HomeMy WebLinkAboutFile Documents.341 Park Ave.0072-2022-BRES (18) APPLICATION ACCEPTED DATE: 2022-06-08 PERMIT NUMBER: 0072-2022-BRES Field Plan Set Must Be Printed In Color 4
0
/11
! 0
COMMUNITY DEVELOPMENT DEPARTMENT �4'101� ASPEN
/' CITY OF ASPEN CITY F
BUILDING PERMIT COVERSHEET \���/
CITY OF ASPEN 0072-2022-BRES These plans musta apt at the
PERMIT NQ building site or inspection
delays may occur.Construction
shall conform to these plans.All
PROPERTY INFORMATION
changes shall be approved by
OWNER Front Four LLC iiiiigingofficial.
ADDRESS: 341 PARK AVE UNIT: _ --- ....�
PARCEL ID: 273707481001 LEGAL DESCRIPTION: COLAS CONDO
OWNER: FRONT FOUR LLC ADDRESS SEPARATE PERMITS ARE
PERMIT CONTRACTOR: GIANT PROPERTI ES I NC 341 Park Ave REQUIRED FOR ELECTRICAL,
PLUMBING,MECHANICAL,OR
- FIRE SPRINKLER WORK
•
PARCEL ID 273707481001 SMOKE ALARMS AND
CARBON MONOXIDE
DESCRIPTION OF WORK Replacement of entry columns and beams in existing locations,front entry door,garage door,and deck doors. DETECTORS REQUIRED
•
Addition ofa decorative metal awninga bove the garage door and a ntrystair window.Stain existing siding. THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
USE OF BUILDING Single Family FIRE SPRINKLER REQUIRED? No 1 It should be known that this review shall
not relieve the applicant of their
responsibility to comply with the
requirements of the City of Aspen
CLASS OF WORK Residential FIRE SPRINKLER TYPE Municipal Code.Pursuant to
Sec.26.104.050,any permit or approval
SPECIAL INSPECTION REQUIRED: issued in error or otherwise not in
conformity with the requirements of this
REQUIRED SPECIAL High-Strength Bolting;Structural -Structural steel welding:Field&Shop Title,shall be void.Similarly,any permit
BUILDING TYPE(IRC) One family -High strength bolting or approval issued in reliance upon or
INSPECTIONS Steel Welding -Epoxy anchors as a result of,a materially false
-Intumescent paint statement or representation made in
-Spray applied fire resistive materials the process of obtaining the permit or
true Table -Permanent micropiles development approval shall,likewise,
CONSTRUCTION TYPE VA ENERGY CODE COMPLIANCE Pre scri
P be void.Any person having received a
Special inspection is required per 2015 IBC void or voidable permit or approval
section 1704.Inspector to verify that copy of shall not be relieved from having to
WORK CHANGES BUILDING agreement for inspection program to be on comply with all applicable terms and
OCCUPANCY GROUP(IBC) R-3 No the job site prior to performing any conditions of this Title and the City shall
FOOTPRINT? inspections.A copy ofall Special Inspector not be estopped from fully enforcing
field reports to be on the job site for same.
inspectors'review if requested.Failure to
CODE EDITIONS 2015 I RC TOTAL SPA SQ.FT. comply may result in denial of inspection.
iEw-gb)
OTHER CODE EDITIONS 2015 I ECC,2015 I EBC,2020 NEC TOTAL SNOWMELT SQ.FT. 07/19/2022
kylas
HISTORIC PROPERTY? No TOTAL POOL SQ.FT. ZONING
FIRE SPRINKLER EXISTING? No rtat6ge 1i�ti121/2022 IV
FORCOl1tGEtMPLINCE
;4' limp; .
'� o A land use application fora Development Order or Notice of Approval was NO,
4`�40 a submitted to the Community Development Department prior to final passage of 1Y1i
0 0$00 the ordinance on December 8,2021,and was subsequently deemed to be
1110 complete by the Community Development DeparbneM Director. CITY OF ASPEN
o The land use application is seeking a Development Order or Notice of Approval EXEMPTION FROM STREAM MARGIN REVIEW
CITY OFASPEN fora project consisting of 100%Affordable Housing as that term Is defined at FOR 341 PARK AVE.
§26 00 of the Aspen Municipal Cade,or as may be deemed necessary for
issuance
412 Rio Grande Place.Aspen.CO 616e the of Certificates of Affordable Housing for a 100%Affordable Housing Address:341 Park Ave.
(v7o)v,osovo project,or as determined by the Community Development Director. Parcel ID:2737-074-81-001
www.aspengo, o The And use application Involves Voluntary AspenModern designation Zone District:R-l3
processes that meet the requirements of Section 26.415.025.0 and
NOTICE OF E%EMPTIONAND AUTHORIZATION TO APPLY FOR LAND 26.415.030. 341 Park Ave is located in the Stream Margin Review Area as established in Section 26.43 040 tithe
USE/BUILDING PERMITS DURING THE EFFECTIVE TERM OF a The And use application or administrable request may be necessary to Issue Aspen Land Use coda.Front Four LLC,represented by Red Room Design has submitted a land use
ORDINANCE#27,SERIES OF 2021 exempt building permits as descdted below,and as determined by the application for a remodel of an existing residence.The exterior scope of work includes the following
Community Development Director. Items:
Property Address: 341 Park Ave,Aspen co aloft The project dascdbad above is permitted to submit for building permit review • Alterations to main level fenestration on the south facade and changes to
because(check all that apply): the front entry porch area.
Parcel ID Number: 273707481001
ProPedY b cost o A building permit application was submitted to the Community Development The project qualifies for an exemption as the review cdteda can be met
Front Four LLC Depatment prior to final passage M the ordinance on December 8,2021,and
subsequently deemed to be complete by the Chief Building Official. a)does nM add more than t0%of the existing floor area,or more than 25%of areas exempt tram floor area
Representative/email: laurend@redroomdesign.wm a It isa building permit fora project that will not increase the gross square b)does not require the removal of any tree
footage M development,Net leasable area,or Net livable area of any building of no portion of are project wrr be any closer to high water line than existing development
Scope of Work(Provide narrative here and a separate pdf which is a succinct and and does not meet the definition of demolition. al woiss no ate no fell run,Nrease to meide of an iamo nl nosing envelope
clear set of supporting documents,to be ached to this form as Exhibit A,such as a It is a building permit fora project that will not Increase the Height of any 9rground coverage within the tgg-year floors plain
att
Letters of Completeness, Resolutions, Development Orders, Land Use Case building.This includes additions to or replacement of mechanical equipment or Staff has reviewed the scope of work and has determined that it will have no impact on the Stream
numbers,Building Pernti numbers etc. If the representation being made is that the energy efficiency systems pursuant to height exemptions as set forth at Margin.There is no ground/site work proposed as part of project,there are no impacts to trees or
work does not involve dimensional changes prohibited by the moratorium provide §26.575.020 of the Aspen Municipal Code,or as...Mooned by the Community vegetation,and no concerns are raised related to Impacts to stonnwater run-off,or water quality.
existing and proposed calculations,floor Plans and and elevations to be attached: Development Director.
o It is a building pernit for commercial and lodge development as stand-alone The scope of work identified above is therefore approved.However,C during the building permit
^-•^^•mu^^•-^^-^^^^•---•-^n^-,... .•,m•^-w•^•^-^.-.•-^^•^••^-^••^^^•• uses on a parcel ornecalcerty. process,the scope of work is amended,a new review will be required that may involve a more extensive
o The project has recewed or is eligible to receive a Development Order or analysis under the Stream Margin Exemption,or Stream Margin Review criteria.
Notice of Approval on the effective date of this ordinance.
o N Is a building permit for 100%affordable housing projects as that term Is This approval does not constitute a site-specific development plan and will not be issued a development
Due to the circumstances noted below,the above referenced project as defined by defined at§26.104.1 of the Aspen Municipal Code. order.The approval does not convey a vested right and the approved project is subject to any changes
the Scope of Work is exempt from the application of Ordinance 427,Series of 2021, o It is a building permitit for demolition or repair of non-habitable structures. to the Land Use Code poor to building permit submittal.
and is authorized to pursue a land use review anchor building permit review during on March 9
the effective term of Ordinance#27,Series of 2021.2021,an ordinance which generally I ,2022 this certificate is valid through Me Approved'
places a moratorium o ntel development. This authorization does not effective date of Ordinance#27,Series of 2021,or any Ordinance which supersedes
guarantee issuance ofa building permit or approval of any land use application. The a provision of Ordinance#27,Series of 2021 in a manner which is relevant to the
applicant must submit complete information and pursue at authorized approvals in a Scope of Work.A copy of this certificate is required when applying for any land use
timely fashion,adhering to at deadlines for submission,terms M Vested Rights, nevor building permit This Notice is not Development Order or Administrative
resew.times required to maintain an active building permit,and all older Land Use Determination that is subject to appeal.
GarreCode end Building Code requirements in effect as of December 8,2021. Any Aayp.$s,5 Planning Director,for Senior Planner Comm Development Date
amendments and o additional approvals not addressed or identified In the G r unity
application,may be subject to Ordinance#27,Series of 2021. Phillip Supino
Community Developm eat Director EXHIBIT A:Proposed Plans(attached)
The project d.cribed above is permitted to proceed with land use review IFFEREIVED m—ade.—tooenh mpe�er emmdeloiledredew.lo araagonressubjedto ONainence21 a2
(check MI that appy,: e1REIVED RECEIVED
06/08/2022 exhibit',Floor plans and elevatios represardrng scope...
06/08/2022 06/08/2022
ASPEN ASPEN
BUILDINGDEFARTMENT was.^,,sww sew,s,v..coe„nws r>.ememecou l r.croexinerr..r.r..e.^. ASPEN
BALDING DEPARTMENT .m BUILDING DEPARTMENT
ilnigi
CITY OF ASPEN B. Owner Responsibilities:The project owner,the design professional in responsible charge,or an agent of
the owner is responsible for employing special-inspection services.The special inspector/agency shall not
SPECIAL INSPECTION AND TESTING AGREEMENT be in the employ of the contractor,subcontractor or material supplier.[IBC Sec 1704.1]In case of an
caner/contractor,the special inspectoMagency shall be employed as specified by the building official. G. building Department Responsibilities:
This form is required for projects needing special inspection and/or testing per Chapter 17 of the Intemational C. Design Professional in Responsible Charge Responsibilities: I. Approve nave s mecinl-ins cction The buildin de arunem shall aall special
Building Code(IBC). Design Professional in Responsible Charge definition:An individual who is registered or licensed to practice their I I I p program. g p approve p
respective design profession as defined by the statutory requirements of the professional registration laws of the state or inspectors and special-inspection requirements.
Project Address:341 Park Ave,Aspen,CO 81611 Permit Number:0072-2022-BRES2. Enforce special inspection.Work requiring special inspection and the building inspector shall
1 p jurisdiction in which,cv the project is to be constructed;who is engaged by the owner b review and coordinate chain monitor the performance of special inspectors.I pis/ller approval,in addition to that of die special
BEFORE A PERMIT CAN BE ISSUED:The owner,or the design professional in responsible charge,acting as aspects of the project,as determined by the building official,for compatibility with the design of the building or
structure. inspector,must be obtained prior to placement of concrete,covering of structural steel,or other
the owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing similar materials. .
Schedule,includingthe required ackoowled rents.A [ruction conference with theparties involved maybe 1. Prepare statement of special inspections.The registered design professional in responsible 3. Review inspection reports.The building official should review special-inspection progress and
g pre-cons charge shall prepare a statement of special inspections in accordance with IBC Section 1705 for final reports.
required to review the special-inspection requirements and procedures. submittal by the applicant.The statement of special inspections shall identify the following: 4. Perform final inspection.The building official should perform the final inspection and approval
APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the projects for a. The materials,systems,components and work required to have special inspection or fora project[IBC Sec.109.3.1]alkr the final special-inspection report has been reviewed and
which they provide special inspections.Special inspectors shall be approved by the building department prior to testing by the building official or by the registered design professional responsible for approved.
performing any duties.Special inspectors shall submit then qualifications and are subject to personal interviews for each portion of the work.
pre-qualification.Special inspectors shall display approved identification,as stipulated by the building official, b. The type and extent of each special inspection.
when performing the function of special inspector. c. The type and extent of each test.
d. For each type of special inspection,identification as to whether it will be continuous
Special inspection and testing shall meet the minimum requirements of the International Building Code Section
1704.The following conditions are also applicable: special inspection or periodic special inspection. project Address:341 Park Ave,Aspen,CO 81611 Pcrmi]Number: 0072-2022-BRES
D. Contractor Responsibilities:
A. Duties and Responsibilities of the Special Inspector: 1. Notify the special inspector.The contractor is responsible for notifying the special inspector or ACKNOWLEDGMENTS
1. Signify presence at job site.Special inspectors should notify contractor personnel of their agency regarding individual inspections for items listed on the attached schedule and as noted on I have read and agree to comply with the conditions of this agreement.
the building department approved plans.Adequate notice shall be provided so the special inspector
presence and responsibilities at the job site.If required by the building official,they shall sign in has time to become familiar with the project.
on the appropriate form posted with the building permit. 2. Provide access to approved plans.The contractor is responsible for providing the special
2. Observe assigned work.The special inspector shall observe assigned work for conformance with inspector access to approved plans. Special Inspection Signature Printed Name Date Grail
the building department approved(stamped)design drawings,specifications,and applicable 3. Retain special inspection records.Upon request,the contractor is also responsible for retaining, Agency""
workmanship provisions of the International Building Code.Architect\engineer-reviewed shop at the job site,all special inspection records completed by the special inspector. T�.n5 la.,[_ �� �,Z a�• 5��
drawings may be used only as an aid to inspection. E. Inspection of Fabricators: V esl.[�1per N
1. Fabrication of structural assemblies and members.Where fabrication of structural load-bearing Owner" Signature �' Printed Name Date Email
For continuous special-inspection,the special inspector shall be on site at all times observing the members and assemblies is halo performed on the premises of a fabricator's oho IBC Section / —
work requiring special inspection.Periodic inspections,if any,must have prior approval based on g P Pe P' DI Structural Proles Design Nate Decker,PE,SE 4.[g.22 mailnate bnl ra
t written 1 d and approved b the building de artment and the en Fabrication
shall require implementation
inspection of the procedure.Thehetsd cams. Design able C Professional in Sighawrc Primed Name Data Email
separate wri plan reviewed pprove y g p engineer or 2. Fabrication and implementation special inspector shall verify that the Responsible Charge'
architect of record. fabricator maintains detailed fabrication and quality control procedures that provide a basis for
3. Report nonconforming items.The special inspector shall bring nonconforming items to the inspection control of the workmanship and the fabricator's ability to conform to approved
immediate attention of the contractor and note all such items in the daily report.If any item is not construction documents and reference standards.The special inspector shall review the procedures Contractor Signature Printed Name Date Email
resolved in a timely manner or is about to be incorporated in the work,the special inspector shall for completeness and adequacy relative to code requirements for fabricator's scope of work.
immediately notify the building department by telephone or in person,notify the engineer or F. Approved Fabricator Responsibilities:
architect,and post a discrepancy notice. Approved fabricator"" Signature Printed Name Date Email
4. Provide timely reports.The special inspector shall complete written inspection reports for each 1. Fabrication exempt inspections.Special inspections are not required where work is done on the
premise of a fabricator registered and approved to perform such work without special inspection.
inspection visit and provide the reports on a timely basis determined by the building official.The If work is done on site that requires special inspection,special inspection will be required. Inspected Fabricator'" Signature Printed Name Date Email
special inspector or inspection agency shall ss these reports directly to the building official, 2. Approval of fabricator.Approval shall be based upon review of the fabricator's written
engineer or architect of record,and othe as designated.[IBC Sec.1704.1.2]These reports should procedural and quality control manuals and periodic auditing offabrication practices by an
r City of Aspen Building ,z .`, >---D---- Jim Pomeroy 10/27/22 jim.pomeroy@anpen.gov
be organized on a daily format and may be submitted weekly at the option of the building official. approved special inspection agency. Department: /Signature Printed Name Date limail
These reports should include: 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator shall submit
a. Description of daily inspections and tests made with applicable locations, certificate of compliance to the building official stating that the work was performed in accordance 'Either the Owe,or Design Professional in Responsible Charge must sign.
e. RLeport
Of nonconforming no rain items, P g 0 g Pe a Ethers Approved fabricator or Inspected Famicatm,rmn nine If MI work is performed in the shop of m Approved Fabricator,the special
bc. Report on how nonconforming items were resolved or unresolved as applicable, with the approved construction documents. Inspection Agency signature is not required(no reed„ore.
d. Itemized changes authorized by the architect,engineer,and building official if
not included in nonconforming items
5. Provide Final Inspection Report.The special inspector shall submit a written final report
documenting required special inspections and coronation of any discrepancies noted in the
inspections prior to the final building inspection.
DES:
0/27/2 RECEIVED �'°7, �I RECEIVED
I_
r m22 r' :�t_
�RmaEr ta,z972ozs� �EIV D
06/08/2022
PONCOMrtawwCE 1 o/z'r/zazz
imp 06/08/2022 Do South Galena Street Aspen CO animw5I P.070.920.5000 I f:970.920519 [excam�.�_.
130 South Galena street Aspen CO Ba6T-i973 I P.970920.5000 I FF.970920.5197 I city o feu pen.corn ASPEN Nlime 06/08/20'2
BUILDING DEPARTMENT no South Galena Street Aspen,CO t:On:n/5I P.970.920.5000 I F.970.920.5197 I cityofaspen.com ASPEN
BUILDING DEPARTMENT ASPEN
BUILDING DEPARTMENT
•
2. Approval of fabricator.Approval shall be based upon review of the fabricator's written
procedural and quality control manuals and periodic auditing of fabrication pmmicea by
anapprovedspecial inspection agency.
a.. Building Deportment Responsibilities:
3. Completion oFGbrica ions open completion of fabrication,the approved fabricator I. Approve speeial-iorpMitas program-the Ivnkling depanmet shall aprewc all special
as[is'clnn nnJ spatial-inslx'a'ion acquire ncnl+.
shall submit certificate of compliance to the building official stating that the work was
L.
performed in accordance with the approved construction documents. Enforce special inspection.Work requiring special inspect ion and the Molding it y xcuo shell
monitor the perforomit'c of-special inspectors.I lis/1lam approval,in uddiliun to that of limo special
G.Building Department Responsibilities
isspedur.must be obtained prior to placement of concrete.covering of stratzwol steel.w Other
similar materials.
I. Approve special-inspectionProgmm.Theb,dldiag department shall approve all
3. Review hasped kin reports.The building official slmuld review speciml-fnaptet imp progress and
special inspectors and special-inspection requmements. heal reports.
4. Perform final imperiling.The building official should perform the final inspection and approval
2. Enforce special inspection.Work lequiring special inspection and the building tiara l jecllllll'Sec.109,1.11 aIi the final sixcial-inspection raptor has been ens,n'd and
inspector shall monitor the performance of special inspectors.His\Her approval,is approved.
addition to that of the special inspector,must be obtained prior to placement of concrete,
covering of structural steel,or other similar materials.
3. Review inspection reports.The building official should review special-inspection
progress and Gnat reports. 341 Park Ave,Aspen,CO 81611 permit Number:
4. Perform final ins The building official should form the final i and 1'ropers Addennas
pinion. ug o per inspection has
approval for a eemna[18C Sec.109.].1)aver the fuel special-inspection report has been
reviewed and approved. AC OWLYIN:MENTS
I ha -ad an gm comply with the conditions tit this agreement,
price,Address: 341 PARK AVE Permit Number Q'�]�
-- Rebeoo GramIlion Bodo/GrenJ i Pion otp� nsposMossQyYno.mm
ACKNOWLEDGMENTSSpecial Invpeliw V --y'rimed-Nand Dat Fossil
Api,cy.an
I have read and agree to comply with the conditions of this agreement.
Special Inspection Agency. Signature: Printed Name: Date: 1//lw�ss se Sig��stt,a„lO������ Peemoed Nance Dote Email
4fi`gn m o 0imi,msa Ceta-M #126/2/ Caefrnekediarrndeslg
I'rmfeasm .ignamre Printed Name I retail ���/
Owner: Signature: Printed Name Dao Rsptaiclhk
Clanger/ea
--_ Giant Conkkection `` .Arad[elememm 12/7/21 Fda®n;anffiseomnmvine.mtn
•Engineer/Architect Signature: Primed Name: Date: Ctmlraelse Signature Petered New I4a I.nad
Oddo Engineering Robert Oddo
Approved Signature Primed Nana Date Final!
Contractor: Signature: Printed Name: • Date: Fabricatrem a
• bspelled Sign:duns Grassi Nana Ihac l:nuil
Approved Fabricator: Signature: Printed Name: Date: Palwrinixesa
City of Aspen Building
' Ihpmnuod: Signature Muted Nana Ihmte Email
Inspected Fabricator: S' mom Printed Name: Date:
Ih0i
Grove Steel Works RogerJ / I act Mc a nrn+sn Ile' rn Nnh..unal n usqunuh4 t firms,mnt.yn
Br Grave / / /Zo 2z •et lannWn,9rtkrosmitnsino,oihk Map: it•m•smmt,,at.irxh4nrnslvn'"... nl'uhnc
••btaa+tM AprtmJ 1 Ntunv,r htyxcwJ I Aw.sl r mew.fs+t if all a,rk,.ry+4mwJ nib Jana m-\rtnmd I insane she 51wWII
(circle oceJ Panted Name: Date: In.A lhn Alw+na uataltre,ituaretlutpJrtxtf i4 a,rkl
CITY OF ASPEN
PITKIN COUNTY: U16\r2'PIEVV`LSSV RECEIVED
3 cvalmne'ekwfon IIRtUU
PtlCO°GIXp 06/08/2022
ASPEN
BUILDING DEPARTMENT