HomeMy WebLinkAboutFile Documents.33 MINING STOCK PKWY.0093-2020-BRES (29)1
2
1
XSD
XSD
X
S
D
XSDXSDXSD
XS
D
XS
D
XS
D
XS
D
XS
D
XSD
XSD
XSD
XSD
XSD
XSD
XSD
XS
D
X
S
D
X
S
D
X
S
D
XSD
XSD
XSD XSD
X
S
D
EX.
SEWER STUB
ELEV. = 7816.65'
X
S
A
X
S
A
EX. SMH #75
RIM = 7820.96'
INV. IN = 7809.94'
INV. OUT = 7809.74'
EX. SMH #76
RIM = 7825.21'
INV. IN = 7815.14'
INV. IN = 7815.14'
INV. OUT = 7814.94'
XSA
EX. SMH #77
RIM = 7827.43'
INV. OUT = 7816.75'
XS
A
XS
A
EX.
SEWER STUB
T.P.ELEV. = 7814.64'
EX.
SEWER STUB
T.P.ELEV. = 7817.69'
XS
A
XSA
EX. SEWER SERVICE
ELEV = 7818.17'
EX.
SEWER BEND
T.P.ELEV. = 7823.43'
EX.
SEWER BEND
T.P.ELEV. = 7824.05'
EX.
SEWER BEND
T.P.ELEV. = 7824.31'
EX.
SEWER SERVICE CAP
T.P.ELEV. = 7826.16'
X
W
L
X
W
L
X
W
L
XW
L
XW
L
XW
L
XWL
XWL
XWL
XWL
XWL
XWL XWL XWL
XW
L
X
W
L
X
W
L
X
W
L
X
W
L
XWL
XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
XWL
XWL
XWL
X
H
C
E
X
H
C
E
X
H
C
E
X
H
C
E
XH
C
E
XH
C
E
XH
C
E
XHC
E
XHCE
XHCE
XHCE
XHCE
XHCE XHCE XHCE
XH
C
E
X
H
C
E
X
H
C
E
XH
C
E
XHCE
XHCE
XHCE
XHCE XHCE XHCE XHCE
EX.
HCE LINE
EX.
HCE LINE
EX.
HCE LINE
EX.
HCE LINE
EX.
HCE LINE
EX.
HCE LINE
EX. HCE
TRANSFORMER
EX. HCE
TRANSFORMER
EX. HCE
TRANSFORMER
XHCE XHCE XHCE XHCE XHCE XHCE XHCE XHCE XHCE XHCE XHCE
XHCE
XHCE
XHCE
XHCE
ASSUMED HCE
TRANSFORMER
PER STAKING
(NO SURVEY DATA)
EX.
HCE LINE
EX.
COA LINE
XGAS XGAS
XGAS
XGAS XGAS XGAS
XGAS
XGAS
XGAS
X
G
A
S
X
G
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XGA
S
XGA
S
XGA
S
XGAS
XGAS
XGAS
XGAS
XGAS
XGAS
XGAS XGAS XGAS XGAS
XGAS
XG
A
S
XG
A
S
XG
A
S
XG
A
S
X
G
A
S
X
G
A
S
X
G
A
S
XG
A
S
X
G
A
S
XG
A
S
XG
A
S
XG
A
S
XGA
S
XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS
XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS
XGAS
XGAS
XGAS
XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS
XGAS
XGAS
XGAS
XGAS
XGAS
XGAS
XGAS
XGAS
XGA
S
X
E
L
X
E
L
X
E
L
X
E
L
XE
L
XE
L
XE
L
XEL
XEL
XEL
XEL
XEL
XEL
XEL XEL
XEL
XEL
XEL
XE
L
XE
L
XE
L
XE
L
XEL
XEL
XEL XEL XEL XEL XEL XEL XEL XEL XEL XEL
XEL XEL XEL XEL XEL XEL XEL XEL
XEL
XEL
XEL
X
G
A
S
EX.
JOINT TRENCH
EX.
JOINT TRENCH
XETC XETC
X
E
L
X
E
L
EX.
JOINT TRENCH
TOP PIPE=7819.62'
EX.
JOINT TRENCH
TOP PIPE=7818.97'
EX.
PRIMARY ELECTRIC
TOP PIPE=7818.09'
EX.
PRIMARY ELECTRIC
TOP PIPE=7817.48'
EX.
PRIMARY ELECTRIC
TOP PIPE=7817.52'
XE
L
XE
L
XE
L
XE
L
XE
L
XG
A
S
XG
A
S
XGA
S
XG
A
S
X
G
A
S
X
G
A
S
X
G
A
S
X
G
A
S
X
G
A
S
XTC
XTC
XTC
XTC
XTC XTC
XTC
XT
C
XT
C
XT
C
XT
C
XT
C
XT
C
XTC
XTC
XTC XTC XTC XTC XTC XTC XTC
XTC XTC XTC XTC
XTC XTC XTC XTC XTC XTC XTC XTC XTC
XTC
XTC XTC
X
T
C
X
T
C
XTC
X
T
C
X
T
C
X
T
C
X
T
C
XT
C
XT
C
XTC
XTC
X
T
C
XT
C
XT
C
XT
C
XT
C
EG
EG
EG
EG
EE
E
E
EE
EE
ETVETVEP
E
P
EP
w
w w w
w
w
w
w
w
w w w w w
w
w
w
w w
w
w
EE
E
E
E
E
EE
E
E
EE
EE
EE
EP
EP EPw
w
ETV
E
T
V
E
T
V
EP
E
P
E
P
ETV
EE
EE
EEE
E
EP
EP
EPEPETV
ETV
ETV
ETV
ETV ETV
ETV
ET
V
ET
V
ET
V
EE
EE
EE
EE
EE
E
E
EEETVEP
ETVEPEE
EP
EP
EP EP
EP
EP
EP
EP
EP
EE
EE
EE
EEEE
EE
EE
EE
EEEE EE
EE
EG
EG
EG
EE
EE
EE EE EE
EP
EP
EP
EP
EE
E
E
EE
ETV
EG
E
G
E
G
EE
ga
s
EG
EP
EP
EP
gas
gas
ga
s
ga
s
E
T
V
ETV
ETV
ET
V
ET
V
ET
V
ET
V
ETV
ETV
ETV
ETV
ETV
ETV EE
EE
EE
EE
EE
EE
EE
w w w w w
EG
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EG EG EG
EG
EG
EG
EG
EG
EGEG
EG
EG
EG
EG
E
G
EG
E
G
ETVETVETV
ETV
ETV
X
S
D
XSD
XSDXSD
XSD
XSD
ESS
ESS
ESS
EWS
EWS
EW
S
EW
S
EWS
E
W
S
EW
S
EWS
EW
S
EW
S
EW
S
EW
S
2
4
"
R
C
P
18"
R
C
P
18"
R
C
P
24"
R
C
P
6"
P
V
C
XSA
XSA
X
S
A
X
S
A
X
S
A
XTC
EX. C
O
A
EL. V
A
U
L
T
X
E
L
X
E
L
XEL
EX. COAEL. VAULT
EX. COA
EL. VAULT
XTC
>>>>>>>>
>
>
>
>
>
>
>
>
>
>
>>>>>>>>>>
>
>
>
>
>
>
>
>
>
>
>
X
S
A
X
S
A
XSA
XSA
XSA XSA
XSA
XSD
X
S
D
XSDXSDXSD
CONSTRUCTION LIMITS
gas
1
5
"
R
C
P
I
N
V
.
O
U
T
7
8
0
2
.
3
9
EWS
CL
O
U
D
E
D
A
R
E
A
U
N
D
E
R
C
O
N
S
T
R
U
C
T
I
O
N
FO
R
P
E
D
E
S
T
A
L
6/
5
/
2
0
2
0
EX. 3' X 3'
AREA INLET
EX. 3' X 3'
AREA INLET
EX. TYPE C
EX. OUTFALL
18" RCP
EX. STORM MH
RIM = (BURIED @
TIME OF SURVEY)
STUBBED & CAPPED PIPE
INV 18" = 7835.1'±
CONTRACTOR TO CONFIRM LOCATION,
SIZE & DEPTH PRIOR TO CONSTRUCTION
EX. 18" AREA INLET
EX. CURB
INLET
EX. 24"
AREA INLET
EX. 24"
AREA INLET
EX. 24"
AREA INLET
EX. CURB INLET
EX. STORM
MH
EX. CURB INLET
EX. 12" PVC PIPE STUBOUT;
TO BE ABANDON AND
REMOVED
EX. STORM MH
EX. 3' x 3' AREA INLET
EX. 2' x 2'
AREA INLET
EX. 2' x 2'
AREA INLET
EX. 3' x 3' INLET
EX. STORM MH
EX. 3' x 3'
AREA INLET EX. 2' x 3'
CURB INLET
EX. 2' x 2'
AREA INLET
EX. 12" INLET
(REMOVE)
EX. STORM MH
EX
.
1
2
"
H
D
P
E
12" STUB OUT; CONTRACTOR TO
CONFIRM LOCATION, SIZE, DEPTH &
MATERIAL PRIOR TO CONSTRUCTION
18" RCP
EX. 15" RCPEX. 15"
RCP
EX
.
1
5
"
R
C
P
E
X
.
1
8
"
R
C
P
24" HDP
E
10" HDPE
EX. INLET
(REMOVE)
EX. INLET
(REMOVE)
EX. 4" UNDERDRAINS
(TO BE REMOVED)
1
EX. GRAVEL ROAD;
RE. TO NOTE 7
EX. SEWER MAIN
1
1
1
1
2
2
3
"STOP"
3
"DO NOT
ENTER"
3
"DO NOT
ENTER"
& "STOP"
3
STREET
NAME
3
SPEED
LIMIT
4
4
4
4
4
4
REPLACE EX. 15"
RCP W/ 18" RCP;
RE. TO PLANS
5
6
6
6
6
6
6 6
HATCHED AREA REPRESENTS LIMITS
OF SLOPE MAINTENANCE EASEMENT
FALLING WITHIN AVLT
CONSERVATION EASEMENT.
EXISTING SEDIMENTATION BASIN; COORDINATE
WITH PROJECT GEOTECH ON RECOMMENDED
SOIL MITIGATION REQUIREMENTS FOR
PROPOSED BLDG 15
EXISTING
SEDIMENTATION BASIN
TO BE ABANDONED
EXISTING GRAVEL TRAIL; RE.
TO PLANS FOR RELOCATION
& COORD. WITH CITY PARKS
ON RE-ALIGNMENT
REMOVE EX.
SIDEWALK
REMOVE EX.
PARALLEL PARKING
L
O
D
L
O
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD LOD
LO
D
LOD LOD
LOD
LOD LOD
LOD
LO
D
LO
D
LOD
L
O
D
L
O
D
LOD
LOD LOD
LOD
LOD LOD
LOD
LOD
LOD LOD LOD LOD LOD
LOD
L
O
D
LO
D
LOD
LOD
LOD
L
O
D
LOD
LOD
LOD
LOD
L
O
D
L
O
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LODLODLODLODLODLOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LOD
LOD
LO
D
L
O
D
LODLOD
LOD
LO
D
LOD
LO
D
LO
D
LOD
LO
D
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
EX. ELEC. VAULT &
CABLE/TELE. PEDS
EX. ELEC. VAULT &
CABLE/TELE. PEDS
EX. ELEC. VAULT &
CABLE/TELE. PEDS
EX. 8" SEWER MAIN STUB OUT;
RE. TO PLANS FOR CONT.
7
7
7
7
ABANDON EX. SEWER SRV. TAP
PER ACSD SPECIFICATIONS
7
MI
N
I
N
G
S
T
O
C
K
P
A
R
K
W
A
Y
HA
R
M
O
N
Y
R
O
A
D
F
O
R
G
E
R
O
A
D
REMOVE EX.
SIDEWALK
EX. 12" PVC PIPE STUBOUT;
CONFIRM, DEPTH, LOCATION &
SIZE PRIOR TO CONSTRUCTION
PARK 2
(UNDER CONSTRUCTION)
CONTRACTOR TO COORDINATE WITH COA PARKS
ON SCHEDULE & GRADING IMPROVEMENTS
PROPOSED ON PARK 2 PRIOR TO CONSTRUCTION
7
7
7
7
7
7
7
7
7
8
8
88
PARK 3
(COORD. W/ COA PARKS ON ALL
PROPOSED IMPROVEMENTS
WITHIN PARK 3)
9
9
9
REPLACE EX. SAN. SEWER
MH; RE. TO 68 WEST SEWER
MAIN IMPROVEMENTS 1
1
REMOVE &
REPLACE EX.
SIDEWALK IN
KIND
EX. STORM VERT.
RISER; INSTALL INLET
PER PLANS
REMOVE EX.
ASPHALT
7
7
7
10
4
PHASE 3 WILL NOT REQUIRE GAS SERVICE.
CONTRACTOR TO COORDINATE WITH BLACK HILLS
ENERGY ON PROPER ABANDONMENT OF EXISTING
GAS MAIN AND ASSOCIATED SERVICE STUBS.
LOT 3
LOT 4
AVLT
CONSERVATION
EASEMENT
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
040 40 80
40
12020
GAS MARKER
EXISTING ELECTRIC MANHOLE
EXISTING SEWER MANHOLE
EXISTING FIRE HYDRANT
EXISTING WATER VALVE
EXISTING ELECTRIC TRANSFORMER
EXISTING TELEPHONE PEDESTAL
EXISTING CATV PEDESTAL
EXISTING LEGEND
EXISTING CONTOUR
EXISTING CONTOUR INTERVAL7900
EXISTING WATER MAINXWLXWL
EXISTING SANITARY SEWER MAIN
EXISTING GAS
XTC XTC XTC
XGAS XGAS XGAS
EXISTING C.O.A. UNDERGROUND ELECTRIC
EXISTING COMMUNICATIONS
XEL XEL XEL
XSA XSA
XHCE XHCE EXISTING HOLY CROSS ELECTRIC
G:
\
2
0
1
9
\
1
9
1
2
0
-
B
G
P
H
3
\
C
I
V
I
L
\
C
I
V
I
L
D
W
G
S
\
P
L
O
T
\
S
H
E
E
T
S
E
T
\
1
9
1
2
0
-
2
A
-
E
X
C
O
N
D
-
D
E
M
O
.
D
W
G
-
D
e
c
1
6
,
2
0
2
0
-
9
:
4
3
a
m
OPRIS ES NGINEERING, LLC.
CIVIL CONSULTANTS
502 MAIN STREET
CARBONDALE, CO 81623
(970) 704-0311
FAX: (970)-704-0313
TOWN STAMP
DISCIPLINE STAMP
BU
R
L
I
N
G
A
M
E
R
A
N
C
H
P
H
A
S
E
3
I
M
P
R
O
V
E
M
E
N
T
S
CI
T
Y
O
F
A
S
P
E
N
,
C
O
L
O
R
A
D
O
PROJECT NUMBER
ISSUE DATE
REVISIONS
SHEET TITLE
ISSUE
SHEET NO.
C2.01
EXISTING
CONDITIONS -
DEMO PLAN
19120
No.Description Date
1
6/19/2020
PERMIT
DRAWINGS
PERMIT SET 6.19.2020
1. SAWCUT AND REMOVE EXISTING CONCRETE AT NEAREST EXISTING CONTROL JOINT
2. SAWCUT AND REMOVE EXISTING ASPHALT PAVEMENT
3. REMOVE AND REUSE EXISTING SIGNS (COORDINATE WITH CITY OF ASPEN); RE. TO SHEET C9.01
4. REMOVE EXISTING STORM INLET AND/OR STORM DRAIN
5. REMOVE LIGHT POLE AND CAISSON. RELOCATE AND REPLACE IN KIND PER PLANS.
6. COORDINATE WITH BLACK HILLS ENERGY ON THE ABANDONMENT OF EXISTING GAS SERVICE AT MAIN.
7. ADJUST EXISTING INLET RIM, MH COVERS, AND/OR VALVE COVERS; RE. TO PLANS.
8. EXISTING RAIN GARDEN TO BE RE-GRADED TO MEET WATER QUALITY VOLUME REQUIREMENTS; RE. TO
PLANS AND DETAIL SHEET C10.07.
9. CONTRACTOR TO COORD. WITH UTILITY PROVIDERS ON SETTING TRANSFORMERS & PULLING
SECONDARY SERVICE FEEDS TO PROJECT; RE. TO UTILITY PLAN FOR MORE INFORMATION. CONTRACTOR
RESPONSIBLE FOR ALL CONDUITS, BEDDING & BACKFILL FOR UTILITY WORK.
10. REMOVE EXISTING BOULDER WALL
SITE DEMOLITION KEY NOTES:
GENERAL SITE DEMOLITION NOTES:
1. EXISTING CONDITIONS BASED UPON SURVEY PERFORMED BY SOPRIS ENGINEERING LLC. DATE OF SURVEY
JANUARY - MAY 2020.
2. THE LOCATIONS OF UNDERGROUND UTILITIES ALONG PAEPCKE ROAD HAVE BEEN PLOTTED BASED ON
UTILITY ASBUILT INFORMATION ACQUIRED DURING PHASE II ACCESS & INFRASTRUCTURE IMPROVEMENTS.
ASBUILT INFORMATION WAS OBTAINED THROUGH THE CONTRACTOR AND IN SOME CASES FIELD LOCATED
BY SOPRIS ENGINEERING. ALL OTHER EXISTING UTILITIES ILLUSTRATED HEREIN WERE OBTAIN THROUGH
UTILITY MAPS, LOCATES OR OTHER INFORMATION PROVIDED BY UTILITY COMPANIES AND ACTUAL FIELD
LOCATION ASBUILTS.
3. ALL UTILITIES, BOTH UNDERGROUND AND OVERHEAD, SHALL BE MAINTAINED IN CONTINUOUS SERVICE
THROUGHOUT THE ENTIRE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL BE RESPONSIBLE AND LIABLE
FOR ANY DAMAGES TO, OR INTERRUPTION OF, SERVICES CAUSED BY THE CONSTRUCTION.
4. THE CONTRACTOR SHALL CONTAIN HIS CONSTRUCTION OPERATIONS TO THE AREA WITHIN THE LIMITS OF
DISTURBANCE (LOD) & SPECIFIED RIGHT OF WAY. THE CONTRACTOR SHALL NOT OPERATE OUT SIDE THIS
AREA WITHOUT THE PRIOR EXPRESSED CONSENT OF THE OWNER OR DEVELOPMENT REPRESENTATIVES.
5. CONTRACTOR TO COORDINATE ALL UTILITY LINEWORK WITH THE RESPECTIVE UTILITY COMPANY PRIOR TO
CONSTRUCTION. ALL UTILITY WORK SHALL BE IN ACCORDANCE WITH THE RULES AND REGULATIONS OF THE
UTILITY PROVIDER.
6. EXISTING ASPHALT AND CONCRETE TO BE REMOVED MAY BE CRUSHED TO A MINUS
3 4" AND REUSED AS FILL
ONSITE.
7. CONTRACTOR TO COORDINATE WITH PROJECT GEOTECHNICAL ENGINEER ON ACCEPTANCE OF EXISTING
GRAVEL ROADWAY TO BE USED AS BASE COURSE.
8. CONTRACTOR TO CONFIRM GRADES AT ALL TIE IN LOCATIONS PRIOR TO CONSTRUCTION & COORDINATE
WITH ENGINEER OF RECORD ON ANY DISCREPANCIES.
9. CONSTRUCTION BMPs SHALL BE INSTALLED PRIOR TO COMMENCEMENT OF DEMOLITION ACTIVITY.
6 12.11.2020PERMIT RESUBMIT 1
7 ADDENDUM 2 12.16.2020
7
7
7
7 Sound Monitoring
station #1
Sound Monitoring
Station #2
SOUND FENCE FOR CRUSHING
OPERATIONS=
COA Fire Department
Emergency Access
There will be Concrete washout pans provided for Concrete trucks,
pumps and miscellaneous tools.