Loading...
HomeMy WebLinkAboutFile Documents.920 E Hyman Ave.0006-2024-BREP (7)SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen Municipal Code. Pursuant to Sec.26.104.050, any permit or approval issued in error or otherwise not in conformity with the requirements of this Title, shall be void. Similarly, any permit or approval issued in reliance upon or as a result of, a materially false statement or representation made in the process of obtaining the permit or development approval shall, likewise, be void. Any person having received a void or voidable permit or approval shall not be relieved from having to comply with all applicable terms and conditions of this Title and the City shall not be estopped from fully enforcing same. SNOWMELT MANDATORY REQ’S. All snowmelt systems shall meet the following per (Ordinance 1 Series 2023): -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. -Automatic controls configured for system shut off when surface temperature and air temperature are above 40°F and no precipitation is falling. -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15 minutes. (2021 IMC Sec. 1208.1) 0006-2024-BREP LITTLE CARDINAL LLC 920 E HYMAN AVE 273718206005 NOTE: any repairs or replacement of sections of the existing walkway will need R10 insulation Aspen Home Inspections was brought on as general contractor for 920 East Hyman on April 3rd, 2024, after failed attempts by the original contractor to remedy a foundation leak at the underpinning of the recently remodeled historic home. Work Completed as of March 2024 • Identified leak in south and east side basement walls. • Excavated approximately 25’ of the east foundation wall, and approximately 30 ’ of the south foundation wall. • Foundation Repair of Western Colorado installed a continuous heat welded drain mat on both the east and south side s of the foundation to keep water away from the foundation walls. • Foundation drain piping installed to transport ground water to a sub-surface collection basin. • From that basin a submersible pump directs the collected water through piping to irrigate the yard. Work to be Completed • Backfill foundation. • Final grading. • Entry walkway installation. • Revegetation. Scope of work narrative 05/08/2024 linzhid