Loading...
HomeMy WebLinkAboutFile Documents.691 Pfister Dr.0023-2024-BROF (9)SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen Municipal Code. Pursuant to Sec.26.104.050, any permit or approval issued in error or otherwise not in conformity with the requirements of this Title, shall be void. Similarly, any permit or approval issued in reliance upon or as a result of, a materially false statement or representation made in the process of obtaining the permit or development approval shall, likewise, be void. Any person having received a void or voidable permit or approval shall not be relieved from having to comply with all applicable terms and conditions of this Title and the City shall not be estopped from fully enforcing same. Snow stops required at all locations where roofs could shed snow onto walkways, stairs, alleys, decks, exits, utilities and meters, emergency escape and rescue opening window wells, or adjacent properties - Ordinance 1, 2023. MID-ROOF AND FINAL ROOF INSPECTIONS REQUIRED TO RECEIVE A LETTER OF COMPLETENESS Mid-Roof Inspection REQUIRED After your roof permit is issued, and you have started work, you must request a mid-roof inspection. Inspectors will verify your Class A assembly on site. You will request inspection directly on SalesForce. Final Roof Inspection REQUIRED Once roof work is complete, you must request a final roof inspection. Inspectors will inspect snow guards and heat tape (if applicable). NOTE: If there is heat tape present, a final roof inspection cannot be requested until the sub-electrical permit is applied for as both final inspections will occur simultaneously. NOTE: You many not substitute roofing components/products that stray from the approved and issued ESR/QAI report without Building department approval. Class A assemblies are tested and listed with the specific roof products called out in the associated documentation. Installers shall follow all manufacturer's installation instructions for Class A roof assembly. 691 Pfister Drive Roof A ssembly Diagram DaVinci Single Width SyntheticShake Shingles _______________________ Eco ChiefSolarhide Fire ResistantUnderlayment _______________________ Carlisle WIP300HT Ice &Water ShieldUnderlayment ______________________ Existing Ice &WaterShield underlayment toremain_______________________ RoofDeck ______________________ Note- all existing copper flashing to remain and be re-used except for valley flashings to be replaced with copper twin W valleys with 24” stretch-out. 1 layer of iceandwater tobe installed under valleys. Edges of valleystobe stripedinwith addition iceandwatershield. 1 A Min.15/32- inch plywood 3:12 One layer ASTM D226 Type II (No. 30)or two layers of ASTM D Type I (No. 15)asphalt-saturated organic felt may be used; or One layer GAF Versashield®Fire-Resistant Roof Deck Protection (ESR-2053) DaVinci Slate 6 2 A Min.15/32- inch plywood 3:12 One layer GAF Versashield®Fire-Resistant Roof Deck Protection (ESR-2053) DaVinci Slate DaVinci Shake 6 to 71/2 9 to 10 3 A Min.15/32- inch plywood 3:12 One layer ASTM D226 Type II (No. 30)asphalt- saturated organic felt plus one layer of ASTM D3909 mineral-surfaced cap sheet DaVinci Slate DaVinci Shake Bellaforté Shake 6 to 8 9 to 10 12 4 A Min.15/32- inch plywood 3:12 Two layers ASTM D226 Type II (No. 30)asphalt- coated glass-fiber-mat DaVinci Slate DaVinci Shake Bellaforté Shake Bellaforté Slate 6 to 8 9 to 10 12 12 5 A Min.15/32- inch plywood 3:12 One layer Eco Chief Products SolarHide™-SRW (ESR-4035) DaVinci Slate DaVinci Shake Bellaforté Shake Bellaforté Slate 6 to 8 9 to 10 12 12 For : 1-inch =25.4 mm; 1ft =0.305m 1 ASTM D226 Type I (No. 15)and Type II (No. 30)underlayment must be installed in accordance with the applicable building code.GAF Versashield®Fire-Resistant Roof Deck Protection underlayment must be installed in accordance with ESR-2053.Eco Chief Products SolarHide™-SRW underlayment must be installed in accordance with ESR-4035. 04/19/2024 AY- not roof BF - not roof No snow retention - solar panels No snow retention 1 1 1 No snow retention- membrane roofing LS No snow retention- decks 1 Chimneys 2 Skylights 22 SL 2 No snow retention-metal roof Snow retention on entire roof except for areas noted 04/19/2024 Existing heat tape is only located in gutters and downspouts and will be left undisturbed during re-roof work. NOTE: If existing heat tape is touched/moved/replaced, REMP will be applied and a sub-electrical permit is required. 05/01/2024 linzhid 0023-2024-BROF SUNDANCE ASPEN LLC 691 PFISTER DR 273511209044