Loading...
HomeMy WebLinkAboutFile Documents.33 MINING STOCK PKWY.0093-2020-BRES (27)1 CONSTRUCTION WASTE MANAGEMENT PLAN: PRE-PROJECT ESTIMATES This form must be completed for the following types of projects:  All New Construction  All Demolition, (excluding single family & duplex)  Addition/Alteration with construction valuation exceeding $50,000 (excluding single family & duplex residential) Company Name:____________________________ Contact Person:___________________________ Address:___________________________________ Telephone #:______________________________ Project Location/Address:_________________________________________________________________ Contractor:________________________________ Architect:__________________________________ Contact Person:____________________________ Contact Person:_____________________________ Telephone #:_______________________________ Telephone #:________________________________ Recycling Coordinators:___________________________________________________________________ Project Description:______________________________________________________________________ ________________________________________________________________________________________ ________________________________________________________________________________________ ________________________________________________________________________________________ ________________________________________________________________________________________ Waste Management Goal: CITY OF ASPEN JEFF PENDARVIS 425 RIO GRANDE PLACE, ASPEN, CO 81611 SHAW CONSTRUCTION CHARLES CUNNIFFE ARCHITECTS 38,000 gsf 4 level office building JACK HUGHES 970.471.0448 970.925.5590 SHAW CONSTRUCTION - TBD 425 RIO GRANDE PLACE ATTACHMENT I RICH PAVCEK 970.429.2786 2  This project will recycle or salvage for reuse a minimum of ______ % by weight of the waste generated on-site. Waste Prevention Planning:  Compliance with City of Aspen mandatory recycling requirements for businesses. Mandatory recyclables (mixed recycling) include: o newspaper o corrugated cardboard o white and colored office paper o plastic and glass bottles and jars o metal cans  Compliance with Pitkin County’s Landfill Bans, i.e. no disposal of tires, appliances, yard waste, mandatory recyclables, hazardous waste, batteries, fluorescent tubes, electronic waste and large metal items.  The General Contractor will contractually require all subcontractors to comply with the mandatory recycling requirements.  The Construction Waste Reduction Plan shall be implemented and executed as follows and as on the chart: o Salvageable materials will be diverted from disposal where feasible. o There will be a designated area on the construction site reserved for dumpsters which are specifically labeled for respective materials to be received. o Hazardous waste will be managed by a licensed hazardous waste vendor. Communication & Education Plan:  As each new subcontractor comes on site, the recycling coordinators will present him/her with a copy of the Waste Management Plan and provide a tour of the recycling areas.  All recycling containers will be clearly labeled. Containers shall be located in close proximity to the building(s) under construction in which recyclables/salvageable materials will be placed.  Recycling coordinators shall inspect the containers on a weekly basis to insure that no contamination is occurring and precautions shall also be taken to deter any contamination by the public. Waste Hauler(s): Company: Contact:  Waste Disposal Fees (fees vary by landfill): o Mixed C&D $______ / ton o Scrap Metal $______ / ton (free at PCSWC) o Soil & Rock $______ / ton o Asphalt $______ / ton o Yard Waste $______ / ton o Recycling $______ / ton Recycling Calculation (Optional): SHAW CONSTRUCTION - TBD 3 If all construction waste was disposed in landfill and none was diverted through salvage, reuse, or recycling: _______ tons x $_______ / ton = $ ______ (Waste) Recycling or Reuse or Salvage: _______ tons (not dumped into landfill) x $ _______ / ton (Recycling) Waste $ _______ - Recycling $ _______= $_________________ TOTAL POTENTIAL SAVINGS Worksheet to estimate the specific materials involved in the waste management plan (This may be done on a separate sheet): 1. Salvage Yes No Do you plan to salvage materials from this project prior to demolition or construction? If YES, list the materials that will be salvaged (e.g., doors, windows, casing, toilets, sinks, fixtures, wood siding, tiles, etc.) Facility or Salvage company receiving material. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 2. Source Separation Yes No Do you plan to source separate any materials for delivery to a recycling facility (e.g. separation of material such as wood, concrete, metal into separate bins)? Materials Hauler Facility 3. On-Site Use Yes No 4 Do you plan any on-site reuse activities for this project (e.g. reuse of wood forms for concrete, on-site crushing of concrete for on-site use, use of reusable containers or pallets for material deliveries, etc.)? If, please describe: 4. Disposal at Landfill Yes No Will any materials be disposed of (not recycled or salvaged) at the landfill? Estimate the number of tons of material to be taken to the landfill for disposal: __________ tons Comments: 5 HERE ARE SOME RESOURCES TO SALVAGE/REUSE/RECYCLE MATERIALS: Material Estimated Quantity Options Facility Options Landscape debris Keep separate for reuse and/or wood sale; Recycle Pitkin County Solid Waste Center Clean dimensional wood and palette wood Keep separate for reuse by on-site construction or by site employees for reuse in home projects; Recycle ReStore; Pitkin County Solid Waste Center; On-Site; Employees Plywood, OSB, particle board Reuse; Recycle Pitkin County Solid Waste Center Painted or treated wood Reuse; Recycle Pitkin County Solid Waste Center Concrete Recycle Pitkin County Solid Waste Center Concrete Masonry Units Recycle; Keep separate for re-use by on-site construction or by site employees Pitkin County Solid Waste Center; On-Site; Employees Metals Recycle Precious Metals Recovery (970-963-8877); Pitkin County Solid Waste Center Paint Recycle (Colorado Bill SB14- 029 prohibits paint going into the landfill) ReStore; Pitkin County Solid Waste Center; Local Paint Stores Window Glass Recycle; Keep separate for re-use by on-site construction or by site employees ReStore; On-Site; Employees; Pitkin County Solid Waste Center Mixed Recyclables: Plastics, Aluminum, Paper, Newsprint, Glass bottles Mandatory recycling of these materials Pitkin County Solid Waste Center; Paper Wise (970-945- 2885) Cabinets, Fixtures, Doors, Windows, Equipment (Stoves, Bathtub), Plumbing Reuse; Resale; Recycle ReStore; Onsite; Pitkin County Solid Waste Center Cardboard Mandatory recycling Pitkin County Solid Waste Center TOTAL Deconstruction Firms:  Aspen Deconstruction (aspendeconstruction.com)  Colorado Deconstruction (coloradodemolition.com)  The Reuse People (deconstructioncolorado.com 1    CONSTRUCTION WASTE MANAGEMENT REPORT: POST-PROJECT TOTALS This form must be completed for the following types of projects:  All New Construction  All Demolition, (excluding single family & duplex)  Addition/Alteration with construction valuation exceeding $50,000 (excluding single family & duplex residential) Completed Summary Reports must be submitted prior to sign off at Final Inspection and issuance of certificate of occupancy or temporary certificate of occupancy. Call (970) 429-1831 or email liz.oconnell@cityofaspen.com with inquiries regarding this form. Permit #:_____________________________________ Project Address: (include floor, suite, etc.): _____________________________________________________ Contact Name: __________________________________ Title: ____________________________________ Company: _______________________________________________________________________________ Contact Mailing Address:___________________________________________________________________ City________________________________________ State___________ ZIP_______________________ Phone: _________________ Fax: __________________ Email: ____________________________________ PLEASE CHECK ALL THAT APPLY: 1. Project Type: New Construction Addition/Alteration Demolition 2. Building Type: Non-Residential Single Family/Duplex Apartment/Multifamily Sewer/Storm Drain Streets/Sidewalks/Traffic Bridge Landscape/Parks/Open Space 3. Size of Project ___________________ sq. ft. Project Valuation $ _______________________ 4. Completion Date _______/________/__________ 5. Describe any difficulties you encountered in complying with your waste management plan and tell us how to remedy the problem in the future. 2    ______________________________________________________________________________ __________________________________________________________________________________________  __________________________________________________________________________________________  __________________________________________________________________________________________ __________________________________________________________________________________________      For City Use Only: Application Filed ____/____/____ Application Received ____/____/____ Diversion Goal Approved Good Cause Non-Attainment Conditional Approval Not Approved, reason _________________________________________________________________ _______________________________________________________________________________________  _______________________________________________________________________________________ ________________________________________________________________________________________       Permit #: Address: REQUIREMENT: Instructions: Using receipts and invoices list the tonnage of materials recycled during construction and demolition. See the Conversion Worksheet to change all materials to tons. Complete the chart below and make sure your column totals are correct. Include destinations for all materials. Please indicate if the receipts are attached as pdf, compressed file or USB-drive. Use Materials Conversion Worksheet to convert from cubic yards, square feet, board feet, etc. to tons. Column A – Tons of material taken to the landfill for disposal (not salvage, reuse or recycle). Columns B, C, D – Quantities of each type of material to be salvaged, reused, or recycled. Column E – list vendors or facilities used for salvage or reuse, recycling, or disposal. Column F - Receipts attached –if not attached, indicate why not. 3    Material Type A B C D E F Total TONS Disposed at Landfill Salvage or Reuse (by weight) Recycling (Source Separated Materials in tons) Compost (tons) Actual Facility Used Receipt Attached (pdf, word, or zip drive) Asphalt/Concrete **DO NOT INCLUDE ASPHALT/CONCRETE IN TOTAL OR CALCULATION BELOW** Material Type A B C D E F Total TONS Disposed at Landfill Salvage or Reuse Recycling (Source Separated Materials) Compost Actual Facility Used Receipt Attached (pdf, word, or zip drive) Mixed C&D Waste Cabinets, Fixtures Doors, Windows, Equipment Wood Metal Cardboard Landscape Debris (Brush, Chips, Stumps) Mixed Recyclables (Plastic, Aluminum, Paper) Other (Describe) Column Totals  4    *Please reference volume-to-weight conversion table. Fill in the blanks below to calculate your recycling rate. Column Totals A + B + C + D = _______ (total waste created) ÷ ______ (B+C+D; total waste diverted) = _______ ×100 = _______ % Diverted Print Name: _________________________________________ Signature: ___________________________________________ Date: __________________________