05/18/21 05/18/21 05/18/21 05/18/21 Set / SSet / Stitch Units 40 07/02/21 08/27/21 07/02/21 08/27/21 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 February March April May June July August S October November December January February March April May June July August S October ber 2021 2022 Landscape Sitework Ins pections Rain Gardern Water LInes Phase 1 Sanitar y Phase 1 Storm Mains Phase 1 Storm Branch Phase 1 Water Lines Phase 2 Water Lines Phase 3&4 Sanitar y Phase 2 Sanitar y Phase 3&4 Storm Mains Phase 2 Storm Mains Phase 3&4 Storm Branch Phase 2 Storm Branchs Phase 3&4 Gas Phase 1 Pirmar y Power Phase 1 Set Transformer Phase 1 Permanent Power Phase 1 Gas Phase 2 Primar y Power Phase 2 Set Transformer Phase 2 Permanent Power Phase 2 Rough Grade Roads Curb, Guttter and Cross pans First Lift Asphalt Final Lift Asphalt Excavate Foundation Pin Footings Form Footings Install Re-bar for Footings Inspection Footings Pour Footings Strip Footings Pin Walls Form Walls Install Re-bar for Walls Install MEP Sleeves Ins pection of Walls Pour Walls Strip Walls Water Proof Foundation Prep grade of S.O.G. Install Radon Piping Ins pection of Radon Install Vapor barrier Pin Foundation for Excavation Form & Poor S.O.G. Back Fill Foundation Install Foundation Drainage System Pin Grade Beams Excavate Grade Beams Form Grade Beams Install Re-bar for Grade Beams Inspection of Grade Beams Pour Grade Beams Back Fill Grade Beams Ufer Install / Ins pection SHAW CONSTRUCTION 11.18.2020 - Burlingame Phase III - Guerden Schedule Burlingame Ranch Phase 3 Print Date: 11/18/20 Data Date: 11/18/20 TASK filter: All Activities Remaining Level of Effort Actual Level of Effort Project Baseline Bar Actual Work Remaining Work Critical Remainin... Page 2 of 11 Date Revision Checked Approved Activity ID Activity Name Original Duration Start Finish BL Project Start BL Project Finish 0806110 Set and Stitch Units 10 07/02/21 07/19/21 07/02/21 07/19/21 0806111 Complete Interior Rough-In Conn 20 07/02/21 07/30/21 07/02/21 07/30/21 0806112 Complete Interior Finishes 20 08/02/21 08/27/21 08/02/21 08/27/21 ExterExteriors 76 07/19/21 11/02/21 07/19/21 11/02/21 0806E1 Complete Exterior Stitching 3 07/19/21 07/21/21 07/19/21 07/21/21 0806E1 Complete Exteriors (Overframing 15 08/05/21 08/25/21 08/05/21 08/25/21 0806E1 Set Truess/Sheet roof and Install 10 07/22/21 08/04/21 07/22/21 08/04/21 0806E1 Dry-In Roof 3 08/26/21 08/30/21 08/26/21 08/30/21 0806E1 Roofing 10 09/15/21 09/28/21 09/15/21 09/28/21 0806E1 Siding 45 08/31/21 11/02/21 08/31/21 11/02/21 GaragGarage / Parking Area Phase 1 82 08/06/21 12/02/21 08/06/21 12/02/21 A1000 Pin Structure 1 08/06/21 08/06/21 08/06/21 08/06/21 A1010 Excavate Foundation 5 08/09/21 08/13/21 08/09/21 08/13/21 A1020 Pin Footings 1 08/16/21 08/16/21 08/16/21 08/16/21 A1030 Form Footings 3 08/17/21 08/19/21 08/17/21 08/19/21 A1040 Install Re-bar Footings 2 08/20/21 08/23/21 08/20/21 08/23/21 A1045 Inspection 1 08/24/21 08/24/21 08/24/21 08/24/21 A1050 Pour Footings 1 08/25/21 08/25/21 08/25/21 08/25/21 A1060 Pin Walls/Pilers 1 08/26/21 08/26/21 08/26/21 08/26/21 A1070 Form Walls/Pilers 5 08/27/21 09/02/21 08/27/21 09/02/21 A1080 Install Re-bar for Walls / Pilers 3 09/03/21 09/08/21 09/03/21 09/08/21 A1090 Inspection 1 09/09/21 09/09/21 09/09/21 09/09/21 A1100 Pour Walls & Pilers 1 09/10/21 09/10/21 09/10/21 09/10/21 A1110 Strip Forms 1 09/13/21 09/13/21 09/13/21 09/13/21 A1120 Water Proof Foundation 1 09/14/21 09/14/21 09/14/21 09/14/21 A1130 Back Fill Deep Foundation 2 09/15/21 09/16/21 09/15/21 09/16/21 A1140 Pin Shallow Footings 1 09/17/21 09/17/21 09/17/21 09/17/21 A1150 Form Shallow Footings 3 09/20/21 09/22/21 09/20/21 09/22/21 A1160 Re-bar for Shallow Footings 2 09/23/21 09/24/21 09/23/21 09/24/21 A1165 Inspection 1 09/27/21 09/27/21 09/27/21 09/27/21 A1170 Pour Shallow Footings 1 09/28/21 09/28/21 09/28/21 09/28/21 A1180 Strip Shallow Footings 1 09/29/21 09/29/21 09/29/21 09/29/21 A1190 Pin Stemwalls 1 09/30/21 09/30/21 09/30/21 09/30/21 A1200 Form Stemwall 1 10/01/21 10/01/21 10/01/21 10/01/21 A1210 Install Re-bar for Stemwalls 1 10/04/21 10/04/21 10/04/21 10/04/21 A1220 Inspection 1 10/05/21 10/05/21 10/05/21 10/05/21 A1230 Pour Stemwalls 1 10/06/21 10/06/21 10/06/21 10/06/21 A1240 Back Fill & Grade for S.O.G.2 10/07/21 10/08/21 10/07/21 10/08/21 A1250 Form & Pour Interior 1 10/11/21 10/11/21 10/11/21 10/11/21 A1260 Stick Frame Garages 15 10/12/21 11/01/21 10/12/21 11/01/21 A1270 Side Garages 20 11/03/21 12/02/21 11/03/21 12/02/21 A1280 Roof Garages 5 11/24/21 12/02/21 11/24/21 12/02/21 HardsHardscape / Landscape 52 03/14/22 05/24/22 03/14/22 05/24/22 08S021 Subgrade / Grade Sidewalks 5 03/14/22*03/18/22 03/14/22 03/18/22 08S021 To psoil Res pread 5 04/04/22 04/08/22 04/04/22 04/08/22 08S021 Landscape 25 04/11/22 05/13/22 04/11/22 05/13/22 08S021 Sitework Ins pections 7 05/16/22 05/24/22 05/16/22 05/24/22 08S031 Flatwork / FRP Sidewalks 10 03/21/22 04/01/22 03/21/22 04/01/22 CloseCloseout 44 11/03/21 01/11/22 11/03/21 01/11/22 08H011 Shaw Pre-Punch 4 11/03/21 11/08/21 11/03/21 11/08/21 08H011 Final Inspections 10 11/09/21 11/22/21 11/09/21 11/22/21 08H011 Contractor Pre-Punch Corrections 5 11/23/21 12/01/21 11/23/21 12/01/21 08H011 Owner Walk 1 12/02/21 12/02/21 12/02/21 12/02/21 08H011 Owner Corrections 5 12/03/21 12/09/21 12/03/21 12/09/21 08H011 Final Clean 4 12/10/21 12/15/21 12/10/21 12/15/21 08H011 Building Completion 0 01/11/22 01/11/22 08H011 Non-Productive Weather Days (1 15 12/16/21 01/11/22 12/16/21 01/11/22 BuildinBuilding 9 281 04/28/21 06/08/22 04/28/21 06/08/22 FoundFoundation 55 04/28/21 07/15/21 04/28/21 07/15/21 0907111 Pin Foundation for Excavation 1 04/28/21 04/28/21 04/28/21 04/28/21 0907112 Excavate Foundation 5 04/29/21 05/05/21 04/29/21 05/05/21 0907113 Pin Footings 1 05/06/21 05/06/21 05/06/21 05/06/21 0907114 Form Footings 3 05/07/21 05/11/21 05/07/21 05/11/21 0907115 Install Re-bar for Footings 2 05/12/21 05/13/21 05/12/21 05/13/21 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 February March April May June July August S October November December January February March April May June July August S October ber 2021 2022 Set and Stitch Units Complete Interior Rough-In Connections Complete Interior Finishes Complete Exterior Stitching Complete Exteriors (Overframing, Balconies, Stairs, etc) Set Truess/Sheet roof and Install Fasica Dry-In Roof Roofing Siding Pin Structure Excavate Foundation Pin Footings Form Footings Install Re-bar Footings Inspection Pour Footings Pin Walls/Pilers Form Walls/Pilers Install Re-bar for Walls / Pilers Inspection Pour Walls & Pilers Strip Forms Water Proof Foundation Back Fill Deep Foundation Pin Shallow Footings Form Shallow Footings Re-bar for Shallow Footings Inspection Pour Shallow Footings Strip Shallow Footings Pin Stemwalls Form Stemwall Install Re-bar for Stemwalls Inspection Pour Stemwalls Back Fill & Grade for S.O.G. Form & Pour Interior Stick Frame Garages Side Garages Roof Garages Subgrade / Grade Sidewalks To psoil Res pread Landscape Sitework Ins pections Flatwork / FRP Sidewalks Shaw Pre-Punch Final Ins pections Contractor Pre-Punch Corrections Owner Walk Owner Corrections Final Clean Building Completion Non-Productive Weather Days (15) Pin Foundation for Excavation Excavate Foundation Pin Footings Form Footings Install Re-bar for Footings SHAW CONSTRUCTION 11.18.2020 - Burlingame Phase III - Guerden Schedule Burlingame Ranch Phase 3 Print Date: 11/18/20 Data Date: 11/18/20 TASK filter: All Activities Remaining Level of Effort Actual Level of Effort Project Baseline Bar Actual Work Remaining Work Critical Remainin... Page 3 of 11 Date Revision Checked Approved Activity ID Activity Name Original Duration Start Finish BL Project Start BL Project Finish 0907116 Inspection Footings 1 05/14/21 05/14/21 05/14/21 05/14/21 0907117 Pour Footings 1 05/17/21 05/17/21 05/17/21 05/17/21 0907118 Strip Footings 1 05/18/21 05/18/21 05/18/21 05/18/21 0907119 Pin Walls 1 05/19/21 05/19/21 05/19/21 05/19/21 090712 Form Walls 5 05/20/21 05/26/21 05/20/21 05/26/21 090712 Install Re-bar for Walls 3 05/27/21 06/01/21 05/27/21 06/01/21 090712 Ufer Install / Ins pection 1 06/02/21 06/02/21 06/02/21 06/02/21 090712 Install MEP Sleeves 1 06/02/21 06/02/21 06/02/21 06/02/21 090712 Inspection of Walls 1 06/03/21 06/03/21 06/03/21 06/03/21 090712 Pour Walls 1 06/04/21 06/04/21 06/04/21 06/04/21 090712 Strip Walls 3 06/10/21 06/14/21 06/10/21 06/14/21 090712 Water Proof Foundation 1 06/15/21 06/15/21 06/15/21 06/15/21 090712 Prep grade of S.O.G.1 06/16/21 06/16/21 06/16/21 06/16/21 090712 Install Radon Piping 2 06/17/21 06/18/21 06/17/21 06/18/21 090713 Inspection of Radon 1 06/21/21 06/21/21 06/21/21 06/21/21 090713 Install Vapor barrier 2 06/22/21 06/23/21 06/22/21 06/23/21 090713 Form & Poor S.O.G.1 06/24/21 06/24/21 06/24/21 06/24/21 090713 Back Fill Foundation 3 06/25/21 06/29/21 06/25/21 06/29/21 090713 Install Foundation Drainage Syste 2 06/29/21 06/30/21 06/29/21 06/30/21 090713 Pin Grade Beams 1 07/01/21 07/01/21 07/01/21 07/01/21 090713 Excavate Grade Beams 2 07/02/21 07/06/21 07/02/21 07/06/21 090713 Form Grade Beams 2 07/07/21 07/08/21 07/07/21 07/08/21 090713 Install Re-bar for Grade Beams 1 07/09/21 07/09/21 07/09/21 07/09/21 090713 Inspection of Grade Beams 1 07/12/21 07/12/21 07/12/21 07/12/21 090714 Pour Grade Beams 1 07/13/21 07/13/21 07/13/21 07/13/21 090714 Back Fill Grade Beams 2 07/14/21 07/15/21 07/14/21 07/15/21 Set / SSet / Stitch Units 50 07/23/21 10/01/21 07/23/21 10/01/21 0906110 Set and Stitch Units 10 07/23/21 08/05/21 07/23/21 08/05/21 0906111 Complete Interior Rough-In Conn 20 08/06/21 09/02/21 08/06/21 09/02/21 0906112 Complete Interior Finishes 20 09/03/21 10/01/21 09/03/21 10/01/21 ExterExteriors 76 08/06/21 11/22/21 08/06/21 11/22/21 0806E1 Complete Exterior Stitching 3 08/06/21 08/10/21 08/06/21 08/10/21 0806E1 Set Truess/Sheet roof and Install 10 08/11/21 08/24/21 08/11/21 08/24/21 0806E1 Complete Exteriors (Overframing 15 08/25/21 09/15/21 08/25/21 09/15/21 0806E1 Dry-In Roof 3 09/16/21 09/20/21 09/16/21 09/20/21 0806E2 Siding 45 09/21/21 11/22/21 09/21/21 11/22/21 0806E2 Roofing 10 10/05/21 10/18/21 10/05/21 10/18/21 HardsHardscape / Landscape 57 03/21/22 06/08/22 03/21/22 06/08/22 09S021 Subgrade / Grade Sidewalks 5 03/21/22 03/25/22 03/21/22 03/25/22 09S021 To psoil Res pread 5 04/11/22 04/15/22 04/11/22 04/15/22 09S021 Landscape 25 04/25/22 05/27/22 04/25/22 05/27/22 09S021 Sitework Inspections 7 05/31/22 06/08/22 05/31/22 06/08/22 09S031 Flatwork / FRP Sidewalks 10 03/28/22 04/08/22 03/28/22 04/08/22 CloseCloseout 44 11/23/21 01/31/22 11/23/21 01/31/22 09H011 Shaw Pre-Punch 4 11/23/21 11/30/21 11/23/21 11/30/21 09H011 Final Inspections 10 12/01/21 12/14/21 12/01/21 12/14/21 09H011 Contractor Pre-Punch Corrections 5 12/15/21 12/21/21 12/15/21 12/21/21 09H011 Owner Walk 1 12/22/21 12/22/21 12/22/21 12/22/21 09H011 Owner Corrections 5 12/23/21 01/04/22 12/23/21 01/04/22 09H011 Final Clean 4 01/05/22 01/10/22 01/05/22 01/10/22 09H011 Building Completion 0 01/31/22 01/31/22 09H011 Non-Productive Weather Days (1 15 01/11/22 01/31/22 01/11/22 01/31/22 BuildinBuilding 10 281 05/12/21 06/22/22 05/12/21 06/22/22 FoundFoundation 55 05/12/21 07/29/21 05/12/21 07/29/21 090714 Pin Foundation for Excavation 1 05/12/21 05/12/21 05/12/21 05/12/21 090714 Excavate Foundation 5 05/13/21 05/19/21 05/13/21 05/19/21 090714 Pin Footings 1 05/20/21 05/20/21 05/20/21 05/20/21 090714 Form Footings 3 05/21/21 05/25/21 05/21/21 05/25/21 090714 Install Re-bar for Footings 2 05/26/21 05/27/21 05/26/21 05/27/21 090714 Inspection Footings 1 05/28/21 05/28/21 05/28/21 05/28/21 090714 Pour Footings 1 06/01/21 06/01/21 06/01/21 06/01/21 090714 Strip Footings 1 06/02/21 06/02/21 06/02/21 06/02/21 090715 Pin Walls 1 06/03/21 06/03/21 06/03/21 06/03/21 090715 Form Walls 5 06/04/21 06/10/21 06/04/21 06/10/21 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 February March April May June July August S October November December January February March April May June July August S October ber 2021 2022 Ins pection Footings Pour Footings Strip Footings Pin Walls Form Walls Install Re-bar for Walls Ufer Install / Ins pection Install MEP Sleeves Ins pection of Walls Pour Walls Strip Walls Water Proof Foundation Prep grade of S.O.G. Install Radon Piping Inspection of Radon Install Vapor barrier Form & Poor S.O.G. Back Fill Foundation Install Foundation Drainage System Pin Grade Beams Excavate Grade Beams Form Grade Beams Install Re-bar for Grade Beams Inspection of Grade Beams Pour Grade Beams Back Fill Grade Beams Set and Stitch Units Complete Interior Rough-In Connections Complete Interior Finishes Complete Exterior Stitching Set Truess/Sheet roof and Install Fasica Complete Exteriors (Overframing, Balconies, Stairs , etc) Dry-In Roof Siding Roofing Subgrade / Grade Sidewalks To psoil Res pread Landscape Sitework Ins pections Flatwork / FRP Sidewalks Shaw Pre-Punch Final Inspections Contractor Pre-Punch Corrections Owner Walk Owner Corrections Final Clean Building Completion Non-Productive Weather Days (15) Pin Foundation for Excavation Excavate Foundation Pin Footings Form Footings Install Re-bar for Footings Inspection Footings Pour Footings Strip Footings Pin Walls Form Walls SHAW CONSTRUCTION 11.18.2020 - Burlingame Phase III - Guerden Schedule Burlingame Ranch Phase 3 Print Date: 11/18/20 Data Date: 11/18/20 TASK filter: All Activities Remaining Level of Effort Actual Level of Effort Project Baseline Bar Actual Work Remaining Work Critical Remainin... Page 4 of 11 Date Revision Checked Approved Activity ID Activity Name Original Duration Start Finish BL Project Start BL Project Finish 090715 Install Re-bar for Walls 3 06/11/21 06/15/21 06/11/21 06/15/21 090715 Ufer Install / Ins pection 1 06/16/21 06/16/21 06/16/21 06/16/21 090715 Install MEP Sleeves 1 06/16/21 06/16/21 06/16/21 06/16/21 090715 Inspection of Walls 1 06/17/21 06/17/21 06/17/21 06/17/21 090715 Pour Walls 1 06/18/21 06/18/21 06/18/21 06/18/21 090715 Strip Walls 3 06/24/21 06/28/21 06/24/21 06/28/21 090715 Water Proof Foundation 1 06/29/21 06/29/21 06/29/21 06/29/21 090715 Prep grade of S.O.G.1 06/30/21 06/30/21 06/30/21 06/30/21 090716 Install Radon Piping 2 07/01/21 07/02/21 07/01/21 07/02/21 090716 Inspection of Radon 1 07/06/21 07/06/21 07/06/21 07/06/21 090716 Install Vapor barrier 2 07/07/21 07/08/21 07/07/21 07/08/21 090716 Form & Poor S.O.G.1 07/09/21 07/09/21 07/09/21 07/09/21 090716 Back Fill Foundation 3 07/12/21 07/14/21 07/12/21 07/14/21 090716 Install Foundation Drainage Syste 2 07/14/21 07/15/21 07/14/21 07/15/21 090716 Pin Grade Beams 1 07/16/21 07/16/21 07/16/21 07/16/21 090716 Excavate Grade Beams 2 07/19/21 07/20/21 07/19/21 07/20/21 090716 Form Grade Beams 2 07/21/21 07/22/21 07/21/21 07/22/21 090716 Install Re-bar for Grade Beams 1 07/23/21 07/23/21 07/23/21 07/23/21 090717 Inspection of Grade Beams 1 07/26/21 07/26/21 07/26/21 07/26/21 090717 Pour Grade Beams 1 07/27/21 07/27/21 07/27/21 07/27/21 090717 Back Fill Grade Beams 2 07/28/21 07/29/21 07/28/21 07/29/21 Set / SSet / Stitch Units 50 07/30/21 10/08/21 07/30/21 10/08/21 1006110 Set and Stitch Units 10 07/30/21 08/12/21 07/30/21 08/12/21 1006111 Complete Interior Rough-In Conn 20 08/13/21 09/10/21 08/13/21 09/10/21 1006112 Complete Interior Finishes 20 09/13/21 10/08/21 09/13/21 10/08/21 ExterExteriors 76 08/13/21 12/01/21 08/13/21 12/01/21 0806E2 Complete Exterior Stitching 3 08/13/21 08/17/21 08/13/21 08/17/21 0806E2 Set Truess/Sheet roof and Install 10 08/18/21 08/31/21 08/18/21 08/31/21 0806E2 Complete Exteriors (Overframing 15 09/01/21 09/22/21 09/01/21 09/22/21 0806E2 Dry-In Roof 3 09/23/21 09/27/21 09/23/21 09/27/21 0806E2 Siding 45 09/28/21 12/01/21 09/28/21 12/01/21 0806E2 Roofing 10 10/12/21 10/25/21 10/12/21 10/25/21 HardsHardscape / Landscape 62 03/28/22 06/22/22 03/28/22 06/22/22 10S021 Subgrade / Grade Sidewalks 5 03/28/22 04/01/22 03/28/22 04/01/22 10S021 To psoil Res pread 5 04/18/22 04/22/22 04/18/22 04/22/22 10S021 Landscape 25 05/09/22 06/13/22 05/09/22 06/13/22 10S021 Sitework Ins pections 7 06/14/22 06/22/22 06/14/22 06/22/22 10S031 Flatwork / FRP Sidewalks 10 04/04/22 04/15/22 04/04/22 04/15/22 GaragGarages / Parking Area Phase 81 09/15/21 01/13/22 09/15/21 01/13/22 A1290 Pin Structure 1 09/15/21 09/15/21 09/15/21 09/15/21 A1300 Excavate Foundation 5 09/16/21 09/22/21 09/16/21 09/22/21 A1310 Pin Footings 1 09/23/21 09/23/21 09/23/21 09/23/21 A1320 Form Footings 3 09/24/21 09/28/21 09/24/21 09/28/21 A1330 Install Re-bar Footings 2 09/29/21 09/30/21 09/29/21 09/30/21 A1340 Inspection 1 10/01/21 10/01/21 10/01/21 10/01/21 A1350 Pour Footings 1 10/04/21 10/04/21 10/04/21 10/04/21 A1360 Pin Walls/Pilers 1 10/05/21 10/05/21 10/05/21 10/05/21 A1370 Form Walls/Pilers 5 10/06/21 10/12/21 10/06/21 10/12/21 A1380 Install Re-bar for Walls / Pilers 3 10/13/21 10/15/21 10/13/21 10/15/21 A1390 Inspection 1 10/18/21 10/18/21 10/18/21 10/18/21 A1400 Pour Walls & Pilers 1 10/19/21 10/19/21 10/19/21 10/19/21 A1410 Strip Forms 1 10/20/21 10/20/21 10/20/21 10/20/21 A1420 Water Proof Foundation 1 10/21/21 10/21/21 10/21/21 10/21/21 A1430 Back Fill Deep Foundation 2 10/22/21 10/25/21 10/22/21 10/25/21 A1440 Pin Shallow Footings 1 10/26/21 10/26/21 10/26/21 10/26/21 A1450 Form Shallow Footings 3 10/27/21 10/29/21 10/27/21 10/29/21 A1460 Re-bar for Shallow Footings 2 11/01/21 11/02/21 11/01/21 11/02/21 A1470 Inspection 1 11/03/21 11/03/21 11/03/21 11/03/21 A1480 Pour Shallow Footings 1 11/04/21 11/04/21 11/04/21 11/04/21 A1490 Strip Shallow Footings 1 11/05/21 11/05/21 11/05/21 11/05/21 A1500 Pin Stemwalls 1 11/08/21 11/08/21 11/08/21 11/08/21 A1510 Form Stemwall 1 11/09/21 11/09/21 11/09/21 11/09/21 A1520 Install Re-bar for Stemwalls 1 11/10/21 11/10/21 11/10/21 11/10/21 A1530 Inspection 1 11/11/21 11/11/21 11/11/21 11/11/21 A1540 Pour Stemwalls 1 11/12/21 11/12/21 11/12/21 11/12/21 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 February March April May June July August S October November December January February March April May June July August S October ber 2021 2022 Install Re-bar for Walls Ufer Install / Inspection Install MEP Sleeves Inspection of Walls Pour Walls Strip Walls Water Proof Foundation Prep grade of S.O.G. Install Radon Piping Ins pection of Radon Install Vapor barrier Form & Poor S.O.G. Back Fill Foundation Install Foundation Drainage System Pin Grade Beams Excavate Grade Beams Form Grade Beams Install Re-bar for Grade Beams Ins pection of Grade Beams Pour Grade Beams Back Fill Grade Beams Set and Stitch Units Complete Interior Rough-In Connections Complete Interior Finishes Complete Exterior Stitching Set Truess/Sheet roof and Install Fasica Complete Exteriors (Overframing, Balconies , Stairs , etc) Dry-In Roof Siding Roofing Subgrade / Grade Sidewalks To psoil Respread Landscape Sitework Ins pections Flatwork / FRP Sidewalks Pin Structure Excavate Foundation Pin Footings Form Footings Install Re-bar Footings Inspection Pour Footings Pin Walls/Pilers Form Walls/Pilers Install Re-bar for Walls / Pilers Ins pection Pour Walls & Pilers Strip Forms Water Proof Foundation Back Fill Deep Foundation Pin Shallow Footings Form Shallow Footings Re-bar for Shallow Footings Ins pection Pour Shallow Footings Strip Shallow Footings Pin Stemwalls Form Stemwall Install Re-bar for Stemwalls Ins pection Pour Stemwalls SHAW CONSTRUCTION 11.18.2020 - Burlingame Phase III - Guerden Schedule Burlingame Ranch Phase 3 Print Date: 11/18/20 Data Date: 11/18/20 TASK filter: All Activities Remaining Level of Effort Actual Level of Effort Project Baseline Bar Actual Work Remaining Work Critical Remainin... Page 5 of 11 Date Revision Checked Approved Activity ID Activity Name Original Duration Start Finish BL Project Start BL Project Finish A1550 Back Fill & Grade for S.O.G.2 11/15/21 11/16/21 11/15/21 11/16/21 A1560 Form & Pour Interior 1 11/17/21 11/17/21 11/17/21 11/17/21 A1570 Stick Frame Garages 15 11/18/21 12/10/21 11/18/21 12/10/21 A1580 Side Garages 20 12/13/21 01/13/22 12/13/21 01/13/22 A1590 Roof Garages 5 01/07/22 01/13/22 01/07/22 01/13/22 CloseCloseout 44 12/02/21 02/07/22 12/02/21 02/07/22 10H011 Shaw Pre-Punch 4 12/02/21 12/07/21 12/02/21 12/07/21 10H011 Final Inspections 10 12/08/21 12/21/21 12/08/21 12/21/21 10H011 Contractor Pre-Punch Corrections 5 12/22/21 12/30/21 12/22/21 12/30/21 10H011 Owner Walk 1 01/04/22 01/04/22 01/04/22 01/04/22 10H011 Owner Corrections 5 01/05/22 01/11/22 01/05/22 01/11/22 10H011 Final Clean 4 01/12/22 01/17/22 01/12/22 01/17/22 10H011 Building Completion 0 02/07/22 02/07/22 10H011 Non-Productive Weather Days (1 15 01/18/22 02/07/22 01/18/22 02/07/22 BuildinBuilding 11 281 05/26/21 07/07/22 05/26/21 07/07/22 FoundFoundation 55 05/26/21 08/12/21 05/26/21 08/12/21 090717 Pin Foundation for Excavation 1 05/26/21 05/26/21 05/26/21 05/26/21 090717 Excavate Foundation 5 05/27/21 06/03/21 05/27/21 06/03/21 090717 Pin Footings 1 06/04/21 06/04/21 06/04/21 06/04/21 090717 Form Footings 3 06/07/21 06/09/21 06/07/21 06/09/21 090717 Install Re-bar for Footings 2 06/10/21 06/11/21 06/10/21 06/11/21 090717 Inspection Footings 1 06/14/21 06/14/21 06/14/21 06/14/21 090717 Pour Footings 1 06/15/21 06/15/21 06/15/21 06/15/21 090718 Strip Footings 1 06/16/21 06/16/21 06/16/21 06/16/21 090718 Pin Walls 1 06/17/21 06/17/21 06/17/21 06/17/21 090718 Form Walls 5 06/18/21 06/24/21 06/18/21 06/24/21 090718 Install Re-bar for Walls 3 06/25/21 06/29/21 06/25/21 06/29/21 090718 Ufer Install / Ins pection 1 06/30/21 06/30/21 06/30/21 06/30/21 090718 Install MEP Sleeves 1 06/30/21 06/30/21 06/30/21 06/30/21 090718 Inspection of Walls 1 07/01/21 07/01/21 07/01/21 07/01/21 090718 Pour Walls 1 07/02/21 07/02/21 07/02/21 07/02/21 090718 Strip Walls 3 07/09/21 07/13/21 07/09/21 07/13/21 090718 Water Proof Foundation 1 07/14/21 07/14/21 07/14/21 07/14/21 090719 Prep grade of S.O.G.1 07/15/21 07/15/21 07/15/21 07/15/21 090719 Install Radon Piping 2 07/16/21 07/19/21 07/16/21 07/19/21 090719 Inspection of Radon 1 07/20/21 07/20/21 07/20/21 07/20/21 090719 Install Vapor barrier 2 07/21/21 07/22/21 07/21/21 07/22/21 090719 Form & Poor S.O.G.1 07/23/21 07/23/21 07/23/21 07/23/21 090719 Back Fill Foundation 3 07/26/21 07/28/21 07/26/21 07/28/21 090719 Install Foundation Drainage Syste 2 07/28/21 07/29/21 07/28/21 07/29/21 090719 Pin Grade Beams 1 07/30/21 07/30/21 07/30/21 07/30/21 090719 Excavate Grade Beams 2 08/02/21 08/03/21 08/02/21 08/03/21 090719 Form Grade Beams 2 08/04/21 08/05/21 08/04/21 08/05/21 090720 Install Re-bar for Grade Beams 1 08/06/21 08/06/21 08/06/21 08/06/21 090720 Inspection of Grade Beams 1 08/09/21 08/09/21 08/09/21 08/09/21 090720 Pour Grade Beams 1 08/10/21 08/10/21 08/10/21 08/10/21 090720 Back Fill Grade Beams 2 08/11/21 08/12/21 08/11/21 08/12/21 Set / SSet / Stitch Units 50 08/13/21 10/22/21 08/13/21 10/22/21 110611 0 Set and Stitch Units 10 08/13/21 08/26/21 08/13/21 08/26/21 1106111 Complete Interior Rough-In Conn 20 08/27/21 09/24/21 08/27/21 09/24/21 110611 2 Complete Interior Finishes 20 09/27/21 10/22/21 09/27/21 10/22/21 ExterExteriors 74 08/27/21 12/13/21 08/27/21 12/13/21 0806E2 Complete Exterior Stitching 3 08/27/21 08/31/21 08/27/21 08/31/21 0806E2 Set Truess/Sheet roof and Install 10 09/01/21 09/15/21 09/01/21 09/15/21 0806E3 Complete Exteriors (Overframing 15 09/16/21 10/06/21 09/16/21 10/06/21 0806E3 Dry-In Roof 1 10/07/21 10/07/21 10/07/21 10/07/21 0806E3 Siding 45 10/08/21 12/13/21 10/08/21 12/13/21 0806E3 Roofing 10 10/29/21 11/11/21 10/29/21 11/11/21 HardsHardscape / Landscape 67 04/04/22 07/07/22 04/04/22 07/07/22 11S021 Subgrade / Grade Sidewalks 5 04/04/22 04/08/22 04/04/22 04/08/22 11S021 Topsoil Respread 5 04/25/22*04/29/22 04/25/22 04/29/22 11S021 Landscape 25 05/23/22 06/27/22 05/23/22 06/27/22 11S021 Sitework Ins pections 7 06/28/22 07/07/22 06/28/22 07/07/22 11S031 Flatwork / FRP Sidewalks 10 04/11/22 04/22/22 04/11/22 04/22/22 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 February March April May June July August S October November December January February March April May June July August S October ber 2021 2022 Back Fill & Grade for S.O.G. Form & Pour Interior Stick Frame Garages Side Garages Roof Garages Shaw Pre-Punch Final Inspections Contractor Pre-Punch Corrections Owner Walk Owner Corrections Final Clean Building Completion Non-Productive Weather Days (15) Pin Foundation for Excavation Excavate Foundation Pin Footings Form Footings Install Re-bar for Footings Ins pection Footings Pour Footings Strip Footings Pin Walls Form Walls Install Re-bar for Walls Ufer Install / Inspection Install MEP Sleeves Inspection of Walls Pour Walls Strip Walls Water Proof Foundation Prep grade of S.O.G. Install Radon Piping Inspection of Radon Install Vapor barrier Form & Poor S.O.G. Back Fill Foundation Install Foundation Drainage System Pin Grade Beams Excavate Grade Beams Form Grade Beams Install Re-bar for Grade Beams Inspection of Grade Beams Pour Grade Beams Back Fill Grade Beams Set and Stitch Units Complete Interior Rough-In Connections Complete Interior Finishes Complete Exterior Stitching Set Truess/Sheet roof and Install Fasica Complete Exteriors (Overframing, Balconies, Stairs, etc ) Dry-In Roof Siding Roofing Subgrade / Grade Sidewalks Topsoil Res pread Landscape Sitework Ins pections Flatwork / FRP Sidewalks SHAW CONSTRUCTION 11.18.2020 - Burlingame Phase III - Guerden Schedule Burlingame Ranch Phase 3 Print Date: 11/18/20 Data Date: 11/18/20 TASK filter: All Activities Remaining Level of Effort Actual Level of Effort Project Baseline Bar Actual Work Remaining Work Critical Remainin... Page 6 of 11 Date Revision Checked Approved Activity ID Activity Name Original Duration Start Finish BL Project Start BL Project Finish CloseCloseout 44 12/14/21 02/17/22 12/14/21 02/17/22 11H011 Shaw Pre-Punch 4 12/14/21 12/17/21 12/14/21 12/17/21 11H011 Final Inspections 10 12/20/21 01/06/22 12/20/21 01/06/22 11H011 Contractor Pre-Punch Corrections 5 01/07/22 01/13/22 01/07/22 01/13/22 11H011 Owner Walk 1 01/14/22 01/14/22 01/14/22 01/14/22 11H011 Owner Corrections 5 01/17/22 01/21/22 01/17/22 01/21/22 11H011 Final Clean 4 01/24/22 01/27/22 01/24/22 01/27/22 11H011 Building Completion 0 02/17/22 02/17/22 11H011 Non-Productive Weather Days (1 15 01/28/22 02/17/22 01/28/22 02/17/22 BuildinBuilding 12 276 06/17/21 07/21/22 06/17/21 07/21/22 FoundFoundation 56 06/17/21 09/03/21 06/17/21 09/03/21 090720 Pin Foundation for Excavation 1 06/17/21 06/17/21 06/17/21 06/17/21 090720 Excavate Foundation 5 06/21/21 06/25/21 06/21/21 06/25/21 090720 Pin Footings 1 06/28/21 06/28/21 06/28/21 06/28/21 090720 Form Footings 3 06/29/21 07/01/21 06/29/21 07/01/21 090720 Install Re-bar for Footings 2 07/02/21 07/06/21 07/02/21 07/06/21 090720 Inspection Footings 1 07/07/21 07/07/21 07/07/21 07/07/21 090721 Pour Footings 1 07/08/21 07/08/21 07/08/21 07/08/21 090721 Strip Footings 1 07/09/21 07/09/21 07/09/21 07/09/21 090721 Pin Walls 1 07/12/21 07/12/21 07/12/21 07/12/21 090721 Form Walls 5 07/13/21 07/19/21 07/13/21 07/19/21 090721 Install Re-bar for Walls 3 07/20/21 07/22/21 07/20/21 07/22/21 090721 Ufer Install / Ins pection 1 07/23/21 07/23/21 07/23/21 07/23/21 090721 Install MEP Sleeves 1 07/23/21 07/23/21 07/23/21 07/23/21 090721 Inspection of Walls 1 07/26/21 07/26/21 07/26/21 07/26/21 090721 Pour Walls 1 07/27/21 07/27/21 07/27/21 07/27/21 090721 Strip Walls 3 08/02/21 08/04/21 08/02/21 08/04/21 090722 Water Proof Foundation 1 08/05/21 08/05/21 08/05/21 08/05/21 090722 Prep grade of S.O.G.1 08/06/21 08/06/21 08/06/21 08/06/21 090722 Install Radon Piping 2 08/09/21 08/10/21 08/09/21 08/10/21 090722 Inspection of Radon 1 08/11/21 08/11/21 08/11/21 08/11/21 090722 Install Vapor barrier 2 08/12/21 08/13/21 08/12/21 08/13/21 090722 Form & Poor S.O.G.1 08/16/21 08/16/21 08/16/21 08/16/21 090722 Back Fill Foundation 3 08/17/21 08/19/21 08/17/21 08/19/21 090722 Install Foundation Drainage Syste 2 08/19/21 08/20/21 08/19/21 08/20/21 090722 Pin Grade Beams 1 08/23/21 08/23/21 08/23/21 08/23/21 090722 Excavate Grade Beams 2 08/24/21 08/25/21 08/24/21 08/25/21 090723 Form Grade Beams 2 08/26/21 08/27/21 08/26/21 08/27/21 090723 Install Re-bar for Grade Beams 1 08/30/21 08/30/21 08/30/21 08/30/21 090723 Inspection of Grade Beams 1 08/31/21 08/31/21 08/31/21 08/31/21 090723 Pour Grade Beams 1 09/01/21 09/01/21 09/01/21 09/01/21 090723 Back Fill Grade Beams 2 09/02/21 09/03/21 09/02/21 09/03/21 Set / SSet / Stitch Units 50 08/31/21 11/09/21 08/31/21 11/09/21 1206110 Set and Stitch Units 10 08/31/21 09/14/21 08/31/21 09/14/21 1206111 Complete Interior Rough-In Conn 20 09/15/21 10/12/21 09/15/21 10/12/21 1206112 Complete Interior Finishes 20 10/13/21 11/09/21 10/13/21 11/09/21 ExterExteriors 75 09/15/21 01/05/22 09/15/21 01/05/22 0806E3 Complete Exterior Stitching 3 09/15/21 09/17/21 09/15/21 09/17/21 0806E3 Set Truess/Sheet roof and Install 10 09/20/21 10/01/21 09/20/21 10/01/21 0806E3 Complete Exteriors (Overframing 15 10/04/21 10/22/21 10/04/21 10/22/21 0806E3 Dry-In Roof 3 10/22/21 10/26/21 10/22/21 10/26/21 0806E3 Siding 45 10/27/21 01/05/22 10/27/21 01/05/22 0806E3 Roofing 10 11/10/21 11/23/21 11/10/21 11/23/21 HardsHardscape / Landscape 72 04/11/22 07/21/22 04/11/22 07/21/22 12S021 Subgrade / Grade Sidewalks 5 04/11/22 04/15/22 04/11/22 04/15/22 12S021 To psoil Res pread 5 05/02/22 05/06/22 05/02/22 05/06/22 12S021 Landscape 25 06/07/22 07/12/22 06/07/22 07/12/22 12S021 Sitework Ins pections 7 07/13/22 07/21/22 07/13/22 07/21/22 12S031 Flatwork / FRP Sidewalks 10 04/18/22 04/29/22 04/18/22 04/29/22 CloseCloseout 44 01/06/22 03/08/22 01/06/22 03/08/22 12H011 Shaw Pre-Punch 4 01/06/22 01/11/22 01/06/22 01/11/22 12H011 Final Inspections 10 01/12/22 01/25/22 01/12/22 01/25/22 12H011 Contractor Pre-Punch Corrections 5 01/26/22 02/01/22 01/26/22 02/01/22 12H011 Owner Walk 1 02/02/22 02/02/22 02/02/22 02/02/22 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 February March April May June July August S October November December January February March April May June July August S October ber 2021 2022 Shaw Pre-Punch Final Ins pections Contractor Pre-Punch Corrections Owner Walk Owner Corrections Final Clean Building Completion Non-Productive Weather Days (15) Pin Foundation for Excavation Excavate Foundation Pin Footings Form Footings Install Re-bar for Footings Ins pection Footings Pour Footings Strip Footings Pin Walls Form Walls Install Re-bar for Walls Ufer Install / Inspection Install MEP Sleeves Ins pection of Walls Pour Walls Strip Walls Water Proof Foundation Prep grade of S.O.G. Install Radon Piping Inspection of Radon Install Vapor barrier Form & Poor S.O.G. Back Fill Foundation Install Foundation Drainage System Pin Grade Beams Excavate Grade Beams Form Grade Beams Install Re-bar for Grade Beams Inspection of Grade Beams Pour Grade Beams Back Fill Grade Beams Set and Stitch Units Complete Interior Rough-In Connections Complete Interior Finishes Complete Exterior Stitching Set Truess/Sheet roof and Install Fasica Complete Exteriors (Overframing, Balconies , Stairs, etc) Dry-In Roof Siding Roofing Subgrade / Grade Sidewalks Topsoil Res pread Landscape Sitework Ins pections Flatwork / FRP Sidewalks Shaw Pre-Punch Final Inspections Contractor Pre-Punch Corrections Owner Walk SHAW CONSTRUCTION 11.18.2020 - Burlingame Phase III - Guerden Schedule Burlingame Ranch Phase 3 Print Date: 11/18/20 Data Date: 11/18/20 TASK filter: All Activities Remaining Level of Effort Actual Level of Effort Project Baseline Bar Actual Work Remaining Work Critical Remainin... Page 7 of 11 Date Revision Checked Approved Activity ID Activity Name Original Duration Start Finish BL Project Start BL Project Finish 12H011 Owner Corrections 5 02/03/22 02/09/22 02/03/22 02/09/22 12H011 Final Clean 4 02/10/22 02/15/22 02/10/22 02/15/22 12H011 Building Completion 0 03/08/22 03/08/22 12H011 Non-Productive Weather Days (1 15 02/16/22 03/08/22 02/16/22 03/08/22 GaragGarage / Parking Area Phase 3 86 10/13/21 02/17/22 10/13/21 02/17/22 A1600 Pin Structure 1 10/13/21 10/13/21 10/13/21 10/13/21 A1610 Excavate Foundation 5 10/14/21 10/20/21 10/14/21 10/20/21 A1620 Pin Footings 1 10/21/21 10/21/21 10/21/21 10/21/21 A1630 Form Footings 3 10/22/21 10/26/21 10/22/21 10/26/21 A1640 Install Re-bar Footings 2 10/27/21 10/28/21 10/27/21 10/28/21 A1650 Inspection 1 10/29/21 10/29/21 10/29/21 10/29/21 A1660 Pour Footings 1 11/01/21 11/01/21 11/01/21 11/01/21 A1670 Pin Walls/Pilers 1 11/02/21 11/02/21 11/02/21 11/02/21 A1680 Form Walls/Pilers 5 11/03/21 11/09/21 11/03/21 11/09/21 A1690 Install Re-bar for Walls / Pilers 3 11/10/21 11/12/21 11/10/21 11/12/21 A1700 Inspection 1 11/15/21 11/15/21 11/15/21 11/15/21 A1710 Pour Walls & Pilers 1 11/16/21 11/16/21 11/16/21 11/16/21 A1720 Strip Forms 1 11/17/21 11/17/21 11/17/21 11/17/21 A1730 Water Proof Foundation 1 11/18/21 11/18/21 11/18/21 11/18/21 A1740 Back Fill Deep Foundation 2 11/19/21 11/22/21 11/19/21 11/22/21 A1750 Pin Shallow Footings 1 11/23/21 11/23/21 11/23/21 11/23/21 A1760 Form Shallow Footings 3 11/24/21 11/30/21 11/24/21 11/30/21 A1770 Re-bar for Shallow Footings 2 12/01/21 12/02/21 12/01/21 12/02/21 A1780 Inspection 1 12/03/21 12/03/21 12/03/21 12/03/21 A1790 Pour Shallow Footings 1 12/06/21 12/06/21 12/06/21 12/06/21 A1800 Strip Shallow Footings 1 12/07/21 12/07/21 12/07/21 12/07/21 A1810 Pin Stemwalls 1 12/08/21 12/08/21 12/08/21 12/08/21 A1820 Form Stemwall 1 12/09/21 12/09/21 12/09/21 12/09/21 A1830 Install Re-bar for Stemwalls 1 12/10/21 12/10/21 12/10/21 12/10/21 A1840 Inspection 1 12/13/21 12/13/21 12/13/21 12/13/21 A1850 Pour Stemwalls 1 12/14/21 12/14/21 12/14/21 12/14/21 A1860 Back Fill & Grade for S.O.G.2 12/15/21 12/16/21 12/15/21 12/16/21 A1870 Form & Pour Interior 1 12/17/21 12/17/21 12/17/21 12/17/21 A1880 Stick Frame Garages 15 12/20/21 01/13/22 12/20/21 01/13/22 A1890 Side Garages 20 01/14/22 02/10/22 01/14/22 02/10/22 A1900 Roof Garages 5 02/11/22 02/17/22 02/11/22 02/17/22 BuildinBuilding 13 272 07/08/21 08/04/22 07/08/21 08/04/22 FoundFoundation 56 07/08/21 09/24/21 07/08/21 09/24/21 090723 Pin Foundation for Excavation 1 07/08/21 07/08/21 07/08/21 07/08/21 090723 Excavate Foundation 5 07/12/21 07/16/21 07/12/21 07/16/21 090723 Pin Footings 1 07/19/21 07/19/21 07/19/21 07/19/21 090723 Form Footings 3 07/20/21 07/22/21 07/20/21 07/22/21 090723 Install Re-bar for Footings 2 07/23/21 07/26/21 07/23/21 07/26/21 090724 Inspection Footings 1 07/27/21 07/27/21 07/27/21 07/27/21 090724 Pour Footings 1 07/28/21 07/28/21 07/28/21 07/28/21 090724 Strip Footings 1 07/29/21 07/29/21 07/29/21 07/29/21 090724 Pin Walls 1 07/30/21 07/30/21 07/30/21 07/30/21 090724 Form Walls 5 08/02/21 08/06/21 08/02/21 08/06/21 090724 Install Re-bar for Walls 3 08/09/21 08/11/21 08/09/21 08/11/21 090724 Ufer Install / Ins pection 1 08/12/21 08/12/21 08/12/21 08/12/21 090724 Install MEP Sleeves 1 08/12/21 08/12/21 08/12/21 08/12/21 090724 Inspection of Walls 1 08/13/21 08/13/21 08/13/21 08/13/21 090724 Pour Walls 1 08/16/21 08/16/21 08/16/21 08/16/21 090725 Strip Walls 3 08/20/21 08/24/21 08/20/21 08/24/21 090725 Water Proof Foundation 1 08/25/21 08/25/21 08/25/21 08/25/21 090725 Prep grade of S.O.G.1 08/26/21 08/26/21 08/26/21 08/26/21 090725 Install Radon Piping 2 08/27/21 08/30/21 08/27/21 08/30/21 090725 Inspection of Radon 1 08/31/21 08/31/21 08/31/21 08/31/21 090725 Install Vapor barrier 2 09/01/21 09/02/21 09/01/21 09/02/21 090725 Form & Poor S.O.G.1 09/03/21 09/03/21 09/03/21 09/03/21 090725 Back Fill Foundation 3 09/07/21 09/09/21 09/07/21 09/09/21 090725 Install Foundation Drainage Syste 2 09/09/21 09/10/21 09/09/21 09/10/21 090725 Pin Grade Beams 1 09/13/21 09/13/21 09/13/21 09/13/21 090726 Excavate Grade Beams 2 09/14/21 09/15/21 09/14/21 09/15/21 090726 Form Grade Beams 2 09/16/21 09/17/21 09/16/21 09/17/21 090726 Install Re-bar for Grade Beams 1 09/20/21 09/20/21 09/20/21 09/20/21 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 February March April May June July August S October November December January February March April May June July August S October ber 2021 2022 Owner Corrections Final Clean Building Completion Non-Productive Weather Days (15) Pin Structure Excavate Foundation Pin Footings Form Footings Install Re-bar Footings Ins pection Pour Footings Pin Walls/Pilers Form Walls/Pilers Install Re-bar for Walls / Pilers Inspection Pour Walls & Pilers Strip Forms Water Proof Foundation Back Fill Deep Foundation Pin Shallow Footings Form Shallow Footings Re-bar for Shallow Footings Ins pection Pour Shallow Footings Strip Shallow Footings Pin Stemwalls Form Stemwall Install Re-bar for Stemwalls Inspection Pour Stemwalls Back Fill & Grade for S.O.G. Form & Pour Interior Stick Frame Garages Side Garages Roof Garages Pin Foundation for Excavation Excavate Foundation Pin Footings Form Footings Install Re-bar for Footings Inspection Footings Pour Footings Strip Footings Pin Walls Form Walls Install Re-bar for Walls Ufer Install / Inspection Install MEP Sleeves Inspection of Walls Pour Walls Strip Walls Water Proof Foundation Prep grade of S.O.G. Install Radon Piping Inspection of Radon Install Vapor barrier Form & Poor S.O.G. Back Fill Foundation Install Foundation Drainage System Pin Grade Beams Excavate Grade Beams Form Grade Beams Install Re-bar for Grade Beams SHAW CONSTRUCTION 11.18.2020 - Burlingame Phase III - Guerden Schedule Burlingame Ranch Phase 3 Print Date: 11/18/20 Data Date: 11/18/20 TASK filter: All Activities Remaining Level of Effort Actual Level of Effort Project Baseline Bar Actual Work Remaining Work Critical Remainin... Page 8 of 11 Date Revision Checked Approved Activity ID Activity Name Original Duration Start Finish BL Project Start BL Project Finish 090726 Inspection of Grade Beams 1 09/21/21 09/21/21 09/21/21 09/21/21 090726 Pour Grade Beams 1 09/22/21 09/22/21 09/22/21 09/22/21 090726 Back Fill Grade Beams 2 09/23/21 09/24/21 09/23/21 09/24/21 Set / SSet / Stitch Units 50 09/27/21 12/07/21 09/27/21 12/07/21 1306110 Set and Stitch Units 10 09/27/21 10/08/21 09/27/21 10/08/21 1306111 Complete Interior Rough-In Conn 20 10/11/21 11/05/21 10/11/21 11/05/21 1306112 Complete Interior Finishes 20 11/08/21 12/07/21 11/08/21 12/07/21 ExterExteriors 76 10/11/21 02/01/22 10/11/21 02/01/22 0806E4 Complete Exterior Stitching 3 10/11/21 10/13/21 10/11/21 10/13/21 0806E4 Set Truess/Sheet roof and Install 10 10/14/21 10/27/21 10/14/21 10/27/21 0806E4 Complete Exteriors (Overframing 15 10/28/21 11/17/21 10/28/21 11/17/21 0806E4 Dry-In Roof 3 11/18/21 11/22/21 11/18/21 11/22/21 0806E4 Siding 45 11/23/21 02/01/22 11/23/21 02/01/22 0806E4 Roofing 10 12/09/21 12/22/21 12/09/21 12/22/21 HardsHardscape / Landscape 77 04/18/22 08/04/22 04/18/22 08/04/22 13S021 Subgrade / Grade Sidewalks 5 04/18/22 04/22/22 04/18/22 04/22/22 13S021 Topsoil Respread 5 05/09/22 05/13/22 05/09/22 05/13/22 13S021 Landscape 25 06/21/22 07/26/22 06/21/22 07/26/22 13S021 Sitework Ins pections 7 07/27/22 08/04/22 07/27/22 08/04/22 13S031 Flatwork / FRP Sidewalks 10 04/25/22 05/06/22 04/25/22 05/06/22 CloseCloseout 44 02/02/22 04/04/22 02/02/22 04/04/22 13H011 Shaw Pre-Punch 4 02/02/22 02/07/22 02/02/22 02/07/22 13H011 Final Inspections 10 02/08/22 02/21/22 02/08/22 02/21/22 13H011 Contractor Pre-Punch Corrections 5 02/22/22 02/28/22 02/22/22 02/28/22 13H011 Owner Walk 1 03/01/22 03/01/22 03/01/22 03/01/22 13H011 Owner Corrections 5 03/02/22 03/08/22 03/02/22 03/08/22 13H011 Final Clean 4 03/09/22 03/14/22 03/09/22 03/14/22 13H011 Building Completion 0 04/04/22 04/04/22 13H011 Non-Productive Weather Days (1 15 03/15/22 04/04/22 03/15/22 04/04/22 BuildinBuilding 14 271 07/23/21 08/18/22 07/23/21 08/18/22 FoundFoundation 56 07/23/21 10/11/21 07/23/21 10/11/21 090726 Pin Foundation for Excavation 1 07/23/21 07/23/21 07/23/21 07/23/21 090726 Excavate Foundation 5 07/27/21 08/02/21 07/27/21 08/02/21 090726 Pin Footings 1 08/03/21 08/03/21 08/03/21 08/03/21 090726 Form Footings 3 08/04/21 08/06/21 08/04/21 08/06/21 090727 Install Re-bar for Footings 2 08/09/21 08/10/21 08/09/21 08/10/21 090727 Inspection Footings 1 08/11/21 08/11/21 08/11/21 08/11/21 090727 Pour Footings 1 08/12/21 08/12/21 08/12/21 08/12/21 090727 Strip Footings 1 08/13/21 08/13/21 08/13/21 08/13/21 090727 Pin Walls 1 08/16/21 08/16/21 08/16/21 08/16/21 090727 Form Walls 5 08/17/21 08/23/21 08/17/21 08/23/21 090727 Install Re-bar for Walls 3 08/24/21 08/26/21 08/24/21 08/26/21 090727 Ufer Install / Ins pection 1 08/27/21 08/27/21 08/27/21 08/27/21 090727 Install MEP Sleeves 1 08/27/21 08/27/21 08/27/21 08/27/21 090727 Inspection of Walls 1 08/30/21 08/30/21 08/30/21 08/30/21 090728 Pour Walls 1 08/31/21 08/31/21 08/31/21 08/31/21 090728 Strip Walls 3 09/07/21 09/09/21 09/07/21 09/09/21 090728 Water Proof Foundation 1 09/10/21 09/10/21 09/10/21 09/10/21 090728 Prep grade of S.O.G.1 09/13/21 09/13/21 09/13/21 09/13/21 090728 Install Radon Piping 2 09/14/21 09/15/21 09/14/21 09/15/21 090728 Inspection of Radon 1 09/16/21 09/16/21 09/16/21 09/16/21 090728 Install Vapor barrier 2 09/17/21 09/20/21 09/17/21 09/20/21 090728 Form & Poor S.O.G.1 09/21/21 09/21/21 09/21/21 09/21/21 090728 Back Fill Foundation 3 09/22/21 09/24/21 09/22/21 09/24/21 090728 Install Foundation Drainage Syste 2 09/24/21 09/27/21 09/24/21 09/27/21 090729 Pin Grade Beams 1 09/28/21 09/28/21 09/28/21 09/28/21 090729 Excavate Grade Beams 2 09/29/21 09/30/21 09/29/21 09/30/21 090729 Form Grade Beams 2 10/01/21 10/04/21 10/01/21 10/04/21 090729 Install Re-bar for Grade Beams 1 10/05/21 10/05/21 10/05/21 10/05/21 090729 Inspection of Grade Beams 1 10/06/21 10/06/21 10/06/21 10/06/21 090729 Pour Grade Beams 1 10/07/21 10/07/21 10/07/21 10/07/21 090729 Back Fill Grade Beams 2 10/08/21 10/11/21 10/08/21 10/11/21 Set / SSet / Stitch Units 50 09/29/21 12/09/21 09/29/21 12/09/21 1406110 Set and Stitch Units 10 09/29/21 10/12/21 09/29/21 10/12/21 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 February March April May June July August S October November December January February March April May June July August S October ber 2021 2022 Inspection of Grade Beams Pour Grade Beams Back Fill Grade Beams Set and Stitch Units Complete Interior Rough-In Connections Complete Interior Finishes Complete Exterior Stitching Set Truess/Sheet roof and Install Fasica Complete Exteriors (Overframing, Balconies, Stairs, etc ) Dry-In Roof Siding Roofing Subgrade / Grade Sidewalks Topsoil Res pread Landscape Sitework Ins pections Flatwork / FRP Sidewalks Shaw Pre-Punch Final Inspections Contractor Pre-Punch Corrections Owner Walk Owner Corrections Final Clean Building Completion Non-Productive Weather Days (15) Pin Foundation for Excavation Excavate Foundation Pin Footings Form Footings Install Re-bar for Footings Inspection Footings Pour Footings Strip Footings Pin Walls Form Walls Install Re-bar for Walls Ufer Install / Inspection Install MEP Sleeves Inspection of Walls Pour Walls Strip Walls Water Proof Foundation Prep grade of S.O.G. Install Radon Piping Inspection of Radon Install Vapor barrier Form & Poor S.O.G. Back Fill Foundation Install Foundation Drainage System Pin Grade Beams Excavate Grade Beams Form Grade Beams Install Re-bar for Grade Beams Inspection of Grade Beams Pour Grade Beams Back Fill Grade Beams Set and Stitch Units SHAW CONSTRUCTION 11.18.2020 - Burlingame Phase III - Guerden Schedule Burlingame Ranch Phase 3 Print Date: 11/18/20 Data Date: 11/18/20 TASK filter: All Activities Remaining Level of Effort Actual Level of Effort Project Baseline Bar Actual Work Remaining Work Critical Remainin... Page 9 of 11 Date Revision Checked Approved Activity ID Activity Name Original Duration Start Finish BL Project Start BL Project Finish 1406111 Complete Interior Rough-In Conn 20 10/13/21 11/09/21 10/13/21 11/09/21 1406112 Complete Interior Finishes 20 11/10/21 12/09/21 11/10/21 12/09/21 ExterExteriors 76 10/13/21 02/03/22 10/13/21 02/03/22 0806E4 Complete Exterior Stitching 3 10/13/21 10/15/21 10/13/21 10/15/21 0806E4 Set Truess/Sheet roof and Install 10 10/18/21 10/29/21 10/18/21 10/29/21 0806E4 Complete Exteriors (Overframing 15 11/01/21 11/19/21 11/01/21 11/19/21 0806E4 Dry-In Roof 3 11/22/21 11/24/21 11/22/21 11/24/21 0806E5 Siding 45 11/29/21 02/03/22 11/29/21 02/03/22 0806E5 Roofing 10 12/13/21 12/28/21 12/13/21 12/28/21 HardsHardscape / Landscape 82 04/25/22 08/18/22 04/25/22 08/18/22 14S021 Subgrade / Grade Sidewalks 5 04/25/22 04/29/22 04/25/22 04/29/22 14S021 Topsoil Respread 5 05/16/22 05/20/22 05/16/22 05/20/22 14S021 Landscape 25 07/06/22 08/09/22 07/06/22 08/09/22 14S021 Sitework Ins pections 7 08/10/22 08/18/22 08/10/22 08/18/22 14S031 Flatwork / FRP Sidewalks 10 05/02/22 05/13/22 05/02/22 05/13/22 CloseCloseout 44 02/04/22 04/06/22 02/04/22 04/06/22 14H011 Shaw Pre-Punch 4 02/04/22 02/09/22 02/04/22 02/09/22 14H011 Final Inspections 10 02/10/22 02/23/22 02/10/22 02/23/22 14H011 Contractor Pre-Punch Corrections 5 02/24/22 03/02/22 02/24/22 03/02/22 14H011 Owner Walk 1 03/03/22 03/03/22 03/03/22 03/03/22 14H011 Owner Corrections 5 03/04/22 03/10/22 03/04/22 03/10/22 14H011 Final Clean 4 03/11/22 03/16/22 03/11/22 03/16/22 14H011 Building Completion 0 04/06/22 04/06/22 14H011 Non-Productive Weather Days (1 15 03/17/22 04/06/22 03/17/22 04/06/22 BuildinBuilding 15 281 08/02/21 09/12/22 08/02/21 09/12/22 FoundFoundation 58 08/02/21 10/21/21 08/02/21 10/21/21 090729 Pin Foundation for Excavation 1 08/02/21 08/02/21 08/02/21 08/02/21 090729 Excavate Foundation 5 08/04/21 08/10/21 08/04/21 08/10/21 090729 Pin Footings 1 08/13/21 08/13/21 08/13/21 08/13/21 090730 Form Footings 3 08/16/21 08/18/21 08/16/21 08/18/21 090730 Install Re-bar for Footings 2 08/19/21 08/20/21 08/19/21 08/20/21 090730 Inspection Footings 1 08/23/21 08/23/21 08/23/21 08/23/21 090730 Pour Footings 1 08/24/21 08/24/21 08/24/21 08/24/21 090730 Strip Footings 1 08/25/21 08/25/21 08/25/21 08/25/21 090730 Pin Walls 1 08/26/21 08/26/21 08/26/21 08/26/21 090730 Form Walls 5 08/27/21 09/02/21 08/27/21 09/02/21 090730 Install Re-bar for Walls 3 09/03/21 09/08/21 09/03/21 09/08/21 090730 Ufer Install / Ins pection 1 09/09/21 09/09/21 09/09/21 09/09/21 090730 Install MEP Sleeves 1 09/09/21 09/09/21 09/09/21 09/09/21 090731 Inspection of Walls 1 09/10/21 09/10/21 09/10/21 09/10/21 090731 Pour Walls 1 09/13/21 09/13/21 09/13/21 09/13/21 090731 Strip Walls 3 09/17/21 09/21/21 09/17/21 09/21/21 090731 Water Proof Foundation 1 09/22/21 09/22/21 09/22/21 09/22/21 090731 Prep grade of S.O.G.1 09/23/21 09/23/21 09/23/21 09/23/21 090731 Install Radon Piping 2 09/24/21 09/27/21 09/24/21 09/27/21 090731 Inspection of Radon 1 09/28/21 09/28/21 09/28/21 09/28/21 090731 Install Vapor barrier 2 09/29/21 09/30/21 09/29/21 09/30/21 090731 Form & Poor S.O.G.1 10/01/21 10/01/21 10/01/21 10/01/21 090731 Back Fill Foundation 3 10/04/21 10/06/21 10/04/21 10/06/21 090732 Install Foundation Drainage Syste 2 10/06/21 10/07/21 10/06/21 10/07/21 090732 Pin Grade Beams 1 10/08/21 10/08/21 10/08/21 10/08/21 090732 Excavate Grade Beams 2 10/11/21 10/12/21 10/11/21 10/12/21 090732 Form Grade Beams 2 10/13/21 10/14/21 10/13/21 10/14/21 090732 Install Re-bar for Grade Beams 1 10/15/21 10/15/21 10/15/21 10/15/21 090732 Inspection of Grade Beams 1 10/18/21 10/18/21 10/18/21 10/18/21 090732 Pour Grade Beams 1 10/19/21 10/19/21 10/19/21 10/19/21 090732 Back Fill Grade Beams 2 10/20/21 10/21/21 10/20/21 10/21/21 Set / SSet / Stitch Units 50 10/07/21 12/17/21 10/07/21 12/17/21 1506110 Set and Stitch Units 10 10/07/21 10/20/21 10/07/21 10/20/21 1506111 Complete Interior Rough-In Conn 20 10/21/21 11/17/21 10/21/21 11/17/21 1506112 Complete Interior Finishes 20 11/18/21 12/17/21 11/18/21 12/17/21 ExterExteriors 87 10/21/21 02/28/22 10/21/21 02/28/22 0806E5 Complete Exterior Stitching 3 10/21/21 10/25/21 10/21/21 10/25/21 0806E5 Set Truess/Sheet roof and Install 10 10/26/21 11/08/21 10/26/21 11/08/21 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 February March April May June July August S October November December January February March April May June July August S October ber 2021 2022 Complete Interior Rough-In Connections Complete Interior Finishes Complete Exterior Stitching Set Truess/Sheet roof and Install Fasica Complete Exteriors (Overframing, Balconies , Stairs , etc) Dry-In Roof Siding Roofing Subgrade / Grade Sidewalks To psoil Respread Landscape Sitework Inspections Flatwork / FRP Sidewalks Shaw Pre-Punch Final Inspections Contractor Pre-Punch Corrections Owner Walk Owner Corrections Final Clean Building Completion Non-Productive Weather Days (15) Pin Foundation for Excavation Excavate Foundation Pin Footings Form Footings Install Re-bar for Footings Ins pection Footings Pour Footings Strip Footings Pin Walls Form Walls Install Re-bar for Walls Ufer Install / Inspection Install MEP Sleeves Ins pection of Walls Pour Walls Strip Walls Water Proof Foundation Prep grade of S.O.G. Install Radon Piping Inspection of Radon Install Vapor barrier Form & Poor S.O.G. Back Fill Foundation Install Foundation Drainage System Pin Grade Beams Excavate Grade Beams Form Grade Beams Install Re-bar for Grade Beams Ins pection of Grade Beams Pour Grade Beams Back Fill Grade Beams Set and Stitch Units Complete Interior Rough-In Connections Complete Interior Finishes Complete Exterior Stitching Set Truess/Sheet roof and Install Fasica SHAW CONSTRUCTION 11.18.2020 - Burlingame Phase III - Guerden Schedule Burlingame Ranch Phase 3 Print Date: 11/18/20 Data Date: 11/18/20 TASK filter: All Activities Remaining Level of Effort Actual Level of Effort Project Baseline Bar Actual Work Remaining Work Critical Remainin... Page 10 of 11 Date Revision Checked Approved Activity ID Activity Name Original Duration Start Finish BL Project Start BL Project Finish 0806E5 Complete Exteriors (Overframing 15 11/09/21 12/01/21 11/09/21 12/01/21 0806E5 Dry-In Roof 3 12/02/21 12/06/21 12/02/21 12/06/21 0806E5 Siding 45 12/02/21 02/08/22 12/02/21 02/08/22 0806E5 Roofing 10 02/15/22 02/28/22 02/15/22 02/28/22 HardsHardscape / Landscape 72 05/23/22 09/01/22 05/23/22 09/01/22 15S021 Subgrade / Grade Sidewalks 5 05/23/22 05/27/22 05/23/22 05/27/22 15S021 To psoil Res pread 5 06/14/22 06/20/22 06/14/22 06/20/22 15S021 Landscape 25 07/20/22 08/23/22 07/20/22 08/23/22 15S021 Sitework Ins pections 7 08/24/22 09/01/22 08/24/22 09/01/22 15S031 Flatwork / FRP Sidewalks 10 05/31/22 06/13/22 05/31/22 06/13/22 CloseCloseout 151 02/09/22 09/12/22 02/09/22 09/12/22 15H011 Shaw Pre-Punch 4 02/09/22 02/14/22 02/09/22 02/14/22 15H011 Final Inspections 10 02/15/22 02/28/22 02/15/22 02/28/22 15H011 Contractor Pre-Punch Corrections 5 03/01/22 03/07/22 03/01/22 03/07/22 15H011 Owner Walk 1 03/08/22 03/08/22 03/08/22 03/08/22 15H011 Owner Corrections 5 03/09/22 03/15/22 03/09/22 03/15/22 15H011 Final Clean 4 03/16/22 03/21/22 03/16/22 03/21/22 15H011 Building Completion 0 03/21/22 03/21/22 15H011 Non-Productive Weather Days (2 20 08/15/22 09/12/22 08/15/22 09/12/22 15H011 Project Substantial Completion 0 09/09/22 09/09/22 09/09/22 09/09/22 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 February March April May June July August S October November December January February March April May June July August S October ber 2021 2022 Complete Exteriors (Overframing, Balconies, Stairs , etc) Dry-In Roof Siding Roofing Subgrade / Grade Sidewalks To psoil Res pread Landscape Sitework Ins pections Flatwork / FRP Sidewalks Shaw Pre-Punch Final Inspections Contractor Pre-Punch Corrections Owner Walk Owner Corrections Final Clean Building Completion Non-Productive Wea Project Substantial Co SHAW CONSTRUCTION 11.18.2020 - Burlingame Phase III - Guerden Schedule Burlingame Ranch Phase 3 Print Date: 11/18/20 Data Date: 11/18/20 TASK filter: All Activities Remaining Level of Effort Actual Level of Effort Project Baseline Bar Actual Work Remaining Work Critical Remainin... Page 11 of 11 Date Revision Checked Approved