HomeMy WebLinkAboutFile Documents.33 MINING STOCK PKWY.0093-2020-BRES (27)1
CONSTRUCTION WASTE MANAGEMENT PLAN:
PRE-PROJECT ESTIMATES
This form must be completed for the following types of projects:
All New Construction
All Demolition, (excluding single family & duplex)
Addition/Alteration with construction valuation exceeding $50,000 (excluding single family &
duplex residential)
Company Name:____________________________ Contact Person:___________________________
Address:___________________________________ Telephone #:______________________________
Project Location/Address:_________________________________________________________________
Contractor:________________________________ Architect:__________________________________
Contact Person:____________________________ Contact Person:_____________________________
Telephone #:_______________________________ Telephone #:________________________________
Recycling Coordinators:___________________________________________________________________
Project Description:______________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
Waste Management Goal:
CITY OF ASPEN JEFF PENDARVIS
425 RIO GRANDE PLACE, ASPEN, CO 81611
SHAW CONSTRUCTION CHARLES CUNNIFFE ARCHITECTS
38,000 gsf 4 level office building
JACK HUGHES
970.471.0448 970.925.5590
SHAW CONSTRUCTION - TBD
425 RIO GRANDE PLACE
ATTACHMENT I
RICH PAVCEK
970.429.2786
2
This project will recycle or salvage for reuse a minimum of ______ % by weight of the waste
generated on-site.
Waste Prevention Planning:
Compliance with City of Aspen mandatory recycling requirements for businesses. Mandatory
recyclables (mixed recycling) include:
o newspaper
o corrugated cardboard
o white and colored office paper
o plastic and glass bottles and jars
o metal cans
Compliance with Pitkin County’s Landfill Bans, i.e. no disposal of tires, appliances, yard waste,
mandatory recyclables, hazardous waste, batteries, fluorescent tubes, electronic waste and large
metal items.
The General Contractor will contractually require all subcontractors to comply with the
mandatory recycling requirements.
The Construction Waste Reduction Plan shall be implemented and executed as follows and as on
the chart:
o Salvageable materials will be diverted from disposal where feasible.
o There will be a designated area on the construction site reserved for dumpsters
which are specifically labeled for respective materials to be received.
o Hazardous waste will be managed by a licensed hazardous waste vendor.
Communication & Education Plan:
As each new subcontractor comes on site, the recycling coordinators will present him/her with a
copy of the Waste Management Plan and provide a tour of the recycling areas.
All recycling containers will be clearly labeled. Containers shall be located in close proximity to the
building(s) under construction in which recyclables/salvageable materials will be placed.
Recycling coordinators shall inspect the containers on a weekly basis to insure that no contamination
is occurring and precautions shall also be taken to deter any contamination by the public.
Waste Hauler(s): Company:
Contact:
Waste Disposal Fees (fees vary by landfill):
o Mixed C&D $______ / ton
o Scrap Metal $______ / ton (free at PCSWC)
o Soil & Rock $______ / ton
o Asphalt $______ / ton
o Yard Waste $______ / ton
o Recycling $______ / ton
Recycling Calculation (Optional):
SHAW CONSTRUCTION - TBD
3
If all construction waste was disposed in landfill and none was diverted through salvage, reuse, or
recycling: _______ tons x $_______ / ton = $ ______ (Waste)
Recycling or Reuse or Salvage: _______ tons (not dumped into landfill) x $ _______ / ton (Recycling)
Waste $ _______ - Recycling $ _______= $_________________ TOTAL POTENTIAL SAVINGS
Worksheet to estimate the specific materials involved in the waste management plan (This may be done
on a separate sheet):
1. Salvage Yes No
Do you plan to salvage materials from this project prior to demolition or
construction?
If YES, list the materials that will be salvaged
(e.g., doors, windows, casing, toilets, sinks,
fixtures, wood siding, tiles, etc.)
Facility or Salvage company receiving
material.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
2. Source Separation Yes No
Do you plan to source separate any materials for delivery to a recycling
facility (e.g. separation of material such as wood, concrete, metal into separate
bins)?
Materials Hauler Facility
3. On-Site Use Yes No
4
Do you plan any on-site reuse activities for this project (e.g. reuse of wood
forms for concrete, on-site crushing of concrete for on-site use, use of reusable
containers or pallets for material deliveries, etc.)?
If, please describe:
4. Disposal at Landfill Yes No
Will any materials be disposed of (not recycled or salvaged) at the landfill?
Estimate the number of tons of material to be taken to the landfill for disposal: __________ tons
Comments:
5
HERE ARE SOME RESOURCES TO SALVAGE/REUSE/RECYCLE MATERIALS:
Material Estimated Quantity Options Facility Options
Landscape debris Keep separate for reuse
and/or wood sale; Recycle
Pitkin County Solid Waste
Center
Clean dimensional wood
and palette wood
Keep separate for reuse by
on-site construction or by site
employees for reuse in home
projects; Recycle
ReStore; Pitkin County Solid
Waste Center; On-Site;
Employees
Plywood, OSB, particle
board
Reuse; Recycle Pitkin County Solid Waste
Center
Painted or treated wood Reuse; Recycle Pitkin County Solid Waste
Center
Concrete Recycle
Pitkin County Solid Waste
Center
Concrete Masonry Units Recycle; Keep separate for
re-use by on-site construction
or by site employees
Pitkin County Solid Waste
Center; On-Site; Employees
Metals Recycle
Precious Metals Recovery
(970-963-8877); Pitkin
County Solid Waste Center
Paint Recycle (Colorado Bill SB14-
029 prohibits paint going into
the landfill)
ReStore; Pitkin County Solid
Waste Center; Local Paint
Stores
Window Glass Recycle; Keep separate for
re-use by on-site
construction or by site
employees
ReStore; On-Site;
Employees; Pitkin County
Solid Waste Center
Mixed Recyclables:
Plastics, Aluminum, Paper,
Newsprint, Glass bottles
Mandatory recycling of these
materials
Pitkin County Solid Waste
Center; Paper Wise (970-945-
2885)
Cabinets, Fixtures, Doors,
Windows, Equipment
(Stoves, Bathtub),
Plumbing
Reuse; Resale; Recycle ReStore; Onsite; Pitkin County
Solid Waste Center
Cardboard Mandatory recycling Pitkin County Solid Waste
Center
TOTAL
Deconstruction Firms:
Aspen Deconstruction (aspendeconstruction.com)
Colorado Deconstruction (coloradodemolition.com)
The Reuse People (deconstructioncolorado.com
1
CONSTRUCTION WASTE MANAGEMENT REPORT:
POST-PROJECT TOTALS
This form must be completed for the following types of projects:
All New Construction
All Demolition, (excluding single family & duplex)
Addition/Alteration with construction valuation exceeding $50,000 (excluding single family & duplex
residential)
Completed Summary Reports must be submitted prior to sign off at Final Inspection and issuance of certificate
of occupancy or temporary certificate of occupancy. Call (970) 429-1831 or email
liz.oconnell@cityofaspen.com with inquiries regarding this form.
Permit #:_____________________________________
Project Address: (include floor, suite, etc.): _____________________________________________________
Contact Name: __________________________________ Title: ____________________________________
Company: _______________________________________________________________________________
Contact Mailing Address:___________________________________________________________________
City________________________________________ State___________ ZIP_______________________
Phone: _________________ Fax: __________________ Email: ____________________________________
PLEASE CHECK ALL THAT APPLY:
1. Project Type: New Construction Addition/Alteration Demolition
2. Building Type: Non-Residential Single Family/Duplex Apartment/Multifamily
Sewer/Storm Drain Streets/Sidewalks/Traffic Bridge
Landscape/Parks/Open Space
3. Size of Project ___________________ sq. ft. Project Valuation $ _______________________
4. Completion Date _______/________/__________
5. Describe any difficulties you encountered in complying with your waste management plan and
tell us how to remedy the problem in the future.
2
______________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
For City Use Only: Application Filed ____/____/____ Application Received ____/____/____
Diversion Goal Approved Good Cause Non-Attainment Conditional Approval
Not Approved, reason _________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
________________________________________________________________________________________
Permit #: Address:
REQUIREMENT:
Instructions: Using receipts and invoices list the tonnage of materials recycled during construction and
demolition. See the Conversion Worksheet to change all materials to tons. Complete the chart below and
make sure your column totals are correct. Include destinations for all materials. Please indicate if the receipts
are attached as pdf, compressed file or USB-drive.
Use Materials Conversion Worksheet to convert from cubic yards, square feet, board feet, etc. to tons.
Column A – Tons of material taken to the landfill for disposal (not salvage, reuse or recycle).
Columns B, C, D – Quantities of each type of material to be salvaged, reused, or recycled.
Column E – list vendors or facilities used for salvage or reuse, recycling, or disposal.
Column F - Receipts attached –if not attached, indicate why not.
3
Material Type
A
B
C
D
E
F
Total TONS
Disposed at
Landfill
Salvage or
Reuse
(by weight)
Recycling
(Source
Separated
Materials in
tons)
Compost
(tons)
Actual
Facility
Used
Receipt
Attached
(pdf, word,
or zip drive)
Asphalt/Concrete
**DO NOT INCLUDE ASPHALT/CONCRETE IN TOTAL OR CALCULATION BELOW**
Material Type
A
B
C
D
E
F
Total TONS
Disposed at
Landfill
Salvage
or
Reuse
Recycling
(Source
Separated
Materials)
Compost
Actual
Facility
Used
Receipt
Attached
(pdf, word,
or zip drive)
Mixed C&D Waste
Cabinets, Fixtures
Doors, Windows,
Equipment
Wood
Metal
Cardboard
Landscape Debris
(Brush, Chips,
Stumps)
Mixed Recyclables
(Plastic,
Aluminum,
Paper)
Other (Describe)
Column Totals
4
*Please reference volume-to-weight conversion table.
Fill in the blanks below to calculate your recycling rate.
Column Totals A + B + C + D = _______ (total waste created) ÷ ______ (B+C+D; total waste diverted) =
_______ ×100 = _______ % Diverted
Print Name: _________________________________________
Signature: ___________________________________________ Date: __________________________