HomeMy WebLinkAboutFile Documents.933 E Hyman Ave.0100-2023-BCHO (6) Field Plan Set Must Be Printed In Color 1►40P00
APPLICATION ACCEPTED DATE: 2023-10-25 PERMIT NUMBER: 0100-2023-BCHO \',idgI
CITY OF
COMMUNITY DEVELOPMENT DEPARTMENT41
;�/; EE NOTES #1 PLANS ASPEN
plans BUILDING PERMIT COVERSHEET ��� These mus'die crept at the
CITY OF ASPEN building site or inspection
delays may occur.Construction
shall conform to these plans.All
PROPERTY INFORMATION changes shall be approved by
the building official.
ADDRESS: 933 E HYMAN AVE UNIT:
PARCEL ID: 273718231044 LEGAL DESCRIPTION: KENTCO LOT SPLIT SEPARATE PERMITS ARE
OWNER: SCHRAGER TERRI L REQUIRED FOR ELECTRICAL,
PERMIT CONTRACTOR: Decatur Wilkie Inc. PLUMBING,MECHANICAL,OR
FIRE SPRINKLER WORK
SMOKE ALARMS AND
External Energy Use Approved CARBON MONOXIDE
DESCRIPTION OF WORK Minor changes to floor plan layouts(Laundry room,Bathroom 3,Den),replacement of elevator cab,like for like SPECIAL INSPECTION REQUIRED: DETECTORS REQUIRED
Q RREMP ❑ CREMP THROUGHOUT DWELLING
window replacement at 5 windows,replacement of structural header/beam,remove proposed spa and REMP -Structural steel welding:Field&Shop UNIT PER CITY OF ASPEN
re-calculations to payment in-lieu -High strength bolting PERMIT#: 0100-2023-BCHO DATE: 3/13/24 MUNICIPAL CODE 8.15
-Epoxy anchors 1788 Existing/repaired,103 New
-Intumescent paint SNOWMELT: It should be known that this review shall
-Spray applied fire resistive materials POOL: N/A
RESIDENTIAL REFERENCES FROM 2015 IBC not relieve the applicant of their
cvics=crawl space ventilation sec.1203.4. 18"x 24"access required -Permanent micropiles SPA: N/A responsibility to comply with the
1209.1 requirements of the City of Aspen
EE=emergency escape required sec 1030 A1.05
Special inspection is required per201518C REMP SHEET: Municipal Code.Pursuant to
USE OF BUILDING SingleFIRE SPRINKLER REQUIRED? Yes EU=enclosedusablespaceunderstairsshallbe1-hrconstructionorstair p
g Familysection 1704.Inspector to verify that copy of
enclosure rating.No access from stair enclosure.%"gypsum permitted for MINIMUM BOILER AFUE: 84% Sec.26.104.050,any permit or approval
stairs inside a single dwellingunit.1011.7.3. agreement for inspection program to be on
g OFFSET: N/A issued in error or otherwise not in
RV=roof and rafter ventilation required 1203.2 the job site prior to performing any conformity with the requirements of this
A=Attic Access 20"x 30"1209.2 inspections.A copy of all Special Inspector
CLASS OF WORK Residential FIRE SPRINKLER TYPE NFPA 13 SA=smoke alarm(NFPA 72)required sec 907.2.11 field reports to be on the job site for REVIEWED BY: Jim Pomeroy Title,shall be void.Similarly,any permit
CO=carbon monoxide detector req.per Aspen Municipal Code 8.15 SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ'S. or approval issued in reliance upon or
inspectors'review if requested.Failure to
SG=safety glazing required sec 2406 Al snow-nee systems shall meet the meowing: as a result of,a materially false
V=mechanical ventilation required sec 1203.1&IMC 403(bath fans and comply may result in denial of inspection.
q -Any portions in the Right or way most be on a separate zone.A ROW d statement or representation made in
SPECIAL whole house ventilation) permit and Permanent Encroachment License are required. the process of obtaining the permit or
REQUIRED
GR=guards,42"min ht,4"max opening.Guards within dwelling unit 36"min -R10 insulation shall be installed under the area to be snow melted or R5
BUILDING TYPE(IRC) Townhouse INSPECTIONS Structural Steel Welding htsec1015 insulation shall be installed under and at the slab edges.(Ordinance 11 development approval shall,likewise,
HR=handrails 34"-38"ht sec 1014 Series 2011) be void.Any person having received a
DS=Draftsto in /fiire718 -Automatic omrolsmsalledfor systemshmoff when pavement void or voidableora approval
stoppingblockingtemperature is above 50"F and no precipitation is falling.(2009 IECC permitPP
RD=Roof drainage 1503.4 Sec.403.8 8 503.2.4.5) shall not be relieved from having to
STC=Sound transmission class not less than 50 at dwelling separations,sec -Automatic or manual controls installed for system shut on when outdoor comply with all applicable terms and
CONSTRUCTION TYPE ENERGY CODE COMPLIANCE Prescriptive Table 1207 temperature is above 40"F.(2009 IECC Sec.403.88503.2.4.5)
SI=Stairway Illumination 1205.4 -Inspection by testing hydrostatically at 1'/:times max system design conditions of this Title and the City shall
PD=protect against decay,sec 2304.12 pressure.but not less than 10opsi,for 15minutes.(2009 IMC sec. not be estopped from fully enforcing
REFERENCES FROM 2015 IMC 120s'1) same.
WORK CHANGES BUILDING DE=clothes dryer exhaust,sec 504.Makeup air req'd if over 200 CFM Recessed luminaires installed
OCCUPANCY GROUP(IBC) R-3 FOOTPRINT? No AS=access and service space for maintenance req'd,sec 306 in building thermal envelope
MA=make up air required if hood exhausts greater than 400 CFM,sec 505.2 shall be sealed and IC-rated—
ET=exhausts terminate 3'from prop line and openings,IS'from intakes, IECC sec R402.4.5 SEE NOTES#1 PLANS
501.3.1
IT=intake openings 10'from lot line&contaminant sources(vents,streets),
CODE EDITIONS 2021 IEBC TOTAL SPA SQ.FT. 401.4
D=fasten and seal all ductwork per 603.9
_ REFERENCES FROM 2015 IFGC
DV=direct vent req'd,sec 303.3
CA=combustion air not taken from bedrooms,bathrooms or
OTHER CODE EDITIONS TOTAL SNOWMELT SQ.FT. 1,891 storage sec 303.3
OD=outdoor appliances must be listed for outdoor use,sec 303.6
REFERENCES FROM 2015 IECC
F=new or replacement fenestration shall not exceed 0.28 U-factor,NFRC
label required,Ordinance 40,2016
HISTORIC PROPERTY? No TOTAL POOL SQ.FT. L=75%of lamps in permanently installed lights must be high efficacy,sec
R404.1
SE=Continuous air barrier required;all exterior joints,cracks,and holes to be
- caulked,gasketed,sealed,table R402.4.1.1
REFERENCES FROM 2014 NEC
FIRE SPRINKLER EXISTING? Yes EP=electric panel'happy space'30"x36"x78",not in storage,sec 110.26
rIIIRCU 03/13/2024 J
OOH000tretellANCE
j imp
ririttAr"
d2 J
/04/2023
ZONING
jligi
CITYOFASPEN c.Building Department Rnenelbintiw:
B. Owner Responsibilities: I. Approve rpMlal-Iaapee9Iun program.The bondingdoparhecnl dull approve ell special
SPECIAL INSPECTION AND TESTING AGREEMENT I. The proja[owner,an agent of the owner,orate design professionalB responsible charge acting inspnema and Lin The yaal Insp yweWI regmmngsp
This form is r dfm eed l ins and/or testier Chapter 17 of the Intonational eo gayshal no,be in the employ
of thge
contractor,
ntral100,subcontractor
or mathal special E. monitor
ehe performance omWurkrcspectr.TI/I/lien apprionalnd the building inspector Moll
squire projecmn inspecia inspection en goer p [IB5.1704.1]shall casetbentheemploy ofinehe spec[m,mbcon71gB1or shall be
lmploye anima,Pet he
prior t impeinn,ofs/Nerappmwldng of steonmll sleet,or specialthr
Building Code(IBC). [IBC specified
by.Me builds g sec owmen/conuacmr,the special inspcctoAagmcy shall be employed flair,materials.mil be obloined prior to plucelnenl al uronvrde,covering of Nnwmnl sleet,another
Project Atldress:833 E.Hymen Ava. ermn umber: D12S-2021-BRES aofessifid Aby Reponsibl o hang smiles nspc -
C.Deign Professional inRrtigge Responsible ,Lnd,0lltiw: 1. final repnepeelion repo..The building nlYclalWwuld review spacial-Inspection Program and
BEFORE A PERMIT CAN BE ISSUED:The owner,a the design professional in responsible charge,acting as ve Professional a (kJ-inning Perform
Schethe dule,
dingshallthe complete coledgments_agreement end ion c ached Special-inspection and Test defined byrc ens
d. Pert° finaln]IBC 1etiom The building It ortcielakuulU painnn the fad inspection 11 and apmawl
Scheddst review t the required acknowledgments_A 04pmsedNon conference with me patties involved maybe ow with
t rev,ew a°Idle building
cam for u Pmjem[IBC Sur IU9.1.11 after iM Rnel apeJal inapewian report has peen reviewed and
required breview the spacial-inspection requirements and procedures. s project,as determined Y building teal,for compatibility with me design afNebuimirgar oppmved.
APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the projects for w I. Prepare statement ofapeciallnspxtiova.The registered design professional in resporoible
which they provide special inspections.Special inspectors shall be approved by the building department prior to charge shall prepare a statement of special inspections i accordance with IBC Section 1705 for
performing any duties.Special inspectors shall submit their qualifications end are subject to personal interviews for submittal by the applicant The statement of special inspetions shall identify the following:
pre-qualifncatin.Special inspectors shall display approved identification, stipulated by me building official, The materials,systems,components and work minted m have special in on or
when performing the function of special inspector m a testing by the building offiial or by the registered design profesinal responsible for
Special anion and maim Imreuhe minimum of International Building code section each" Pea.Addis.:933 f.ONO me Pernik Number: DMg.2.0ZI-gCFS
pmi p g shal requirements o vg b-The type and extent of each special Inspection.
1704.The following conditions are also applicable: c.The type and mai Meech teat ACKNOWLEDGMENTS
A.Special Inspector Responsibilities: d. For each type of special inaction,identification as[o whether it be continuous I have end and agree to amply with De conditions oflhis agmemet.
(alai Inspection or periodic special Dead°,
I. Signify presence at job rite.Special inspectors should notify contactor personnel of then D.Contractor Responeibilitles:
presence and responsibilities at the job site.If required by the building official,they shall sign iu INotify the special inspector.The contractor is responsible far notifying the special impactor or
on the appropriate form posted with the building permit. agency regarding individual inspections for items listed n Me attached schedule and as noted an — -
1. Oboe assigned work.The special inspector shall observe assigned work for conformance with the buildingdepartment approved Plan Adm.notice shall be provided so the special inspector Spwiel Inspeetion Signulltm Printed Name Dale Email
the building department approved(stamped)design drawings,specification and applicable1. Provide access has mbeotoappme rvedp�she project
per p Agony.**
workmanship provisions of the International Building Code. rch' Pe 6 d shopTh bl f 'din i ecul ','���."r "�JJ[/�Jr'��/{�'� �jrj ,,{{ 41,a,,,Ner4a4eAA
drawings may b d 1 d 'spec' inspectorRetain special impection records.Upon request,ihe contractor is alsoresponsible for retaining "^"er/ PrintedN ODD Email
For coven I' N W' shall be 11' b i me j b- 'p�a'sPn'on records completed by h Pecial inspector. �C �� II�� 4'' 11
P P spec P % f ♦fff / o1raMF IS 73 ✓3D O WI.Cnwl
work requiring special inspection.Periodic inspections,if any,must have approval on E. Inspection o Fabricators:
prior approveI. Fabrication of structural assemblies and members,Where fabrication of sbuctunl load-bearing Hofuaional in Signsmrt Hinted Nanm Mlv Email
a separate written plan reviewed and approved by the building department and the engineer or members and assemblies is being performed on the premises of a fabricator's shop,IBC Senior, Rospomeble Chow.
architect of record.
3. R nonconforming items.Th uli rshall b' nconfoml gitems to the 1]04.2 shall re special inspectionoftM1e fabricated items
sportvo g The aspect Ming ao Fab implementation ro d inspector Dna'iu1 WU'In _''''far/ 4/a f. .i5 EB./l FJ.A.. evi/kip,LO so
1. Fabrication and ins emen ionp ce urn.The special inspe or shall verify that ere '�I'rt°
mediate attention of the contractor Rd note all such items in the daily report.If any item is not fabricator maintains derailed fabrication and quality Iprocdures that provide abasis for Contractor Signature Printed Nano Dete Email
resolved in a timely manner or is about to be incorporated in the work,the special inspector shall inspection ry Coumo
,mmedately notify the building department by telephone or in persoq notify the engineer m consenrol of the workmanship and the standards.The
special ability to conform to approved •
architect,and posta discrepancy notice. es and
ssandafeaative to The5ments rDr ecmr illsrevew work. s Approve -- SigMupo- Hinted Name Date Email
4. Provide time) Thes ial insector shall comlete mitten in for each F dFabuoiond adequacy rele� de rryuirese inspector
'scope ore pro. roved....
Y P P P P spec reports Approved RwPoneibNtlea
inspection visit andp 'd the reports on a timely basis determined by the building -.The I. Fabrication exempt Inspections.Special i p 9 ired where work-done on theRDaeoi ��ar rk�L..sI�� N q
special inspectorp agency shall furnish these reports directly h building official, premix of a fabricator registered and approved pin h k withoutinspection.
9 --- RPDLILNm{T D �Q/LfrJ� fe+Ml;fes!''vOH�I�{pM
engineer or M1' f cord,and others as designated.[IBC Sec ITM12]These repo.should If work is done on site that requires special inspection,ep 'al inspection will be required. hauled Signature Printed Name One Email
be organized on a daily fostvat and may be submitted weekly at Me option of Me build official. 1. Approval of fabricator.Approval shall be based upon review of the fabricator's mitten Rrrorv'
These reports should include: and and quality control manuals d periodic Fab
ic auditing of fabrication practices by an City of Amen Building a. Description of daily inspections and tests made with applicable locations, approved special inspection agency. Dped.. Signature _ Prnmd Name Dam Email
b. Listing of nonconforming items, 3. Completion of fabrication. s completion of fabrication,tile approved fabricator shall submit
c. Report on how nonconforming item were resolved or unresolved as applicable, enificat m building officials g that the work was performed in accordanso,ce us tis_
m d. Itemized changes authorized by the architect,engineer,,and building official if with the n ts approved documen.
not
included in nonconforming items ^171Plu col.,tPpmm0H� bdnsTrelmpietlrsdm n bd nunalga lfalllm%�hr[Mnmdlnmin ititirm PppAwl Frbn'dm.tlle Spa5. Provide Final Dope..Report.Thc special inspector shall submit a written final moon *tit.arms'close.Is w requlrel(m rmwakl
documenting required special inspections and correction of my discrepancies noted ill the
inspections prior to the final building inspection.
RECEIVED RECEIVED RECEIVED
02/11/20 02/11/2024 ---—------1.0/22/2023
I
..,swah r,.n.�,,,,.°y new"d:0.:amtw,t t,antvwswu t r.nnevpa5tm 1.mP.oen-
wmsameWamwee e0e.e0anttws I P.w0v2o.50p01 PC 0100l0SllIIo:not .epold ASPEN ,cos<.mAlto,,SteelAPE,eoemnw,aiF.PI0000sdwotr.v/G.vmswrimtvel ASPEN ASPEN
BUILDINGDEPAR1 ,-geld BUILDING DEPARTMENT BUILDING DEPARTMENT J
G.seildilie Department Responnlimies:
I. Approve meeieMespeeMo Pigram.The bnndiag...nem shall approve ill special
inspolors nod•paip,myanion rcquinmcros.
1. Enforcesprnel inspection.Work rcgmriug special inspection and Mc Wilding impactor shall B€Eo
inonitor the perfonnbtce of special imya t...lie/Ntt apprawl,in addition to Mat of the special
he obmimd prior to yloonent of commie,covering of9melnnl Heel,°molter
milar° .
3. Review
mpemoe reports.The building oficial about review specialenspenian programa.
final repass.
4. Perform final inspection.The building official should perform the final inspection and approval --
fur n project IIBC Sec 100.1.11 aper the foal speciohimpvaion report hart been reviewed and
nppmved. „Iwo
io...O.Csu-r
Project Addrem:153 $,d'Ugj AVE. Pnmtlt MM.., B I,Z43•ZOZ1.gZ85 1
ACKNOWLEDGMENTS AWS\ CA i
I have rend and give m wooly will:Me nmdmons of the..mem - �r
gW$W\e gr 1= 1 D I=r..m a.
U 1 EXP. 02s ..r.. 9.
Specie!Inspection Signature Rented Name Dale Enna I - g!
Agency..
�IT'I�cn9gfl ..g{ LiV."/re t.ay�dl'1.w,
�xr er�� PtiHind Nama J Item Email .a. ..'...............
Flmhn v u•r m`�` r"22 ' X�RA5201 ON 1423 t'o, ,t.0,1 ���///
I r f ris ono!to Signal Minced Wen MI En
Respoosibde Charge"• '
craw- .i r5 g //o/sr,:.>:c✓6,4g'a7iP3a:/A4.fAa.
S's Printed D. DWI
p iUL.03 D �� ,''_�_��
dRdtOR ay �r"'"`$aemf �., R�mcArkD.—
•
1 um9 Printed Moll fed k i1
hncuon
IFsbriwmr. Nownsl=to' Slgnaurc Printed Now Dam Email -- —. ,
City of A:pen Building Jim Pomeroy 2/28/24 Ilm.Pwnoroy@aspengov
Depnmm: signature-- Primed Nave rerc Email
rp.aiwa, Nnamadam4anarr m Fwewolh,5R11
BUILDING DEPARTMENT
RECEIVED
02/11/2024
.,air,.. .utter main amin, ASPEN
BUILDING DEPARTMENT