HomeMy WebLinkAboutFile Documents.1440 Crystal Lake Rd.0102-2022-BRES (11) 0102-2022-BRES_1440 Crystal Lake_BuildingCommentl
90. Architecture Plans_20220715.pdf(4)
Subject: PlanCheck 4Provide a typical party wall
t na Page Label: 3
wall Mai or rwte Author:justinh detail, or note that the contractor
will not disturb more than
File Name: 90.Architecture Plans 20220715.pdf
"`"" """`"`°^° �' Q - 32.sq.ft. of the existing party wall
Color: •
uutltl construction with this alteration.
wwNo ennxo awrnmu I
^ Q 1. � _
J or xm"=1- .! :'
p i�___ IWheeler: No work to impact existing party wall. Wall to remain intact.
wirn Subject: PlanCheck Note max U value of.55 and 4"
Note max Uvaaluue of Page Label: 4 curb required (IRC 308.6.8)for
I PLAN NOi SHOWN 55 and 4 curb Author:
required(IRC 308.6.8) justinh
-for the new skylight. File Name: 90.Architecture Plans_20220715.pdf the new skylight.
Color: ■
UMILO BEYOND,FLOOR PLAN
ffF_NEosEY0000
/fy WORK BEYDND,490 CRC Wheeler: Note has been added to roof plan &skylight schedule
Subject: PlanCheck Provide documentation that this
Page Label: 6 achieves a class A assembly
Author:justinh rating. Per the Carlisle ES
-- .�e _ File Name: 90.Architecture Plans_20220715.pdf report I have(ESR-1463)it calls
- - Color: • out densdeck, strataguard, and
_. `�` .® securock as compliant barrier
boards, but I'm not finding any
a°—"°— --.-- \— ,�= L Wheeler: Roof was replaced under previous permit. Roof work no cureshield or
M ` °" longer art of this permit. Detail and notes have been removed. it material.
9 p
Subject: PlanCheck
Page Label: 7 4 Will the existing ceilings be
Author:justinh taken down throughout this unit
File Name: 90.Architecture Plans_20220715.pdf to facilitate lighting updates or
Color: • for other aspects of this
w^ °°®� " a.� °^°° remodel? The building gross fire
=""`.° area exceeds 5000 sq.ft., and
you've indicated that the unit is
not currently sprinklered.
Please clarify the expected
extent of ceiling disturbance. If
ceilings are opened up
throughout on all levels the
installation of fire sprinklers will
likely be required.
Wheeler: Ceiling removal will be minimal. Most recessed lights will be
replaced utilizing existing locations and wiring. See zoning drawing
Z1.03 for areas of ceiling to be removed. Demo extents doesn't
warrant addition of a sprinkler system.
RECEIVED
12/22/2022
ASPEN
BUILDING DEPARTMENT