HomeMy WebLinkAboutFile Documents.931 Gibson Ave.0037-2019-BRES (66)Markup Summary 931 Gibson Storm
Subject: Certificate of Occupancy Requirements
Page: C0.0 COVER SHEET
Author: aaronr
Date: 11/18/2019 9:52:54 AM
File Name: 931 Gibson - Civil Plans.pdf
Attendee: Unchecked
Certificate of Occupancy Requirements (1)
Subject: Dev Rev
Page: C600 EROSION CONTROL
Author: aaronr
Date: 11/18/2019 9:59:43 AM
File Name: 931 Gibson - Civil Plans.pdf
Attendee: Unchecked
Ensure all area drains are
protected after installation and
until site has been stabilized.
Dev Rev (3)
Subject: Dev Rev
Page: C600 EROSION CONTROL
Author: aaronr
Date: 11/18/2019 10:00:49 AM
File Name: 931 Gibson - Civil Plans.pdf
Attendee: Unchecked
Ensure temporary toilet is
appropriately anchored.
Subject: Dev Rev
Page: C600 EROSION CONTROL
Author: aaronr
Date: 11/18/2019 10:01:31 AM
File Name: 931 Gibson - Civil Plans.pdf
Attendee: Unchecked
Provide BMPs for any stockpiles
on site.
WOODY CREEK
P.O.
WOODY CREEK
(P): 97
WOODYCREEK
0.00 FT
PA
T
I
O
:
7
9
3
2
.
6
TD:
7
CONCEALED TRENCH
DRAIN 2 (SEE ARCH)
Ensure all area
drains are protected
after installation and
until site has been
stabilized.
5.00 FT
Ensure temporary
toilet is appropriately
anchored.
Provide BMPs for
any stockpiles on
site.
Please refer to CMP
Please refer to CMP
Please refer to CMP
01/22/2020