Loading...
HomeMy WebLinkAboutFile Documents.1440 Crystal Lake Rd.0102-2022-BRES (6) Zoning Comments 1 - 1440 Crystal Lake Rd - 0102-2022-BRES i(i) Page: 1 Please make these numbers Page Index: 1 W Author: luisp match File Name: 90. Zoning Plans_20220715.pdf 11 l 44/ (Wheeler: Numbers have been updated. 3 (2) Page: 3 Page Index: 3 Demolition is calculated Author: luisp according to the entire lot, File Name: 90. Zoning Plans_20220715.pdf instead of just per unit. Please recalculate molition is calculated according to the as of usl per unh.Please reealnalate Wheeler: Entire existing structure has been drawn and calculations are now updated based on the entire structure. Elevations are separated by each unit, but total wall calculations are provided in the spreadsheet. Page: 3 ,FNp Page Index: 3 Multiple numbers on the table do ❑,axortxlmosWALL Author: luispAPEA REDUCED FOP not match the wall sections. Amur utoBEREMOVRT°° File Name: 90. ZoningPlans_20220715.pdf Please correct. ®�a�arw>amataEawEa p Mulsple numbers on the table do not 9l s9 R u match the wall sections.Please correct. yyy Wheeler: All wall calculations have been ssq„. verified. Spreadsheet updated accordingly. MqR YryR °"" „," Note, some walls have multiple numbers that >Q� M,14R� add to total the wall area, see example on right: „°, rsegR aq St siR iiMi usiR Mph 10 (1) WALL'A" WALL'A" Page: 10 Page Index: 10 Are one of these two the existing Author: luisp or supposed to be existing? If File Name: 90.Architecture Plans_20220715.pdf so, please indicate/change on Are one or these two the existing the document. or supposed to be existing?If so, please indicate/change on the document `°" Wheeler: Elevation has been updated to show existing. UPPER IEVEL, RECEIVED 12/22/2022 ASPEN BUILDING DEPARTMENT