Loading...
HomeMy WebLinkAboutagenda.hpc.20251022AGENDA ASPEN HISTORIC PRESERVATION COMMISSION October 22, 2025 4:30 PM, City Council Chambers - 3rd Floor 427 Rio Grande Place Aspen, CO 81611 I.ROLL CALL II.MINUTES II.A Draft Minutes - 9/23/25 III.PUBLIC COMMENTS IV.COMMISSIONER MEMBER COMMENTS V.DISCLOSURE OF CONFLICT OF INTEREST VI.PROJECT MONITORING VII.STAFF COMMENTS VIII.CERTIFICATE OF NO NEGATIVE EFFECT ISSUED IX.CALL UP REPORTS X.SUBMIT PUBLIC NOTICE FOR AGENDA ITEMS XI.SUBSTANTIAL AMENDMENT XII.OLD BUSINESS XII.A Certificate of Appropriateness for Major Development Final Review and Permitted Use Variance for 337 Lake Ave. minutes.hpc.20250923_DRAFT.docx HPC Memo.337 Lake Ave.Final.pdf Draft HPC Resolution # 12 , Series of 2025.pdf Exhibit A. Historic Preservation Design Guidelines Staff Findings.pdf Exhibit B. Variance Criteria Staff Analysis.pdf Exhibit C. Conceptual Application Referral Comments.pdf Exhibit D. Final Application Referral Comments.pdf 1 1 XIII.NEW BUSINESS XIV.ADJOURN XV.NEXT RESOLUTION NUMBER Exhibit E. Final Application.pdf TYPICAL PROCEEDING FORMAT FOR ALL PUBLIC HEARINGS (1 Hour, 15 Minutes for each Major Agenda Item) 1. Declaration of Conflicts of Interest (at beginning of agenda) 2. Presentation of proof of legal notice (at beginning of agenda) 3. Applicant presentation (10 minutes for minor development; 20 minutes for major development) 4. Board questions and clarifications of applicant (5 minutes) 5. Staff presentation (5 minutes for minor development; 10 minutes for major development) 6. Board questions and clarifications of staff (5 minutes) 7. Public comments (5 minutes total, or 3 minutes/ person or as determined by the Chair) 8. Close public comment portion of hearing 9. Applicant rebuttal/clarification (5 minutes) 10. Staff rebuttal/clarification (5 minutes) End of fact finding. Chairperson identifies the issues to be discussed. 11. Deliberation by the commission and findings based on criteria commences. No further input from applicant or staff unless invited by the Chair. Staff may ask to be recognized if there is a factual error to be corrected. If the item is to be continued, the Chair may provide a summary of areas to be restudied at their discretion, but the applicant is not to re-start discussion of the case or the board’s direction. (20 minutes) 12. Motion. Prior to vote the chair will allow for call for clarification for the proposed resolution. Please note that staff and/or the applicant must vacate the dais during the opposite presentation and board question and clarification session. Both staff and applicant team will vacate the dais during HPC deliberation unless invited by the chair to return. Updated: March 7, 2024 2 2 REGULAR MEETING HISTORIC PRESERVATION COMMISSION SEPTEMBER 23RD, 2025 Vice - Chair Raymond opened the regular meeting of the Aspen Historic Preservation Commission at 4:30pm. Commissioners in attendance: Kim Raymond. Absent were Roger Moyer, Barb Pitchford, Jodi Surfas, Dakota Severe, Duncan Clauss and Kara Thompson. Staff present: Luisa Berne – Assistant City Attorney Mike Sear – Deputy City Clerk Ms. Berne noted for the record that due to a scrivener’s error during the June 25th, 2025 HPC meeting, the 623 / 625 East Hopkins Ave. item had been continued to this date. Since then, the application had been withdrawn and thus did not need to be further continued. ____________________ Mike Sear, Deputy City Clerk 3 Page 1 of 6 427 Rio Grande Place, Aspen, CO 81611-1975 | P: 970.920.5000 | cityofaspen.com Memorandum TO: Aspen Historic Preservation Commission (HPC) FROM: Gillian White, Historic Preservation Officer, Principal Planner THROUGH: Dan Folke, Planning Director MEETING DATE: October 22, 2025 RE: 337 Lake Ave. – Certificate of Appropriateness for Major Development Final Review, Residential Design Standards, Temporary Use Variance APPLICANT/OWNER: Aspen West AJ, LLC Representative: Sara Adams, BendonAdams, LLC Location: 337 Lake Ave. Aspen, CO 81611 Legal Description: Lot B, Daggs Historic Landmark Lot Split, Aspen, Pitkin County, Colorado Parcel Identification Number: 2735-121-35-002 Current Zoning & Use: R-6 – Residential Proposed Use: Residential SUMMARY: The applicant requests a Certificate of Appropriateness for Major Development at 337 Lake Avenue for the purpose of constructing a new, detached, one-story, single-family residence on the vacant parcel created out of a Historic Landmark Lot Split per Ordinance #47, Series of 2005. The applicant is also requesting a permitted use variance for temporary construction staging. STAFF RECOMMENDATION: Historic Preservation Staff recommend Approval of Resolution #12, of Series 2025, for a Certificate of Appropriateness for Major Development Final Review for 337 Lake Avenue. Figure 1. 337 Lake Ave. – Site Location Aerial Image 4 Page 2 of 6 427 Rio Grande Place, Aspen, CO 81611-1975 | P: 970.920.5000 | cityofaspen.com BACKGROUND: Located in the Medium Density Residential (R-6) Zone District between Hallam Lake and Aspen Meadows on the north side of Aspen’s West End neighborhood, the property referred to as 337 Lake Ave. is a 6,000-square-foot parcel that is currently vacant. 337 Lake Ave. and 335 Lake Ave. were included in the Aspen Inventory of Historic Landmarks as a single parcel in 2001, under the address of 640 N. Third St, per Ordinance #18, Series of 2001. HPC Resolution #45, Series of 2005, and Ordinance #47, Series of 2005, created the Daggs Historic Landmark Lot Split Subdivision Exemption (Book 80, Page 97, Reception #427631). The Historic Landmark Lot Split resulted in Lot A (335 Lake Ave.), which contains a circa 1889 AspenVictorian Miner’s Cottage, and Lot B (337 Lake Ave.) the subject property of this request. Pursuant to Ordinance #47, Series of 2005, both lots created as part of the Daggs Historic Landmark Lot Split must conform to the requirements of their underlying zone district. The Ordinance and associated plat states that Lot B has an allowed floor area of 1,700 sq. ft. Variations provided for in Section 26.415.110(c)(1)a-c are not applicable to Lot B, as it does not contain the historic structure. The maximum potential buildout for the two parcels created by the lot split is not to exceed three units, which may be composed of a duplex and a single-family home. The Ordinance also states that any lot for which development is proposed shall be subject to affordable housing mitigation, which in the City of Aspen Municipal Land Use Code includes Growth Management Residential Development review per Section 26.470.090(a). Figure 2. 337 Lake Ave. on the 1896 Willits Map Figure 3. Northeast corner of Block 102, City and Township of Aspen (Poley, H. S., 1990-1899) 5 Page 3 of 6 427 Rio Grande Place, Aspen, CO 81611-1975 | P: 970.920.5000 | cityofaspen.com REQUEST OF THE HISTORIC PRESERVATION COMMISSION (HPC) The Applicant is requesting the following land use approval(s): • Certificate of Appropriateness for Major Development (Section 26.415.070(d)): for the construction of a new structure within a historic property, the extent of which exceeds the parameters set forth for minor development per the City of Aspen Land Use Code Section 26.415.070(c). • Residential Design Standards (RDS) (Section 26.410) • Authorized Variances (Section 26.314.030) The HPC is the final review authority for Certificate of Appropriateness for Major Development and permitted use variance. PROJECT SUMMARY: The applicant proposes to construct a one-story, stand-alone, single-family dwelling with a basement on a vacant lot. In addition to the detached dwelling, the proposed project includes a patio, side-yard fencing, new vehicular paving, and landscaping. Additionally, the applicant is requesting a permitted use variance for temporary construction staging. The applicant presented the conceptual design at an HPC public hearing on January 22, 2025, where the HPC voted four to zero (4-0) to approve the proposal via Resolution 1 of Series 2025. The request was brought before City Council for a notice of call-up on March 11, 2025, where Council upheld the HPC’s decision. Fig. 4. Existing lot as seen from Lake Ave. Figure 5. Rendering of proposed dwelling. 6 Page 4 of 6 427 Rio Grande Place, Aspen, CO 81611-1975 | P: 970.920.5000 | cityofaspen.com STAFF EVALUATION The application (LPA-24-106) for Certificate of Appropriateness Major Development at 337 Lake Ave. deserves commendation for its general approach to satisfying the City’s intent to “draw a reasonable balance between private property rights and the public interest in preserving the City's cultural, historic, and architectural heritage” as set forth in Aspen Land Use Code Chapter 26.415. Major Development: As detailed in Exhibit A, the application satisfies most of the applicable Historic Preservation Design Guidelines. The previously determined maximum floor area condition, as a result of the historic lot split, has aided in the satisfactory review of many of the Guidelines. This was Figure 6. East elevation of conceptual design showing Lot A (left, existing historic resource) and Lot B (right, proposed structure) Figure 7. East elevation of final design showing Lot A (left, existing historic resource) and Lot B (right, proposed structure) 7 Page 5 of 6 427 Rio Grande Place, Aspen, CO 81611-1975 | P: 970.920.5000 | cityofaspen.com particularly the case for Guidelines 1.7 and 1.11, where the limited floor area allowed for more open space and the preservation of specific trees. The proposed new building remains subordinate to the neighboring historic resource in both size and scale, while still relating to the historic context by way of materials and form. Although Guideline 11.3 calls for new construction to appear similar in scale with the existing historic resource, the allowable floor area demands the proposed structure be smaller in scale. Staff find the proposal to be acceptable for this project and appreciate the refined nature of the design. At the time of Conceptual Review, all applicable HP Design Guidelines were met with the exception of those related to final site elements such as fencing and lighting, which include Guideline 1.10, 1.14, 1.19, 1.20, and 12.3. These details have been submitted with the final design and staff’s review found that these remaining applicable Guidelines have been met. Guideline 1.10 calls for built in furnishings to not be intrusive or degrade the integrity of the neighborhood, site, or existing historic landscape. The proposed built-in grill is located behind the structure and is not negatively impacting the existing site or neighborhood context. Guideline 1.14 calls for visual impacts of landscape lighting to be minimized; the proposed landscape lighting is a mix of recessed step lighting and 1” diameter cylindrical path lighting, both of which meet Guideline 1.14. Guideline 1.19 calls for new fences to have a transparent quality, allowing views into the yard from the street; the proposed new 42” fence is located at the rear of the property along the alley, resulting in views from Lake Ave. being maintained. A 72” fence is located on the north side of the structure to screen mechanical equipment. Guideline 1.20 calls for fences taller than 42” to be designed so as not to block public views of important features of designated resources; the only fence taller than 42” is being used to screen mechanical equipment and is not blocking any views. Guideline 12.3 calls for exterior lighting to be simple in character with appropriate form, finish, and scale; the proposed lighting is simple and modest in design, and the fixtures meet this Guideline. Please refer to Exhibit A for staff analysis of all applicable Guidelines. Residential Design Standards: The submitted final application meets all Residential Design Standards. Permitted Use Variance: The applicant has updated their application to request a variance from the permitted use for 337 Lake Ave. to allow for the currently vacant lot to be used for construction staging for the ongoing restoration work at 335 Lake Ave. In accordance with applicable criteria related to this request, the applicant has provided notice to surrounding properties, both properties are under the same 8 Page 6 of 6 427 Rio Grande Place, Aspen, CO 81611-1975 | P: 970.920.5000 | cityofaspen.com ownership, and using the vacant lot for construction staging minimizes disruption of normal neighborhood activities. Staff find this variance request to be minimal and reasonable in this instance. Please refer to Exhibit B for staff analysis of the applicable variance criteria. REFERRAL COMMENTS The application was referred out to other City departments who have requirements that will affect the permit review. As this project qualifies as a Major Engineering Review, the Engineering Department provided several comments that are to be responded to/met at the time of permit. The Building and Parks Department reviewers did not have any comments or concerns related to this final proposal. The combined referral comments from the conceptual application are included as Exhibit C and combined referral comments from the final application are included as Exhibit D. RECOMMENDATION: Staff recommend that the HPC approve Resolution #12, Series of 2025 for the request for a Certificate of Appropriateness for Major Development Final Review and permitted use variance for 337 Lake Ave. ATTACHMENTS Resolution #12, Series of 2025 Exhibit A – Historic Preservation Design Guidelines Staff Findings Exhibit B – Variance Criteria Staff Analysis Exhibit C – Conceptual Application Referral Comments Exhibit D – Final Application Referral Comments Exhibit E – Final Application 9 HPC Resolution #12, Series of 2025 Page 1 of 4 RESOLUTION # 12, (SERIES OF 2025) A RESOLUTION OF THE ASPEN HISTORIC PRESERVATION COMMISSION (HPC) GRANTING A CERTIFICATE OF APPROPRIATENESS FOR MAJOR DEVELOPMENT FINAL REVIEW AND VARIATION FOR THE PROPERTY LOCATED AT 337 LAKE AVENUE, LEGALLY DESCRIBED AS LOT B, DAGGS HISTORIC LANDMARK LOT SPLIT ASPEN, PITKIN COUNTY, COLORADO PARCEL ID: 2735-121-35-002 WHEREAS, the applicant, Aspen West AJ, LLC, represented by Sara Adams, BendonAdams LLC, has requested HPC approval for Certificate of Appropriateness Major Development, Final Review and a Permitted Use Variance for the property located at 337 Lake Avenue, Lot B, Daggs Historic Landmark Lot Split, Aspen, Pitkin County, Colorado; and WHEREAS, Section 26.415.070 of the Municipal Code states that “no building or structure shall be erected, constructed, enlarged, altered, repaired, relocated or improved involving a designated historic property or district until plans or sufficient information have been submitted to the Community Development Director and approved in accordance with the procedures established for their review;” and WHEREAS, for approval of a Certificate of Appropriateness for Major Development, the HPC must review the application, a staff analysis report and the evidence presented at a hearing to determine the project’s conformance with the City of Aspen Historic Preservation Design Guidelines per Section 26.415.070(d) of the Municipal Code and other applicable Code Sections. The HPC may approve, disapprove, approve with conditions, or continue the application to obtain additional information necessary to make a decision to approve or deny; and WHEREAS, this property is subject to Residential Design Standards, of which the conceptual plans comply; and WHEREAS, Community Development Department staff reviewed the application for compliance with the applicable review standards and recommended approval of a Certificate of Appropriateness for Major Development Final Review; and WHEREAS, Community Development Department staff reviewed the Permitted Use Variance request with the applicable review criteria and recommended approval; and WHEREAS, the HPC reviewed the project on October 22, 2025. The HPC considered the application, the staff memo and public comments, and found the proposal consistent with the review standards and granted approval by a vote of X to X (x-x). NOW, THEREFORE, BE IT RESOLVED: That HPC hereby approves a Certificate of Appropriateness for Major Development Final Review and a Permitted Use Variance for 337 Lake Avenue, Lot B, Daggs Historic Landmark Lot Split, Aspen, Pitkin County, Colorado as follows: 10 HPC Resolution #12, Series of 2025 Page 2 of 4 Section 1: Conditions of Approval 1. A Construction Staging Plan for 337 Lake Ave. shall be approved as part of the building permit for the redevelopment of 335 Lake Ave. 2. No activity or disturbance of any kind shall extend beyond the limits of the building envelope and an agreed upon vehicular access path from N. 3rd Street to the building envelope. 3. Vehicular access to the building envelope will be determined at a site visit with the Parks Department to ensure access has the most minimal impact on the site. Vehicular access shall not exceed 15’ in width. The extents of vehicular access boundaries and the building envelope shall be shown on all Construction Staging documents included in the building permit review. 4. Construction staging is permitted on 337 Lake Ave. as long as a valid permit is in effect for 335 Lake Ave. 5. The City of Aspen Parks, Community Development, and Engineering Departments must inspect and approve the restoration of 337 Lake Ave. prior to issuance of a Certificate of Occupancy for 335 Lake Ave. Restoration and use of 337 Lake Ave. for construction staging conditions are outlined below. Section 2: Engineering Department All activity on 337 Lake Ave. must comply with Title 21 of the City of Aspen Municipal Code, and all adopted regulations of the City of Aspen Engineering Department. The following conditions shall be met prior to issuance of a building permit for any permits for 335 or 337 Lake Ave.: 1. Construction Management Plan: The Applicant shall submit a CMP to the Engineering Department that includes all activity on 335 and 337 Lake Ave. The CMP shall be approved prior to building permit issuance. 2. Revegetation Plan: An approved revegetation plan shall be approved by the Parks Department for 337 Lake Ave. prior to building permit issuance. 3. Erosion Control Plan: An erosion and sediment control plan must be included in the CMP for both properties. 4. Drainage: The site drainage shall comply with all rules and regulations as deemed necessary by the Engineering Department. Section 3: Parks Department All activity on 337 Lake Ave. must comply with all adopted regulations of the City of Aspen Parks Department. The following conditions shall be met prior to issuance of a building permit for any permits for 335 or 337 Lake Ave.: 1. A site visit is required with the City of Aspen Parks Department and Applicant prior to building permit issuance to discuss all anticipated activity on 337 Lake Ave. 2. Revegetation Plan: An approved revegetation plan shall be approved by the Parks Department for 337 Lake Ave. prior to building permit issuance. 3. Tree Protection Plan: A tree protection plan and any required tree removal permits must be approved prior to building permit issuance. 4. No activity or storage of material is allowed within the Tree Protection Fencing. 5. The Parks Department and Applicant shall meet on-site prior to building permit issuance to determine the most appropriate vehicular access to the approved Building Envelope. The vehicular access path shall not exceed 15’ in width. The vehicular access path and extents of the building envelope shall be depicted on all Construction Staging Plan documents. Section 4: Material Representations 11 HPC Resolution #12, Series of 2025 Page 3 of 4 All material representations and commitments made by the Applicant pursuant to the development proposal approvals as herein awarded, whether in public hearing or documentation presented before the Community Development Department, the Historic Preservation Commission, or the Aspen City Council are hereby incorporated in such plan development approvals and the same shall be complied with as if fully set forth herein, unless amended by other specific conditions or an authorized authority. Section 5: Existing Litigation This Resolution shall not affect any existing litigation and shall not operate as an abatement of any action or proceeding now pending under or by virtue of the ordinances repealed or amended as herein provided, and the same shall be conducted and concluded under such prior ordinances. Section 6: Severability If any section, subsection, sentence, clause, phrase, or portion of this Resolution is for any reason held invalid or unconstitutional in a court of competent jurisdiction, such portion shall be deemed a separate, distinct and independent provision and shall not affect the validity of the remaining portions thereof. Section 7: Vested Rights The development approvals granted herein shall constitute a site-specific development plan vested for a period of three (3) years from the date of issuance of a development order. However, any failure to abide by any of the terms and conditions attendant to this approval shall result in the forfeiture of said vested property rights. Unless otherwise exempted or extended, failure to properly record all plats and agreements required to be recorded, as specified herein, within 180 days of the effective date of the development order shall also result in the forfeiture of said vested property rights and shall render the development order void within the meaning of Section 26.104.050 (Void permits). Zoning that is not part of the approved site-specific development plan shall not result in the creation of a vested property right. No later than fourteen (14) days following final approval of all requisite reviews necessary to obtain a development order as set forth in this Ordinance, the City Clerk shall cause to be published in a newspaper of general circulation within the jurisdictional boundaries of the City of Aspen, a notice advising the general public of the approval of a site specific development plan and creation of a vested property right pursuant to this Title. Such notice shall be substantially in the following form: Notice is hereby given to the general public of the approval of a site specific development plan, and the creation of a vested property right, valid for a period of three (3) years, pursuant to the Land Use Code of the City of Aspen and Title 24, Article 68, Colorado Revised Statutes, pertaining to the following described property: 337 Lake Ave. Nothing in this approval shall exempt the development order from subsequent reviews and approvals required by this approval of the general rules, regulations and ordinances or the City of Aspen provided that such reviews and approvals are not inconsistent with this approval. The approval granted hereby shall be subject to all rights of referendum and judicial review; the period of time permitted by law for the exercise of such rights shall not begin to run until the date 12 HPC Resolution #12, Series of 2025 Page 4 of 4 of publication of the notice of final development approval as required under Section 26.304.070(A). The rights of referendum shall be limited as set forth in the Colorado Constitution and the Aspen Home Rule Charter. APPROVED BY THE COMMISSION at its regular meeting on the 22nd day of October 2025. Approved as to Form: Approved as to Content: __________________________________ ____________________________________ Luisa Berne, Assistant City Attorney Kara Thompson, Chair ATTEST: _________________________________ Mike Sear, Deputy City Clerk 13 Page 1 of 8 Exhibit A Historic Preservation Design Guidelines Criteria Staff Findings 26.415.070.D – Certificate of Appropriateness for Major Development 1) The review and decision on the issuance of a certificate of appropriateness for major development shall begin with a determination by the Community Development Director that the proposed project constitutes a major development. A major development includes one or more of the following activities: a. The construction of a new structure within a historic district; and/or b. Alterations to more than three (3) elements of a building façade including its windows, doors, roof planes or materials, exterior wall material, dormers, porches, exterior staircase, balcony or ornamental trim; and/or c. The expansion of a building increasing the floor area by more than two hundred and fifty (250) square feet; and/or d. Any new development that has not been determined to be minor development. 14 Page 2 of 8 Relevant Historic Preservation Design Guidelines & Findings The applicant requests a Certificate of Appropriateness for Major Development at 337 Lake Avenue for the purposes of constructing a new one-story, single family detached dwelling. Chapter 1: Site Planning and Landscape Finding 1.1 All projects shall respect the historic development pattern or context of the block, neighborhood or district. • Building footprint and location should reinforce the traditional patterns of the neighborhood. • Allow for some porosity on a site. In a residential project, setback to setback development is typically uncharacteristic of the historic context. Do not design a project which leaves no useful open space visible from the street. Met 1.4 Design a new driveway or improve an existing driveway in a manner that minimizes its visual impact. • If an alley exists at the site, the new driveway must be located off it. • Tracks, gravel, light grey concrete with minimal seams, or similar materials are appropriate for driveways on Aspen Victorian properties. Met 1.5 Maintain the historic hierarchy of spaces. • Reflect the established progression of public to private spaces from the public sidewalk to a semi-public walkway, to a semi private entry feature, to private spaces. Met 1.6 Provide a simple walkway running perpendicular from the street to the front entry on residential projects. • Meandering walkways are not allowed, except where it is needed to avoid a tree or is typical of the period of significance. • Use paving materials that are similar to those used historically for the building style and install them in the manner that they would have been used historically. For example on an Aspen Victorian landmark set flagstone pavers in sand, rather than in concrete. Light grey concrete, brick or red sandstone are appropriate private walkway materials for most landmarks. • The width of a new entry sidewalk should generally be three feet or less for residential properties. A wider sidewalk may be appropriate for an AspenModern property. Met 1.7 Provide positive open space within a project site. • Ensure that open space on site is meaningful and consolidated into a few large spaces rather than many small unusable areas. • Open space should be designed to support and complement the historic building. Met 15 Page 3 of 8 1.8 Consider stormwater quality needs early in the design process. • When included in the initial planning for a project, stormwater quality facilities can be better integrated into the proposal. All landscape plans presented for HPC review must include at least a preliminary representation of the stormwater design. A more detailed design must be reviewed and approved by Planning and Engineering prior to building permit submittal. • Site designs and stormwater management should provide positive drainage away from the historic landmark, preserve the use of natural drainage and treatment systems of the site, reduce the generation of additional stormwater runoff, and increase infiltration into the ground. Stormwater facilities and conveyances located in front of a landmark should have minimal visual impact when viewed from the public right of way. • Refer to City Engineering for additional guidance and requirements. Met 1.10 Built-in furnishings, such as water features, fire pits, grills, and hot tubs, that could interfere with or block views of historic structures are inappropriate. • Site furnishings that are added to the historic property should not be intrusive or degrade the integrity of the neighborhood patterns, site, or existing historic landscape. • Consolidating and screening these elements is preferred. Met 1.11 Preserve and maintain historically significant landscaping on site, particularly landmark trees and shrubs. • Retaining historic planting beds and landscape features is encouraged. • Protect historically significant vegetation during construction to avoid damage. Removal of damaged, aged, or diseased trees must be approved by the Parks Department. • If a significant tree must be removed, replace it with the same or similar species in coordination with the Parks Department. • The removal of non-historic planting schemes is encouraged. • Consider restoring the original landscape if information is available, including original plant materials. Met 16 Page 4 of 8 1.12 Provide an appropriate context for historic structures. See diagram. • Simplicity and restraint are required. Do not overplant a site, or install a landscape which is overtextured or overly complex in relationship to the historic resource, particularly in Zone A. In Zone A, new planting shall be species that were used historically or species of similar attributes. • In areas immediately adjacent to the landmark, Zone A and Zone B, plants up 42” in height, sod, and low shrubs are often appropriate. • Contemporary planting, walls and other features are not appropriate in Zone A. A more contemporary landscape may surround new development or be located in the rear of the property, in Zone C. • Do not cover areas which were historically unpaved with hard surfaces, except for a limited patio where appropriate. • Where residential structures are being adapted to commercial use, proposals to alter the landscape will be considered on a case-by-case basis. The residential nature of the building must be honored. • In the case of a historic landmark lot split, careful consideration should be given so as not to over plant either property, or remove all evidence of the landscape characteristics from before the property was divided. • Contemporary landscapes that highlight an AspenModern architectural style are encouraged. Met 1.13 Additions of plant material to the landscape that could interfere with or block views of historic structures are inappropriate. • Low plantings and ground covers are preferred. • Do not place trees, shrubs, or hedgerows in locations that will obscure, damage, or block significant architectural features or views to the building. Hedgerows are not allowed as fences. • Consider mature canopy size when planting new trees adjacent to historic resources. Planting trees too close to a landmark may result in building deteriorate or blocked views and is inappropriate. Climbing vines can damage historic structures and are not allowed. Met 1.14 Minimize the visual impacts of landscape lighting. • Landscape and pathway lighting is not permitted in Zone A (refer to diagram) on Aspen Victorian properties unless an exception is approved by HPC based on safety considerations. • Landscape, driveway, and pathway lighting on AspenModern properties is addressed on a case-by-case basis. • Landscape light fixtures should be carefully selected so that they are compatible with the building, yet recognizable as a product of their own time. • Driveway lighting is not permitted on Aspen Victorian properties. • Landscape uplighting is not allowed. Met 17 Page 5 of 8 1.18 When building an entirely new fence, use materials that are appropriate to the building type and style. • The new fence should use materials that were used on similar properties during the period of significance. • A wood fence is the appropriate solution in most locations. • Ornate fences, including wrought iron, may create a false history are not appropriate for Aspen Victorian landmarks unless there is evidence that a decorative fence historically existed on the site. • A modest wire fence was common locally in the early 1900s and is appropriate for Aspen Victorian properties. This fence type has many desirable characteristics including transparency, a low height, and a simple design. When this material is used, posts should be simply detailed and not oversized. Met 1.19 A new fence should have a transparent quality, allowing views into the yard from the street. • A fence that defines a front yard must be low in height and transparent in nature. • For a picket fence, spacing between the pickets must be a minimum of 1/2 the width of the picket. • For Post-WWII properties where a more solid type of fence may be historically appropriate, proposals will be reviewed on a case-by-case basis. • Fence columns or piers should be proportional to the fence segment. Met 1.20 Any fence taller than 42” should be designed so that it avoids blocking public views of important features of a designated building. • A privacy fence should incorporate transparent elements to minimize the possible visual impacts. Consider staggering the fence boards on either side of the fence rail. This will give the appearance of a solid plank fence when seen head on. Also consider using lattice, or other transparent detailing on the upper portions of the fence. • A privacy fence should allow the building corners and any important architectural features that are visible from the street to continue to be viewed. • All hedgerows (trees, shrub bushes, etc.) are prohibited in Zones A and B. Met 1.22 When a new retaining wall is necessary, its height and visibility should be minimized. • All wall materials, including veneer and mortar, will be reviewed on a case by case basis and should be compatible with the palette used on the historic structure. Met 1.24 Preserve historically significant landscapes with few or no alterations. • An analysis of the historic landscape and an assessment of the current condition of the landscape should be done before the beginning of any project. • The key features of the historic landscape and its overall design intent must be preserved. Met 18 Page 6 of 8 1.25 New development on these sites should respect the historic design of the landscape and its built features. • Do not add features that damage the integrity of the historic landscape. • Maintain the existing pattern of setbacks and siting of structures. • Maintain the historic relationship of the built landscape to natural features on the site. • All additions to these landscapes must be clearly identifiable as recent work. • New artwork must be subordinate to the designed landscape in terms of placement, height, material, and overall appearance. Place new art away from significant landscape features. • Avoid installing utility trenches in cultural landscapes if possible. Met 1.26 Preserve the historic circulation system. • Minimize the impact of new vehicular circulation. • Minimize the visual impact of new parking. • Maintain the separation of pedestrian and vehicle which occurred historically. Met 1.27 Preserve and maintain significant landscaping on site. • Protect established vegetation during any construction. • If any tree or shrub needs to be removed, replace it with the same or similar species. • New planting should be of a species used historically or a similar species. • Maintain and preserve any gardens and/or ornamental planting on the site. • Maintain and preserve any historic landscape elements. Met • Chapter 11: New Buildings on Landmarked Properties Finding 11.1 Orient the new building to the street. • Aspen Victorian buildings should be arranged parallel to the lot lines, maintaining the traditional grid pattern. • AspenModern alignments shall be handled case-by-case. • Generally, do not set the new structure forward of the historic resource. Alignment of their front setbacks is preferred. An exception may be made on a corner lot or where a recessed siting for the new structure is a better preservation outcome. Met 11.2 In a residential context, clearly define the primary entrance to a new building by using a front porch. • The front porch shall be functional, and used as the means of access to the front door. • A new porch must be similar in size and shape to those seen traditionally. Met 11.3 Construct a new building to appear similar in scale and proportion with the historic buildings on a parcel. • Subdivide larger masses into smaller “modules” that are similar in size to the historic buildings on the original site. • Reflect the heights and proportions that characterize the historic resource. Met/Not Met 19 Page 7 of 8 11.4 Design a front elevation to be similar in scale to the historic building. • The primary plane of the front shall not appear taller than the historic structure. Met 11.5 The intent of the historic landmark lot split is to remove most of the development potential from the historic resource and place it in the new structure(s). • This should be kept in mind when determining how floor area will be allocated between structures proposed as part of a lot split. Met 11.6 Design a new structure to be recognized as a product of its time. • Consider these three aspects of a new building; form, materials, and fenestration. A project must relate strongly to the historic resource in at least two of these elements. Departing from the historic resource in one of these categories allows for creativity and a contemporary design response. • When choosing to relate to building form, use forms that are similar to the historic resource. • When choosing to relate to materials, use materials that appear similar in scale and finish to those used historically on the site and use building materials that contribute to a traditional sense of human scale. • When choosing to relate to fenestration, use windows and doors that are similar in size and shape to those of the historic resource. Met 11.7 The imitation of older historic styles is discouraged. • This blurs the distinction between old and new buildings. • Overall, details shall be modest in character. Met Chapter 12: Accessibility, Architectural lighting, Mechanical Equipment, Service Areas, and Signage Finding 12.3 Exterior light fixtures should be simple in character. • The design of a new fixture should be appropriate in form, finish, and scale with the structure. • New fixtures should not reflect a different period of history than that of the affected building, or be associated with a different architectural style. • Lighting should be placed in a manner that is consistent with the period of the building, and should not provide a level of illumination that is out of character. • One light adjacent to each entry is appropriate on an Aspen Victorian residential structure. A recessed fixture, surface mounted light, pendant or sconce will be considered if suited to the building type or style. • On commercial structures and AspenModern properties, recessed lights and concealed lights are often most appropriate. Met 20 Page 8 of 8 12.4 Minimize the visual impacts of utilitarian areas, such as mechanical equipment and trash storage. • Place mechanical equipment on the ground where it can be screened. • Mechanical equipment may only be mounted on a building on an alley façade. • Rooftop mechanical equipment or vents must be grouped together to minimize their visual impact. Where rooftop units are visible, it may be appropriate to provide screening with materials that are compatible with those of the building itself. Use the smallest, low profile units available for the purpose. • Window air conditioning units are not allowed. • Minimize the visual impacts of utility connections and service boxes. Group them in a discrete location. Use pedestals when possible, rather than mounting on a historic building. • Paint mechanical equipment in a neutral color to minimize their appearance by blending with their backgrounds. • In general, mechanical equipment should be vented through the roof, rather than a wall, in a manner that has the least visual impact possible. • Avoid surface mounted conduit on historic structures. Met 21 Exhibit A Permitted Use Variance – Review Criteria 26.314.040 – Variances B. In order to authorize a variance from the permitted uses of Title 26, the appropriate decision- making body shall make a finding that all of the following circumstances exist: 1. Notice by publication, mailing and posting of the proposed variance has been provided to surrounding property owners in accordance with Subparagraphs 26.304.060(e)(3)a.— c. Staff Response: Adequate noticing was provided for the request – staff finds this criterion to be met. 2. A variance is the only reasonable method by which to afford the applicant relief, and to deny a variance would cause the applicant unnecessary hardship such that the property would be rendered practically undevelopable, as distinguished from mere inconvenience. Staff Response: Staging the construction equipment at 337 Lake Ave. for the restoration of the historic resource at 335 Lake Ave. minimizes the impact on the surrounding neighborhood and staff see this as a reasonable request. 3. The temporary off-site storage or construction staging can be undertaken in such a manner so as to minimize disruption, if any, of normal neighborhood activities surrounding the subject parcel. Staff Response: Staging the construction equipment at 337 Lake Ave. for the restoration of the historic resource at 335 Lake Ave. minimizes the impact on the surrounding neighborhood and staff see this as a reasonable request. 4. If ownership of the off-site parcel subject to the proposed variance is not vested in the applicant, then verified written authorization of the parcel's owner must be provided. Staff Response: Both properties are under the same ownership. 5. Adequate provision is made to restore the subject parcel to its original condition upon expiration of the variance, including the posting of such financial security as deemed appropriate and necessary by the appropriate decision-making body to ensure such restoration. Staff Response: A condition of approval is included that requires the Applicant to address all impacts of the construction staging, including a revegetation plan. Approval by the City of Aspen Engineering and Parks Departments for all impacts to 337 Lake Ave., will be required prior to building permit issuance for 335 Lake Ave. 22 Memorandum TO: Sara Adams, BendonAdams FROM: Gillian White, Historic Preservation Officer DATE: November 12, 2024 PROJECT: LPA-24-106, Major Development - Conceptual HPC Review, Development of New House on Vacant Lot at 337 Lake Avenue COMMENTS: These comments are not intended to be exhaustive, but an initial response to the Land Use application submitted for review. Other requirements may be requested at time of permit. Engineering: 1. This project will qualify as a major level Engineering Review. A full drainage report and civil plans will be required at the time of permit. a. Ensure all utility crossing minimums are maintained. 2. A Permanent Revocable Encroachment License will be required prior to Certificate of Occupancy for the retaining wall and stairs in the Right of Way. 3. The fence should not block the curb stop and should always be accessible. 4. This appears to be shown as two separate units, each unit needs its own service lines for utilities. 5. Show routing of green roof to storm system in permit documents. 6. Mech room should be located in the rear to reduce distance between the potable water entry to the structure and the meter and backflow prevention assembly. Water Distribution Standard 5.8.1 require all meters to set as close as possible to the point where the service enters the building. 7. Curb cuts should be a minimum of 25ft away from an adjacent curb cut. There is currently only approximately 22ft. Amend the driveway location. 8. If any snowmelt is proposed, it is not permitted over the water main. Historic Preservation: 1. Preliminary material representations are requested when available. 2. Sheet LX-01 shows the retaining wall partially on 335 Lake Ave property – are you only demolishing to the property line? 3. Please include photo of the existing retaining wall. Building: No Comments. Parks: No Comments. Zoning: No Comments. 23 Memorandum TO: Gillian White, gillian.white@aspen.gov Community Development Department FROM: Kyla Smits, Kyla.smits@aspen.gov Engineering Department DATE: September 29, 2025 SUBJECT: Engineering Department Referral Comments PROJECT: LPA-25-102, 337 Lake Ave – Major HP Development Final COMMENTS: These comments are not intended to be exhaustive, but an initial response to the project packet submitted for the purpose of the Historical Preservation Committee meeting. Other requirements may be requested at time of permit. 1. This project will qualify as a major level Engineering Review. A full drainage report and civil plans will be required at the time of permit. a. Ensure all utility crossing minimums are maintained. 2. A Permanent Revocable Encroachment License will be required prior to Certificate of Occupancy for the retaining wall and stairs in the Right of Way. 3. Water Distribution Standard 5.8.1 requires all meters to set as close as possible to the point where the service enters the building. 4. If any snowmelt is proposed, it is not permitted over the water main. 5. The conceptual CMP plans are sufficient for Land Use. Final CMP approval will be at building permit. 24 MEMORANDUM TO: Gillian White, Historic Preservation Officer FROM: Owen Palcsik, Planner Technician DATE: 09/25/2025 RE: Zoning Referral Comments – LPA-25-102 – 337 Lake Avenue Please respond to the following before board approval: 1. Please demonstrate compliance with Sec. 26.512, Outdoor Lighting, in the form of a completed Outdoor Lighting Compliance Calculator that aligns with the Lighting Plan for the parcel. A variety of other requirements may be necessary for building permit submittal and zoning review. 25 300 SO SPRING ST | 202 | ASPEN, CO 81611 970.925.2855 | BENDONADAMS.COM Gillian White Aspen Historic Preservation Commission May 28, 2025 Revised September 17, 2025 Re: 337 Lake Avenue – HP Major Development Final Application and Request for Temporary Construction Staging Dear Gillian and HPC, Please accept this application for Major Development Final Review of the vacant property located at 337 Lake Avenue, Lot B of the Daggs Historic Landmark Lot Split. This 6,001 sf property is under the purview of the Historic Preservation Commission (HPC). The owners, Abby and Jon, propose to construct a small studio residence with a basement. The project conforms to both the R-6 zone district and the specifications in the lot split subdivision agreement (Exhibit J.2). HPC granted Conceptual Major Development approval in January 2025 via Resolution 1-2025 (Exhibit J.4). City Council did not call up the project. Background 337 Lake Avenue was created in 2005 through the historic landmark lot split incentive – Lot A (335 Lake Avenue) contains the 1880s historic landmark and is 5,706 sf; and Lot B (subject property) is vacant and 6,001 sf. The total allowable floor area plus the 500 sf floor area bonus for historic restoration was allocated to the newly created lots through the lot split process – Lot A is permitted 2,542 sf of floor area plus a 500 sf bonus for a total of 3,042 sf; and Lot B is permitted 1,700 sf of floor area. The allocation of floor area between the lots clearly indicates a desire for Lot B to be developed with a small residence. Figures 1 & 2: Historic 335 Lake (left) and proposed 337 Lake (right). 26 Page 2 of 3 335 Lake Avenue recently received Minor Development approval from HPC for a remodel of the existing home, and a building permit is under review. Proposal A one story studio residence with basement is proposed on the vacant lot. The home complies with the underlying R-6 zone district, Residential Design Standards, and is about 600 sf below the maximum floor area of 1,700 sf and about 10 ft below the maximum height of 25 ft. The primary roof form is a gable and horizontal siding is proposed. The house sits on its own fee simple lot, but clearly pulls inspiration from the adjacent historic landmark through the prominent front porch, simple forms, and material application. Modern architectural details, front porch, and fenestration, and a flat green roof distinguish the new building as a product of its own time. Historic Preservation Design Guidelines are addressed in Exhibit A. The project team worked closely with the City Forester early in the design process to identify trees to preserve and trees to remove. Coordination with the Forester to establish a tree setback informed the site plan during conceptual review, and another meeting this past winter was conducted to review the cottonwoods along Lake Avenue and an appropriate location for the sewer line. A more developed storm water management plan and landscape plan are included in the design set and all design criteria are addressed in Exhibit A. Residential Design Standards are addressed in Exhibit K. A physical model and material samples will be presented at the public hearing. In addition to Final Design Review, HPC is asked to consider a request to temporarily use the vacant 337 Lake Avenue property as “temporary construction material storage and staging ” for the 335 Lake remodel project for a period of 32 months. The Code allows HPC to grant a temporary use variance to allow “off-site” construction storage and staging. Staging on the property next to the historic home at 335 Lake avoids negative impacts on the neighborhood, traffic flow to the Aspen Meadows, and results in a significantly faster construction timeframe - a benefit to the entire community. Locating an excavator on the 337 Lake property to repair and excavate a deeper basement allows the historic home to be underpinned, rather than lifted. Underpinning is HPC’s preferred method to excavate a basement in order to avoid unintended consequences to historic material associated with lifting the house. All trees will be protected on the 337 Lake property during staging for 335 Lake, and construction of the 337 Lake project is expected to begin about 16 months after 335 starts and a building permit is issued. Review criteria and construction management site plan are included as Exhibit A.2. Kind Regards, Sara Adams, AICP BendonAdams, LLC 27 Page 3 of 3 Exhibits A Review Criteria A.1 Historic Preservation Design Guidelines A.2 Temporary Variance for Construction Staging B. Land Use Application C. Pre-application summary D. Authorization to represent E. Proof of ownership E.1 Title commitment E.2 Statement of authority F. Agreement to Pay G. HOA form H. Vicinity Map I. Mailing list J. Past approvals J.1 Ordinance 47-2005 approving the historic lot split J.2 Subdivision agreement J.3 Subdivision plat J.4 HPC Resolution 1-2025 K. Residential Design Standard Checklist L. Drawing set including survey and civil drawings 28 Exhibit A.1 HP Design Review Sec. 26.415.060.A Approvals Required Any development involving properties designated on the aspen Inventory of Historic Landmark Sites and Structures, as an individual property or located within the boundaries of a Historic District, unless determined exempt, requires the approval of a development order and either a certificate of no negative effect or a certificate of appropriateness before a building permit or any other work authorization will be issued by the City. HPC shall provide referral comments for major projects to rights of way located within the boundaries of a Historic District. Response: Applicable Design Guidelines are addressed below: Streetscape 1.1 All projects shall respect the historic development pattern or context of the block, neighborhood or district. Response – The building faces Lake Avenue similar to the adjacent landmark. Open space and porosity are maximized in the site plan – the proposed site coverage is 15% where 50% is the maximum allowed. 1.2 Preserve the system and character of historic streets, alleys, and ditches. Response – No change to historic streets is proposed. 1.3 Remove driveways or parking areas accessed directly from the street if they were not part of the original development of the site. Response – No change to access. 1.4 Design a new driveway or improve an existing driveway in a manner that minimizes its visual impact. Response – Access to the property is from Third Street via cobble stone tracks that transition to grass pavers to accommodate the required surface parking space. 1.5 Maintain the historic hierarchy of spaces. Response – A simple walkway from Lake Avenue to the entry porch is proposed to reflect the traditional transition from public to private space. 1.6 Provide a simple walkway running perpendicular from the street to the front entry on residential projects. Response – A simple concrete walkway with steps and a handrail is proposed from Lake Avenue to the front entry- there is significant grade change between the property and Lake Avenue and a metal handrail is needed for safety. The width of the walkway is three feet. Large cottonwoods in the right of way necessitate a jog in the walkway to accommodate tree roots and the required sewer line per the Parks Proposed site plan at 337 Lake (top) compared to historic resource at 335 Lake (bottom). 29 Exhibit A.1 Design Review Criteria Department. A dry stack stone retaining wall to replace the existing wall is proposed along Lake Avenue which will be coordinated with the Engineering Department and will match the adjacent retaining wall at 335 Lake. 1.7 Provide positive open space within a project site. Response – Open space is provided around the new home to create usable outdoor areas and passive landscaped areas. Two rain gardens are located on the north and south of the gable roof volume, and hardscape is limited to the south side yard. A back patio with trellis is proposed facing Third Street. 1.8 Consider stormwater quality needs early in the design process. Response – Civil plans are included in drawing set, sheets C1- C4. The civil plans show utility lines, storm drains and inlets, the proposed rain gardens, and the proposed green roof. Two underground storm water treatment systems are proposed in the south side yard. Access lids will be solid and covered with sod to avoid any visual impacts as viewed from either street. 1.9 Landscape development on AspenModern landmarks shall be addressed on a case by case basis. Response – n/a. 1.10 Built-in furnishings, such as water features, fire pits, grills, and hot tubs, that could interfere with or block views of historic structures are inappropriate. Response – A built in grill is proposed on the stone patio on the rear of the new home. 1.11 Preserve and maintain historically significant landscaping on site, particularly landmark trees and shrubs. Response – Existing cottonwoods in the right of way along Lake Avenue, and significant trees along the west property line are preserved and protected per the Parks Department’s specifications. A revised tree removal plan that reflects Parks’ recent direction on tree removals is included as Sheet LX-01. Proposed new trees are shown on Sheet LX-03. 1.12 Provide an appropriate context for historic structures. See diagram. Response – A simple landscape is proposed around the new house as shown on Sheets LX-03 - 06 of the drawing set. A mix of native perennials, shrubs, and grasses are proposed around the new home and along the Third Street fence line. The design team proposes planting only by the new home to maintain the current openness of the lot and to reflect traditional planting patterns. Historic maps depict the lot as containing 335 Lake Avenue before it was moved as part of the historic landmark lot split in 2005. The proposed landscape plan honors the history of the lot with restrained native planting. Landscape and hardscape create a subtle link between 337 Lake and 335 Lake that is further expressed through the architecture of 337. Historic Willits Map. 30 Exhibit A.1 Design Review Criteria Proposed trees and shrubs. Proposed perennial mix at right. 31 Exhibit A.1 Design Review Criteria 1.13 Additions of plant material to the landscape that could interfere with or block views of historic structures are inappropriate. Response – Plants do not obscure the view of the new building or the adjacent landmark. 1.14 Minimize the visual impacts of landscape lighting. Response – Landscape lighting is not proposed at this time. Pathway lighting is proposed along the front walkway from Lake Avenue to illuminate the steps and the jogs in the path as shown below. The light fixture is 15” maximum height and 1” in diameter, similar to the pathway lights approved at 335 Lake. A lighting plan and proposed fixtures are on Sheet EL0.01 – 0.06 and EL1.00. 1.15 Preserve original fences. Response – n/a. 1.16 When possible, replicate a missing historic fence based on photographic evidence. Response – n/a. 1.17 No fence in the front yard is often the most appropriate solution. • Reserve fences for back yards and behind street facing façades, as the best way to preserve the character of a property. Response – No fence is proposed in the front yard. Fencing is proposed in the south side (existing fence) and rear yard (new fence facing Third Street). 1.18 When building an entirely new fence, use materials that are appropriate to the building type and style. Response – The existing south side fence is proposed to remain. The rear fence facing Third Street will be 42” tall wood fence with horizontal boards. A detail of the fence and gate are provided on Sheets LX-04 and LX-05. This wood fence matches the adjacent fence at 335 Lake, and a vehicular gate is proposed Proposed outdoor lighting plan. Blue arrows indicate the stairs and where the pathway jogs 90 degrees. 32 Exhibit A.1 Design Review Criteria 1.19 A new fence should have a transparent quality, allowing views into the yard from the street. Response – The rear fence is 42” in height and is horizontal wooden boards of varying width. The low height of the fence and ½” spacing between boards allows views from the street into the rear yard. 1.20 Any fence taller than 42” should be designed so that it avoids blocking public views of important features of a designated building. Response – This property does not contain a designated building. The adjacent landmark at 335 Lake is not blocked by the proposed rear fence. 1.21 Preserve original retaining walls • Replace only those portions that are deteriorated beyond repair. Any replacement materials should match the original in color, texture, size and finish. • Painting or covering a historic masonry retaining wall or covering is not allowed. • Increasing the height of a retaining wall is inappropriate. Response – n/a. 1.22 When a new retaining wall is necessary, its height and visibility should be minimized. • All wall materials, including veneer and mortar, will be reviewed on a case by case basis and should be compatible with the palette used on the historic structure. Response – The existing red sandstone retaining wall in the right of way is proposed to be replaced with a grey dry stack stone wall. 1.23 Re-grading the site in a manner that changes historic grade is generally not allowed and will be reviewed on a case by case basis. Response – The site is relatively flat – regrading is not anticipated at this time. 1.24 Preserve historically significant landscapes with few or no alterations. Response – Existing cottonwood trees in the right of way along Lake Avenue are protected and preserved per the Parks Department’s specifications. 1.25 New development on these sites should respect the historic design of the landscape and its built features. Response – A simple landscape with traditional plant species is proposed as explained above. 1.26 Preserve the historic circulation system. Response – A surface parking space is proposed off Third Street. Simple cobble stone tracks and grass pavers are proposed to minimize the impact of the new curb cut. Detail of wood fence approved at 335. 33 Exhibit A.1 Design Review Criteria Venting and Gutters 1.27 Preserve and maintain significant landscaping on site. Response – All new plantings are simple and reference historically used native species as described above. Significant cottonwood trees are preserved and protected per Parks Department direction. 7.4 New vents should be minimized, carefully, placed and painted a dark color. Response – Two roof vents with metal shrouds are proposed on the gable roof. Both vents are setback from the street facing façade and are painted matte black. Elevations on Sheet A3.01 show the expected heights of both vents. 7.10 Design gutters so that their visibility on the structure is minimized to the extent possible. Response – Gutters and downspouts, painted matte black, are proposed for the gable roof portion of the home. A detail of the gutter style is provided on Sheet A8.00, and the roof plan on Sheet A2.02 shows locations of the gutters. Downspouts are setback from building corners to not be visible from the street and to drain into the proposed rain gardens. 34 Exhibit A.1 Design Review Criteria New Buildings on Landmarked Properties 11.1 Orient the new building to the street. Response – The new building is oriented to Lake Avenue and is aligned with the historic landmark while still respecting the tree root protection area and meeting the “build to requirement” in the Residential Design Standards. 11.2 In a residential context, clearly define the primary entrance to a new building by using a front porch. Response – A recessed front porch with 3’6” cantilevered metal roof provides primary entry into the home. The historic landmark has a 65 sf recessed front porch, and the new home proposes a similarly sized recessed rectangular front porch. 11.3 Construct a new building to appear similar in scale and proportion with the historic buildings on a parcel. Response – The new building is a simple one story gable form that transitions into a flat green roof toward the rear of the property. The new building is 19’2” wide compared to the primary front module of the landmark which is 20’ 8” wide. The building is one story and significantly shorter than the adjacent landmark. 11.4 Design a front elevation to be similar in scale to the historic building. Response – The front façade of the new building is not taller than the historic structure. 11.5 The intent of the historic landmark lot split is to remove most of the development potential from the historic resource and place it in the new structure(s). Response – n/a. The lot split was approved in 2005 at which time floor area and the FAR Bonus were allocated. 337 Lake Avenue was allocated 1,700 sf of floor area with the intention of developing a small home on this lot. Comparison of Lot A (historic) and Lot B (new) front facades. 35 Exhibit A.1 Design Review Criteria 11.6 Design a new structure to be recognized as a product of its time. Response – The new structure is recognized as a product of its own time in the size and application of the fenestration and solid to void ratios on the building facades. The gable roof form relates to surrounding historic landmarks. Primary material is horizontal stained wood siding with either a concrete foundation or metal flashing. A treated cedar shingle roof is proposed for the gable portion to match the landmark, and a green roof is proposed on the flat portion of the home. A metal trellis, metal window and door systems, metal gutters and downspouts, and metal shroud around roof vents are proposed to minimize the material palette. Concrete is proposed for site walls, the exterior stair to the basement, and the rain gardens. A metal mesh guardrail is proposed along the exterior stairs. Physical samples will be provided at the public hearing. Materials are labelled on the elevations on Sheet A3.01. Modern architectural details like eave depth, cantilevered metal porch roof, and the flat green roof viewed from Third Street, distinguish this home as new construction that fits into the neighborhood. Historic photographs below illustrate traditional forms and details along Lake Avenue. 11.7 The imitation of older historic styles is discouraged. Response – The new home is modest in character and is clearly a product of its own time as expressed through architectural details, fenestration size and placement, and the treatment of the wood siding (stained dark). 220 Lake Avenue, 1978. Aspen Historical Society. Lake Avenue streetscape with prominent street facing gables. Aspen Historical Society. Proposed material palette. 36 Exhibit A.1 Design Review Criteria 12.3 Exterior light fixtures should be simple in character. • Lighting should be placed in a manner that is consistent with the period of the building, and should not provide a level of illumination that is out of character. Response – An exterior lighting plan is included as Sheet EL1.00 and cut sheets for each fixture are provided as Sheets EL0.01-0.06. One light is proposed at each entry. Lights are proposed along the pathway where necessary (as discussed above in Chapter 1) and are proposed along the exterior stair for safety. The lighting plan is minimal and all lights are downcast. EL1 – 2” aperture entry light recessed in porch soffit; EL2 – light within trellis; EL3 – lights at stairway near Lake Avenue; EL4 - !” diameter surface mounted light at basement door; EL5 – three pathway lights at critical locations; EL6 – cast in concrete step light along exterior stairs to basement; EL7A – 1” surface mounted downlight at side door. Lighting and Mechanical Historic home at 335 Lake (left) and proposed new home at 337 Lake (right). 37 Exhibit A.1 Design Review Criteria 12.4 Minimize the visual impacts of utilitarian areas, such as mechanical equipment and trash storage. Response – The mechanical equipment will mostly be located in the basement. Required outdoor units are conceptually located in the side yard with a 6’ tall wood screen (detail on Sheet LX-05). This small area is significantly setback from the front façade and plantings are proposed to further screen the area. This property has two street facing yards – utilizing the side yard for mechanical equipment is the least impactful option. We coordinated the location with the City Forester to ensure significant tree roots are not impacted. Location of above grade mechanical equipment. The area is fully screened and has been vetted with Parks. 38 Lot A 5,706 sq ft ± 0.131 Acres ± Lot B 6,001 sq ft ± 0.138 Acres ± MARTIN CONDO ASSOC COMMON AREA ASPEN CO 81611 Parcel No. 273512127800 E A ALTEMUS PARTNERSHIP LLLP PO BOX 5000 ASPEN CO 81612 Parcel No. 273512108003North Third Street65.0' R-O-WLake Avenue75.0' R-O-WSALTER/LUBAR LOT LINE ADJUSTMENT Plat Book 88, Page 67 Unit B MARTIN CONDOMINIUMS Plat Book 22, Page 51 Unit A MARTIN CONDOMINIUMS Plat Book 22, Page 51 T1 T2 Gas ac ac ac ac T4 T3 T5 T7 T8 T6 T9 T10 T11 T12 T14 T15 T16 T20 T21 T22 T23 T24 T25 T26T27T28T29T30T31T32T33T34T35T36 FF=7884.88' FF=7884.21' FF Garage 7884.24' Ridge El=7904.86'Ridge El=7907.69'Covered StoneSteps ww ww ww ww Electrical Transformer Electric Meter 5/8" Rebar & Red Plastic Cap LS No. 25947 5/8" Rebar & Red Plastic Cap LS No. 25947 Site Benchmark Elev.=7883.90' 5/8" Rebar & Red Plastic Cap LS No. 25947 5/8" Rebar 5/8" Rebar & Yellow Plastic Cap LS No. 9184 5/8" Rebar & Yellow Plastic Cap LS No. 9184 Edge of Asphalt Light Pole Storm Grate Mail Box Stone Stone Stone Stone Stone Stone 2 Story Frame House Posted Address: 638 N. 3rd St. 2 Story Frame House w/ Basement Address: 335 Lake Ave. Concrete Driveway Top Back Curb Edge of Asphalt Flow Line Curb Electric Box CoveredDeckCovered Stone Planter Planter Planter Stone Retaining Walls Upper Level Deck Upper Level Deck FenceAdjoining House Fence Storm Inlet Rim El.=7874.2' Storm Inlet 10.21' 11.45' T13 T17 T19 T18 LEGEND Found Monument Electric Meter Telephone Pedestal Cable Pedestal Electrical Transformer Window Well Sewer Clean-out Storm Inlet Light Pole Fir Tree Aspen Tree Deciduous Tree ww PROPERTY DESCRIPTION LOT A & B DAGGS HISTORIC LANDMARK LOT SPLIT SUBDIVISION EXEMPTION RECORDED AT PLAT BOOK 80, PAGE 97. CITY OF ASPEN COUNTY OF PITKIN STATE OF COLORADO EXISTING CONDITIONS SURVEY LOT A & B DAGGS HISTORIC LANDMARK LOT SPLIT SUBDIVISION EXEMPTION COUNTY OF PITKIN, STATE OF COLORADO U.S. SURVEY FEET USED NOTES 1.) DATE OF THE FIELD SURVEY WAS MAY 30, 2023. 2.) THIS PROPERTY IS SUBJECT TO EASEMENTS, RIGHTS OF WAY AND/ OR REQUIREMENTS AS NOTED OR SHOWN IN THE RECORDS OF THE PITKIN COUNTY CLERK & RECORDER. 3.) ELEVATIONS ARE BASED UPON CITY OF ASPEN BENCHMARK GPS 9 (NAVD 88). 4.) NO TITLE COMMITMENT WAS PROVIDED FOR THIS SURVEY. 5.) CONTOUR INTERVAL IS ONE FOOT. 6.) THIS SURVEY IS BASED ON DAGGS HISTORIC LANDMARK LOT SPLIT SUBDIVISION EXEMPTION RECORDED AT PLAT BOOK 80, PAGE 97. SURVEYOR'S CERTIFICATE I, SCOTT R. BLACKARD, DO HEREBY CERTIFY THAT I AM A PROFESSIONAL LAND SURVEYOR LICENSED UNDER THE LAWS OF THE STATE OF COLORADO, AND THAT THIS SURVEY IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. __________________________________ SCOTT R. BLACKARD P.L.S. 38342 email: sblackard11@gmail.com EXISTING CONDITIONS SURVEY LOT A & B DAGGS HISTORIC LANDMARK LOT SPLIT SUBDIVISION EXEMPTION COUNTY OF PITKIN, STATE OF COLORADO TREE TABLE Office trailer Loading and drop off area. Staging area Haul off dumpster and trash sorting area. Lay-down and storage re-vegetate this area after construction. Lay-down and storage re-vegetate this area after construction. 2 Portable Toilets Access gate with lock. Project Access Gates Construction Fence Vehicle Tracking Pad Appendix H PARKING RESERVATIONS (3 spaces)CMP plan with staging at 337 Lake 39 Lot A 5,706 sq ft ± 0.131 Acres ± Lot B 6,001 sq ft ± 0.138 Acres ± MARTIN CONDO ASSOC COMMON AREA ASPEN CO 81611 Parcel No. 273512127800 E A ALTEMUS PARTNERSHIP LLLP PO BOX 5000 ASPEN CO 81612 Parcel No. 273512108003North Third Street65.0' R-O-WLake Avenue75.0' R-O-WSALTER/LUBAR LOT LINE ADJUSTMENT Plat Book 88, Page 67 Unit B MARTIN CONDOMINIUMS Plat Book 22, Page 51 Unit A MARTIN CONDOMINIUMS Plat Book 22, Page 51 T1 T2 Gas ac ac ac ac T4 T3 T5 T7 T8 T6 T9 T10 T11 T12 T14 T15 T16 T20 T21 T22 T23 T24 T25 T26T27T28T29T30T31T32T33T34T35T36 FF=7884.88' FF=7884.21' FF Garage 7884.24' Ridge El=7904.86'Ridge El=7907.69'Covered StoneSteps ww ww ww ww Electrical Transformer Electric Meter 5/8" Rebar & Red Plastic Cap LS No. 25947 5/8" Rebar & Red Plastic Cap LS No. 25947 Site Benchmark Elev.=7883.90' 5/8" Rebar & Red Plastic Cap LS No. 25947 5/8" Rebar 5/8" Rebar & Yellow Plastic Cap LS No. 9184 5/8" Rebar & Yellow Plastic Cap LS No. 9184 Edge of Asphalt Light Pole Storm Grate Mail Box Stone Stone Stone Stone Stone Stone 2 Story Frame House Posted Address: 638 N. 3rd St. 2 Story Frame House w/ Basement Address: 335 Lake Ave. Concrete Driveway Top Back Curb Edge of Asphalt Flow Line Curb Electric Box CoveredDeckCovered Stone Planter Planter Planter Stone Retaining Walls Upper Level Deck Upper Level Deck FenceAdjoining House Fence Storm Inlet Rim El.=7874.2' Storm Inlet 10.21' 11.45' T13 T17 T19 T18 LEGEND Found Monument Electric Meter Telephone Pedestal Cable Pedestal Electrical Transformer Window Well Sewer Clean-out Storm Inlet Light Pole Fir Tree Aspen Tree Deciduous Tree ww PROPERTY DESCRIPTION LOT A & B DAGGS HISTORIC LANDMARK LOT SPLIT SUBDIVISION EXEMPTION RECORDED AT PLAT BOOK 80, PAGE 97. CITY OF ASPEN COUNTY OF PITKIN STATE OF COLORADO EXISTING CONDITIONS SURVEY LOT A & B DAGGS HISTORIC LANDMARK LOT SPLIT SUBDIVISION EXEMPTION COUNTY OF PITKIN, STATE OF COLORADO U.S. SURVEY FEET USED NOTES 1.) DATE OF THE FIELD SURVEY WAS MAY 30, 2023. 2.) THIS PROPERTY IS SUBJECT TO EASEMENTS, RIGHTS OF WAY AND/ OR REQUIREMENTS AS NOTED OR SHOWN IN THE RECORDS OF THE PITKIN COUNTY CLERK & RECORDER. 3.) ELEVATIONS ARE BASED UPON CITY OF ASPEN BENCHMARK GPS 9 (NAVD 88). 4.) NO TITLE COMMITMENT WAS PROVIDED FOR THIS SURVEY. 5.) CONTOUR INTERVAL IS ONE FOOT. 6.) THIS SURVEY IS BASED ON DAGGS HISTORIC LANDMARK LOT SPLIT SUBDIVISION EXEMPTION RECORDED AT PLAT BOOK 80, PAGE 97. SURVEYOR'S CERTIFICATE I, SCOTT R. BLACKARD, DO HEREBY CERTIFY THAT I AM A PROFESSIONAL LAND SURVEYOR LICENSED UNDER THE LAWS OF THE STATE OF COLORADO, AND THAT THIS SURVEY IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. __________________________________ SCOTT R. BLACKARD P.L.S. 38342 email: sblackard11@gmail.com EXISTING CONDITIONS SURVEY LOT A & B DAGGS HISTORIC LANDMARK LOT SPLIT SUBDIVISION EXEMPTION COUNTY OF PITKIN, STATE OF COLORADO TREE TABLE TPZ for these areas to be adjusted as necessary with permission by Parks department to allow for construction in this area. Loading and drop off area. Haul off dumpster and trash sorting area. Access gate with lock. Project Access Gates Construction Fence Appendix H PARKING RESERVATIONS / Temp Encroachment (12 spaces) Haul off dumpster and trash sorting area. Lay-down and storage Office ToiletsTCP/One-Way Road Closed 8-5pm M-F As RequiredEmergency access will be allowed.TCP/One-Way Road Closed 8-5pm M-F As RequiredEmergency access will be allowed.Staging area CMP plan if no staging at 337 Lake 40 Lot A 5,706 sq ft ± 0.131 Acres ± Lot B 6,001 sq ft ± 0.138 Acres ± MARTIN CONDO ASSOC COMMON AREA ASPEN CO 81611 Parcel No. 273512127800 E A ALTEMUS PARTNERSHIP LLLP PO BOX 5000 ASPEN CO 81612 Parcel No. 273512108003North Third Street65.0' R-O-WLake Avenue75.0' R-O-WSALTER/LUBAR LOT LINE ADJUSTMENT Plat Book 88, Page 67 Unit B MARTIN CONDOMINIUMS Plat Book 22, Page 51 Unit A MARTIN CONDOMINIUMS Plat Book 22, Page 51 T1 T2 Gas ac ac ac ac T4 T3 T5 T7 T8 T6 T9 T10 T11 T12 T14 T15 T16 T20 T21 T22 T23 T24 T25 T26T27T28T29T30T31T32T33T34T35T36 FF=7884.88' FF=7884.21' FF Garage 7884.24' Ridge El=7904.86'Ridge El=7907.69'Covered StoneSteps ww ww ww ww Electrical Transformer Electric Meter 5/8" Rebar & Red Plastic Cap LS No. 25947 5/8" Rebar & Red Plastic Cap LS No. 25947 Site Benchmark Elev.=7883.90' 5/8" Rebar & Red Plastic Cap LS No. 25947 5/8" Rebar 5/8" Rebar & Yellow Plastic Cap LS No. 9184 5/8" Rebar & Yellow Plastic Cap LS No. 9184 Edge of Asphalt Light Pole Storm Grate Mail Box Stone Stone Stone Stone Stone Stone 2 Story Frame House Posted Address: 638 N. 3rd St. 2 Story Frame House w/ Basement Address: 335 Lake Ave. Concrete Driveway Top Back Curb Edge of Asphalt Flow Line Curb Electric Box CoveredDeckCovered Stone Planter Planter Planter Stone Retaining Walls Upper Level Deck Upper Level Deck FenceAdjoining House Fence Storm Inlet Rim El.=7874.2' Storm Inlet 10.21' 11.45' T13 T17 T19 T18 LEGEND Found Monument Electric Meter Telephone Pedestal Cable Pedestal Electrical Transformer Window Well Sewer Clean-out Storm Inlet Light Pole Fir Tree Aspen Tree Deciduous Tree ww PROPERTY DESCRIPTION LOT A & B DAGGS HISTORIC LANDMARK LOT SPLIT SUBDIVISION EXEMPTION RECORDED AT PLAT BOOK 80, PAGE 97. CITY OF ASPEN COUNTY OF PITKIN STATE OF COLORADO EXISTING CONDITIONS SURVEY LOT A & B DAGGS HISTORIC LANDMARK LOT SPLIT SUBDIVISION EXEMPTION COUNTY OF PITKIN, STATE OF COLORADO U.S. SURVEY FEET USED NOTES 1.) DATE OF THE FIELD SURVEY WAS MAY 30, 2023. 2.) THIS PROPERTY IS SUBJECT TO EASEMENTS, RIGHTS OF WAY AND/ OR REQUIREMENTS AS NOTED OR SHOWN IN THE RECORDS OF THE PITKIN COUNTY CLERK & RECORDER. 3.) ELEVATIONS ARE BASED UPON CITY OF ASPEN BENCHMARK GPS 9 (NAVD 88). 4.) NO TITLE COMMITMENT WAS PROVIDED FOR THIS SURVEY. 5.) CONTOUR INTERVAL IS ONE FOOT. 6.) THIS SURVEY IS BASED ON DAGGS HISTORIC LANDMARK LOT SPLIT SUBDIVISION EXEMPTION RECORDED AT PLAT BOOK 80, PAGE 97. SURVEYOR'S CERTIFICATE I, SCOTT R. BLACKARD, DO HEREBY CERTIFY THAT I AM A PROFESSIONAL LAND SURVEYOR LICENSED UNDER THE LAWS OF THE STATE OF COLORADO, AND THAT THIS SURVEY IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. __________________________________ SCOTT R. BLACKARD P.L.S. 38342 email: sblackard11@gmail.com EXISTING CONDITIONS SURVEY LOT A & B DAGGS HISTORIC LANDMARK LOT SPLIT SUBDIVISION EXEMPTION COUNTY OF PITKIN, STATE OF COLORADO TREE TABLE Dumpsters TPZ for these areas to be adjusted as necessary with permission by Parks department to allow for construction in this area.Crane Access / Loading Area.Site Fence & Access Gates Construction Fence Appendix H PARKING RESERVATIONS / Temp Encroachment (12 spaces) Haul off dumpster and trash sorting area. Lay-down and storage Office ToiletsTCP/One-Way Road Closed 8-5pm M-F As RequiredTCP/One-Way Road Closed 8-5pm M-F As RequiredEmergency access will be allowed.Crane Access / Loading Area.CMP plan if no staging at 337 Lake Deliveries 41 Exhibit A.2 Construction Staging Variance Sec. 26.413.030 Authorized Variances Variances may only be granted from the following requirements of this Title 26: (a) Dimensional requirements. Response – n/a. (b) Permitted uses, but only to allow for the temporary off-site location or storage of materials, structures or equipment pursuant to building construction or construction staging. Response – HPC is asked to grant a variance for temporary construction staging for the 335 Lake Avenue project, on the 337 Lake Avenue property. Both properties are under single ownership. (b) In order to authorize a variance from the permitted uses of Title 26, the appropriate decision- making body shall make a finding that all of the following circumstances exist: (1) Notice by publication, mailing and posting of the proposed variance has been provided to surrounding property owners in accordance with Subparagraphs 26.304.060(e)(3)a.—c. Response – Notice will be provided prior to the public hearing in accordance with Section 26.304.060 (2) A variance is the only reasonable method by which to afford the applicant relief, and to deny a variance would cause the applicant unnecessary hardship such that the property would be rendered practically undevelopable, as distinguished from mere inconvenience. Response – The requested variance to temporarily stage construction materials, the temporary construction office, and equipment at 337 Lake avoids an unnecessary hardship as described below. 335 Lake is a historic property with approval to expand the existing basement. HPC strongly prefers underpinning the historic resource in order to preserve historic framing and siding, and to limit unintended consequences associated with lifting the historic home. Underpinning is not a viable option without the use of an excavator on the 337 Lake property, which requires a variance for temporary construction staging. Requiring all construction staging to occur on the 335 Lake property extends the construction by about 8 months and greatly impacts the neighborhood – for example, an extra sound barrier was going to be added around 337 Lake to further limit construction noise. The only other option for this project is to stage partially on property and partially in the right of way (ROW) through a ROW permit which extends the construction timeframe; increases construction impacts with more workers, truck trips, etc.; interrupts the neighborhood; and adversely impacts traffic for neighbors and for visitors to the adjacent Aspen Meadows campus. Two construction management site plans are included that compare the impacts of staging at 337 versus only using 335 and the right of way. Not allowing construction staging, storage of materials, and other construction activities on the vacant 337 Lake property creates an unnecessary hardship for the owner to complete the project and underpin the resource, and creates unnecessary hardship for the entire neighborhood. 42 Exhibit A.2 Variance for Temporary Construction Staging (2) The temporary off-site storage or construction staging can be undertaken in such a manner so as to minimize disruption, if any, of normal neighborhood activities surrounding the subject parcel. Response – The offsite storage and staging at 337 Lake does not disrupt the neighborhood activities; and in fact, it avoids construction staging in the right of way which interrupts the neighborhood and significantly extends the construction timeframe. (4) If ownership of the off-site parcel subject to the proposed variance is not vested in the applicant, then verified written authorization of the parcel's owner must be provided. Response – The “offsite” parcel at 337 Lake is owned by Aspen West AJ LLC which also owns 335 Lake Avenue. (5) Adequate provision is made to restore the subject parcel to its original condition upon expiration of the variance, including the posting of such financial security as deemed appropriate and necessary by the appropriate decision-making body to ensure such restoration. Response – Upon substantial completion of the 335 Lake remodel project, 337 Lake will begin construction for the HPC approved project. The variance is requested for 32 months which is the expected duration for construction of the 335 Lake project.. 43 LAND USE APPLICATION PACKET Name: __________________________________________________________________________________ Location: ________________________________________________________________________________ _______________________________________________________________________________________ (Indicate street address, lot & block number or metes and bounds description of property) Parcel ID #: ______________________________________________________________________________ PROJECT: Name: __________________________________________________________________________________ Address: ________________________________________________________________________________ Phone # : _______________________ E-mail: __________________________________________________ APPLICANT: Name: __________________________________________________________________________________ Address: ________________________________________________________________________________ Phone # : _______________________ E-mail: __________________________________________________ REPRESENTATIVE: EXISTING CONDITIONS: (description of existing buildings, uses, previous approvals, etc.) PROPOSAL: (description of proposed buildings, uses, modifications, etc.) City of Aspen | City Hall, 427 Rio Grande Place Aspen, CO 81611 | (970) 920-5000 LAND USE APPLICATION FORM Exhibit B 44 City of Aspen | City Hall, 427 Rio Grande Place Aspen, CO 81611 | (970) 920-5000 DIMENSIONAL REQUIREMENTS FORM LAND USE APPLICATION PACKET Project: __________________________________________________________________________________________ Applicant: ________________________________________________________________________________________ Project Location: ___________________________________________________________________________________ Zone District: _____________________________________________________________________________________ Lot Size: _________________________________________________________________________________________ Gross Lot Area:________________________________ Net Lot Area:_________________________________________ For the purposes of calculating Floor Area, Lot Area may be reduced for areas within the high-water mark, easements, and steep slopes. Please refer to the definition of Lot Area in the Municipal Code. Existing non-conformities or encroachments and note if encroachment licenses have been issued: Variations requested (identify the exact variations being requested): 45 City of Aspen | City Hall, 427 Rio Grande Place Aspen, CO 81611 | (970) 920-5000 DIMENSIONAL REQUIREMENTS FORM LAND USE APPLICATION PACKET Commercial net leaseable: Existing: _____________ Proposed: _____________ Number of Lodge Pillows: Existing: _____________ Proposed: _____________ Number of Lodge Units: Existing: _____________ Proposed: _____________ Number of residential units: Existing: _____________ Proposed: _____________ Number of Free-Market residential units: Existing: _____________ Proposed: _____________ Number of Affordable residential units: Existing: _____________ Proposed: _____________ Proposed % of demolition: ________________ % DIMENSIONS: Write N/A where no requirements exists in the zone district. Floor Area: Existing: _____________ Allowable: _____________ Proposed: _____________ Height Principal Building: Existing: _____________ Allowable: _____________ Proposed: _____________ Accessory Building: Existing:_____________ Allowable: _____________ Proposed: _____________ On-Site Parking: Existing: _____________ Allowable: _____________ Proposed: _____________ % Site Coverage: Existing: _____________ Allowable: _____________ Proposed: _____________ % Open Space: Existing: _____________ Allowable: _____________ Proposed: _____________ Front Setback: Existing: _____________ Allowable: _____________ Proposed: _____________ Rear Setback: Existing: _____________ Allowable: _____________ Proposed: _____________ Combined Front/Rear: Existing: _____________ Allowable: _____________ Proposed: _____________ Indicate N, S, E, W Side Setback: Existing: _____________ Allowable: _____________ Proposed: _____________ Side Setback: Existing: _____________ Allowable: _____________ Proposed: _____________ Combined Front/Rear: Existing: _____________ Allowable: _____________ Proposed: _____________ Distance between Buildings: Existing: _____________ Allowable: _____________ Proposed: _____________ 46 LAND USE APPLICATION PACKET TYPE OF APPLICATION ESA Review (Stream Margin, 8040 Greenline, View Plane, or Hallam Lake Bluff) Non Conformities Pre-Development Topography Temporary Use Accessory Dwelling Unit/Carriage House Dimensional Variance Growth Management Review Outdoor Vending Planned Development Review Certificates of Affordable Housing Credit Establishment of Zoning or Rezoning Subdivision Review Condominiumization Approval Documents Special Review Wireless Facilities Residential Design Standard Review Conditional Use Review Historic Designation Certificate of Appropriateness Minor Historic Development Major Historic Development (select one below) Conceptual Development Final Development Relocation (temporary, on or off-site) Demolition (total demolition) Substantial Historic Preservation Amendment Historic Landmark Lot Split Establishment of Transferable Development Rights (TDRs) Other City of Aspen | City Hall, 427 Rio Grande Place Aspen, CO 81611 | (970) 920-5000 HISTORIC PRESERVATION REVIEWS 47 PRE-APPLICATION SUMMARY DATE: June 30, 2023 PLANNER: Kirsten Armstrong - Principal Planner, Historic Preservation, kirsten.armstrong@aspen.gov REPRESENTATIVE: Sara Adams, AICP, sara@bendonadams.com PROJECT LOCATION: 337 Lake Avenue; Lot B, Daggs Historic Landmark Lot Split PARCEL ID: 2735-121-35-002 REQUEST: Historic Preservation – Major Development Review DESCRIPTION: In 2005, a historic landmark lot split regarding the current subject property was approved by the Historic Preservation Commission (Resolution #45, series of 2005) and City Council (Ordinance #47, series of 2005). The Historic Lot Split Subdivision Exemption Plat and the Subdivision Exemption Agreement for the Daggs Historic Landmark Lot Split were recorded in 2006, Book 80, Page 97 and Reception #427631, respectively. The Daggs Historic Landmark Lot Split Subdivision Exemption created Lots A and B out of the original parcel for 640 N. Third Street, consisting of Lots 4, 5, and 6 (Less the southerly 3.2’ of Lot 6) Block 102, Hallam’s Addition to the City and Townsite of Aspen. Lot A is a 5707 sq. ft. lot containing an AspenVictorian landmark. Lot B, to the north of Lot A, is a vacant 6,000 sq. ft. lot, and is the subject of this request. Both are located in the R-6 zone district. Both parcels are designated historic and are subject to development review by the Aspen Historic Preservation Commission. The owner would like to develop Lot B with new construction. Pursuant to Ordinance #47, Series of 2005, both lots created as part of the Daggs Historic Landmark Lot Split must conform to the requirements of their underlying zone district. The Ordinance and associated plat states that Lot B has an allowed floor area of 1,700 sq. ft. Variations provided for in Section 26.415.110.C.1.a-c are not applicable to Lot B, as it does not contain the historic structure. The maximum potential buildout for the two parcels created by the lot split is not to exceed three units, which may be composed of a duplex and a single-family home. The Ordinance also states that any lot for which development is proposed shall be subject to affordable housing mitigation, which in the 2023 City of Aspen Municipal Land Use Code includes Growth Management Residential Development review per Section 26.470.090.A. The scope of work qualifies as Major Development, which is a two-step process, requiring the approval of Conceptual Design and a Final Design. Conceptual Design review will consider mass, scale and site plan.. Following Conceptual, staff will inform City Council of the HPC decision, allowing them the opportunity to uphold or to “Call Up” aspects of the design approval for further discussion. This is a standard practice for all significant HPC projects. Following the Notice of Call Up, HPC will conduct Final Design review to consider landscape, lighting and materials. The Historic Preservation Design Guidelines and the Land Use Code Sections that are applicable to this project will be used to evaluate the proposal. This property is subject to Residential Design Standard Review (RDS). RELEVANT LAND USE CODE SECTIONS: Section Number Section Title 26.304 Common Development Review Procedures 26.410 Residential Design Standards (RDS) 26.415.070.D Historic Preservation – Major Development 26.470.090.A Growth Management, Administrative Applications 26.575.020 Calculations and Measurements 26.710.090 Medium-Density Residential (R-6) Exhibit C 48 For your convenience – links to the Land Use Application and Land Use Code are below: Application Packet Historic Preservation Design Guidelines Municipal Code REVIEW BY: • Staff for completeness and recommendations • HPC for decisions. City Council for Notice of Call Up. PUBLIC HEARING: • Yes, at Conceptual and Final PLANNING FEES: $1,950 for 6 billable hours of staff time. (Additional/ lesser hours will be billed/ refunded at a rate of $325 per hour.) This fee will be due at Conceptual and Final submittal. REFERRAL FEES: $0. Staff will seek referral comments from the Building Department, Zoning, Engineering and Parks regarding any relevant code requirements or considerations. There will be no Development Review Committee meeting or referral fees. TOTAL DEPOSIT: $1,950 at Conceptual and Final (additional/lesser planning hours are billed/refunded at a rate of $325/hour). APPLICATION CHECKLIST: Below is a list of submittal requirements. Please email the entire application as one .pdf to kirsten.armstrong@aspen.gov. The fee will be requested after the application is determined to be complete.  Completed Land Use Application and signed Fee Agreement.  Pre-application Conference Summary (this document).  Street address and legal description of the parcel on which development is proposed to occur, consisting of a current (no older than 6 months) certificate from a title insurance company, an ownership and encumbrance report, or attorney licensed to practice in the State of Colorado, listing the names of all owners of the property, and all mortgages, judgments, liens, easements, contracts and agreements affecting the parcel, and demonstrating the owner’s right to apply for the Development Application.  Applicant’s name, address and telephone number in a letter signed by the applicant that states the name, address and telephone number of the representative authorized to act on behalf of the applicant.  HOA Compliance form.  List of adjacent property owners within 300’ for public hearing.  An 8 1/2” by 11” vicinity map locating the parcel within the City of Aspen.  Site improvement survey, no more than a year old, showing all existing conditions including topography and vegetation, certified by a registered land surveyor, licensed in the state of Colorado. 49 APPLICATION CHECKLIST CONTINUED:  A written description of the proposal (scope of work) and written explanation of how the proposed work complies with the relevant Historic Preservation Guidelines and any other relevant land use code at Conceptual and Final.  An existing and proposed site plan showing property boundaries, setbacks and parking.  Scaled floor plans and elevations of the proposed structure(s) clearly depicting form, height, mass/scale and roof plan. If possible, a project model is appreciated, to assist the HPC in their analysis.  An accurate representation of all building materials and finishes to be used in the development. Please include relevant cut-sheets for all materials for review.  Supplemental materials to provide a visual description of the context surrounding the designated historic property including photographs and other exhibits, as needed, to accurately depict location and extent of proposed work. For Conceptual, the following will need to be submitted in addition to the items listed above:  A preliminary stormwater design. For Final Review, the following items will need to be submitted in addition to the items listed above:  Drawings of the street facing facades must be provided at ¼” scale.  Final selection of all exterior materials, and samples or clearly illustrated photographs. Samples are preferred for the presentation to HPC.  A lighting plan and landscape plan, including any visible stormwater mitigation features. Disclaimer: The foregoing summary is advisory in nature only and is not binding on the City. The summary is based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. The summary does not create a legal or vested right. 50 Exhibit D 51 Customer Distribution Prevent fraud - Please call a member of our closing team for wire transfer instructions or to initiate a wire transfer. Note that our wiring instructions will never change. Order Number: Q62017442 Date: 08/13/2024 Property Address: 337 LAKE AVENUE, ASPEN, CO 81611 For Closing Assistance For Title Assistance Land Title Roaring Fork Valley Title Team 533 E HOPKINS #102 ASPEN, CO 81611 (970) 927-0405 (Work) (970) 925-0610 (Work Fax) valleyresponse@ltgc.com Seller/Owner ASPEN WEST AJ LLC Delivered via: No Commitment Delivery BENDONADAMS LLC Attention: ERIN WACKERLE 300 S SPRING STREET SUITE 202 Aspen, CO 81611 (406) 531-0806 (Cell) (970) 925-2855 (Work) erin@bendonadams.com Delivered via: Electronic Mail Exhibit E.1 52 Estimate of Title Fees Order Number: Q62017442 Date: 08/13/2024 Property Address: 337 LAKE AVENUE, ASPEN, CO 81611 Seller(s): ASPEN WEST AJ, LLC, A COLORADO LIMITED LIABILITY COMPANY Buyer(s): Thank you for putting your trust in Land Title. Below is the estimate of title fees for the transaction. The final fees will be collected at closing. Visit ltgc.com to learn more about Land Title. Estimate of Title Insurance Fees "TBD" Commitment $279.00 TOTAL $279.00 Note: The documents linked in this commitment should be reviewed carefully. These documents, such as covenants conditions and restrictions, may affect the title, ownership and use of the property. You may wish to engage legal assistance in order to fully understand and be aware of the implications of the documents on your property. Chain of Title Documents: Pitkin county recorded 10/19/2022 under reception no. 690992 Plat Map(s): Pitkin county recorded 08/18/2006 at book 80 page 97 53 Copyright 2006-2024 American Land Title Association. All rights reserved. The use of this Form is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. Property Address: 337 LAKE AVENUE, ASPEN, CO 81611 1.Effective Date: 07/26/2024 at 5:00 P.M. 2.Policy to be Issued and Proposed Insured: "TBD" Commitment Proposed Insured: $0.00 3.The estate or interest in the land described or referred to in this Commitment and covered herein is: FEE SIMPLE 4.Title to the estate or interest covered herein is at the effective date hereof vested in: ASPEN WEST AJ, LLC, A COLORADO LIMITED LIABILITY COMPANY 5.The Land referred to in this Commitment is described as follows: LOT B, DAGGS HISTORIC LANDMARK LOT SPLIT SUBDIVISION EXEMPTION, ACCORDING TO THE PLAT THEREOF RECORDED AUGUST 18, 2006 IN PLAT BOOK 80 AT PAGE 97 AS RECEPTION NO. 527634.​ COUNTY OF PITKIN, STATE OF COLORADO. ALTA COMMITMENT Old Republic National Title Insurance Company Schedule A Order Number:Q62017442 54 ALTA COMMITMENT Old Republic National Title Insurance Company Schedule B, Part I (Requirements) Order Number: Q62017442 All of the following Requirements must be met: This proposed Insured must notify the Company in writing of the name of any party not referred to in this Commitment who will obtain an interest in the Land or who will make a loan on the Land. The Company may then make additional Requirements or Exceptions. Pay the agreed amount for the estate or interest to be insured. Pay the premiums, fees, and charges for the Policy to the Company. Documents satisfactory to the Company that convey the Title or create the Mortgage to be insured, or both, must be properly authorized, executed, delivered, and recorded in the Public Records. THIS COMMITMENT IS FOR INFORMATION ONLY, AND NO POLICY WILL BE ISSUED PURSUANT HERETO. 55 This commitment does not republish any covenants, condition, restriction, or limitation contained in any document referred to in this commitment to the extent that the specific covenant, conditions, restriction, or limitation violates state or federal law based on race, color, religion, sex, sexual orientation, gender identity, handicap, familial status, or national origin. 1.Any facts, rights, interests, or claims thereof, not shown by the Public Records but that could be ascertained by an inspection of the Land or that may be asserted by persons in possession of the Land. 2.Easements, liens or encumbrances, or claims thereof, not shown by the Public Records. 3.Any encroachment, encumbrance, violation, variation, or adverse circumstance affecting the Title that would be disclosed by an accurate and complete land survey of the Land and not shown by the Public Records. 4.Any lien, or right to a lien, for services, labor or material heretofore or hereafter furnished, imposed by law and not shown by the Public Records. 5.Defects, liens, encumbrances, adverse claims or other matters, if any, created, first appearing in the public records or attaching subsequent to the effective date hereof but prior to the date of the proposed insured acquires of record for value the estate or interest or mortgage thereon covered by this Commitment. 6.(a) Taxes or assessments that are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the Public Records; (b) proceedings by a public agency that may result in taxes or assessments, or notices of such proceedings, whether or not shown by the records of such agency or by the Public Records. 7.(a) Unpatented mining claims; (b) reservations or exceptions in patents or in Acts authorizing the issuance thereof; (c) water rights, claims or title to water. 8.RIGHT OF PROPRIETOR OF A VEIN OR LODE TO EXTRACT AND REMOVE HIS ORE THEREFROM SHOULD THE SAME BE FOUND TO PENETRATE OR INTERSECT THE PREMISES AS RESERVED IN UNITED STATES PATENT RECORDED JUNE 07, 1888, IN BOOK 55 AT PAGE 2. 9.TERMS, CONDITIONS AND PROVISIONS OF ORDINANCE# 18, SERIES OF 2001 RECORDED AUGUST 16, 2001 UNDER RECEPTION NO. 457607. 10.TERMS, CONDITIONS AND PROVISIONS OF RESOLUTION# 20, SERIES OF 2001 RECORDED AUGUST 16, 2001 UNDER RECEPTION NO. 457608. 11.TERMS, CONDITIONS AND PROVISIONS OF RESOLUTION OF THE ASPEN HISTORIC PRESERVATION COMMISSION RECORDED JANUARY 17, 2003 UNDER RECEPTION NO. 477482. 12.TERMS, CONDITIONS AND PROVISIONS OF ACCESSORY DWELLING UNIT DEED RESTRICTION RECORDED OCTOBER 21, 2005 UNDER RECEPTION NO. 516549. 13.TERMS, CONDITIONS AND PROVISIONS OF RESOLUTION# 40, SERIES OF 2005 RECORDED OCTOBER 27, 2005 UNDER RECEPTION NO. 516762. 14.TERMS, CONDITIONS AND PROVISIONS OF APPROVAL OF HISTORIC LANDMARK LOT SPLIT RECORDED NOVEMBER 21, 2005 UNDER RECEPTION NO. 517646. 15.TERMS, CONDITIONS AND PROVISIONS OF SUBDIVISION EXEMPTION AGREEMENT RECORDED AUGUST 18, 2006 UNDER RECEPTION NO. 527631. 16.TERMS, CONDITIONS AND PROVISIONS OF ORDINANCE# 47, SERIES OF 2005 RECORDED AUGUST 18, 2006 UNDER RECEPTION NO. 527632. ALTA COMMITMENT Old Republic National Title Insurance Company Schedule B, Part II (Exceptions) Order Number: Q62017442 56 17.TERMS, CONDITIONS AND PROVISIONS OF RESOLUTION APPROVING A VARIANCE RECORDED MARCH 15, 2007 UNDER RECEPTION NO. 535454. 18.EASEMENTS, RIGHTS OF WAY AND ALL OTHER MATTERS AS SHOWN ON PLAT OF SUBJECT PROPERTY RECORDED AUGUST 18, 2006 IN PLAT BOOK 80 AT PAGE 97. 19.TERMS, CONDITIONS, PROVISIONS AND OBLIGATIONS AS SET FORTH IN REVOCABLE ENCROACHMENT LICENSE RECORDED JUNE 28, 2012 AS RECEPTION NO. 590247 AND AGREEMENT TO SHARE REVOCABLE ENCROACHMENT LICENSE RECORDED JULY 31, 2015 AS RECEPTION NO. 622009. 20.CLAIMS OF RIGHT, TITLE AND/OR INTEREST IN THE PROPERTY BETWEEN THE BOUNDARY LINES AND THE FENCES AS DEPICTED ON THE SURVEY PREPARED BY ASPEN SURVEY, DATED SEPTEMBER 21, 2022, JOB NO. 210578 WHETHER SAID CLAIMS ARISE BY ABANDONMENT, ADVERSE POSSESSION OR OTHER MEANS. SAID DOCUMENT STORE AS OUR ESI 40895826 ALTA COMMITMENT Old Republic National Title Insurance Company Schedule B, Part II (Exceptions) Order Number: Q62017442 57 Land Title Guarantee Company Disclosure Statements Note: Pursuant to CRS 10-11-122, notice is hereby given that: Note: Effective September 1, 1997, CRS 30-10-406 requires that all documents received for recording or filing in the clerk and recorder's office shall contain a top margin of at least one inch and a left, right and bottom margin of at least one half of an inch. The clerk and recorder may refuse to record or file any document that does not conform, except that, the requirement for the top margin shall not apply to documents using forms on which space is provided for recording or filing information at the top margin of the document. Note: Colorado Division of Insurance Regulations 8-1-2 requires that "Every title entity shall be responsible for all matters which appear of record prior to the time of recording whenever the title entity conducts the closing and is responsible for recording or filing of legal documents resulting from the transaction which was closed". Provided that Land Title Guarantee Company conducts the closing of the insured transaction and is responsible for recording the legal documents from the transaction, exception number 5 will not appear on the Owner's Title Policy and the Lenders Policy when issued. Note: Affirmative mechanic's lien protection for the Owner may be available (typically by deletion of Exception no. 4 of Schedule B, Section 2 of the Commitment from the Owner's Policy to be issued) upon compliance with the following conditions: No coverage will be given under any circumstances for labor or material for which the insured has contracted for or agreed to pay. Note: Pursuant to CRS 10-11-123, notice is hereby given: The Subject real property may be located in a special taxing district.(A) A certificate of taxes due listing each taxing jurisdiction will be obtained from the county treasurer of the county in which the real property is located or that county treasurer's authorized agent unless the proposed insured provides written instructions to the contrary. (for an Owner's Policy of Title Insurance pertaining to a sale of residential real property). (B) The information regarding special districts and the boundaries of such districts may be obtained from the Board of County Commissioners, the County Clerk and Recorder, or the County Assessor. (C) The land described in Schedule A of this commitment must be a single family residence which includes a condominium or townhouse unit. (A) No labor or materials have been furnished by mechanics or material-men for purposes of construction on the land described in Schedule A of this Commitment within the past 6 months. (B) The Company must receive an appropriate affidavit indemnifying the Company against un-filed mechanic's and material-men's liens. (C) The Company must receive payment of the appropriate premium.(D) If there has been construction, improvements or major repairs undertaken on the property to be purchased within six months prior to the Date of Commitment, the requirements to obtain coverage for unrecorded liens will include: disclosure of certain construction information; financial information as to the seller, the builder and or the contractor; payment of the appropriate premium fully executed Indemnity Agreements satisfactory to the company, and, any additional requirements as may be necessary after an examination of the aforesaid information by the Company. (E) 58 This notice applies to owner's policy commitments disclosing that a mineral estate has been severed from the surface estate, in Schedule B-2. Note: Pursuant to CRS 10-1-128(6)(a), It is unlawful to knowingly provide false, incomplete, or misleading facts or information to an insurance company for the purpose of defrauding or attempting to defraud the company. Penalties may include imprisonment, fines, denial of insurance, and civil damages. Any insurance company or agent of an insurance company who knowingly provides false, incomplete, or misleading facts or information to a policyholder or claimant for the purpose of defrauding or attempting to defraud the policyholder or claimant with regard to a settlement or award payable from insurance proceeds shall be reported to the Colorado Division of Insurance within the Department of Regulatory Agencies. Note: Pursuant to Colorado Division of Insurance Regulations 8-1-3, notice is hereby given of the availability of a closing protection letter for the lender, purchaser, lessee or seller in connection with this transaction. Note: Pursuant to CRS 24-21-514.5, Colorado notaries may remotely notarize real estate deeds and other documents using real-time audio-video communication technology. You may choose not to use remote notarization for any document. That there is recorded evidence that a mineral estate has been severed, leased, or otherwise conveyed from the surface estate and that there is substantial likelihood that a third party holds some or all interest in oil, gas, other minerals, or geothermal energy in the property; and (A) That such mineral estate may include the right to enter and use the property without the surface owner's permission. (B) 59 Joint Notice of Privacy Policy of Land Title Guarantee Company Land Title Insurance Corporation and Old Republic National Title Insurancy Company This Statement is provided to you as a customer of Land Title Guarantee Company as agent for Land Title Insurance Corporation and Old Republic National Title Insurance Company. We want you to know that we recognize and respect your privacy expectations and the requirements of federal and state privacy laws. Information security is one of our highest priorities. We recognize that maintaining your trust and confidence is the bedrock of our business. We maintain and regularly review internal and external safeguards against unauthorized access to your non-public personal information ("Personal Information"). In the course of our business, we may collect Personal Information about you from: applications or other forms we receive from you, including communications sent through TMX, our web-based transaction management system; your transactions with, or from the services being performed by us, our affiliates, or others; a consumer reporting agency, if such information is provided to us in connection with your transaction; and The public records maintained by governmental entities that we obtain either directly from those entities, or from our affiliates and non-affiliates. Our policies regarding the protection of the confidentiality and security of your Personal Information are as follows: We restrict access to all Personal Information about you to those employees who need to know that information in order to provide products and services to you. We may share your Personal Information with affiliated contractors or service providers who provide services in the course of our business, but only to the extent necessary for these providers to perform their services and to provide these services to you as may be required by your transaction. We maintain physical, electronic and procedural safeguards that comply with federal standards to protect your Personal Information from unauthorized access or intrusion. Employees who violate our strict policies and procedures regarding privacy are subject to disciplinary action. We regularly assess security standards and procedures to protect against unauthorized access to Personal Information. WE DO NOT DISCLOSE ANY PERSONAL INFORMATION ABOUT YOU WITH ANYONE FOR ANY PURPOSE THAT IS NOT STATED ABOVE OR PERMITTED BY LAW. Consistent with applicable privacy laws, there are some situations in which Personal Information may be disclosed. We may disclose your Personal Information when you direct or give us permission; when we are required by law to do so, for example, if we are served a subpoena; or when we suspect fraudulent or criminal activities. We also may disclose your Personal Information when otherwise permitted by applicable privacy laws such as, for example, when disclosure is needed to enforce our rights arising out of any agreement, transaction or relationship with you. Our policy regarding dispute resolution is as follows: Any controversy or claim arising out of or relating to our privacy policy, or the breach thereof, shall be settled by arbitration in accordance with the rules of the American Arbitration 60 Association, and judgment upon the award rendered by the arbitrator(s) may be entered in any court having jurisdiction thereof. 61 Commitment For Title Insurance Issued by Old Republic National Title Insurance Company NOTICE IMPORTANT—READ CAREFULLY: THIS COMMITMENT IS AN OFFER TO ISSUE ONE OR MORE TITLE INSURANCE POLICIES. ALL CLAIMS OR REMEDIES SOUGHT AGAINST THE COMPANY INVOLVING THE CONTENT OF THIS COMMITMENT OR THE POLICY MUST BE BASED SOLELY IN CONTRACT. THIS COMMITMENT IS NOT AN ABSTRACT OF TITLE, REPORT OF THE CONDITION OF TITLE, LEGAL OPINION, OPINION OF TITLE, OR OTHER REPRESENTATION OF THE STATUS OF TITLE. THE PROCEDURES USED BY THE COMPANY TO DETERMINE INSURABILITY OF THE TITLE, INCLUDING ANY SEARCH AND EXAMINATION, ARE PROPRIETARY TO THE COMPANY, WERE PERFORMED SOLELY FOR THE BENEFIT OF THE COMPANY, AND CREATE NO EXTRACONTRACTUAL LIABILITY TO ANY PERSON, INCLUDING A PROPOSED INSURED. THE COMPANY’S OBLIGATION UNDER THIS COMMITMENT IS TO ISSUE A POLICY TO A PROPOSED INSURED IDENTIFIED IN SCHEDULE A IN ACCORDANCE WITH THE TERMS AND PROVISIONS OF THIS COMMITMENT. THE COMPANY HAS NO LIABILITY OR OBLIGATION INVOLVING THE CONTENT OF THIS COMMITMENT TO ANY OTHER PERSON. . COMMITMENT TO ISSUE POLICY Subject to the Notice; Schedule B, Part I—Requirements; Schedule B, Part II—Exceptions; and the Commitment Conditions, Old Republic National Title Insurance Company, a Minnesota corporation (the “Company”), commits to issue the Policy according to the terms and provisions of this Commitment. This Commitment is effective as of the Commitment Date shown in Schedule A for each Policy described in Schedule A, only when the Company has entered in Schedule A both the specified dollar amount as the Proposed Policy Amount and the name of the Proposed Insured. If all of the Schedule B, Part I—Requirements have not been met within 6 months after the Commitment Date, this Commitment terminates and the Company’s liability and obligation end. COMMITMENT CONDITIONS 1. DEFINITIONS 2. If all of the Schedule B, Part I—Requirements have not been met within the time period specified in the Commitment to Issue Policy, Commitment terminates and the Company’s liability and obligation end. 3. The Company’s liability and obligation is limited by and this Commitment is not valid without: 4. COMPANY’S RIGHT TO AMEND The Company may amend this Commitment at any time. If the Company amends this Commitment to add a defect, lien, encumbrance, adverse claim, or other matter recorded in the Public Records prior to the Commitment Date, any liability of the Company is limited by Commitment Condition 5. The Company shall not be liable for any other amendment to this Commitment. 5. LIMITATIONS OF LIABILITY i. comply with the Schedule B, Part I—Requirements; ii. eliminate, with the Company’s written consent, any Schedule B, Part II—Exceptions; or iii. acquire the Title or create the Mortgage covered by this Commitment. 6. LIABILITY OF THE COMPANY MUST BE BASED ON THIS COMMITMENT “Knowledge” or “Known”: Actual or imputed knowledge, but not constructive notice imparted by the Public Records.(a) “Land”: The land described in Schedule A and affixed improvements that by law constitute real property. The term “Land” does not include any property beyond the lines of the area described in Schedule A, nor any right, title, interest, estate, or easement in abutting streets, roads, avenues, alleys, lanes, ways, or waterways, but this does not modify or limit the extent that a right of access to and from the Land is to be insured by the Policy. (b) “Mortgage”: A mortgage, deed of trust, or other security instrument, including one evidenced by electronic means authorized by law.(c) “Policy”: Each contract of title insurance, in a form adopted by the American Land Title Association, issued or to be issued by the Company pursuant to this Commitment. (d) “Proposed Insured”: Each person identified in Schedule A as the Proposed Insured of each Policy to be issued pursuant to this Commitment.(e) “Proposed Policy Amount”: Each dollar amount specified in Schedule A as the Proposed Policy Amount of each Policy to be issued pursuant to this Commitment. (f) “Public Records”: Records established under state statutes at the Commitment Date for the purpose of imparting constructive notice of matters relating to real property to purchasers for value and without Knowledge. (g) “Title”: The estate or interest described in Schedule A.(h) the Notice;(a) the Commitment to Issue Policy;(b) the Commitment Conditions;(c) Schedule A;(d) Schedule B, Part I—Requirements; and(e) Schedule B, Part II—Exceptions; and(f) a counter-signature by the Company or its issuing agent that may be in electronic form.(g) The Company’s liability under Commitment Condition 4 is limited to the Proposed Insured’s actual expense incurred in the interval between the Company’s delivery to the Proposed Insured of the Commitment and the delivery of the amended Commitment, resulting from the Proposed Insured’s good faith reliance to: (a) The Company shall not be liable under Commitment Condition 5(a) if the Proposed Insured requested the amendment or had Knowledge of the matter and did not notify the Company about it in writing. (b) The Company will only have liability under Commitment Condition 4 if the Proposed Insured would not have incurred the expense had the Commitment included the added matter when the Commitment was first delivered to the Proposed Insured. (c) The Company’s liability shall not exceed the lesser of the Proposed Insured’s actual expense incurred in good faith and described in Commitment Conditions 5(a)(i) through 5(a)(iii) or the Proposed Policy Amount. (d) The Company shall not be liable for the content of the Transaction Identification Data, if any.(e) In no event shall the Company be obligated to issue the Policy referred to in this Commitment unless all of the Schedule B, Part I—Requirements have been met to the satisfaction of the Company. (f) In any event, the Company’s liability is limited by the terms and provisions of the Policy.(g) Only a Proposed Insured identified in Schedule A, and no other person, may make a claim under this Commitment.(a) Any claim must be based in contract and must be restricted solely to the terms and provisions of this Commitment.(b) Until the Policy is issued, this Commitment, as last revised, is the exclusive and entire agreement between the parties with respect to the subject matter of this Commitment and supersedes all prior commitment negotiations, representations, and proposals of any kind, whether written or oral, express or implied, relating to the subject matter of this Commitment. (c) 62 7. IF THIS COMMITMENT HAS BEEN ISSUED BY AN ISSUING AGENT The issuing agent is the Company’s agent only for the limited purpose of issuing title insurance commitments and policies. The issuing agent is not the Company’s agent for the purpose of providing closing or settlement services. 8. PRO-FORMA POLICY The Company may provide, at the request of a Proposed Insured, a pro-forma policy illustrating the coverage that the Company may provide. A pro-forma policy neither reflects the status of Title at the time that the pro-forma policy is delivered to a Proposed Insured, nor is it a commitment to insure. 9. ARBITRATION The Policy contains an arbitration clause. All arbitrable matters when the Proposed Policy Amount is $2,000,000 or less shall be arbitrated at the option of either the Company or the Proposed Insured as the exclusive remedy of the parties. A Proposed Insured may review a copy of the arbitration rules at http://www.alta.org/arbitration. IN WITNESS WHEREOF, Land Title Insurance Corporation has caused its corporate name and seal to be affixed by its duly authorized officers on the date shown in Schedule A to be valid when countersigned by a validating officer or other authorized signatory. Issued by: Land Title Guarantee Company 3033 East First Avenue Suite 600 Denver, Colorado 80206 303-321-1880 Craig B. Rants, Senior Vice President This page is only a part of a 2016 ALTA® Commitment for Title Insurance issued by Old Republic National Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule B, Part I—Requirements; and Schedule B, Part II —Exceptions; and a counter-signature by the Company or its issuing agent that may be in electronic form. Copyright 2006-2016 American Land Title Association. All rights reserved. The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. The deletion or modification of any Schedule B, Part II—Exception does not constitute an agreement or obligation to provide coverage beyond the terms and provisions of this Commitment or the Policy. (d) Any amendment or endorsement to this Commitment must be in writing and authenticated by a person authorized by the Company.(e) When the Policy is issued, all liability and obligation under this Commitment will end and the Company’s only liability will be under the Policy.(f) 63 Exhibit E.2 64 65 Exhibit F 66 abbywinkelried@gmail.com 973-943-7020 Exhibit G 67 415 411 406 420 411415 329 335401 337 600 701 340 320 620 315 330 350 312 311 314 710707 300 330 400 360 0 0.01 0.030.01 mi FLegend Aspen Address Parcels Source: City of Aspen GIS Vicinity Map Exhibit H68 Pitkin County Mailing List of 300 Feet Radius Pitkin County GIS presents the information and data on this web site as a service to the public. Every effort has been made to ensure that the information and data contained in this electronic system is accurate, but the accuracy may change. The information maintained by the County may not be complete as to mineral estate ownership and that information should be determined by separate legal and property analysis. Pitkin County GIS makes no warranty or guarantee concerning the completeness, accuracy, or reliability of the content at this site or at other sites to which we link. Assessing accuracy and reliability of information and data is the sole responsibility of the user. The user understands he or she is solely responsible and liable for use, modification, or distribution of any information or data obtained on this web site. This document contains a Mailing List formatted to be printed on Avery 5160 Labels. If printing, DO NOT "fit to page" or "shrink oversized pages." This will manipulate the margins such that they no longer line up on the labels sheet. Print actual size. From Parcel: 273512135002 on 05/29/2025 Instructions: Disclaimer: http://www.pitkinmapsandmore.com Exhibit I 69 315 LAKE LLC ASPEN, CO 81611 315 LAKE AVE 320 LAKE LLC NEW YORK, NY 10028 151 E 85TH ST #C 330 GILLESPIE TRUST SAN ANTONIO, TX 78231 4114 POND HILL RD #201 400 & 410 LAKE AVE LLC ASPEN, CO 81611 101 S MILL #200 420 WEST NORTH LLC SEATTLE, WA 98103 3518 FREMONT AVE N #508 707 NORTH THIRD STREET LLC CUMBERLAND, RI 02864 200 SCENIC VIEW DR AR GILLESPIE VENTURES LLC GOLDEN, CO 80403 5713 SECREST CR ASPEN CTR FOR ENVIRON STUDIES ASPEN, CO 81611 100 PUPPY SMITH ST ASPEN RESIDENCE SBLMSL LLC MILWAUKEE, WI 53202 833 E MICHIGAN ST #1500 ASPEN WEST AJ LLC GARDEN CITY, NY 11530 PO BOX 7138 BART ASPEN LLC NEW ORLEANS, LA 70130-6036 601 POYDRAS ST FL 24 BERGER BARBARA QPRT #1 ASPEN, CO 81611 600 E HOPKINS AVE #202 BERGER BRUCE C QPRT #1 ASPEN, CO 81611 600 E HOPKINS AVE #202 BERGER ILYSE D 1998 TRUST ASPEN, CO 81611 600 E HOPKINS AVE # 202 BERGER SETH P ASPEN, CO 81611 600 E HOPKINS AVE # 202 BRAND NEW DAY LLC NASHVILLE, TN 37205 1203 CANTERBURY DR CAD ASPEN LLC ASPEN, CO 81611 710 N 3RD ST D STREET PARTNERS LLC MIDLAND, TX 79702 PO BOX 10703 DURAND LOYAL & BERNICE ASPEN REV TRUST ASPEN, CO 816111256 415 PEARL CT E A ALTEMUS PARTNERSHIP LLLP ASPEN, CO 81612 PO BOX 5000 EFH HOLDINGS LP LOS ANGELES, CA 90049 801 BRAMBLE WY ELEVATE DEVELOPMENT & DESIGN #002 LLC SNOWMASS VILLAGE, CO 81615 PO BOX 5223 GILLESPIE LLC NORTHBROOK , IL 60062 401 HUEHL RD # 1A HUNT WILLIAM O JR MARITAL INCOME TRUST LOS ANGELES, CA 90049 801 BRAMBLE WY KDR TRUST CARBONDALE, CO 816238812 5329 COUNTY RD #100 LAKE AVENUE PARTNERS LLC SOUTHLAKE, TX 76092 690 S PEYTONVILLE AVE MARTIN CONDO ASSOC ASPEN, CO 81611 COMMON AREA MUSIC ASSOCIATES OF ASPEN INC ASPEN, CO 81611 225 MUSIC SCHOOL RD NORTH THIRD STREET LLC WALNUT CREEK, CA 94596 500 YGNACIO VALLEY RD #360 OAK LODGE LLC ASPEN, CO 81612 PO BOX 7951 70 PEACHES TRUST SANTA BARBARA, CA 93101 200 E CARRILLO ST #300 PEARL COURT LLC CORAL GABLES, FL 33156 5299 HAMMOCK DR PETERSON JAMES D & HENSLEY R ASPEN, CO 81612 PO BOX 1714 PINES DAVID & ARONELLE S REV TRUST URBANA, IL 618014964 403 W MICHIGAN AVE WOOD DUCK LLC ENGLEWOOD, CO 80112 9033 E EASTER PL #112 71 Exhibit J.1 72 73 74 75 76 Exhibit J.2 77 78 79 80 81 Exhibit J.3 82 Exhibit J.4 83 84 Residential Design Standards Administrative Compliance Review Applicant Checklist Standard Complies Alternative Compliance N/A Sheet #(s)/Notes B.1.Articulation of Building Mass (Non-flexible) B.2.Building Orientation (Flexible) B.3.Build-to Requirement (Flexible) B.4.One Story Element (Flexible) C.1.Garage Access (Non-flexible) C.2.Garage Placement (Non-flexible) C.3.Garage Dimensions (Flexible) Instructions: Please fill out the checklist below, marking whether the proposed design complies with the applicable standard as written or is requesting Alternative Compliance (only permitted for Flexible standards). Also include the sheet #(s) demonstrating the applicable standard. If a standard does not apply, please mark N/A and include in the Notes section why it does not apply. If Alternative Compliance is requested for a Flexible standard, include in the Notes section how the proposed design meets the intent of the standard(s). Additional sheets/graphics may be attached. Disclaimer: This application is only valid for the attached design. If any element of the design subject to Residential Design Standards changes prior to or during building permit review, the applicant shall be required to apply for a new Administrative Compliance Review. Address: Parcel ID: Zone District/PD: Representative: Email: Phone: Page 1 of 2 Exhibit K 85 Standard Complies Alternative Compliance N/A Sheet #(s)/Notes C.4.Garage Door Design (Flexible) D.1.Entry Connection (Non-flexible) D.2.Door Height (Flexible) D.3.Entry Porch (Flexible) E.1.Principle Window (Flexible) E.2.Window Placement (Flexible) E.3.Nonorthogonal Window Limit (Flexible) E.4.Lightwell/Stairwell Location (Flexible) E.5.Materials (Flexible) Residential Design Standards Administrative Compliance Review Applicant Checklist Disclaimer: This application is only valid for the attached design. If any element of the design subject to Residential Design Standards changes prior to or during building permit review, the applicant shall be required to apply for a new Administrative Compliance Review. Page 2 of 2 86 WEST END GARDEN HOUSE HISTORIC PRESERVATION COMMISSION FINAL REVIEW SET 337 Lake Avenue Aspen, CO 81611 05/12/2025 DRAWING INDEX - HPC GENERAL G0.00GENERAL NOTES AND PROJECT INFORMATION G0.01NEIGHBORHOOD CONTEXT G0.02EXTERIOR MATERIALS G0.03SUBGRADE CALCULATIONS G0.04FLOOR AREA CALCAULATIONS AND BUILDING HEIGHT DIAGRAM SURVEY .SURVEY CIVIL C1COVER SHEET C2SITE LAYOUT C3UTILITIES PLAN C4CONCEPTUAL GRADING & DRAINAGE PLAN LANDSCAPE LX.01TREE PROTECTION AND REMOVAL PLAN LX.02MATERIALS PLAN LX.03LANDSCAPE PLAN LX.04MATERIAL PALETTE LX.05SITE DETAILS LX.06PLANTING PALETTE LX.07PLANTING PALETTE DRAWING INDEX - HPC ARCHITECTURE A1.00 SITE PLAN A1.01 LOT A AND B ADJACENCY PLAN AND ELEVATION A2.01 BASEMENT & MAIN LEVEL FLOOR PLANS A2.02 ROOF PLAN A3.01 EXTERIOR ELEVATIONS A8.00 EXTERIOR DETAILS LIGTHING EL0.01 LIGHTING CUTSHEETS EL0.02 LIGHTING CUTSHEETS EL0.03 LIGHTING CUTSHEETS EL0.04 LIGHTING CUTSHEETS EL0.05 LIGHTING CUTSHEETS EL0.06 LIGHTING CUTSHEETS EL1.00 SITE LIGHTING PLAN 87 1. GRID LINE REFERENCE GENERAL SYMBOLS LEGEND ELEVATION NAME --- AX.XX X AX.XX X 2. LEVEL / DATUM REFERENCE 3. EXTERIOR ELEVATION REFERENCE 5. BUILDING SECTION REFERENCE 4. INTERIOR ELEVATION REFERENCE 7. DETAIL SECTION REFERENCE 8. CALLOUT/DETAIL REFERENCE 9. REVISION REFERENCE 10. ROOM REFERENCE AXXX X AX.00 Drawing Number Sheet Number Drawing Number Sheet Number --- AX.XX X6. WALL SECTION REFERENCE Drawing Number Sheet Number # # # # Drawing Number Sheet Number Drawing Number Sheet Number Drawing Number Sheet Number # D001 W# 11. ASSEMBLY REFERENCE 12. WINDOW REFERENCE 13. DOOR REFERENCE 14. NORTH ARROW AX.XX X # 100 ROOM NAME X# MATERIALS LEGEND WOOD BLOCKING (SHIM) WOOD FRAMING (CONTINUOUS) FINISHED WOODPLYWOOD BATT INSULATIONRIGID INSULATION GRAVELEARTH ALUMINUMSTEEL MASONRY (CMU)BRICK MINERAL WOOL INSULATIONFOAM INSULATION LOCATION MAP NOT TO SCALE VICINITY MAP NOT TO SCALE SITE SITE project:stamp/seal: sheet: title: checked by: drawn by: project manager: principal architect: revisions: job no.:WEST END GARDEN HOUSE337 Lake Avenue Aspen, CO 81611337 Lake Avenue Aspen, CO 81611GENERAL NOTES AND PROJECT INFORMATION G0.00 23002 EW, EH TK NOT FOR CONSTRUCTION 05/12/2025 HISTORIC PRESERVATION COMMISSION FINAL REVIEW SET KT, MK ABBREVIATIONS @AT ØDIAMETER #POUND OR NUMBER (E)EXISTING (N)NEW ABANCHOR BOLT ABVABOVE ACCACCESS ACOUSACOUSTICAL ACPASPHALT CONCRETE PAVING ACTACOUSTIAL CEILING TILE ACS PNLACCESS PANEL ADAREA DRAIN ADAAMERICANS WITH DISABILITIES ADJADJUSTABLE AFFABOVE FINISHED FLOOR AGGRAGGREGATE AIBAIR INFILTRATION BARRIER ALTALTERNATE ALUMALUMINIUM APPROXAPPROXIMATE ARCHARCHITECTURAL APSHASPHALT AUTOAUTOMATIC BDBOARD BITUMBITUMINOUS BLDGBUILDING BLKGBLOCKING BMBEAM BOBOTTOM OF BOTBOTTOM BRGBEARING BSMTBASEMENT BURBUILT UP ROOFING CABCABINET CBCATCH BASIN CEMCEMENT CERCERAMIC CIPCAST-IN-PLACE CJCONTROL JOINT CLGCEILING CLKCAULKING CLOCLOSET CLRCLEAR CMUCONCRETE MASONRY UNIT CNTRCOUNTER COLCOLUMN CONCCONCRETE CONNCONNECTION CONSTRCONSTRUCTION CONTCONTINUOUS CONTRCONTRACTOR CORRCORRIDOR CPTCARPET; CARPETED CRSCOLD ROLLED STEEL CSKCOUNTERSUNK CTRCENTER CU FTCUBIC FEET CTCERAMIC TILE DBLDOUBLE DEMODEMOLITION DETDETAIL DIADIAMETER DIMDIMENSION DLDEAD LOAD DNDOWN DRDOOR DR OPNGDOOR OPENING DSDOWNSPOUT DSPDRY STANDPIPE DTDRAIN TILE DWDISHWASHER DWGDRAWING EEAST EAEACH EJEXPANSION JOINT ELELEVATION ELECELECTRICAL ELEVELEVATOR ENCLENCLOSURE EQEQUAL EQUIPEQUIPMENT ESTESTIMATE EFEXHAUST FAN EXISTEXISTING EXPEXPANDED; EXPANSION EXP BTEXPANSION BOLT EXPOEXPOSED EXTEXTERIOR EWEACH WAY FAFIRE ALARM FBFLAT BAR FDFLOOR DRAIN FEFIRE EXTINGUISHER FECFIRE EXTINGUISHER CABINET FF ELFINISH FLOOR ELEVATION FHFIRE HYDRANT FHCFIRE HOSE CABINET FIN FLRFINISH FLOOR FFFINISH TO FINISH FINFINISH FLASHFLASHING FLRFLOOR; FLOORING FLUORFLUORESCENT FOCFACE OF CONCRETE FOFFACE OF FINISH FOICFURNISHED BY OWNER-INSTALLED BY CONTRACTOR FOMFACE OF MASONRY FOSFACE OF STUDS FPFIREPROOF FPLFIREPLACE FRFRAME FTFOOT OR FEET FTGFOOTING FURRFURRING FUTFUTURE FWFULL WIDTH PROJECT DIRECTORY CLIENT: ARCHITECT: GEOTECH: K+A/ KUMAR & ASSOCIATES 5020 COUNTY ROAD 154 GLENWOOD SPRINGS, CO 81601 T: 970.384.4844 CONTACT: STEVEN L. PAWLAK, P.E. SPAWLAK@KUMARUSA.COM CONTRACTOR: HANSEN CONSTRUCTION INC. 310 AABC ASPEN, CO 81611 T: 970.920.1558 EXT. 108 CONTACT: TIM O'CONNELL TOCONNELL@HANSENCONST.COM PLANNING CONSULTANT: CIVIL: ROARING FORK ENGINEERING 592 CO-133 CARBONDALE, CO 81623 T: 970.340.4130 CONTACT: ANTHONY ALFINI ANTHONYA@RFENG.BIZ LANDSCAPE: DESIGN WORKSHOP 22860 TWO RIVERS ROAD, SUITE 102 BASALT, CO 81621 T: 970.925.8354 CONTACT: MIKE ALBERT MALBERT@DESIGNWORKSHOP.COM STRUCTURAL ENGINEER: KL&A ENGINEERS & BUILDERS 1717 WASHINGTON AVE GOLDEN, CO 80401 T: 303.384.9910 PRINCIPAL: DAN DOHERTY CONTACT: MEGAN SKODACK MSKODACK@KLAA.COM MEP: BG BUILDINGWORKS 222 CHAPEL PLACE, SUITE AC-201 AVON, CO 81620 P.O. BOX 9650 AVON, CO 81620 T: 970.949.6108 CONTACT:PETER B. MORABITO PBMORABITO@BGBUILDINGWORKS.COM LIGHTING: NITEO 1932 1ST AVE, SUITE 605 SEATTLE, WA 98101 T: 206.456.4554 EXT. 104 CONTACT: ERIK CROWELL ERIK@NITEOLIGHTING.COM ENVELOPE CONSULTANT: WISS, JANNEY, ELSTNER ASSOCIATES, INC. 3609 S WADSWORTH, SUITE 400 LAKEWOOD, CO 80235 T: 303.914.4300 CONTACT: SCOTT R. SONDRUP SSONDRUP@WJE.COM INTERIOR: VICTORIA HAGAN 5 COLUMBUS CIRCLE 19TH FLOOR NEW YOR, NY 10019 T: 212.888.1178 CONTACT: VICTORIA HAGAN VHAGAN@VICTORIAHAGAN.COM BENDONADAMS 335 LAKE AVE ASPEN, CO 81611 SURVEY: THE SEXTON SURVEY COMPANY P.O BOX 912 SILT, CO 81652 T: 970.456.3081 CONTACT: SCOTT R. BLACKARD SBLACKARD11@GMAIL.COM OLSON KUNDIG 159 SOUTH JACKSON STREET, SUITE 600 SEATTLE, WA 98104 T: 206.624.5670 F: 206.624.3730 PRINCIPAL ARCHITECT: TOM KUNDIG CONTACT: ERICA WILLIAMS ERICA@OLSONKUNDIG.COM EKRAM HASSEN EKRAMH@OLSONKUNDIG.COM BENDONADAMS 300 S SPRING ST #202 ASPEN, CO 81611 T: 970.925.2855 CONTACT: SARA ADAMS SARA@BENDONADAMS.COM GENERAL NOTES 1.CODES: ALL WORK SHALL CONFORM APPLICABLE LAND USE AND BUILDING CODES AS AMENDED BY AUTHORITIES HAVING JURISDICTION. 2.DO NOT SCALE DIMENSIONS FROM DRAWINGS. USE CALCULATED DIMENSIONS ONLY. NOTIFY THE ARCHITECT IMMEDIATELY IF ANY CONFLICTS EXIST. 3.CONTRACTOR SHALL VERIFY ALL CONDITIONS PRIOR TO INITIATING THE WORK. NOTIFY THE ARCHITECT OF ANY DISCREPANCIES. 4.VERIFY ALL ROUGH-IN DIMENSIONS FOR EQUIPMENT. PROVIDE ALL BUCK-OUT, BLOCKING, BACKING, AND JACKS REQUIRED FOR INSTALLATIONS. 5.DIMENSIONS ARE TO EXTERIOR FACE OF CONCRETE / WOOD FRAMING UNLESS OTHERWISE NOTED. 6.EXTERIOR WALL FRAMING 2x6 WOOD STUDS UNLESS OTHERWISE NOTED. 7.INTERIOR WALL FRAMING 2x6 WOOD STUDS UNLESS OTHERWISE NOTED. BUILDING CODE / ZONING SUMMARY PROJECT ADDRESS:337 LAKE AVENUE ASPEN, CO 81611 ASSESOR'S PARCEL NUMBER:273512135002 LEGAL DESCRIPTION:SUBDIVISION: DAGGS HISTORIC LANDMARK LOT SPLIT LOT: B APPLICABLE CODES:TITLE 8 AMENDMENTS TO ALL CODES EXCEPT ENERGY 2021 INTERNATIONAL BUILDING CODE ADAPTED APPENDICES C, E, P 2021 ASPEN ENERGY CODE 2021 INTERNATIONAL FIRE CODE 2021 INTERNATIONAL MECHANICAL CODE 2021 INTERNATIONAL FUEL GAS CODE 2021 UNIFORM PLUMBING CODE 2021 INTERNATIONAL SOLAR ENERGY PROVISIONS 2023 NATIONAL ELECTRICAL CODE AUTHORITY HAVING JURISDICTION:CITY OF ASPEN PHYSICAL ADDRESS:ASPEN CITY HALL 427 RIO GRANDE PLACE ASPEN, CO 81611 PHONE:970.920.5000 LOT SIZE:6,001 SQFT LAND USE DESIGNATION:R-6 ZONE DISTRICT DENSITY:MEDIUM DENSITY RESIDENTIAL PROJECT DESCRIPTION:CONSTRUCTION OF A NEW ONE STORY, SINGLE FAMILY RESIDENCE. HEIGHT:ALLOWED: 25 FT PROPOSED: 14 FT 3 IN YARD SETBACKS:FRONT: 10 FT SIDE: 5 FT REAR: 10 FT ENERGY CODE COMPLIANCE:COMPLIANCE PER 2021 ASPEN RESIDENTIAL ENERGY CODE PRESCRIPTIVE REQUIREMENTS TABLE 402.1.3 -INSULATION MINIMUM R-VALUE AND FENESTRATION REQUIRMENTS BY COMPONENT FOR CLIMATE ZONE 7. ci = continuous insulation. a. R-values are minimums. U-factors and SHGC are maximums. Where insulation is installed in a cavity that is less than the label or design thickness of the insulation, the installed R-value of the insulation shall be not less than the R-value specified in the table. b. The fenestration U-factor column excludes skylights. The SHGC column applies to all glazed fenestration. c. R-10 insulation shall be provided under the full slab area of a heated slab in addition to the required slab edge insulation R-value for slabs as indicated in the table. The slab-edge insulation for heated slabs shall not be required to extend below the slab. d. The first value is cavity insulation; the second value is continuous insulation. Therefore, as an example, “13 + 5” means R-13 cavity insulation plus R-5 continuous insulation. e. Mass walls shall be in accordance with Section R402.2.5. The second R-value applies where more than half of the insulation is on the interior of the mass wall. Vertical fenestration shall also comply with R402.3.6 and R402.3.7.Doors may have a U-factor of 0.28 or less. ABBREVIATIONS GAGAUGE GALVGALVANIZED GCGENERAL CONTRACTOR GLGLASS GLAMGLUE-LAMINATED GRGRADE GWBGYPSUM WALL BOARD GYPGYPSUM HBHOSE BIB HCHOLLOW CORE HDOHIGH DENSITY OVERLAY HDRHEADER HDWDHARDWOOD HDWHARDWARE HMHOLLOW METAL HORIZHORIZONTAL HPHIGH POINT HRHOUR HRHOUR HTHEIGHT HVACHEATING/VENTILATING/AIR CONDITIONING HWHOT WATER HWTHOT WATER TANK IDINSIDE DIAMETER ININCH INCLINCLUDED INSULINSULATION INTINTERIOR INVINVERT JBJUNCTION BOX JFJOINT FILLER JTJOINT KITKITCHEN KOKNOCKOUT LAMLAMINATE; LAMINATED LAVLAVATORY LBSPOUNDS LFLINEAR FEET (FOOT) LHLEFT HAND LLLIVE LOAD LOCLOCATION LPLOW POINT LTLIGHT MASMASONRY MATLMATERIAL MAXMAXIMUM MBMACHINE BOLT MCMEDICINE CABINET MDFMEDIUM DENSITY FIBERBOARD MDOMEDIUM DENSITY OVERLAY MECHMECHANICAL MEMBMEMBRANE MEZZMEZZANINE MFRMANUFACTURER MINMINIMUM MIRMIRROR MISCMISCELLANEOUS MOMASONRY OPENING MTDMOUNTED MTLMETAL MULMULLION NNORTH N/ANOT APPLICABLE NONUMBER NOMNOMINAL NRNOISE REDUCTION NTSNOT TO SCALE NICNOT IN CONTRACT OAOVERALL OCON CENTER ODOUTSIDE DIAMETER; OVERFLOW DRAIN OFFOFFICE OHOVERHEAD OHWMORDINARY HIGH WATER MARK OPNGOPENING OPPOPPOSITE OSBORIENTED STRAND BOARD OCCOCCUPANTS OLFOCCUPANT LOAD FACTOR PBDPARTICLE BOARD PCCPRECAST CONCRETE PCFPOUNDS PER CUBIC FOOT PERFPERFORATED PERPPERPENDICULAR PLPLATE PLAMPLASTIC LAMINATE PLASPLASTER PLWDPLYWOOD PNLPANEL PNTPOINT PRPAIR PRCSTPRECAST PSFPOUNDS PER CUBIC FOOT PSIPOUNDS PER SQUARE INCH PTPRESERVATIVE TREATED PTNPARTITION PVCPOLYVINYL CHLORIDE RRISER RARETURN AIR RADRADIUS RDROOF DRAIN REFREFERENCE REFRREFRIGERATOR REGREGISTER REINFREINFORCED REMREMAINDER REQREQUIRED RESILRESILIENT REVREVISION(S); REVISED RHRIGHT HAND RMROOM ABBREVIATIONS ROROUGH OPENING RWLRAIN WATER LEADER SSOUTH SAFSELF-ADHERED FLASHING SAMSELF-ADHERED MEMBRANE SCSOLID CORE SCHEDSCHEDULE SDSMOKE DETECTOR SECTSECTION SGSAFETY GLAZING SHVSHELF; SHELVING SHRSHOWER SHTSHEET SHT MTLSHEET METAL SHTGSHEATHING SIMSIMILAR SOGSLAB ON GRADE SPECSPECIFICATION SQ FTSQUARE FOOT (FEET) SQ INSQUARE INCH(ES) SSTSTAINLESS STEEL STDSTANDARD STLSTEEL STORSTORAGE STRUCTSTRUCTURAL SUSPSUSPENDED SYMSYMETRICAL TTREAD T&GTONGUE AND GROOVE TELTELEPHONE TERTERRAZZO TGTEMPERED GLASS THKTHICK TOTOP OF TOBTO OF BEAM TOCTOP OF CONCRETE; CURB TOFTOP OF FLOOR; FOOTING; FRAME TOMTOP OF MASONRY TOPTOP OF PARAPET; PAVEMENT TOPOTOPOGRAPHY TOSTOP OF SLAB; STEEL TOWTOP OF WALL TSTUBE STEEL TSTATTHERMOSTAT TYPTYPICAL UNOUNLESS NOTED OTHERWISE VBVINYL BASE VENVENEER VERTVERTICAL VESTVESTIBULE VGVERTICAL GRAIN VIFVERIFY IN FIELD VTVINYL TILE WWEST W/WITH W/OWITHOUT WCWATER CLOSET WDWOOD WDWWINDOW WFWIDE FLANGE WF BMWIDE FLANGE BEAM WGWIRED GLASS WHWATER HEATER WLWATER LINE WLDWELDED WPWATERPROOF WPMWATERPROOF MEMBRANE WRWATER RESISTANT WSCTWAINSCOT WSGWIRE SAFETY GLASS WTRWATER WWFWELDED WIRE FABRIC WWMWELDED WIRE MESH WTWEIGHT no.:date:description: 88 project:stamp/seal: sheet: title: checked by: drawn by: project manager: principal architect: revisions: job no.:WEST END GARDEN HOUSE337 Lake Avenue Aspen, CO 81611337 Lake Avenue Aspen, CO 81611NEIGHBORHOOD CONTEXT G0.01 23002 EW, EH TK NOT FOR CONSTRUCTION 05/12/2025 HISTORIC PRESERVATION COMMISSION FINAL REVIEW SET KT, MK no.:date:description: 89 project:stamp/seal: sheet: title: checked by: drawn by: project manager: principal architect: revisions: job no.:WEST END GARDEN HOUSE337 Lake Avenue Aspen, CO 81611337 Lake Avenue Aspen, CO 81611EXTERIOR MATERIALS G0.02 23002 EW, EH TK NOT FOR CONSTRUCTION 05/12/2025 HISTORIC PRESERVATION COMMISSION FINAL REVIEW SET KT, MK PROPOSED BUILDING MATERIALS CEDAR SHAKE ROOFSTAINED WOOD SIDING (DARK)CONCRETE BASE CLADDING MESH SCREEN GUARDRAILROOF STEEL PLATECEDAR SOFFIT WOOD no.:date:description: STEEL WINDOW SYSTEM, FRAMES PAINTED BLACK 90 42133.8 4 558 SF 65'-0" B A.5 3 93 SF 10'-10 1/2" 4 3.8 2 48 SF 5'-7 1/4" 100'-0" MAIN FLOOR 89'-6" BASEMENT AA.5 98'-1" BO MAIN FLOOR 1 72 SF 8'-4" 2 133.8 6 429 SF 59'-4 3/4" 81 SF 100'-0" MAIN FLOOR 89'-6" BASEMENT BAA.5 98'-1" BO MAIN FLOOR 5 165 SF 19'-2 1/2" SUBGRADE CALCULATIONS 1 2 3 4 TOTAL WALL AREA EXPOSED WALL AREA UNEXPOSED WALL AREA % OF EXPOSED WALL AREA (EXPOSED/TOTAL) WALL ELEVATIONS WALL AREA (SQ FT)EXPOSED WALL AREA (SQ FT) 72 48 93 558 1,446 6% 0 0 0 0 81 UNEXPOSED WALL AREA (SQ FT) 72 48 93 558 1,365 % OF UNEXPOSED WALL AREA (UNEXPOSED/TOTAL)94% 5 165 0 165 6 510 81 429 SUBGRADE LEGEND BELOW GRADE ABOVE GRADE GRADE ABOVE STRUCTURAL CEILING 6 5 4 3 21 project:stamp/seal: sheet: title: checked by: drawn by: project manager: principal architect: revisions: job no.:WEST END GARDEN HOUSE337 Lake Avenue Aspen, CO 81611337 Lake Avenue Aspen, CO 81611SUBGRADE CALCULATIONS G0.03 23002 EW, EH TK NOT FOR CONSTRUCTION 05/12/2025 HISTORIC PRESERVATION COMMISSION FINAL REVIEW SET KT, MK no.:date:description: 91 UP DN 1202 SF BASEMENT FIREPLACE ABOVE 912 SF MAIN LEVEL 52 SF EXEMPT PORCH EXEMPT PATIO (BELOW TRELLIS) TRELLIS ABOVE ROOF ABOVE 18 SF GRILL 81 SF EXTERIOR STAIR EXEMPT PATIO 383 SF 340 SF 76 SF EXEMPT PATIO FLOOR AREA LEGEND FLOOR AREA EXEMPT FLOOR AREA DECK FLOOR AREA CALCULATIONS TOTAL ALLOWABLE FLOOR AREA = 1,700 SF DECK EXEMPTION = 255 SF (15% OF ALLOWABLE FLOOR AREA) BASEMENT LEVEL = 72 SF (FLOOR AREA * EXPOSED WALL % (1,202 * 0.06)) MAIN LEVEL = 912 SF TOTAL DECK = 113 SF ((81 SF (EXT STAIR) + 269 (TRELLIS) - 255 SF) + 18 SF (GRILL)) TOTAL = 1,097 SF (72 SF + 912 SF + 113 SF) EXISTING GRADE MAXIMUM ALLOWED BUILDING HEIGHT 15'-6"PROPOSED HEIGHT: 1/3 POINT FROM EAVE TO RIDGE PROPOSED GRADE25'-0"SITE COVERAGE LOT AREA = 6,001 SF MAIN LEVEL AREA = 912 SF SITE COVERAGE PERCENTAGE = 15% (912 SF / 6,001 SF)project:stamp/seal: sheet: title: checked by: drawn by: project manager: principal architect: revisions: job no.:WEST END GARDEN HOUSE337 Lake Avenue Aspen, CO 81611337 Lake Avenue Aspen, CO 81611FLOOR AREA CALCAULATIONS AND BUILDING HEIGHT DIAGRAM G0.04 23002 EW, EH TK NOT FOR CONSTRUCTION 05/12/2025 HISTORIC PRESERVATION COMMISSION FINAL REVIEW SET KT, MK SCALE: 1/8" = 1'-0"1 BASEMENT SCALE: 1/8" = 1'-0"2 MAIN LEVEL no.:date:description: SCALE: 1" = 10'-0"3BUILDING HEIGHT DIAGRAM 92 93 C1Cover SheetPROPERTY DESCRIPTIONLOCATION:337 LAKE AVENUEOWNER:STEVEN L BLACKPARCEL NUMBER:273512135002AREA:6,001 SQUARE FEETLEGAL DESCRIPTION:SUBDIVISION: DAGGS HISTORICLANDMARK LOT SPLIT Lot: BZONING:MEDIUM DENSITY RESIDENTIAL (R-6)WEST END RESIDENCE337 LAKE AVENUE | ASPEN, COCHECKED BY:#DESCRIPTION DATE DRAWN BYCONSTRUCTION DRAWN BY:JOB #:2023-53NOT FORROARING FORK ENGINEERING 592 HIGHWAY 133 CARBONDALE, CO 81623 RFENG.BIZ | (970) 340-4130AWAJAKWEST END RESIDENCE GARDEN HOUSE 337 LAKE AVENUE ASPEN, COOf 41 HPC FINAL REVIEW SET 05.12.25 JAKHPC SUBMITTAL94 CHECKED BY:#DESCRIPTION DATE DRAWN BYCONSTRUCTION DRAWN BY:JOB #:2023-53NOT FORROARING FORK ENGINEERING 592 HIGHWAY 133 CARBONDALE, CO 81623 RFENG.BIZ | (970) 340-4130AWAJAKWEST END RESIDENCE GARDEN HOUSE 337 LAKE AVENUE ASPEN, COOf 41 HPC FINAL REVIEW SET 05.12.25 JAK C2Site Layout95 C3Utilities PlanCHECKED BY:#DESCRIPTION DATE DRAWN BYCONSTRUCTION DRAWN BY:JOB #:2023-53NOT FORROARING FORK ENGINEERING 592 HIGHWAY 133 CARBONDALE, CO 81623 RFENG.BIZ | (970) 340-4130AWAJAKWEST END RESIDENCE GARDEN HOUSE 337 LAKE AVENUE ASPEN, COOf 41 HPC FINAL REVIEW SET 05.12.25 JAK 96 FFE +82.29 +82.27 +82.18 +81.10 +74.56+74.59+74.76 +80.70 +7874.43FFE +82.29+82.27TW +7878TW +86.03+82.00+82.00LL FFE+73.79FFE +82.29+82.278382LP +82.12+82.271.5%2.0%1.5%1.5%+82.1+80.90+80.90 1.9%CHECKED BY:#DESCRIPTION DATE DRAWN BYCONSTRUCTION DRAWN BY:JOB #:2023-53NOT FORROARING FORK ENGINEERING 592 HIGHWAY 133 CARBONDALE, CO 81623 RFENG.BIZ | (970) 340-4130AWAJAKWEST END RESIDENCE GARDEN HOUSE 337 LAKE AVENUE ASPEN, COOf 41 HPC FINAL REVIEW SET 05.12.25 JAK C4Conceptual Grading &Drainage Plan97 T4 -10" T3 - 16" T8 - 20" T6 - 24" T10 - 6" T11 - 6"T12 - 8"T14 - 8" T15 - 4" T16 - 4" T22 - 24" May 12, 2025 - 5:23pm\\aspvmactive\aspen\PROJECTS_A-L\7302-335 337 Lake Avenue\D-CAD\02. Sheets\DW-7302-HPC Submission_337.dwgC ISSUE DATE: SHEET NUMBER REVIEWED: PROJECT NUMBER: DRAWN: 1 REVISIONS 7302 2 3 4 5 6 7 A B C D E ASPEN, COC O P Y R I G H T D E S I G N W O R K S H O P, I N C. F 8 9 1 2 3 4 5 6 7 8 9 May 12, 2025 - 5:23pm\\aspvmactive\aspen\PROJECTS_A-L\7302-335 337 Lake Avenue\D-CAD\02. Sheets\DW-7302-HPC Submission_337.dwgEP, XL MA 05/12/2025 DESIGN WORKSHOP Landscape Architecture · Land Planning Urban Design · Tourism Planning Aspen · Austin · Chicago · Denver · Houston Lake Tahoe · Los Angeles · Raleigh W W W . D E S I G N W O R K S H O P . C O M LX-01 22860 Two Rivers Road #1 Basalt, CO 81621 (970) 925-8354 337 LAKE AVENUETREE PROTECTION AND REMOVAL PLAN NORTH 0 ORIGINAL SCALE: 5'10'20' 1"=10' TREE REMOVAL CHART T3 T4 T6 T8 T10 T11 T12 T14 T15 T16 T22 TREE SURVEY# TREE TYPE D.B.H FIR ASPEN FIR FIR ASPEN (DEAD) ASPEN ASPEN ASPEN ASPEN ASPEN DECIDUOUS 16" 10" 24" 20" 6" 6" 8" 8" 4" 4" 24" TREE PROTECTION FENCE, TYP. CRITICAL ROOT ZONE, TYP. EXISTING CURB TO BE REMOVED EXISTING WALL TO BE REMOVED NOT FOR CONSTRUCTION HPC FINAL REVIEW SET 98 DN Oct 02, 2025 - 10:04am\\aspvmactive\aspen\PROJECTS_A-L\7302-335 337 Lake Avenue\D-CAD\02. Sheets\DW-7302-HPC Submission_337.dwgC ISSUE DATE: SHEET NUMBER REVIEWED: PROJECT NUMBER: DRAWN: 1 REVISIONS 7302 2 3 4 5 6 7 A B C D E ASPEN, COC O P Y R I G H T D E S I G N W O R K S H O P, I N C. F 8 9 1 2 3 4 5 6 7 8 9 Oct 02, 2025 - 10:04am\\aspvmactive\aspen\PROJECTS_A-L\7302-335 337 Lake Avenue\D-CAD\02. Sheets\DW-7302-HPC Submission_337.dwgEP, XL MA 05/12/2025 DESIGN WORKSHOP Landscape Architecture · Land Planning Urban Design · Tourism Planning Aspen · Austin · Chicago · Denver · Houston Lake Tahoe · Los Angeles · Raleigh W W W . D E S I G N W O R K S H O P . C O M LX-02 22860 Two Rivers Road #1 Basalt, CO 81621 (970) 925-8354 337 LAKE AVENUEMATERIALS PLAN NORTH 0 ORIGINAL SCALE: 5'10'20' 1"=10' VEHICULAR PAVING - COBBLE STONE STONE PAVER TYPE 2 - SAND SET STONE STEP DRY STACK STONE WALL MATERIAL WOOD FENCE VEHICULAR PAVING CONCRETE PAVER, TYP. CONCRETE STEP, TYP. IMPROVED DRY STACK STONE WALL WOOD FENCE (42" HEIGHT) LEGEND STONE PAVER TYPE 1 - MORTAR SET GUARDRAIL PER ARCH HANDRAILPA PA PA PA PA PA PA CONCRETE STEP CONCRETE PAVER CONCRETE BOARD FORM WALL EXISTING WOOD FENCE STONE PAVER TYPE 1, TYP. STONE PAVER TYPE 2, TYP. CONCRETE BOARD FORM WALL GRILL AND COUNTER HANDRAIL CONCRETE PAD ROOFLINE, TYP RE: ARCH PA CONCRETE PAD (6" OR LESS OF EXCAVATION WITHIN DRIPLINE OF TREE) RAIN GARDEN WITH CONCRETE CURB RAIN GARDEN WITH CONCRETE CURB STONE STEPS ADJACENT LOT CURB CUT PA N. THIRD STREETLAKE AVEADJACENT LOT CURB CUT PA NOT FOR CONSTRUCTION HPC FINAL REVIEW SET VEHICULAR PAVING - GRASS PAVE WOOD FENCE (72" HEIGHT)25'-0"18'-0"8'-6"99 DN DN UP LEGEND GREEN ROOF (HATCH) PROPOSED DECIDUOUS SHRUB PERENNIALS MIX (HATCH) PROPOSED DECIDUOUS TREE Oct 02, 2025 - 10:04am\\aspvmactive\aspen\PROJECTS_A-L\7302-335 337 Lake Avenue\D-CAD\02. Sheets\DW-7302-HPC Submission_337.dwgC ISSUE DATE: SHEET NUMBER REVIEWED: PROJECT NUMBER: DRAWN: 1 REVISIONS 7302 2 3 4 5 6 7 A B C D E ASPEN, COC O P Y R I G H T D E S I G N W O R K S H O P, I N C. F 8 9 1 2 3 4 5 6 7 8 9 Oct 02, 2025 - 10:04am\\aspvmactive\aspen\PROJECTS_A-L\7302-335 337 Lake Avenue\D-CAD\02. Sheets\DW-7302-HPC Submission_337.dwgEP, XL MA 05/12/2025 DESIGN WORKSHOP Landscape Architecture · Land Planning Urban Design · Tourism Planning Aspen · Austin · Chicago · Denver · Houston Lake Tahoe · Los Angeles · Raleigh W W W . D E S I G N W O R K S H O P . C O M LX-03 22860 Two Rivers Road #1 Basalt, CO 81621 (970) 925-8354 337 LAKE AVENUELANDSCAPE PLAN NORTH 0 ORIGINAL SCALE: 5'10'20' 1"=10' PLANT CODE BOTANICAL NAME COMMON NAME TREES MS-5 Malus x `Spring Snow`Spring Snow Crabapple PP-10 Picea pungens Colorado Spruce PT Pinus thunbergii Japanese Black Pine PT-4 Populus tremuloides Quaking Aspen SHRUBS BM-5 Buxus microphylla japonica 'Winter Gem'Winter Gem Japanese Boxwood CI-5 Cornus sericea `Isanti`Isanti Red Twig Dogwood CB-5 Cornus sericea 'Baileyi'Bayley's Red Twig Dogwood CA-10 Cotoneaster acutifolius Peking Cotoneaster PO-5 Physocarpus opulifolius Ninebark RP-1 Rubus parviflorus Thimbleberry SB-5 Spiraea betulifolia Birchleaf Spirea SJ-3 Spiraea japonica 'Froebelii'Froebelii Japanese Spirea SV-5 Syringa vulgaris Common Purple Lilac VD-5 Viburnum dentatum 'Blue Muffin'Blue Muffin Arrowwood Viburnum ORNAMENTAL GRASSES HS-1 Helictotrichon sempervirens Blue Oat Grass GROUND COVERS PR-4 Petrosedum rupestre 'Blue Spruce'Blue Spruce Stonecrop PERENNIALS AM-1 Achillea millefolium Common Yarrow AP-1 Aegopodium podagraria 'Variegatum'Variegated Bishop Weed AXM-1 Allium x `Millenium`Millenium Ornamental Onion EP-1 Echinacea purpurea 'PAS702918'PowWow® White Coneflower LA-1 Leucanthemum x superbum `Alaska`Alaska Shasta Daisy NF-1 Nepeta x faassenii Catmint SP-1 Salvia nemorosa Meadow Sage TM-4 Thymus praecox Mother of Thyme SOD/SEED TBN Turf sod BioNative Drought Tolerant Fescue Blend PLANTING KEY LEGEND PERENNIAL MIX, TYP. HPC FINAL REVIEW SET EXISTING TREE TO REMAIN, TYP. PROPOSED CONIFEROUS TREE PROPOSED ORNAMENTAL GRASS TURF (HATCH) EXISTING TREE TO REMAIN, TYP. METAL EDGER, TYP. NOT FOR CONSTRUCTION EXISTING TREE TO REMAIN, TYP. REINFORCED GRASS PAVING N. THIRD STREETLAKE AVE100 May 12, 2025 - 5:12pm\\aspvmactive\aspen\PROJECTS_A-L\7302-335 337 Lake Avenue\D-CAD\02. Sheets\DW-7302-HPC Submission_337.dwgC ISSUE DATE: SHEET NUMBER REVIEWED: PROJECT NUMBER: DRAWN: 1 REVISIONS 7302 2 3 4 5 6 7 A B C D E ASPEN, COC O P Y R I G H T D E S I G N W O R K S H O P, I N C. F 8 9 1 2 3 4 5 6 7 8 9 May 12, 2025 - 5:12pm\\aspvmactive\aspen\PROJECTS_A-L\7302-335 337 Lake Avenue\D-CAD\02. Sheets\DW-7302-HPC Submission_337.dwgEP, XL MA 05/12/2025 DESIGN WORKSHOP Landscape Architecture · Land Planning Urban Design · Tourism Planning Aspen · Austin · Chicago · Denver · Houston Lake Tahoe · Los Angeles · Raleigh W W W . D E S I G N W O R K S H O P . C O M LX-04 22860 Two Rivers Road #1 Basalt, CO 81621 (970) 925-8354 337 LAKE AVENUEMATERIAL PALETTE MATERIALS VEHICULAR PAVING - GRANITE COBBLE HANDRAIL NOT FOR CONSTRUCTION HPC FINAL REVIEW SET CONCRETE PAVER: -CONCRETE PAVER TYPE 1 AND 2 -CONCRETE STEPS DRY STACK STONE WALL STONE PAVER: -STONE PAVER TYPE 1 AND 2 WOOD FENCE AND GATE VEHICULAR PAVING - REINFORCED GRASS PAVING 101 Oct 01, 2025 - 2:41pmF:\PROJECTS_A-L\7302-335 337 Lake Avenue\D-CAD\02. Sheets\DW-7302-HPC Submission_337.dwgC ISSUE DATE: SHEET NUMBER REVIEWED: PROJECT NUMBER: DRAWN: 1 REVISIONS 7302 2 3 4 5 6 7 A B C D E ASPEN, COC O P Y R I G H T D E S I G N W O R K S H O P, I N C. F 8 9 1 2 3 4 5 6 7 8 9 Oct 01, 2025 - 2:41pmF:\PROJECTS_A-L\7302-335 337 Lake Avenue\D-CAD\02. Sheets\DW-7302-HPC Submission_337.dwgEP, XL MA 05/12/2025 DESIGN WORKSHOP Landscape Architecture · Land Planning Urban Design · Tourism Planning Aspen · Austin · Chicago · Denver · Houston Lake Tahoe · Los Angeles · Raleigh W W W . D E S I G N W O R K S H O P . C O M LX-05 22860 Two Rivers Road #1 Basalt, CO 81621 (970) 925-8354 337 LAKE AVENUEMATERIAL PALETTE NOT FOR CONSTRUCTION HPC FINAL REVIEW SET2WOOD FENCE TYPE 2 1/2"=1'-0" 1 WOOD FENCE TYPE 1 1/2"=1'-0" WOOD FENCE BOARD WOOD FENCE BOARD 1'-0"6'-6"1 8"5"FINISHED SURFACE, SEE PLANS3'-6" MAX.WOOD FENCE BOARD 112" TYP.112" TYP.SONOTUBE, RE: STRUCTURAL 2X2 HOLLOW METAL POST EMBEDDED INTO CONCRETE FINISHED SURFACE, SEE PLANS 1'-0"4"6'-6" SONOTUBE, RE: STRUCTURAL WOOD FENCE BOARD 1'-0"6'-6"1 8"5"6'-0" MAX.WOOD FENCE BOARD112" TYP.112" TYP.FINISHED SURFACE, SEE PLANS 1'-0"4"6'-6" 2X2 HOLLOW METAL POST EMBEDDED INTO CONCRETE SONOTUBE, RE: STRUCTURAL 2X2 HOLLOW METAL POST EMBEDDED INTO CONCRETE WOOD FENCE BOARD 2X2 HOLLOW METAL POST EMBEDDED INTO CONCRETE FINISHED SURFACE, SEE PLANS 102 May 12, 2025 - 5:13pm\\aspvmactive\aspen\PROJECTS_A-L\7302-335 337 Lake Avenue\D-CAD\02. Sheets\DW-7302-HPC Submission_337.dwgC ISSUE DATE: SHEET NUMBER REVIEWED: PROJECT NUMBER: DRAWN: 1 REVISIONS 7302 2 3 4 5 6 7 A B C D E ASPEN, COC O P Y R I G H T D E S I G N W O R K S H O P, I N C. F 8 9 1 2 3 4 5 6 7 8 9 May 12, 2025 - 5:13pm\\aspvmactive\aspen\PROJECTS_A-L\7302-335 337 Lake Avenue\D-CAD\02. Sheets\DW-7302-HPC Submission_337.dwgEP, XL MA 05/12/2025 DESIGN WORKSHOP Landscape Architecture · Land Planning Urban Design · Tourism Planning Aspen · Austin · Chicago · Denver · Houston Lake Tahoe · Los Angeles · Raleigh W W W . D E S I G N W O R K S H O P . C O M LX-06 22860 Two Rivers Road #1 Basalt, CO 81621 (970) 925-8354 337 LAKE AVENUEPLANTING PALETTE TREES Malus x 'Spring Snow' SHRUBS Spring Snow Crabapple Picea pungens Colorado Spruce Buxus microphylla japonica 'Winter Gem' Winter Gem Japanese Boxwood Cornus sericea 'Baileyi' Bayley's Red Twig Dogwood Spiraea betulifolia Birchleaf Spirea Spiraea japonica 'Froebelii' Froebelii Japanese Spirea Pinus thunbergii Japanese Black Pine Populus tremuloides Quaking Aspen Cotoneaster acutifolius Peking Cotoneaster Syringa vulgaris Common Purple Lilac Physocarpus opulifolius Ninebark Viburnum dentatum 'Blue Muffin' Blue Muffin Arrowwood Viburnum Rubus parviflorus Thimbleberry Cornus sericea 'Isanti' Isanti Red Twig Dogwood NOT FOR CONSTRUCTION HPC FINAL REVIEW SET 103 PLANTING PALETTE PERENNIALS Echinacea purpurea 'PAS702918' PowWow® White Coneflower Salvia nemorosa Meadow Sage Helictotrichon sempervirens Blue Oat Grass Nepeta x faassenii Catmint May 12, 2025 - 5:13pm\\aspvmactive\aspen\PROJECTS_A-L\7302-335 337 Lake Avenue\D-CAD\02. Sheets\DW-7302-HPC Submission_337.dwgC ISSUE DATE: SHEET NUMBER REVIEWED: PROJECT NUMBER: DRAWN: 1 REVISIONS 7302 2 3 4 5 6 7 A B C D E ASPEN, COC O P Y R I G H T D E S I G N W O R K S H O P, I N C. F 8 9 1 2 3 4 5 6 7 8 9 May 12, 2025 - 5:13pm\\aspvmactive\aspen\PROJECTS_A-L\7302-335 337 Lake Avenue\D-CAD\02. Sheets\DW-7302-HPC Submission_337.dwgEP, XL MA 05/12/2025 DESIGN WORKSHOP Landscape Architecture · Land Planning Urban Design · Tourism Planning Aspen · Austin · Chicago · Denver · Houston Lake Tahoe · Los Angeles · Raleigh W W W . D E S I G N W O R K S H O P . C O M LX-07 22860 Two Rivers Road #1 Basalt, CO 81621 (970) 925-8354 337 LAKE AVENUEGROUND COVERS Aegopodium podagraria 'Variegatum' Variegated Bishop's Weed Petrosedum rupestre 'Blue Spruce' Blue Spruce Stonecrop ORNAMENTAL GRASSES Allium x 'Millenium' Millenium Ornamental Onion NOT FOR CONSTRUCTION HPC FINAL REVIEW SET Achillea millefolium Common Yarrow Leucanthemm x superbum 'Alaska' Alaska Shasta Daisy Thymus praecox Mother of Thyme 104 5'-0" FACE OF BUILDING 421 B A 10'-0"10'-0"SETABACK)10'-0"(15'-0" COMBINED5'-0"PROPERTY LINE SIDE SETBACK SIDE SETBACKREAR SETBACKFRONT SETBACK3 GREEN ROOF CEDAR SHINGLES METAL TRELLIS 337 LAKE AVENUE HISTORIC LANDMARK LOT SPLIT LOT B LOT SIZE: 6,001 SF ZONE DISTRICT R-6 METAL FIREPLACE 1'-6" METAL CANOPY 3.8 A.5 CANOPY IN SETBACK BUILD-TO REQUIREMENT - SEC. 26.410.030.(B)(3)C MECHANICAL EQUIPMENT PARKING SPACE 3RD STREETLAKE AVE.8'-6"36'-1 1/4" MECHANICAL ENCLOSURE, SEE LANDSCAPE RAIN GARDEN, SEE LANDSCAPE RAIN GARDEN, SEE LANDSCAPE 18'-0"project:stamp/seal: sheet: title: checked by: drawn by: project manager: principal architect: revisions: job no.:WEST END GARDEN HOUSE337 Lake Avenue Aspen, CO 81611337 Lake Avenue Aspen, CO 81611SITE PLAN A1.00 23002 EW, EH TK NOT FOR CONSTRUCTION 05/12/2025 HISTORIC PRESERVATION COMMISSION FINAL REVIEW SET KT, MK SCALE: 1/8" = 1'-0"1SITE PLAN no.:date:description: NOTE: REFER TO LANDSCAPE DRAWINGS FOR LANDSCAPE RELATED INFORMATION. 105 PROPERTY LINE 337 LAKE AVENUE HISTORIC LANDMARK LOT SPLIT LOT B LOT SIZE: 6,001 SF ZONE DISTRICT R-6 337 LAKE AVENUE HISTORIC LANDMARK LOT SPLIT LOT A LOT SIZE: 5,706 SF ZONE DISTRICT R-63RD STREETLAKE AVE.LOT BLOT A project:stamp/seal: sheet: title: checked by: drawn by: project manager: principal architect: revisions: job no.:WEST END GARDEN HOUSE337 Lake Avenue Aspen, CO 81611337 Lake Avenue Aspen, CO 81611LOT A AND B ADJACENCY PLAN AND ELEVATION A1.01 23002 EW, EH TK NOT FOR CONSTRUCTION 05/12/2025 HISTORIC PRESERVATION COMMISSION FINAL REVIEW SET KT, MK SCALE: 1/8" = 1'-0"1LOT A AND B ADJACENCY PLAN NOTE: REFER TO LANDSCAPE DRAWINGS FOR LANDSCAPE RELATED INFORMATION. no.:date:description: SCALE: 1/8" = 1'-0"2LOT A AND B ADJACENCY ELEVATION (EAST) 106 DN UP A3.01 1 A3.01 2 A3.01 3 A3.01 4 20'-0"49'-9 1/4"19'-2 1/2"421 B A 3 102 KITCHEN 100 ENTRY 103 LIVING / BEDROOM 101 POWDER METAL GUARDRAIL RETAINING WALL GAS FIREPLACE EDGE OF METAL PLATE CANOPY ABOVE EDGE OF ROOF ABOVE METAL TRELLIS ABOVE 4 3/4"10'-10 1/2"8'-4"4 3/4"15'-4"3'-10 1/2"4'-4 3/4"19'-0"1'-0"3.8 A.5 EL 100'-0" 7'-9"1'-4"5'-6"1'-4"23'-7 1/2"3'-10"5'-7 1/4"9"9"F3F2 F5 R1 4 3/4"22'-10"26'-1 3/4" 4 3/4" 4 3/4" A3.01 1 A3.01 2 A3.01 3 A3.01 4 421 B A 3 001 BASEMENT 65'-0"19'-2 1/2"003 MECH. ROOM CONCRETE SLAB CONCRETE FOUNDATION, TYP.10'-10 1/2"8'-4"11'-0 3/4"48'-4"5'-7 1/4"4'-8 3/4"EL 89'-6" 3.8 A.5 F1 52'-5 3/4"12'-6 1/4"project:stamp/seal: sheet: title: checked by: drawn by: project manager: principal architect: revisions: job no.:WEST END GARDEN HOUSE337 Lake Avenue Aspen, CO 81611337 Lake Avenue Aspen, CO 81611BASEMENT & MAIN LEVEL FLOOR PLANS A2.01 23002 EW, EH TK NOT FOR CONSTRUCTION 05/12/2025 HISTORIC PRESERVATION COMMISSION FINAL REVIEW SET KT, MK SCALE: 1/4" = 1'-0"2MAIN FLOOR PLAN SCALE: 1/4" = 1'-0"1BASEMENT PLAN no.:date:description: 107 A3.01 1 A3.01 2 A3.01 3 A3.01 4 421 B A 3 23'-2 3/4"25'-9" 48'-11 3/4"19'-2 1/2"METAL PLATE CANOPY CEDAR SHINGLESMETAL TRELLISGREEN ROOF 3.8 A.5 METAL SHROUD AROUND KITCHEN EXHAUST, PAINTED MATTE BLACK METAL FIREPLACE METAL ROOF9 3/4" TYP. SPACE BETWEEN METAL SHROUD AROUND VENT PIPES, PAINTED MATTE BLACK METAL GUTTER AND DOWNSPOUT, PAINTED MATTE BLACK METAL GUTTER AND DOWNSPOUT, PAINTED MATTE BLACK project:stamp/seal: sheet: title: checked by: drawn by: project manager: principal architect: revisions: job no.:WEST END GARDEN HOUSE337 Lake Avenue Aspen, CO 81611337 Lake Avenue Aspen, CO 81611ROOF PLAN A2.02 23002 EW, EH TK NOT FOR CONSTRUCTION 05/12/2025 HISTORIC PRESERVATION COMMISSION FINAL REVIEW SET KT, MK no.:date:description: SCALE: 1/4" = 1'-0"1ROOF PLAN 108 100'-0" MAIN FLOOR 89'-6" BASEMENT 4213 CEDAR SHINGLE ROOF STAINED WOOD SIDING METAL WINDOW & DOOR SYSTEM, TYP. METAL TRELLIS BOARD-FORM CONCRETE SITE WALL METAL FASCIA 3.8 25'-9"23'-2 3/4"16'-0 1/4" 48'-11 3/4" CONCRETE OR METAL FLASHING, TBD METAL PLATE ROOF CANOPY AT ENTRY METAL SHROUD AROUND VENT PIPES, PAINTED MATTE BLACK METAL GUTTER AND DOWNSPOUT, PAINTED MATTE BLACK 100'-0" MAIN FLOOR 89'-6" BASEMENT BA METAL WINDOW & DOOR SYSTEM, TYP. STAINED WOOD SIDING, BEYOND METAL FASCIA METAL TRELLIS A.5 19'-2 1/2"MAX. ALLOWED 25'-0"12'-0"GREEN ROOF ASSEMBLY METAL GUTTER AND DOWNSPOUT, PAINTED MATTE BLACK18"-24"100'-0" MAIN FLOOR 89'-6" BASEMENT B A METAL PLATE ROOF CANOPY AT ENTRY 1/3 POINT FROM EAVE TO RIDGE METAL WINDOW & DOOR SYSTEM, TYP. STAINED WOOD SIDING 10'-0"3'-5"4'-1"8'-0"A.5 MAX. ALLOWED 25'-0"15'-6"10'-10 1/2"8'-4" 19'-2 1/2" 4 3/4"4 3/4" CONCRETE OR METAL FLASHING, TBD 3'-0"4'-0"METAL GUTTER AND DOWNSPOUT, PAINTED MATTE BLACK METAL SHROUD AROUND KITCHEN EXHAUST, PAINTED MATTE BLACKMETAL SHROUD AROUND VENT PIPES, PAINTED MATTE BLACK 100'-0" MAIN FLOOR 89'-6" BASEMENT 42 13 DOORS TO BASEMENT, SHOWN DASHED STAIR TO BASEMENT, SHOWN DASHED METAL MESH GUARDRAIL CONCRETE RETAINING WALL METAL TRELLIS METAL WINDOW SYSTEM, TYP. STAINED WOOD SIDING CEDAR SHINGLES METAL FIREPLACE 3.8 5'-7 1/4"20'-1 3/4"23'-2 3/4"16'-0 1/4" 48'-11 3/4" BOARD-FORM CONCRETE SITE WALL CONCRETE OR METAL FLASHING, TBDSEE LANDSCAPEHEIGHT LESS THAN 6'-0"METAL SHROUD AROUND KITCHEN EXHAUST, PAINTED MATTE BLACK METAL GUTTER AND DOWNSPOUT, PAINTED MATTE BLACK 3'-0"project:stamp/seal: sheet: title: checked by: drawn by: project manager: principal architect: revisions: job no.:WEST END GARDEN HOUSE337 Lake Avenue Aspen, CO 81611337 Lake Avenue Aspen, CO 81611EXTERIOR ELEVATIONS A3.01 23002 EW, EH TK NOT FOR CONSTRUCTION 05/12/2025 HISTORIC PRESERVATION COMMISSION FINAL REVIEW SET KT, MK SCALE: 1/4" = 1'-0"2SOUTH ELEVATION SCALE: 1/4" = 1'-0"3 WEST ELEVATION SCALE: 1/4" = 1'-0"1 EAST ELEVATION SCALE: 1/4" = 1'-0"4NORTH ELEVATION no.:date:description: 109 110'-0" BO CEILING B METAL GUTTER, PAINTED MATTE BLACK ROOF GABLE ROOF BEYOND METAL FASCIA METAL WINDOW & DOOR SYSTEM WALL BEYOND METAL DOWNSPOUT BEYOND, PAINTED MATTE BLACK project:stamp/seal: sheet: title: checked by: drawn by: project manager: principal architect: revisions: job no.:WEST END GARDEN HOUSE337 Lake Avenue Aspen, CO 81611337 Lake Avenue Aspen, CO 81611EXTERIOR DETAILS A8.00 23002 EW, EH TK NOT FOR CONSTRUCTION 05/12/2025 HISTORIC PRESERVATION COMMISSION FINAL REVIEW SET KT, MK no.:date:description: SCALE: 3" = 1'-0"1 ROOF EDGE AND GUTTER DETAIL AT LIVING - SOUTH 110 project:stamp/seal:sheet:title:checked by:drawn by:project manager:principal architect:revisions:job no.:1932 1ST Ave. Suite 605Seattle, WA 98101niteolighting.com206.456.4554WEST END GARDEN HOUSE 337 Lake Avenue Aspen, CO, 8161123002EW, EHTKNOT FOR CONSTRUCTIONHISTORIC PRESERVATION COMMISSIONFINAL REVIEW SETKT, MKno.:date:description:05/12/2025CITY OF ASPENOUTDOOR LIGHTINGCODE COMPLIANCEEL0.00A111 Outdoor Lighting Compliance Statement Per Section 26.512.040, a signed Outdoor Lighting Compliance Statement (this form) is required: (1) as a permit submission document for the Performance method; (2) prior to Certificate of Occupancy for either the Performance or Prescriptive methods. Address Parcel ID # Purpose of Form: (pick one) Submission – Performance Method. Proceed to A. Certificate of Occupancy. Proceed to B. A.Submission – Performance Method. I certify that the outdoor lighting luminaire type, quantity, and output at the subject property meets the requirements of Chapter 26.512 – Outdoor lighting. B. Certificate of Occupancy. I certify as follows: (pick one) The outdoor lighting luminaire type, quantity, and output at the subject property meets the requirements of Chapter 26.512 – Outdoor lighting and has not changed from the approved permit documents. Prescriptive Method Only: The outdoor lighting luminaire type, quantity, and output at the subject property has changed from the approved permit documents and the revised lighting plan meets the requirements of Chapter 26.512 - Outdoor lighting. I have included an updated City of Aspen Outdoor Lighting Permit Submission Tool and updated supporting documents per 26.512.040(b) to show compliance with Chapter 26.512 - Outdoor Lighting. Performance Method Only: The outdoor lighting luminaire type, quantity, and output at the subject property has changed from the approved permit documents and the revised lighting plan meets the requirements of Chapter 26.512 - Outdoor lighting. I have included a revised lighting calculation plan to show compliance with Chapter 26.512 -Outdoor Lighting. I understand this policy and I understand that any lighting plans &/or installations that do not meet the requirements of Chapter 26.512 will be treated as a violation of the City of Aspen Municipal Code. I understand that this document is a public document. Architect, Electrical Engineer, Contractor, or Lighting Designer Signature: ___________________________________________________________________________________________ Printed name: Date: ____________________________________ __________________________ 335 LAKE AVE, ASPEN 273512135001 Angelina Fernandez 10/02/2025 ■ ■ 112 LIGHTING CUTSHEETSEL0.01project:stamp/seal:sheet:title:checked by:drawn by:project manager:principal architect:revisions:job no.:1932 1ST Ave. Suite 605Seattle, WA 98101niteolighting.com206.456.4554WEST END GARDEN HOUSE 337 Lake Avenue Aspen, CO, 8161123002EW, EHTKNOT FOR CONSTRUCTIONHISTORIC PRESERVATION COMMISSIONFINAL REVIEW SETKT, MKno.:date:description:05/12/2025113 LIGHTING CUTSHEETSEL0.02project:stamp/seal:sheet:title:checked by:drawn by:project manager:principal architect:revisions:job no.:1932 1ST Ave. Suite 605Seattle, WA 98101niteolighting.com206.456.4554WEST END GARDEN HOUSE 337 Lake Avenue Aspen, CO, 8161123002EW, EHTKNOT FOR CONSTRUCTIONHISTORIC PRESERVATION COMMISSIONFINAL REVIEW SETKT, MKno.:date:description:05/12/2025114 LIGHTING CUTSHEETSEL0.03project:stamp/seal:sheet:title:checked by:drawn by:project manager:principal architect:revisions:job no.:1932 1ST Ave. Suite 605Seattle, WA 98101niteolighting.com206.456.4554WEST END GARDEN HOUSE 337 Lake Avenue Aspen, CO, 8161123002EW, EHTKNOT FOR CONSTRUCTIONHISTORIC PRESERVATION COMMISSIONFINAL REVIEW SETKT, MKno.:date:description:05/12/2025115 LIGHTING CUTSHEETSEL0.04project:stamp/seal:sheet:title:checked by:drawn by:project manager:principal architect:revisions:job no.:1932 1ST Ave. Suite 605Seattle, WA 98101niteolighting.com206.456.4554WEST END GARDEN HOUSE 337 Lake Avenue Aspen, CO, 8161123002EW, EHTKNOT FOR CONSTRUCTIONHISTORIC PRESERVATION COMMISSIONFINAL REVIEW SETKT, MKno.:date:description:05/12/2025116 LIGHTING CUTSHEETSEL0.05project:stamp/seal:sheet:title:checked by:drawn by:project manager:principal architect:revisions:job no.:1932 1ST Ave. Suite 605Seattle, WA 98101niteolighting.com206.456.4554WEST END GARDEN HOUSE 337 Lake Avenue Aspen, CO, 8161123002EW, EHTKNOT FOR CONSTRUCTIONHISTORIC PRESERVATION COMMISSIONFINAL REVIEW SETKT, MKno.:date:description:05/12/2025117 LIGHTING CUTSHEETSEL0.06project:stamp/seal:sheet:title:checked by:drawn by:project manager:principal architect:revisions:job no.:1932 1ST Ave. Suite 605Seattle, WA 98101niteolighting.com206.456.4554WEST END GARDEN HOUSE 337 Lake Avenue Aspen, CO, 8161123002EW, EHTKNOT FOR CONSTRUCTIONHISTORIC PRESERVATION COMMISSIONFINAL REVIEW SETKT, MKno.:date:description:05/12/2025118 project:stamp/seal:sheet:title:checked by:drawn by:project manager:principal architect:revisions:job no.:1932 1ST Ave. Suite 605Seattle, WA 98101niteolighting.com206.456.4554WEST END GARDEN HOUSE 337 Lake Avenue Aspen, CO, 8161123002EW, EHTKNOT FOR CONSTRUCTIONHISTORIC PRESERVATION COMMISSIONFINAL REVIEW SETKT, MKno.:date:description:05/12/2025SITE LIGHTING PLANEL1.00EL6EL1EL7AEL2EL4EL5EL3EL5EL5NOT TO SCALE1SITE LIGHTING PLAN119