HomeMy WebLinkAboutFile Documents.691 Pfister Dr.0023-2024-BROF (9)SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
It should be known that this review shall
not relieve the applicant of their
responsibility to comply with the
requirements of the City of Aspen
Municipal Code. Pursuant to
Sec.26.104.050, any permit or approval
issued in error or otherwise not in
conformity with the requirements of this
Title, shall be void. Similarly, any permit
or approval issued in reliance upon or
as a result of, a materially false
statement or representation made in
the process of obtaining the permit or
development approval shall, likewise,
be void. Any person having received a
void or voidable permit or approval
shall not be relieved from having to
comply with all applicable terms and
conditions of this Title and the City shall
not be estopped from fully enforcing
same.
Snow stops required at all locations
where roofs could shed snow onto
walkways, stairs, alleys, decks, exits,
utilities and meters, emergency escape
and rescue opening window wells, or
adjacent properties - Ordinance 1,
2023.
MID-ROOF AND FINAL
ROOF INSPECTIONS
REQUIRED TO RECEIVE A
LETTER OF
COMPLETENESS
Mid-Roof Inspection
REQUIRED
After your roof permit is issued,
and you have started work, you
must request a mid-roof
inspection.
Inspectors will verify your Class
A assembly on site.
You will request inspection
directly on SalesForce.
Final Roof Inspection
REQUIRED
Once roof work is complete, you
must request a final roof
inspection.
Inspectors will inspect snow
guards and heat tape (if
applicable).
NOTE: If there is heat tape
present, a final roof inspection
cannot be requested until the
sub-electrical permit is applied
for as both final inspections will
occur simultaneously.
NOTE: You many not substitute roofing components/products that stray
from the approved and issued ESR/QAI report without Building
department approval.
Class A assemblies are tested and listed with the specific roof products
called out in the associated documentation. Installers shall follow all
manufacturer's installation instructions for Class A roof assembly.
691 Pfister Drive Roof A ssembly Diagram
DaVinci Single Width SyntheticShake Shingles _______________________
Eco ChiefSolarhide Fire ResistantUnderlayment _______________________
Carlisle WIP300HT Ice &Water ShieldUnderlayment ______________________
Existing Ice &WaterShield underlayment toremain_______________________
RoofDeck ______________________
Note- all existing copper flashing to remain and be re-used except for valley
flashings to be replaced with copper twin W valleys with 24” stretch-out.
1 layer of iceandwater tobe installed under valleys. Edges of valleystobe stripedinwith addition
iceandwatershield.
1 A Min.15/32-
inch plywood 3:12
One layer ASTM D226 Type II (No. 30)or two layers
of ASTM D Type I (No. 15)asphalt-saturated organic
felt may be used; or
One layer GAF Versashield®Fire-Resistant Roof
Deck Protection (ESR-2053)
DaVinci Slate 6
2 A Min.15/32-
inch plywood 3:12 One layer GAF Versashield®Fire-Resistant Roof
Deck Protection (ESR-2053)
DaVinci Slate
DaVinci Shake
6 to 71/2
9 to 10
3 A Min.15/32-
inch plywood 3:12
One layer ASTM D226 Type II (No. 30)asphalt-
saturated organic felt plus one layer of ASTM D3909
mineral-surfaced cap sheet
DaVinci Slate
DaVinci Shake
Bellaforté Shake
6 to 8
9 to 10
12
4 A Min.15/32-
inch plywood 3:12 Two layers ASTM D226 Type II (No. 30)asphalt-
coated glass-fiber-mat
DaVinci Slate
DaVinci Shake
Bellaforté Shake
Bellaforté Slate
6 to 8
9 to 10
12
12
5 A Min.15/32-
inch plywood 3:12 One layer Eco Chief Products SolarHide™-SRW
(ESR-4035)
DaVinci Slate
DaVinci Shake
Bellaforté Shake
Bellaforté Slate
6 to 8
9 to 10
12
12
For : 1-inch =25.4 mm; 1ft =0.305m
1 ASTM D226 Type I (No. 15)and Type II (No. 30)underlayment must be installed in accordance with the applicable building code.GAF
Versashield®Fire-Resistant Roof Deck Protection underlayment must be installed in accordance with ESR-2053.Eco Chief Products
SolarHide™-SRW underlayment must be installed in accordance with ESR-4035.
04/19/2024
AY- not roof
BF - not roof
No snow retention - solar panels
No snow retention
1
1
1
No snow retention- membrane roofing LS
No snow retention- decks
1 Chimneys
2 Skylights
22
SL 2
No snow retention-metal roof
Snow retention on entire roof except for areas noted
04/19/2024
Existing heat tape is only located in gutters and downspouts and
will be left undisturbed during re-roof work.
NOTE: If existing heat tape is touched/moved/replaced, REMP
will be applied and a sub-electrical permit is required.
05/01/2024
linzhid
0023-2024-BROF
SUNDANCE ASPEN LLC
691 PFISTER DR
273511209044