HomeMy WebLinkAboutFile Documents.931 Gibson Ave.0037-2019-BRES (51)ASPEN LINE GRADE VERIFICATION FORMASPEN LINE GRADE VERIFICATION FORM
Webpage: http://www.aspenpitkin.com/pdfs/depts/41/linegradeverificationform.pdf Rev. 04-08
Verification of Building Location by Building Contractor
For Building and Permit Information, please refer to our website at:
http://www.aspenpitkin.com/depts/41/
Exemption
A City verification of building location is not needed when the project creates less the 200 square feet of new floor area.
PART A: Complete and Submit as part of the Building Permit Application
o Building / Job Address or Location: _____________________________________________
o Your Name (Person Completing Part A): ____________________________________________
o Your Company: ________________________________________________________________
o Plans must show horizontal dimensions that ‘tie’ the building to the property boundary.
Are building ties shown? (circle one) ‘Yes’ ‘No’
o An elevation benchmark needs to be established on the site by a licensed surveyor and shown on the plans. What is the
elevation of this benchmark? _________________________________
o If the garage is located within 10 feet of the roadway or sidewalk, provide spot elevation on the on the roadway or sidewalk.
Is a spot elevation shown? ‘Yes’ ‘No’ ‘N/A’
o Provide the equation comparing site (surveyed) elevation to structure/ architectural plan elevation:
(i.e., 100’ first floor elev = 7962.50’) _______________________________
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PART B: Complete prior to first Foundation Inspection, by a licensed surveyor or an individual prequalified by the City
o Do field measured building ties to property match building ties shown on the plan? (circle one): ‘Yes’ ‘No’
o Surveyor needs to confirm that one spot on the top of the foundation wall is at the same elevation shown on the approved
building plans.
o What is the field measured elevation of top of foundation wall relative to the site bench mark? ____________
o According to the building plans, what was the design elevation for the same place on the foundation wall?
______________________________
o Was the elevation of the building adjusted in field? (circle one): ‘Yes’ ‘No’
o If yes, why? ________________________________________________
The undersigned qualified individual certifies that the information in Part B is accurate -
Signature: Date: _
Printed Name: Contact ph. # : ____________________
Company: ______________________________________________________________
931 Gibson Ave., Aspen, CO 81611
Flynn Stewart-Severy, AIA
F&M Architects
100'-0" = 7934'-0"
7933.87' (in SE corner)
- Please refer to Line Grade Verification Exhibit -
09/04/2019
79 35
7 9 3 6
79 36
79 35
7933
79
34
79 37
79 38
7 9 3 7
1
0
'
-
0
"
R
E
A
R
S
E
T
B
A
C
K
10'-0"
SIDE SETBACK
10'-0"
SIDE SETBACK
GIBSON AVE.
25
'
-
0
"
FR
O
N
T
S
E
T
B
A
C
K
EEEEE
OSW
S
79
3
2
79
3
4
79
3
6
7934
7933
7935
7933
79
3
2
7937
79
3
8
OP
E
N
LINE GRADE VERIFICATION EXHIBIT
Scale: 1" = 20'-0"1
EXISTING BUILDING FOOTPRINT
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
39'-5 1/2"
55'-6 1/4"
4
3
'
-
9
1
/
4
"
36'-3
1/4"
LINE GRADE VERIFICATION EXHIBIT DATE:
F &M A R C H I T E C T S
COPYRIGHT 2019
F&M Architects, LLC
Snowmass Village, CO 81615970.987.2707
INTER DUO
8/30/19
09/04/2019Please add these
dimensions to a sheet
in the plan set.