HomeMy WebLinkAboutFile Documents.341 Park Ave.0072-2022-BRES (16)INDUSTRIAL INSPECTION
SERVICES
Special Inspector's Final Report
REPORT DATE: December 1*, 2023
JOB NAME: 341 Park Ave, Aspen
ABBRESS: 341 Park Ave, Aspen
BUILDING TYPE: Residential Remodel
INSPECTION DATES: August 28t, 2023
PERMIT #
GEMERAL CONTRACTOR: Giant Construction
WALL TYPE: Wood framed / Structural steel
DESCRIPTION OF INSPECTION WORK PERFORMED: Speclal inspection provided to monitor and witness shop
welding and fabrication of structural steel moment frame as required by the 2018 IBC, structural engineer, manufacturer
and local bullding
LOCATION IN STRUCTURE: Special Inspection provided to witness shop welding of full-penetration groove welds at structural steel
bent roof beam / columns / frame as detailed and approved by structural engineer. (DB Structural
REMARKS FOR STRUCTURAL STEEL: Verification and witness of shop welding as detalled and designed by structural
engineer. Welding was performed by certifled welders employed by Grove Steelworks using approved filler materlals and
processes. Weld discontinultles were corrected in Inspector's presence and re-welded in accordance with AWS D1.1
/AISC specifications. MIll certifications for steel elements revlewed and kept on file by fabricators. No additional problems
noted. Upon the completion of the work described herein, the work performed, the materials utilized and the processes
used appear to fully comply with the approved plans and applicable codes.
REMARKS GENERAL: Special Inspection on this project was performed per the speclal Inspection requirements adopted
from the 2018 IBC by the City of Aspen / Pitkin County Bullding Department as part of the approved plan.
ALL WORK REFERENCED ABOVE WITNESSED BY INDUSTRIAL INSPECTION SERVICES PERSONNEL, PERFORMED THROUGH
AUGUST, 2023 WAS SATISFACTORILY COMPLETED AND CONFORMS TO THE APPROVED PLANS, THE 2018 INTERNATIONAL
BUILDING CODES (IBC), THE ADOPTED PROVISIONS OF THE AWS D1.1 AND THE AISC MANUAL OF STEEL
360, SECTION N. THIS STATEMENT APPLIED DIRECTLY TO THOSE PORTIONS OF THE STRUCTURE WHICH
INSPECTION WAS PRESCRIBED AS PART OF THE APPROVED PLANS. DETAILED ACCOUNT OF DAILY EVENTS AVAILABLE
UPON REQUEST.Seeks
Special inspector of Record:
Date: