HomeMy WebLinkAboutFile Documents.1427 Crystal Lake Rd.0057-2021-BCHO (5) A
Field Plan Set Must Be Printed In Color 1`1�;DATE: PERMIT NUMBER: 00s]-2021-BCHO MASTER PERMIT 00140-2020-BRES t'',I
COMMUNITY DEVELOPMENT DEPARTMENT 4giol CITY.OF ASPEN I
CITY OF
BUILDING PERMIT APPLICATION
CITY OF ASPEN PERMIT NO.0057-2021-BCHO ASPEN
PROPERTY INFORMATION OW.■N ER
ADDRESS. 1427 CRYSTAL LAKE RD UNIT: MISCHIEF IN THE MOUNTAINS LLC n� �r�,/ p rf p
Steel Fabrication
PERMIT CONTRACTOR: MI N EO FI NE HOMEBUILDERS LLC ADDRESS 1427 CRYSTAL LAKE RD These tans e tat the
OWNER: MISCHIEFINTHEMOUNTAINSLLC ''��`J'- building site or inspection
.
• delays may occur.Construction
PARCEL ID 273718131005 shall conform to these plans.All
c.a.„Barag. Rattmaaa� changes shall be approved by
DESCRIPTION OF WORK This Change0rderlis adding structural drawings to the permit set. .Aprm•pedlbract.KW..,The lw:e.o..1.meJ.l�I1.n..ara.�i
m-, r �>�N the building official.
x Zama sp.tans:o Ireq...PIC.1 e,,. roemld.tbeam,salt
eop"ras PUs.tha ar..A1 hl.m, .. ..pr..u.0tiaao Y ore.NY..
I�m¢r.a.b dbamdpn.m pl.vr®r oroom.4 ra•.W ol.a.coN ml.oea
ant.Gc.ml...rpm>Tb GOJIgoOral dot.mraedt.tR.la MP...
PROJECT VALUATION 175000.0 CODE EDITIONS zols IEec Wcilar truss,.
x ...p.a SEPARATE PERMITS ARE
a �jmc�s'm..ass_0 .'to East r.aA 5 to REQUIRED FOR ELECTRICAL,
PLUMBING,MECHANICAL,OR
USE OF BUILDING Multi-Family BUILDING TYPE IIRCI !1- Lake i�, p FIRE SPRINKLER WORK
CLASS OF WORK Residenaal CONSTRUCTION TYPE VA r..l..'W'x[41l S.r I.4e 24 ha.*Na d,CIttO--O7SCJ QES
•a�•`.r.^ RNSWIMmen SMOKE ALARMS AND
CARBON MONOXIDE
Sq FT OF BUILDING WORK 535.0 OCCUPANCY GROUP(IBC) R-2 Ivj rA ,.J•5 IQ J P
AREA Crrcrn web ma...
arr. S�•I„Q PLO•,ssiC.s.n•�.m DETECTORS REQUIRED
•
c R 3.3a 2z � a��v.
INSPECTIONS
, '�'�� D. �' Yaj^A°.�rYl THROUGHOUT DWELLING
LOTSIZE(SOFT) 2521.0 aL� �� '� UNIT PER CITY OF ASPEN
INSPECTIONS • R' 1=s+ttlD- u]O@If`1D i!Y I Qa11b .c:on'1 MUNICIPAL CODE 8.15
• bD lossZ t 9e1donlbneeMlL"t%lz1 eLytrnf�5iiioro r.9n
SQ FT OF SOIL DISTURBANCE 0.0 ENERGY CODE COMPLIANCE naiP a Pmrd la m"e WI GOh
EXISTING SNOW MELT ENERGYc. 9.
BUILDING FOOTPRINT Cu.. I N.D.,' Z. r wail
USE [ME.RS Co cite&4wetsv 71,5122.MOuiuAR? eNSus uDrc. SPECIAL INSPECTION REQUIRED:
can
HARDSCAPE AREA(%) 0.0 NEW SNOWMELT ENERGY USE ERS4 pram"� S.
D. -tnlctural steel welding:Field BSho
strength bolting
Ikeasru.ma eremNua D. m.J -Epoxy anchors
'a.k.a.,. ��Gy�y,
ZONE DISTRICT R-15 ADDITIONAL COMMENTS C Justin Hahn 11/17/23 justin.hahn@aspen.gov < -Intumescent paint
O _.ts.pmadKma
�PTaa' clap... M.D. D. E.au -Spray applied fire resistive materials
.. o.or' `...,..„„:„.„.`c* -Permanent micropiles
.44444.4•7s.-11.44aura.w tw..%
Special inspection is required per 20151BC
section 1704.Inspector to verify that copy of
agreement for inspection program to be on
a...w.-.. .>•..•...t w.r,J...a t onpe,..en r r v... the job site prior to performing any
inspections.A copy of all Special Inspector
CITY OF ASPEN 12020 130 S GALENA ST I ASPEN,CO 81611 field reports to be on the job site for
inspectors'review if requested.Failure to
comply may result in denial of inspection.
•
4`4APo,h.',r
B. Owner Responsibilities: a t fthe owner is
CITY OF ASPEN 1. The project owner,the design professional in responsible charge,or an gin o
msponsible for employing special-inspection services.The special inspectar/agency shall not be in
SPECIAL INSPECTION AND TESTING AGREEMENT the employ of the contractor,subcontractor or material supplier.[IBC Sec 1704.1]In case of an Intumescent Paint-
caner/contractor,the special inspector\agency shall be employed as specified by the building
This form is required for projects needing special inspection and/or testing per Chapter 17 of the International official.
Building Code(IBC). '�ii,, -T D^Q e.-n_.- `� � R(nI C. Design Professional in Responsible Charge Respponsibildues who is mgistered or licensed to pracdce their U.
Banding
tom. AP Pr.p.n sue shall W
Dept..RegendWdellec
IL 1 O] �j l hk0,e•-"l Permit Namber•O '..l--L�KE Deric iorral in Responsible Charge defrnirro t fthe ! Iregistmtion laws of[he state or . buildings .peen genial
Project Address: i� respective design profession as defined by the statutory requiremen s o pro essiona impactors and Rwui�up.doa ngvin....
BEFORE A PERMIT CAN BE ISSUED:The owner,or the design professional in responsible charge,acting as jurisdiction in which the project is to be constructed;who is engaged bythe owner to reviewnnod coordinate certain a Worsee. ttseeurlmgao e.Wart TReidInapdasKaffir,ppEagaronnm thcbmsGEdSrfa ram
aurisdipfthe loot Aas determined by ihnstructede builtfing oFiicial,ngagedpatihilitywiththe f the buddieoordeatencor oierthepdrforrmme of roiunibI.mo,e.HJa approval,i..ddiUonmeat or the ohm
the owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing stmcmre. �°Cr b°°bn'°�price m Pi.amml alcopuxq covering al.uama>t re�.a pea
for
Schedule,including the required acknowledgments.A err-construction conference with the parties involved may be Wailer `
required to review thespecial-inspection re uirements and procedures. I. Prepare statement of special inapeeNons.The compatibility
ant professional in responsible 3. Harks t.wrnip.eaP•.ta'rh.haliaiagoiscm.maia ravi.w.pcci.4inwatbv propea rod
qq Prot chaz hall tatament ofs eclat inspections in accordance with BC Section 1705 for �N.M.
APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the projects for submittal by the pplicant.The statement of special inspections shall identify the following: 4. Perrone Ed bop...Ilk building official ebo dpahnthe final lmpmm nod appears!
which they provide special inspections.Special inspectors shall be approved by the building department prior to a. The materials,systems,components and work required to have special inspection or for a project[IBC 5..109.31)0W the goal Racial-iapdwon report her ban sainted and
performing any duties.Special inspectors shall submit their qualifications and are subject to personal interviews for testing by the building official or by the registered design professional responsible for .Feared
pre-qualification.Special inspectors shall display approved identification,as stipulated by the building official, each portion of the work.
when performing the function of special inspector. b. The type and extent of each special inspection.
c. The type and extent of each test.
Special inspection and testing shall meet the minimum requirements of the International Building Code Section d. For each type of special inspection,identification as to whether it will be continuous `n o
1704.The following conditions are also applicable: special inspection or periodic special inspection. Feted Adds=14xt CA Permit Nod.Ott[O a-OaO-sees
A. Special Inspector Responsibilities: D. Contractor Responsibilities: A DWLEDGMCNITI
1. Notify the special inspector.The contractor is responsible for notifying the special inspector or with the roodldon.
1. Signify presence at job site.Special inspectors should notify contractor personnel of their agency regarding individual inspections for items listed on the attached schedule and as noted on C71-Halt,,,..,e1 ve � er of. IZ -,L Ile p dt l{Horn rs<n.ea,.,
presence and responsibilities at the job site.If required by the building official,they shall sign in the building department approved plans.Adequate notice shall be provided so the special inspector • ""-77 M,�- �1AJ,]r
on the appropriate form posted with the building permit. has time to become familiar with the project. imi S ss
2. Observe assigned work.The special inspector shall observe assigned work for conformance with 2. Provide access to approved plans.The contractor is responsible for providing the special Doe Eol1 Yay}p'p,(��l
the building department approved(stamped)design drawings,specifications,and applicable inspector access to approved plans. �� r
workmanship provisions of the International Building Code.Architectfengineer-reviewed shop 3. Retain special inspection records.Upon request,the contractor is also responsible for retaining, • �,�,r mil[p 1y1�ar •ithtrt[IYCd r/1C.C,OWt
drawings maybe used only as an aid to inspection. at the job site,all special inspection records completed by the special inspector. p tP�ra�md Nrvn •r'
Email
E. Inspection of Fabricators: a 7 hpeJpt .1,10s 7-A.A4.%'12.61. 1 yOvn{ata•�
For continuous special-inspection,the special inspector shall be on site at all times observing the 1. Fabrication of structural assemblies and members.Where fabrication of structural load-bearing •p'� m Puma Ne® Dam �e'QR
work requiring special inspection.Periodic inspections,if any,must have prior approval based on members and assemblies is being performed on the premises of a fabricator's shop,BC Section Duero •i CQT
a separate written plan reviewed and approved by the building department and the engineer or 1704.2 shall require special inspection of the fabricated items. lt,P /0 aaa,ee
architect of record. 2. Fabrication and implementation procedures.The special inspector shall verify that the f�fyttms. ,L._ f� 7 y 3,6
3. Report nonconforming items.The special inspector shall bring nonconforming items to the fabricator maintains detailed fabrication and quality control dotes that provide a basis for • ,v.,`-.•s fwMr't`5 Then rlmtneoQ.pt inmA
qua tyc procedures p Coot..� Si Printed Name Data Email
immediate attention of the contractor and note all such items in the daily report.If any item is not inspection control of the workmanship and the fabricator's ability to conform to approved CAM,resolved in a timely manner or is about to be incorporated in the work,the special inspector shall construction documents and reference standards.The special inspector shall review the procedures
immediately notify the building department by telephone or in person,notify the engineer or for completeness and adequacy relative to code requirements for fabricators scope of work. APPoned P S/n Pram:0a.on Date Sava
architect,and post a discrepancy notice. F. Approved Fabricator Responsibilities:
4. Provide timely reports.The special inspector shall complete written inspection reports for each 1. Fabrication exempt inspections.Special inspections are not required where work is done on the
inspection visit and provide the reports on a timely basis determined by the budding official.The premise of a fabricator registered and approved to perform such work without special inspection. !repeated SVWmre PriomdNu n Dam mad
special inspector or inspection agency shall furnish these reports directly to the building official, if work is done on site that requires special inspection,special inspection will be required. Pbiwae•• ,,z,/�,
engineer or architect ofrecord,and others as designated.[IBC Sec.1704.1.2]These reports should 2. Approval offabricator.Approval shall be based upon review of the fabricator's written pry d'ARm B,didiaj �J"van Justin Hahn 11/17/23 justin.hahn@aspee.gov
be organized on a daily format and may be submitted weekly at the option of the building official. procedural and quality control manuals and periodic auditing of fabrication practices by an D.pet®t Signature Printed Name Dab Email
These reports should include: approved special inspection agency. sJre.o....o.o.la Pura �...wD„em,,,,4.
a. Description of daily inspections and tests made with applicable locations, 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator shall submit ^nenasprtee.ta.t:a.p�"oo.•urmamaeemuaerp.mme.J.s.amr+erl:resp..
b. Listing of nonconforming items, certificate ofcomplianceto the building official stating that the work was performed in accordance e.A•.m+.+ar o-rm�uutSW rvv a eire.asa wR Yp.araE:ruwaava•no aromrou.a•sp.w
c. Report on how nonconforming items were resolved or unresolved as applicable, with the approved contraction documents.
d. Itemized changes authorized by the architect,engineer,and building official if
not included in nonconforming items SEE NOTES#1 PLANS
5. Provide Final Inspection Report,The special inspector shall submit a written final report
documenting required special inspections and correction of any discrepancies noted in the -
inspections prior to the final building inspection. r:sn.srr.J..s..cr.e...a•e.r'or,I p.war..enxu I r,wavn.sinr I,i,,e....,
RECE - RECEI RECEIVED
1 ��.
04/18, 04/18/ 04/18/2022ASP I' 07/O5/2022
ASPEN
BUILDINGDE BUILDINGDEP BUILDIASPEN
EP RTMENT iustinh