Page: 1 Please make these numbers
Page Index: 1
W Author: luisp match
File Name: 90. Zoning Plans_20220715.pdf
11 l
44/
(Wheeler: Numbers have been updated.
3 (2)
Page: 3
Page Index: 3 Demolition is calculated
Author: luisp according to the entire lot,
File Name: 90. Zoning Plans_20220715.pdf instead of just per unit. Please
recalculate
molition is calculated according to the
as of usl per unh.Please
reealnalate Wheeler: Entire existing structure has been drawn and calculations are now updated
based on the entire structure. Elevations are separated by each unit, but total wall
calculations are provided in the spreadsheet.
Page: 3
,FNp Page Index: 3 Multiple numbers on the table do
❑,axortxlmosWALL Author: luispAPEA REDUCED FOP not match the wall sections.
Amur utoBEREMOVRT°° File Name: 90. ZoningPlans_20220715.pdf
Please correct.
®�a�arw>amataEawEa p
Mulsple numbers on the table do not 9l s9 R
u match the wall sections.Please correct. yyy
Wheeler: All wall calculations have been ssq„.
verified. Spreadsheet updated accordingly. MqR
YryR
°"" „," Note, some walls have multiple numbers that >Q�
M,14R�
add to total the wall area, see example on right: „°,
rsegR aq St siR iiMi usiR Mph
10 (1) WALL'A" WALL'A"
Page: 10
Page Index: 10 Are one of these two the existing
Author: luisp or supposed to be existing? If
File Name: 90.Architecture Plans_20220715.pdf so, please indicate/change on
Are one or these two the existing the document.
or supposed to be existing?If so,
please indicate/change on the
document
`°" Wheeler: Elevation has been updated to show existing.
UPPER IEVEL,
RECEIVED
12/22/2022
ASPEN
BUILDING DEPARTMENT