HomeMy WebLinkAboutFile Documents.105 W Hyman Ave.0108-2022-BRES (13)SHEET OF
SHEET TITLE
DESCRIPTION
PROJECT NO:
MODEL FILE:
DRAWN BY:
CHK'D BY:
COPYRIGHT
MARK DATE
AS-102
BRAD ELLIOTT ARCHITECT INC.
BE
BE
0903
DD
A A
B B
C C
D D
1
1
2
2
3
3
4
4
5
5
Progress09/04/07
Lipton Remodel Permit 080822.pln
4 96
Lipton Remodel
970.927.7620
204 Park Ave. Suite 2F
PO Box 4432
Basalt, CO 81621
Construction Staging Plan
105 W Hyman
Aspen, CO
/Volumes/Macintosh HD/Dropbox/BEA Folder/BEA Projects/zBEA Project Archive/Lipton Rem 0903/1 Lipton Cad Drawings/1 Lipton Model/Lipton Remodel Permit 080822.pln
60'-0"
100'-0"
PROJECT SIGN MEETING
THE REQUIREMENTS OF
City Municipal Code
26.510.030B4
EMERGENCY VEHICLE
ACCESS
ALL ADDITIONAL
CONSTRUCTION STAGING
TO OCCUR WITHIN EXISTING
FENCED YARD
ALLEY
U N I T A
SETBACK
PROPERTY LINE
R
T
GARMISCH
LIMIT
CONSTRUCTION
TRAFFIC
HYMAN
DELIVERY & CONSTRUCTION VEHICLES ARE TO
ACCESS THE SITE FROM HYMAN AND THE ALLEY
TO AVOID CONFLICTS WITH BUS ROUTE
HAUL ROUTE- NOT ANTICIPATED
HEAVY DELIVERY & CONSTRUCTION VEHICLES ARE
TO ACCESS THE SITE FROM HYMAN AND RETURN TO
MAIN STREET VIA SOUTH ASPEN STREET WHICH IS A
DESIGNATED HALL ROUTE STREET.
U N I T B
GARAGE TO SERVE AS
CONSTRUCTION
MATERIALS STORAGE
BEDROOM & BATHROOM
ABOVE GARAGE TO SERVE
AS CONSTRUCTION OFFICE/
RESTROOM
RECYCLE AND
WASTE DUMPSTERS
(2)
ADD
RECYCLING
TO EXISTING
SERVICE
DUMPSTER
VEHICLE
PARKING (2)
SCALE: 1" = 10'1 Construction Staging Plan
PROJECT LOCATION
HAUL ROUTE
09/26/2022