HomeMy WebLinkAboutFile Documents.601 S Monarch St.0025-2024-BROF (12) . . _ f�l ,1 . s- Field Plan Set Must Be Printed In Color 4. 4
• '! `• .�PG� l— !t` ESR-2119 I Most Widely Accepted and Trusted Page 3 of 7 4` /
SeeSalesForce Info for all six units on — jam—G4 { 4.8 Reroofing: 5.2 The roof shingles are manufactured in Lenexa, 0 A A
.•� - I• Prior to application of the shingles, the existing roof Kansas, under a quality-control program with
• ,gir • covering and undedayment must be completely removed. inspections by ICC-ES.
Any damaged sheathing must be replaced.The installation 6.0 EVIDENCE SUBMITTED
of the shingles must then proceed as described in CITY OF
second page !pi `` _ Data in accordance with the ICC-ES Acceptanr Criteria
` Sections 4.1 through 4.5.An existing self-adhered ice for Special Roofing Systems(AC07),dated February 2014
__ - `r barrier membrane may remain in place if covered with a ASPEN
new ice barrier membrane in accordance with the (editorially revised May 2016).
applicable code.The roof classification is as noted in 7.0 IDENTIFICATION
T&A Section 4.6 and Table 1.
It7.1 Each roof shingle is labeled with the report holder's
5.0 CONDITIONS OF USE name(DaVinci Roofscapes,LLC)and address,the These plans must be kept at the
4 � The DaVinci Slate,DaVinci Shake,Bellaforte Shake,and product name,the shingle width,a production date
Bellaforte Slate roof shingles described in this report code, and the ICC-ES evaluation report number building site or inspection
comply with, or are suitable alternatives to what is (ESR-2119). delays may occur.Construction
44 ., specified in,those codes listed in Section 1.0 of this report, 7.2 The report holder's contact information is the shall conform to these plans.All
subject to the following conditions: following:
.f, • changes shall be approved by
t 5.1 Installation must comply with the applicable code,the DaVINCI ROOFSCAPES,LLC
r J't s • tofficial.
M 6P" manufacturer's published installation instructions and 13890 WEST 101.T STREET
this report.In the event of a conflict between this LENEXA,KANSAS 66215
_.,� '��•:�, , . -_ ;°""' 1� �_ report and the manufacturers published installation (913)599-0766
instructions,this report governs. www.davinciroofscapes.com
a1114' , k 1. •� SEPARATE PERMITS ARE
n >,•�- ` �?. 1 171 r-�, 1 -1 REQUIRED FOR ELECTRICAL,'" ' ; > . DaVinci ESR PLUMBING,MECHANICAL,ORr
-�n•. .. ,f, i' qi _ 1 FIRE SPRINKLER WORK
s6 • a
r TABLE 1—FIRE CLASSIFICATIONS SMOKE ALARMS AND
•
$111
, DaVINCI ROOF SHINGLE CARBON MONOXIDE
• SYSTEM ROOF ROOF MIN. DETECTORS REQUIRED
i - "�! .� ti ahror
NO. CLASS DECK SLOPEUNDERLAYMENTsK iiih I Roof Shingle Exposure(In.) THROUGHOUT DWELLING
„ J t, 7 - UNIT PER CITY OF ASPEN
7 _ ��i One layer ASTM D226 Type I I(NO 30)or two layers
j` of ASTM D Type (NO.15)asphalt saturated organic MUNICIPAL CODE 8.15
• �'� '� 1 A Min.1O/sr 3:12 felt may be used Or Davincl Slate 6
iI 1 ' I
inch plywood One layer GAF VersashleME Fire-Resistant Roof
Deck Protection(ESR-2053)
. " Min.t'oo One layer GAF Versashidde Fire-Resistant Roof DaVinci Slate 8 t°7'/2
��1 :.a - r . •• .•� 2 A inch plywood 3'12 Deck Protection(ESR-2053) DaVinci Shake 9to 10 IT should be known that this review shall
One layer ASTM D226 Type an(No 30)asphalt- DaV nc Slate 6 to 8 not relieve the applicant of their
_ / 3 A inch plywood 3:12 saluratetlorgancfeltplusonelayeronASTMD3909 DaVncShake 9 to 10 responsibility to comply with the
i;� --k 5 - >t fl1r 'm.A - . mineral-surfaced cap sheet Bellaforte Shake 12 Aspen
ry `5• �• ra ">'�'.,., -• -�. ' requirements of the Cityof As
> . ' - 'rlr "• K •' t DaVinci Slate 6128
�, w�., ti �sA3 `. Municipal Code.Pursuant to
•t' Y% �'��.'� „•r- 5?'''- x u"_ ,{wYAQ' �C -. �, Flat roof- no snow stops required - - Min.ywo Two layers ASTM D226 Type II(No.30)asphalt- Davin Shake 9to 10
i ��" t \,,,:1 s £• k 4_4:":z•+�`rhT�.•, --?,—-'J,, p q * 4 A inch plywood 312 �aletlglaaa-char mat Banaenesnake ,2 Sec.26.104.O50,anypermitorapproval
�-". �, �? � jwv s _ Bellaforte Slate 12 issued in error or otherwise not in
} "''Y :Y.� - +r- - •''''.-
4.' DaVinci Slate
� 7� ,k;}y » .. ,r • �- , "- conformity with the requirements of this
J, tp
M n."/sr One layer Eco Ch of Products SolarH de^^SRW DaV in Shake 9 to 10
4 BSI�-J 43 �` �' � dsv r� � � ,1 - 5 A inch plywood 3'12 (ESR-4035) Bellaforte Shake 12 Title,shall be void.Similarly,any permit
�_;; --z —,-- ' t- - - -• Bella forte slate 2 or approval issued in reliance upon or
.ziF , Z a/G' -- Forst t nc425�mrr-1x-•eaosro as a result of,a material) false
J.. _s � J _ •r ;K+ *`�~w Jr.- vereash'deM elld®BFreRese I istant RtofdDt k Proecton)underaymenl must be installed
ayment must be led lledn accordance
with
ESR the I2053eEco Chef Produ building code. cts statement or representation made in
- + ' fl _ , ns "accordance the process of obtaining the permit or
�c Y/ ,LC, -�t-Je__ SolarHldeT,SRW underiayment must be installed In accordance with ESR-4035.
x_ _ _ �/►����'�'`•`' /�! �yy^. developmentd.Anyperson havingl
shall,likewise,
r • "f =`�-= (((/1I L• , \a./�S TPO ESR bvo'dorvodablehavingreiveda
w.
•'•= - - Roof parapet does not permitor approval
/ have enough room to addshall not be relieved from having to
g ESR-1463I Most Widely Accepted and Trusted Page comply with all applicable terms and
additional insulation to TABLET-PRODUCT NAMES(continued) conditions of this Title and the City shall
not be estopped from fullyenforcing
- CARLISLEROOFING PRODUCTS pp
. - - �- -..- meet
p G MULE-HNAME PRODUCT VERSICUPRODUCT PRODUCT NAMD
--_ mGGt the nGw - PRODUCT NAME NAME NAME PRODUCT NAME INTERNATIONAL same.
i. , `. -\ • -..fi C p p A PRODUCT NAME
' ' - •-• :'^' insulation requirement. Cold Applied Adhesive Cold Applied Adhesive Cold Applied Adhesive Cold Applied Adhesive RPI Cold Applied
_ T Adhes ve
ij � • 's w TA D S r Hel�AMaxdhesive
Low-Rise FantSond Flex Adhesive
VIM AIM \!/V7 r �� J Flexble FAST Atlhesve Flexible DASH Adhesive Flexible DASH Adhesive
Atlhes e
10 • 7_ \' OlyBond 500 Adhesive OlyBond 500 Adhesive OlyBond 500 Adhesive OlyBond 500 Adhesive rewieril
e1 •♦ i \ �• D� SDE TABLE 2-FIRE CLASSIFICATION ASSEMBLIES-ADHERED ROOFING SYSTEMS.
. .
r~Ifs_ '. . iiiIIIGGG.)/ MAx 6 2024 j
=.' I •• J♦ Y• � SYSTEM ROOF BARRIER BOARD
ace ••-ip, 1 ♦ ',, ae , NO. CLASS DECK SLOPE OR SLIP SHEET INSULATION' MEMBRANE
- t' wV- . ;,` _ • ,]L> Me M� �' , '/.:12 Sure Weld,Spectro-weldFOR COM�
r' ♦ f.�" _1n Y+t` UMW. /e•i•- -White,
al FR Sure-Tough tin zhid
•"r¢- j .8 _ ', •••J7 .4; • Sure Wh to Sure Seal FleeceBACK,
�� ` ij7. C_..J Sure Weld HS Sure Weld SAT-TPO,
A 2 0,12 An fthe follown
• li �4' • _ • AZ
y O g Sure Weld FleeceBACK
44..�\ , .. � ,''- •h_' insulations,,non min.1/sr..` a► _ ,. h _ Spectra-Weld FleeceBACK,
'= ecurSess Carlisle Sure-White FleeceBACK
t • -...7 N:' ~ ' ,� _ - �U � NE A Noncombustible - SecurBeeld Poly so,
1� Irj� 7J ` ". \ J0 % �1 ^ "InsulBase Hunter Sure-Flex PVC FleeceBACK,
���•,�r..// Panels"H-Sh eld"or"H- Sure-Flex KEE HP FleeceBACK,
T�.(�w• �,. I, or,'�I� �•i •" -'`II •
•_ 3 '4:12 Shield-CG- Sure-Flex PVC FRS FleeceBACK.
�j�� 'pq,- •�. y_%1' i�`48 Sure-Flex KEE HP FRS FleeceBACK
I•' • f� /� )� 4 �y;12 Sure-Flex PVC,Sure-Flex PVC FRS,
44,4. _ = ,. ?,��f 4 L .
1r C S 5 1:12 Sure-White Sure-Flex FleeceBACK
Y V�`•tL ( (�� )( /' /r V� 6 1:12 Sure-Seal FR,Sure-Tough
�/�/ /cinch-thick fiberboard", Sure-White,Sure-Seal FleeceBACK,
/cinch-thick fiberboard" Sure-Weld,Spectra-Weld,Sure-Weld
or barrier boats HS,Sure-Weld SAT-TPO,
(see Section 3.6)o Sure-Weld FleeceBACK,
Final Roof Inspection A Noncombustible - 5-Inch max Insulfoam Speclro-Weld FleeceBACK,
EPS','/cinch-thick
REQUIRED 7 2 Sure-Flex PVC,Sure-Flex PVC FRS,
fiberboard or barrier board Sure-Flan KEE HP,
W 1 e (see Section 3over Se PVC FleeceBACK,
System No.1 inssululations $re-Flxure- KEE HP FleeceBACK,
Sure-Flex PVC FRS FleeceBACK,
u E HP FRS FleeceBACK
Once roof work is complete, you ` 8 '4:12 Sure-White Fe CK
e 0 1 D� 1'/z:12 Sure-White,Sure-Seal Fleece'At
Mid-Roof Inspection must request a final roof Sure-Tough,Sure-Weld,Spectro-Weld,
10 Noncombustible 3:12 V.-Inch thick Sure-Weld FleeceBACK,
REQUIRED Or Combustible "DensDeck Prime' Spectra-Weld FleeceBACK
inspection. /, • `G 11 A "min.110-inch- 4:12 Or'/.-inch thick - Sure-Weld HS,Sure-Weld SAT-TPO
y \�.1 thick plywood or "SECUROCK Sure-Seal FR,Sure-Flex PVC,
i rr 12 /i,-inch- Unlimited Gypsum Fiber Roof Sure-Flex PVC FRS,Sure-Flex KEE HP
thick OSB. Board'
After your roof permit is issued, Inspectors will inspect snow p Sure-Flex PVC FleeceBACK,
V �,1 '����� 312 Sure-Flex xKEE R FleceBAC
and you have started work, you guards and heat tape (if �`1 +rv�,l 1•T Sure-Flex FRS Flee K,
Sure-Flex KEE IeeceBdck
must request a mid-roof applicable).inspection. 6v'1TU.
NOTE: If there is heat tape
Inspectors will verify your Class present, a final roof inspection
A assembly on site. cannot be requested until the NOTE: You many not substitute roofing components/products that stray i Work on heat tape is not permitted
sub-electrical permit is applied from the approved and issued ESR/QAI report without Building
You will request inspection for as both final inspections will department approval- under this scope MID-ROOF AND FINAL
directly on SalesForce. occur simultaneously. ROOF INSPECTIONS
Class A assemblies are tested and listed with the specific roof products REQUIRED TO RECEIVE A
called out in the associated documentation. Installers shall follow all LETTER OF
manufacturer's installation instructions for Class A roof assembly. COMPLETENESS
CITY OF ASPEN
CITY OF ASPEN CITY OFASPEN
PERMIT NO.0027-2D24-BROF Field Plan Set Must Be Printed In Color 1► 1�
PERMIT NO.0025-2024-BROF PERMIT NO.0026-2024-BROF ; %'/
OWNER RR LOCHHEAD INVESTMENT LLC ','ii.,I
OWNER GOLDSMITH ADAM D OWNER RR LOCHHEAD INVESTMENT LLC
ADDRESS ADDRESS 601 S MONARCH ST 2
ADDRESS
601 S MONARCH ST 6 601 S MONARCH ST 1OF
PARCEL ID 273513132003 CITY ASPEN
PARCEL ID 273513132002 PARCEL ID 273513132006
These plans muus eKeept at the
APPLICATION ACCEPTED DATE: 2024-04-25 PERMIT NUMBER: 0025-2024-BROF
APPLICATION ACCEPTED DATE: 202000-25 PERMIT NUMBER: 002E2024-BROF APPLICATION ACCEPTED RITE: 2024-0425 PERMIT NUMBER: 002?-20?4-PROF building site or inspection
delays may occur.Construction
l �� 1 (COMMUNITY DEVELOPMENT DEPARTMENT 1�� ` COMMUNITY DEVELOPMENT DEPARTMENT 4, , shall conform to these plans.All
COMMUNITY DEVELOPMENT DEPARTMENT N114PK► aa��►� +I changes shall be approved by
:I��II BUILDING PERMIT 4�( �9 BUILDING PERMITCOVERSHEET Ingofficial.
BUILDING PERMIT COVERSHEET
CRY OFASPEN� \ CITY Of ASPEN
PROPERTY INFORMATION
PROPERTY INFORMATION
PROPERTY INFORMATION SEPARATE PERMITS ARE
ADDRESS'. EOASMONARCH STS UNIT: ADDRESS, 601 S MONARCH ST2 UNIT:
ADDRESS. 6015 MONARCH ST6 UNIT: PARCEL ID: 273513132003 LEGAL DESCRIPTION: AZTEC REQUIRED FOR ELECTRICAL,
PARCEL ID: 273513132006 LEGAL DESCRIPTION: AZTEC
PARCEL ID,
273513132002 LEGAL DESCRIPTIONAZTEC OWNER'. RR LO(HHEAD INVESTMENT LLC OWNER: RR IOEHHEAD INVESTMENT LLC PLUMBING,MECHANICAL,OR
OWNER GOLDSMITH ADAM PERMIT CONTRACTOR: High Peak Roofing,LLC PERMIT CONTRACTOR: High Peak Roofing,LLC
PERMIT CONTRACTOR: Nigh Peak Roofing,LLC FIRE SPRINKLER WORK
DESCRIPTION OF WORK Tear off existing roof,install 1/4 inch ISO taper system,install dens deck board,install TPO membrane,imtall DESCRIPTION OF WORK Tear offexisungroof,install 1/4 lord ISOtapersystem,install dens dock hoard,install TPA membrane,Install SMOKE ALARMS AND
DESCRIPTION OF WORK Tear off exlstlr0roof,install 1/0Inch ISO Mper System,install dens deck board,ins tall TP0 membrane,Install flashing,dry In with WIP 303,install Solar hide,install DaVind shingles,Install gutters Bashing,tlryinwith WIP300,install Solarhitle,install DaVin[i SM1inglTo instill gutters CARBON MONOXIDE
flashing,dry in with WIP 300,install Solar hide,Install Davincl shingles,Install gutters
DETECTORS REQUIRED
— THROUGHOUT DWELLING
USE OF BUILDING MUKiFamlly FARE SPRINKLER REQUIRED? USE OF BUILDING Multi-Family FIRE SPRINKLER REQUIRED? UNIT PER CITY OF ASPEN
USE OF BUILDING Multi-RamhN FIRE SPRINKLER REQUIRED? - MUNICIPAL CODE 8.15
CLASS OF WORK Residential FIRE SPRINKLER TYPE CLASS OF WORK Residential FIRE SPRINKLER TYPE
CLASS OP WORK Residential FIRE SPRINKLER TYPE -
REQUIREDSPECW BUILDING TYPE RRQ REQUIRED SPECIAL
REQUIRED SPECIAL BUILDING TYPE ORE) INSPECTIONS INSPECTIONS
BUILDING TYPE TIRO INSRCTTON5 It should be known that this review shall
CONSTRUCTION TYPE ENERGY CODE COMPLIANCE not relieve the applicant of their
CONSTRUCTION TYPE ENERGY[ODE COMPLIANCE CONSTRUCTION TYPE ENERGY CODE COMPLIANCE responsibility
to complywith the
-
WORK CHANGES BUILDING OCCUPANLYGROUPIIKI WORKCHANGESBUILIKNG requirements of the City of Aspen
WORK CHANGES BUILDING OCCUPANCY GROUP OKI POOIORINTT FOOTPRINT? Municipal Code.Pursuant to
0C1P"""GROUP(IBC) FOO1PRINE7 Sec.26.104.050,any permit or approval
CODE EDITIONS 2021 IBC TOTAL SPA PVT. CODE EDITIONS 2021MC TOTAL SPASK.FT. issued in error or otherwise not in
CODE EDITIONS 202118E TOTAL SPA SQPT. • conformity with the requirements of this
-
OTHERCOOE EDITIONS TOTM SBOWMELTSQPT. OTHER CODE EDITIONS TOTAL 5NDWMELTSQ.Fr. Title,shall be void.Similarly,any permit
OTHER CODE EDITIONS TOTAL SNOWMELTSQ.RT. - or approvalissued in reliance upon or
as a result
of,a materially false
— HISTORIC PROPERTY? No TOTAL POOL SQ.FT. XISTORIC PRORERIYT No TOTAL°OOLSQR' statement or representation made in
HISTORIC PROPERTY? No TOTAL POOL SQ.FT. • the process of obtaining the permit or
- FIRE SPRINKLER EXISTING? development approval shall,likewise,
FIRE SPRINKLER EXISTING? P PP
FIRE SPNNKLER EXISTING? be void.Any person having received a
void or voidable permit or approval
shall not be relieved from having to
comply with all applicable terms and
CITY OF ASPEN CITY OF ASPEN conditions ofoppedis ltle from fully enforcing the City ll
CITY OF ASPEN 0030 2024-BROF not be estopped
NOe 0026-2024-BROF.
PERMIT NO.0029-2024-BROF PERMIT N0. Same.
OWNER OWNER NOLAN STEPHEN M&SHANNON.
ICAHN LIBA FREIRICH MARK A
OWNER
ADDRESS 601 S MONARCH ST 4 ADDRESS 601 S MONARCH ST 5
ADDRESS 601 S MONARCH ST 3
PARCEL ID PARCEL ID 273513132005
PARCEL ID 273513132004
273513132001
APPLICATION ACCEPTED DATE: 2024-04-25 PERMIT NUMBER: 0028-2024-BROF APPLICATION ACCEPTED DATE: 12024-04-25 PERMIT NUMBER: 0029-2024-DROP
APPLICATION ACCEPTED DATE: 2024-04-25 PERMIT NUMBER: 0030-2024-DROP
COMMUNITY DEVELOPMENT DEPARTMENT (COMMUNITY DEVELOPMENT DEPARTMENT N`jj14� COMMUNITY DEVELOPMENT DEPARTMENT NPj
BUILDING PERMIT COVERSHEET yBY�� y1,0►0 004 ip
BUILDING PERMIT COVERSHEET BUILDING PERMIT COVERSHEET 4161..
CITY OF ASPEN) CITY OFASPEN CITY OF ASPEN
PROPERTY INFORMATION PROPERTY INFORMATION
PROPERTY INFORMATION
ADDRESS, 6015 MONARCH ST 3 UNIT: ADDRESS: 6015 MONARCH ST 4 UNIT: ADDRESS: 6015 MONARCH ST 5 UNIT:
PARCEL ID: 273513132001 LEGAL DESCRIPTION: AZTEC PARCEL ID: 273513132004 LEGAL DESCRIPTION: AZTEC PARCEL ID: 273513132005 LEGAL DESCRIPTION: AZTEC
OWNER: ICAHN LIBA OWNER'. FREIRICH MARK A OWNER: NOLAN STEPHEN M&SHANNON
PERMIT CONTRACTOR: High Peak Roofing,LLC PERMIT CONTRACTOR: High Peak Roofing,LLC PERMIT CONTRACTOR: High Peak Roofing,LLC
DESCRIPTION OF WORK Tear off existing roof,Install 1/4 inch ISO taper system,install dens deck board,install TPO membrane,install DESCRIPTION OF WORK Tear off existing roof,Install 1/4 inch ISO taper system,install dens deck board,install TPO membrane,install DESCRIPTION OF WORK Tear off existing roof,install 1/4 inch ISO taper system,install dens deck board,install TPO membrane,install
flashing,dry in with WIP 300,install Solar hide,install DAVinci shingles,install gutters flashing,dry in with WIP 300,install Solo hide,install Dannci shingles,install gutters gashing,dry in with WIP 300,install Solar hide,install DaVinci shingles,install gutters
USE OF BUILDING Muhi•Family FIRE SPRINKLER REQUIRED? USE OF BUILDING Multi•Family FIRE SPRINKLER REQUIRED? USE OF BUILDING Multi-Family FIRE SPRINKLER REQUIRED?
CLASS OF WORK Residential FIRE SPRINKLER TYPE CLASS OF WORK Residential FIRE SPRINKLER TYPE CLASS OF WORK Residential FIRE SPRINKLER TYPE
BUILDING TYPE(IBC) REQUIRED
NSECIAL BUILDING TYPE(IBC) REQUIRED SPECIAL BUILDING TYPE(IRE) REQUIRED SPECIAL
INSPECTIONS I INSPECTIONS
CONSTRUCTION TYPE ENERGY CODE COMPLIANCE CONSTRUCTION TYPE ENERGY CODE COMPLIANCE CONSTRUCTION TYPE ENERGY CODE COMPLIANCE
OCCUPANCY GROUP(IBC) WORN CHANGES BUILDING WORKGROUP(IBC) WORK CHANGES BUILDING
FOOTPRINT?
FOOTPRINT? OCCUPANCY GROUP IILtcI FOOTPRINT?
BUILDING
CODE EDITIONS 2021 IBC TOTAL SPA SCLFT. CODE EDITIONS 2021 IBC TOTAL SPA SOFT. CODE EDITIONS 2021 IBC TOTAL SPA SQ.FT.
OTHER CODE EDITIONS TOTAL SNOWMELT SOFT. OTHER CODE EDITIONS TOTAL SNOWMELT SOFT. OTHER CODE EDITIONS TOTAL SNOWMELT SOFT.
HISTORIC PAOPERIYP No TOTAL POOL SOFT. HISTORIC PROPERTY? No TOTAL POOL SQ.FT. HISTORIC PROPERTY? No TOTAL POOL SQ.FT.
1
FIRE SPRINKLER EXISTING? FIRE SPRINKLER EXISTING? FIRE SPRINKLER EXISTING?