Loading...
HomeMy WebLinkAboutFile Documents.105 W Hyman Ave.0108-2022-BRES (13)SHEET OF SHEET TITLE DESCRIPTION PROJECT NO: MODEL FILE: DRAWN BY: CHK'D BY: COPYRIGHT MARK DATE AS-102 BRAD ELLIOTT ARCHITECT INC. BE BE 0903 DD A A B B C C D D 1 1 2 2 3 3 4 4 5 5 Progress09/04/07 Lipton Remodel Permit 080822.pln 4 96 Lipton Remodel 970.927.7620 204 Park Ave. Suite 2F PO Box 4432 Basalt, CO 81621 Construction Staging Plan 105 W Hyman Aspen, CO /Volumes/Macintosh HD/Dropbox/BEA Folder/BEA Projects/zBEA Project Archive/Lipton Rem 0903/1 Lipton Cad Drawings/1 Lipton Model/Lipton Remodel Permit 080822.pln 60'-0" 100'-0" PROJECT SIGN MEETING THE REQUIREMENTS OF City Municipal Code 26.510.030B4 EMERGENCY VEHICLE ACCESS ALL ADDITIONAL CONSTRUCTION STAGING TO OCCUR WITHIN EXISTING FENCED YARD ALLEY U N I T A SETBACK PROPERTY LINE R T GARMISCH LIMIT CONSTRUCTION TRAFFIC HYMAN DELIVERY & CONSTRUCTION VEHICLES ARE TO ACCESS THE SITE FROM HYMAN AND THE ALLEY TO AVOID CONFLICTS WITH BUS ROUTE HAUL ROUTE- NOT ANTICIPATED HEAVY DELIVERY & CONSTRUCTION VEHICLES ARE TO ACCESS THE SITE FROM HYMAN AND RETURN TO MAIN STREET VIA SOUTH ASPEN STREET WHICH IS A DESIGNATED HALL ROUTE STREET. U N I T B GARAGE TO SERVE AS CONSTRUCTION MATERIALS STORAGE BEDROOM & BATHROOM ABOVE GARAGE TO SERVE AS CONSTRUCTION OFFICE/ RESTROOM RECYCLE AND WASTE DUMPSTERS (2) ADD RECYCLING TO EXISTING SERVICE DUMPSTER VEHICLE PARKING (2) SCALE: 1" = 10'1 Construction Staging Plan PROJECT LOCATION HAUL ROUTE 09/26/2022