Loading...
HomeMy WebLinkAboutFile Documents.33 MINING STOCK PKWY.0093-2020-BRES (55)Monday, June 1, 2020 at 20:33:31 Mountain Daylight Time Page 1 of 3 Subject:RE: Burlingame Ranch Insubstan5al Amendment 1 of 2 Date:Friday, April 3, 2020 at 10:24:33 Mountain Daylight Time From:GarreG Larimer To:Christopher Everson, Will Hentschel CC:Will Hentschel, MaG Wiedenman, Chris Penney ACachments:image009.png, image010.jpg, image011.jpg, image012.jpg Hi All, I took the proposed amendments for B-Game Phase III to staff today and got posi5ve feedback on all items. Staff feels all changes are within the insubstan5al amendment allowances, to summarize our discussion: 1. No concerns with grading, as long as engineering is sa5sfied. 2. Boulder wall/gabion wall approach was well received. Staff comments deferred to building (structural) and engineering. As long as those two agencies have the details they need, we can document changes through building permit/change orders. 3. Water u5lity rooms change design approach confirmed, again, just make sure you comply with dimensional limita5ons for each building 4. Privacy screens concept wasn’t viewed as adding bulk to the buildings and could be approved through this admin process. We’ll need plans for all buildings to document and confirm. There may be some discussion about specific areas once we have the full plan if some high visibility areas have an impact on massing, but generally this was not a concern. 5. Architectural Detailing – understand the change, suppor5ve of direc5on, but wanted to see if there were design alterna5ves that could mimic original architecture more closely. The two concerns expressed were that the steel was more slender than the bulkier wood posts and beams and there was significantly less wood detail with the steel. As is, we would approve it but if there are ways to bring the proposed altera5ons closer to the original look and feel staff supports moving in that direc5on. Denis was in the mee5ng but I didn’t discuss any of the accessibility items so that conversa5on should happen prior to submi`ng for land use. Once that is ironed out, and engineering is in a good place, it seems like we’re in good shape for the land use applica5on. Let me know if you have any follow up ques5ons or would like to jump on a call to discuss. Thanks, GarreG To promote the health and safety of our staff and community and to minimize the spread of COVID-19, Community Development staff are conducNng business by email and phone and are only available in person by appointment. Contact informaNon for our enNre staff and how best to get the services you need can be found on our website: cityofaspen.com/177/Community-Development. Thank you for your understanding. Garrett Larimer Community Development Department 08/26/2020 Page 2 of 3 Planner 130 S. Galena St. Aspen, CO 81611 p 970.429.2739 www.cityofaspen.com www.aspencommunityvoice.com Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the sender that you have received the message in error and then delete it. Further, the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions contain in the email are based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. From: Christopher Everson <chris.everson@cityofaspen.com> Sent: Wednesday, April 1, 2020 5:14 PM To: Will Hentschel <whentschel@359design.co>; GarreG Larimer <garreG.larimer@cityofaspen.com> Cc: Will Hentschel <willhentschel@gmail.com>; MaG Wiedenman <mwiedenman@359design.co>; Chris Penney <chris.penney@artaicgroup.com> Subject: RE: Burlingame Ranch Insubstan5al Amendment 1 of 2 Hi, Garret. In case it helps for distribu5on, here’s the full package in one pdf file. Thanks! Chris Everson Affordable Housing Project Manager City of Aspen, 130 South Galena Street, Aspen, CO 81611 Phone: 970.429.1834 / Email: chris.everson@cityofaspen.com From: Will Hentschel <whentschel@359design.co> Sent: Wednesday, April 1, 2020 4:38 PM To: GarreG Larimer <garreG.larimer@cityofaspen.com> Cc: Christopher Everson <chris.everson@cityofaspen.com>; Will Hentschel <willhentschel@gmail.com>; MaG Wiedenman <mwiedenman@359design.co>; Chris Penney <chris.penney@artaicgroup.com> Subject: Burlingame Ranch Insubstan5al Amendment 1 of 2 GarreG Gree5ngs. I hope this email finds you well. Please use the aGached leGer and two files(in separate emails) that contain Exhibits A-C & Exhibits D-G. Please let me know if you have ques5ons. Email 1 of 2 Contains: Cover LeGer - Progress_BG3 PD_Amendment LeGer 31Mar2020.pdf 20200331_Insubstan5al PD Amendment_Exhibits_A-C Exhibit A - Park 3 Revisions to Grading 08/26/2020 Page 3 of 3 Exhibit B - Revisions to grading at Carports P8- P12 at uphill grades Exhibit C – Alternate Landscape Walls Email 2 of 2 Contains: 20200331_Insubstan5al PD Amendment_Exhibits_D-G Exhibit D - Water Entry Room loca5ons Exhibit E - Architectural Privacy Screens Exhibit F - Architectural and Structural Detailing at Decks and Railings Exhibit G – Correspondence with the Engineering Department on March 27, 2020 Stay Healthy! Will Will Hentschel Principal 359 Design, LLC 3630 Osage Street Denver, CO 80211 359design.co +1 303 884 9131 whentschel@359design.co Oh ----please wash your hands! Thank you. 08/26/2020