Loading...
HomeMy WebLinkAboutFile Documents.555 E Durant Ave.0055-2023-BCHO (4) Installation Manual Installation and Appliance Setup CAUTION! Risk of Fire! DO NOT store instruction manuals inside fireplace cavity. High temperatures could cause a fire. INSTALLER: Leave this manual with the appliance, not inside the appliance. CONSUMER: Retain this manual for future reference. Do not store inside the appliance. NOTICE: DO NOT discard this manual! A WARNING: H EAT&G LO FIRE OR EXPLOSION HAZARD Failure to follow safety warnings exactly No one builds a better fire Models: could result in serious injury, death, or MEZZO36-C GAS-FIRED property damage. MEZZO36ST-C Pl. • DO NOT store or use gasoline or other flam- C Us mable vapors and liquids in the vicinity of this MEZZO48-C or any other appliance. MEZZO48ST-C LISTED • What to do if you smell gas MEZZO60-C - DO NOT try to light any appliance. MEZZO6OST-C 1 - DO NOT touch any electrical switch. DO NOT use any phone in your building. MEZZO72-C 410 - Leave the building immediately. MEZZO72ST-C (4 • - Immediately call your gas supplier from A. a neighbor's phone. Follow the gas sup- 410 plier's instructions. • - If you cannot reach your gas supplier, call the fire department. ` • Installation and service must be performed o � by a qualified installer, service agency, or the IVgas supplier. • ! DANGER ,. HOT GLASS WILL This appliance may be installed as an OEM CAUSE BURNS. installation in manufactured home (USA DO NOT TOUCH GLASS only) or mobile home and must be installed UNTIL COOLED. in accordance with the manufacturer's NEVER ALLOW CHILDREN instructions and the Manufactured Home TO TOUCH GLASS. Construction and Safety Standard, Title 24 A barrier designed to reduce the risk of CFR, Part 3280 in the United States, or the burns from the hot viewing glass is provided Standard for Installation in Mobile Homes, with this appliance and must be installed for CAN/CSA Z240 MH Series, in Canada. the protection of children and other at-risk This appliance is only for use with the type(s) individuals. of gas indicated on the rating plate. This Decorative barrier front must be ordered€eE4VEL�� appliance is not convertible for use with other time of appliance purchase. See Section gases, unless a certified kit is used. 06/12/2023 Heat&Glo • MEZZ036-C/ST-C,MEZZ048-C/ST-C, MEZZ060-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev.N ABREN 1 BUILDING DEPARTMENT A Safety Alert Key: • DANGER!Indicates a hazardous situation which, if not avoided will result in death or serious injury. • WARNING!Indicates a hazardous situation which, if not avoided could result in death or serious injury. • CAUTION!Indicates a hazardous situation which, if not avoided, could result in minor or moderate injury. • NOTICE: Used to address practices not related to personal injury. Note: The term "recommend"or "recommended"does not indicate a requirement. It is a best practice suggested by Hearth &Home Technologies®. Table of Contents Installation Standard Work Checklist 3 7 Venting A. Assemble Vent Sections (DVP Pipe Only) 51 1 Product Specific and Important Safety Information B. Assemble Slip Sections 52 A. Appliance Certification 4 C. Secure the Vent Sections 53 B. Glass Specifications 4 D. Disassemble Vent Sections 53 C. BTU Specifications 4 E. Vertical Termination Requirements 54 D. High Altitude Installations 4 F. Horizontal Termination Requirements 55 E. Non-Combustible Materials Specification 5 F. Combustible Materials Specification 5 8 Electrical Information G. Electrical Codes 5 A. General Information 57 H. California 5 B. Wiring Requirements 59 I. Requirements for the Commonwealth of Massachusetts. . 6 9 Gas Information 2 Getting Started A. Fuel Conversion 61 A. Design and Installation Considerations 7 B. Gas Pressure 61 B. Good Faith Wall Surface 8 C. Gas Service Access 61 C. Tools and Supplies Needed 10 D. Gas Connection 63 D. Inspect Appliance and Components 10 E. High Altitude Installations 63 F. Air Shutter Setting 64 3 Framing and Clearances A. Appliance/Decorative Barrier Front Dimension Diagrams 11 10 Finishing B. Appliance Location and Clearances to Combustibles . . . 18 A. Facing Material 65 (- 4 C. Constructing the Appliance Chase 30 B. Drywall Installation 66 D. Floor Protection 31 C. Decorative Barrier Fronts 69 4 E. Vinyl Flooring 31 D. Mantel and Wall Projections 74 4 Termination Location and Vent Information 11 Appliance Setup A. Approved Pipe 32 A. Fixed Glass Assembly Removal and Replacement 77 B. Vent Termination Minimum Clearances 32 B. Remove the Shipping Materials/Install Bottom Glass C. Vent Terminal Clearances 34 Shield 77 D. Use of Elbows 35 C. Clean the Appliance 78 E. Vent Diagrams 36 D. Install Glass Refractory Panels 78 E. Install Media 80 5 Vent Clearances and Vent Framing F. Install Log Set(Optional) 80 A. Vent Clearances to Combustibles 44 G. IntelliFire Touch®Control System Setup 80 B. Wall Penetration Framing/Firestops 45 H. Install Decorative Barrier Front 80 C. Ceiling Firestop/Floor Penetration Framing 46 D. Install Attic Insulation Shield 46 12 Reference Materials A. Vent Components Diagrams 81 6 Appliance Preparation B. Accessories 88 A. Top Standoff Preparation 47 B. Prepare For Heat Management 48 C. Securing and Leveling the Appliance 49 4 = Contains updated information. RECEIVED D. Installing Non-Combustible Facing Material 50 06/12/2023 2 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N •APEN BUILDING DEPARTMENT Installation Standard Work Checklist ATTENTION INSTALLER: Follow this Standard Work Checklist This standard work checklist is to be used by the installer in conjunction with, not instead of, the instructions contained in this installation manual. Customer: Date Installed: Lot/Address: Location of Fireplace: Installer: Model(circle one): MEZZO36-C MEZZO48-C MEZZO60-C MEZZO72-C Dealer/Distributor Phone# MEZZO36ST-C MEZZO48ST-C MEZZO6OST-C MEZZO72ST-C Serial#: AWARNING!Risk of Fire or Explosion!Failure to install appliance according to these instructions can lead to a fire or explosion. Install ONLY components and accessories approved by Hearth &Home Technolo- gies. Unapproved components and accessories could cause fireplace to overheat. Appliance Install Sections 3 and 6 YES IF NO,WHY? Verified that the chase is insulated and sealed. (Pg. 30) 0 Required factory included non-combustible board is installed. (Pg 50) Standoffs bent up into installation position and secured. (Pg. 47) Verified clearances to combustibles. (Pg. 18-29) ❑ Fireplace is leveled and secured. (Pg. 49) ❑ Header no wider than 3.5 in.(2x4) (Pg.20-23) ❑ Heat management system(s)and/or power vent properly installed. ❑ Venting/Chimney Sections 4,5 and 7 Venting configuration complies to vent diagrams. (Pg 36-43) ❑ Venting installed, locked,and secured in place with proper clearance. ❑ (May need to order separately.) Firestops installed. (Section 5) ❑ Attic insulation shield installed. (Pg 46) ❑ Exterior wall/Roof flashing installed and sealed. (Section 7) Terminations installed and sealed. (Section 7) Electrical Section 8 (Pg 57-60) Unswitched power(110-120 VAC)provided to the appliance. ❑ Switch wires properly installed. ❑ Gas Section 9 (Pg 61-64) Proper appliance for fuel type. Was a conversion performed? Leak check performed and inlet pressure verified. 1E1 Verified proper air shutter setting for installation type. Finishing Section 10 (Pg 65-76) Combustible materials not installed in non-combustible areas. LI Verified all clearances meet installation manual requirements. 0 Finishing done correctly using inside fit or overlap fit method. ❑ Bottom finishing template and finishing guards removed. ❑ Mantels and wall projections comply with installation manual requirements. ❑ Appliance Setup Section 11 (Pg 77-80) All packaging and protective materials removed(inside&outside of appliance). ❑ Refractories and media installed correctly. ❑ Glass assembly installed and secured. ❑ Accessories installed properly. ❑ Decorative barrier front properly installed. (May need to order separately.) ❑ Manual bag and all of its contents are removed from inside/under the appliance and given to party responsible for use and operation. ❑ Started appliance and verified no gas leaks exist. 0 Lights work in all switched positions (if so equipped). ❑ Component heat shield is installed. (Pg 58) ❑ Hearth & Home Technologies recommends the following: • Photographing the installation and copying this checklist for your file. • That this checklist remain visible at all times on the appliance until the installation is complete. Comments: Further description of the issues,who is responsible (Installer/Builder/Other Trades, etc)and ca'-"""'''' E action needed tly Comments Communicated to party responsible by on 4 = Contains updated information. (Builder/Gen. Contractor/) (Installer) (Dat66 J 12 2 02 3 2600-982 Rev.F 8/21/ Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N AS EN 3 BUILDING DEPARTMENT 1 Product Specific and Important Safety Information A. Appliance Certification C. BTU Specifications Models Maximum Minimum Orifice MODEL:MEZZO36-C MEZZO36ST-C Input BTU/h Input Size e r (U.S,or Canada) BTU/h (DMS) MEZZO48-C, MEZZO48ST-C, MEZZO36-C (0-2000 ft) 30,000 17,500 #36 MEZZO60-C, MEZZO6OST-C, (NG) MEZZO72-C, MEZZO72ST-C MEZZO36-C LABORATORY: Underwriters Laboratories, Inc. (UL) (Propane) (0-2000 ft) 29,000 15,500 #52 TYPE: Direct Vent Heater MEZZO36ST-C (0-2000 ft) 30,000 17,500 #36 STANDARD:CSA/ANSI Z21.88-2019•CSA 2.33-2019 - (NG) MEZZ036ST C (0-2000 ft) 29,000 15,500 #52 This product is listed to ANSI standards for "Vented (Propane) Gas Fireplace Heaters" and applicable sections of "Gas ME(NOj$C (0-2000ft) 40,000 21,000 .124 GBurning Heating Appliances for Manufactured Homes and Recreational Vehicles", and "Gas Fired Appliances MEzzo48-C (0-2000 ft) 36,000 19,500 #49 (Propane) for Use at High Altitudes". Also Certified for Installation in a Bedroom or a Bedsitting Room. MEZ(OG8)ST-C (0-2000 ft) 40,000 21,000 .124 MEZZ048ST-C (0-2000 ft) 36,000 19,500 #49 (Propane) NOTICE: This installation must conform with local codes. In the absence of local codes you must comply with the ME(NO)O-C (0-2000 ft) 50,000 26,000 #28 GNational Fuel Gas Code, ANSI Z223.1-latest edition in the U.S.A. and the CAN/CGA B149 Installation Codes in MEZZO60-C (0-2000 ft) 41,000 22,000 #48 Canada. (Propane) MEZZO6OST-C (0-2000 ft) 50,000 26,000 #28 (NG) MEZZO6OST-C (0-2000ft) 41,000 22,000 #48 NOT INTENDED FOR USE AS A PRIMARY HEAT SOURCE. (Propane) This appliance is tested and approved as either supplemen- tal room heat or as a decorative appliance. It should not be ME(NO)72-C (0-2000 ft) 58,000 30,000 #23 Gfactored as primary heat in residential heating calculations. MEZZ072-C (0-2000 ft) 46,000 24,000 #45 (Propane) MEZZO72ST-C (0-2000 ft) 58,000 30,000 #23 B. Glass Specifications (NG) This appliance is equipped with 5 mm ceramic glass. Re- MEZZO72ST-c (0-2000 ft) 46,000 24,000 #45 place glass only with 5 mm ceramic glass. Please contact (Propane) your dealer for replacement glass. D. High Altitude Installations NOTICE:If the heating value of the gas has been reduced, these rules do not apply. Check with your local gas utility or authorities having jurisdiction. When installing above 2000 feet elevation: • In the USA: Reduce input rate 4% for each 1000 feet above 2000 feet. • In CANADA: Input ratings are certified without a reduction of input rate for elevations up to 4500 feet (1370 m) above sea level. Please consult provincial and/or local authorities having jurisdic ���� installations at elevations above 4500 .�'1 Check with your local gas utility to det6rifi523 orifice size. 4 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N •AMEN BUILDING DEPARTMENT E. Non-Combustible Materials Specification Material which will not ignite and burn. Such materials are those consisting entirely of steel, iron, brick,tile, concrete, slate, glass or plasters, or any combination thereof. Materials that are reported as passing ASTM E 136, Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750 °C shall be considered non-combustible materials. F. Combustible Materials Specification Materials made of or surfaced with wood, compressed pa- per, plant fibers, plastics, or other material that can ignite and burn, whether flame proofed or not, or plastered or unplastered shall be considered combustible materials. G. Electrical Codes NOTICE: This appliance must be electrically wired and grounded in accordance with local codes or, in the absence of local codes, with National Electric Code ANSI/NFPA 70-latest edition or the Canadian Electric Code CSA C22.1. • A 110-120 VAC circuit for this product must be pro- tected with ground-fault circuit interrupter protection, in compliance with the applicable electrical codes, when it is installed in locations such as in bathrooms or near sinks. H. California AWARNING: This product and the fuels used to operate this product (liquid propane or natural gas), and the products of combustion of such fuels, can expose you to chemicals including benzene, which is known to the State of California to cause cancer and reproductive harm. For more information go to: www. P65Warnings.ca.gov. RECEIVED 06/12/2023 Heat&Glo • MEZZO36-C/ST-C,MEZZ048-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N ABIEN 5 3UILDING DEPARTMENT Inspection Note: The following requirements reference various Massachusetts and national codes not contained in this The state or local gas inspector of the side wall horizon- document. tally vented gas fueled equipment shall not approve the installation unless, upon inspection, the inspector ob- serves carbon monoxide detectors and signage installed I. Requirements for the Commonwealth of in accordance with the provisions of 248 CMR 5.08(2)(a)1 Massachusetts through 4. For all side wall horizontally vented gas fueled equipment Exemptions installed in every dwelling, building or structure used in whole or in part for residential purposes, including those The following equipment is exempt from 248 CMR 5.08(2) owned or operated by the Commonwealth and where the (a)1 through 4: side wall exhaust vent termination is less than seven (7) • The equipment listed in Chapter 10 entitled "Equipment feet above finished grade in the area of the venting, in- Not Required To Be Vented" in the most current edition cluding but not limited to decks and porches,the following of NFPA 54 as adopted by the Board; and requirements shall be satisfied: • Product Approved side wall horizontally vented gas fu- Installation of Carbon Monoxide Detectors eled equipment installed in a room or structure separate At the time of installation of the side wall horizontal vented from the dwelling, building or structure used in whole or gas fueled equipment, the installing plumber or gas fitter in part for residential purposes. shall observe that a hard wired carbon monoxide detector with an alarm and battery back-up is installed on the floor MANUFACTURER REQUIREMENTS level where the gas equipment is to be installed. In addi- Gas Equipment Venting System Provided tion, the installing plumber or gas fitter shall observe that a battery operated or hard wired carbon monoxide detec- When the manufacturer of Product Approved side wall tor with an alarm is installed on each additional level of horizontally vented gas equipment provides a venting the dwelling, building or structure served by the side wall system design or venting system components with the horizontal vented gas fueled equipment. It shall be the equipment, the instructions provided by the manufacturer responsibility of the property owner to secure the services for installation of the equipment and the venting system of qualified licensed professionals for the installation of shall include: hard wired carbon monoxide detectors. • Detailed instructions for the installation of the venting In the event that the side wall horizontally vented gas fu- system design or the venting system components; and eled equipment is installed in a crawl space or an attic, • A complete parts list for the venting system design or the hard wired carbon monoxide detector with alarm and venting system. battery back-up may be installed on the next adjacent floor level. Gas Equipment Venting System NOT Provided In the event that the requirements of this subdivision can When the manufacturer of a Product Approved side wall not be met at the time of completion of installation, the owner shall have a period of thirty (30) days to comply horizontally vented gas fueled equipment does not pro- with the above requirements; provided, however,that dur- vide the parts for venting the flue gases, but identifies ing said thirty (30) day period, a battery operated carbon "special venting systems", the following requirements monoxide detector with an alarm shall be installed. shall be satisfied by the manufacturer: Approved Carbon Monoxide Detectors • The referenced "special venting system" instructions shall be included with the appliance or equipment in- Each carbon monoxide detector as required in accor- stallation instructions; and dance with the above provisions shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certified. • The "special venting systems" shall be Product Ap- proved by the Board, and the instructions for that sys- Signage tem shall include a parts list and detailed installation A metal or plastic identification plate shall be permanent- instructions. ly mounted to the exterior of the building at a minimum height of eight(8)feet above grade directly in line with the A copy of all installation instructions for all Product Ap- exhaust vent terminal for the horizontally vented gas fu- proved side wall horizontally vented gas fueled equip- eled heating appliance or equipment. The sign shall read, ment, all venting instructions, all parts lists for venting in print size no less than one-half (1/2) in. in size, "GAS instructions, and/or all venting design instructions shall VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OB- remain with the appliance or equipment at the completion STRUCTIONS". of the installation. ,,/I See Gas Connection section for addi € Ff AD wealth of Massachusetts requirements. 06/12/2023 6 Heat&Glo • MEZZ036-C/ST-C, MEZZ048-C/ST-C, MEZZO60-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev. N •AMEN BUILDING DEPARTMENT 2 Getting Started A. Design and Installation Considerations WARNING!Risk of Fire or Explosion!Read all instruc- tions before starting the installation. Heat & Glo direct vent gas appliances are designed to operate with all combustion air siphoned from outside of the building and all exhaust gases expelled to the outside. No additional outside air source is required. Installation MUST comply with local, regional, state and national codes and regulations. Consult insurance carrier, local building inspector, fire officials or authorities having jurisdiction over restrictions, installation inspection and permits. Before installing, determine the following: • Where the appliance is to be installed. • The vent system configuration to be used. If Passive Heat will be installed, consider location of discharge opening in relation to venting and other construction materials. • Gas supply piping requirements. • Provisions for optional heat management system(s). • Electrical wiring requirements. • Framing and finishing details. • Whether optional accessories—devices such as a fan, wall switch, or remote control—are desired. Installation and service of this appliance should be performed by qualified personnel.Hearth&Home Technologies recommends HHT Factory Trained or NFI certified professionals. hearthED NPI F NATONAL REIPLACE FACTORY TRAINING INSTITUTE' Improper installation, adjustment, alteration, service or maintenance can cause injury or property damage. For assistance or additional information, consult a qualified service technician, service agency or your dealer. RECEIVED 06/12/2023 Heat&Glo • MEZZO36-C/ST-C,MEZZ048-C/ST-C, MEZZ060-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev. N AS2EN 7 BUILDING DEPARTMENT B. Good Faith Wall Surface The MEZZO-C models may be installed with or without OPTIONAL PASSIVE HEAT KIT INSTALLED optional heat management systems, including the Pas- FIREPLACE sive Heat kit. The installation of a heat management sys- OPENING tern will affect certain aspects of the appliance installation - including framing dimensions and clearances to combus- tibles. Note that Figure 2.3 in this section refers to the tr7'11 wall surface temperatures when the Passive Heat kit is 95 F installed. 95°F 95°F FIREPLACE OPENING I 1 95°F 48 in. 125°F ` — -i • 105°F 42 in. 36 in. 125°F 115°F J 1 30 in. 130°F F 2 140°F T 42 in. • A• 14 18 in. L 1 I 1 I 145°F I 36 in. _ 7iik12 in. 30 in. 6 in. 155°F 24 in. • € 18 in. MEASUREMENTS FROM 170°F TOP EDGE OF THE OPENING • 12I in. • ° APPLIANCE FRONT �n ' • `Y `I� v v FACTORY-SUPPLIED NON-COMBUSTIBLE L ° BOARD SHOWN INSTALLED. ° MEASUREMENTS FROM • TOP EDGE OF THE FIREPLA( Figure 2.3 Good Faith Wall Surface Temperatures Above Appliance OPENING with Passive Heat Kit Installed APPLIANCE FRONT FACTORY-SUPPLIED NON-COMBUSTIBLE ° BOARD SHOWN INSTALLED.• NOTICE:Surface temperatures listed above are taken with a temperature measuring probe as prescribed by the test Figure 2.1 Good Faith Wall Surface Temperatures Above Appliance standard used for appliance certification. Temperatures (MEZZ036-C/MEZZ036ST-C/MEZZO48-C/MEZZO48ST-C) on walls or mantels taken with an infrared thermometer may yield increased temperatures of up to 30°F(17°C)or more depending on the thermometer settings and material FIREPLACE OPENING characteristics being measured. Use appropriate finishing _ materials that are able to withstand these conditions. For additional finishing guidelines, see Section 10. I 12 Il 5"F 125'F 135.F L - _I 140°F T 1 42 in. 155•F 3610 If installing a television (TV) above the appliance, see 30 in. �190•F 241n. Figure 2.4. For installations with the Passive Heat kit, refer to Section 10, Figure 10.19. 2, IF f 18' [1 I• i n. H _ 4 r r r 'Of - • MEASUREMENTS FROM TOP EDGE OF THE OPENING • ( APPLIANCE FRONT C FACTORY-SUPPLIED NON-COMBUSTI BOARD SHOWN INSTALLED• o RECEIVED Figure 2.2 Good Faith Wall Surface Temperatures Above Appliance (M EZZO60-C/M EZZO6OST-C/M EZZ072-C/M EZZO72ST-C) 06/12/2023 8 Heat&Glo • MEZZ036-C/ST-C, MEZZ048-C/ST-C, MEZZ060-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev.N •APEN BUILDING DEPARTMENT Good Faith Guidelines for TV Installations Above Appliance TV on the wall TV recessed into the wall TV Item Minimum Dimensions A 2.5 inches TV Wall B 2 inches minimum to 3 inches maximum Bracket COMBUSTIBLE:23 inches:MEZZO36/ST-C&48/ST-C C COMBUSTIBLE:27 inches: MEZZO60/ST-C&72/ST-C NON-COMBUSTIBLE 18 inches: ALL SIZES D Wall Brkt+TV Thickness+2.5 inches COMBUSTIBLE:46 inches MEZZ036/48/60-C&ST-C E 58 inches MEZZO72-C&ST-C A 1 1 B tB Mantel tT t I1 ♦ D C A E 1 1 Appliance Appliance Notes: 1.These are good faith recommended clearances only and not a guarantee of compliance with all TV manufacturers'maximim allowable operating temperatures. 2. Since every home has unique air flow characteristics and maximum allowable operating temperatures can vary from manufacturer to manufacturer and from model to model,actual TV temperatures should be validated at the time of each installation. TVs should not be used in situations where the actual TV temperature exceeds the manufacturers' maximum allowable operating temperatures identified in the TV's technical specifications. Contact the TV's manufacturer directly if you cannot locate this information or have questions regarding the information. 3. Mantel height and depth must conform to mantel requirements specified in the fireplace installation manual. 4. "C"and"E"dimensions taken from the top of the hood or fireplace opening. 5. Suggestions on how to further reduce TV temperatures: a. Increase"A"dimension. b. Increase"C"and"E"dimension, however, increasing"B"dimension beyond maximum recommended typically results in higher temperatures. REC EI VIE Figure 2.4 Good Faith TV Guidelines 06/12/2023 Heat&Glo • MEZZO36-C/ST-C,MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N ASH g 3UILDING DEPARTMENT C. Tools and Supplies Needed D. Inspect Appliance and Components Before beginning the installation be sure that the following WARNING! Risk of Fire or Explosion! Damaged parts tools and building supplies are available. could impair safe operation. DO NOT install damaged, in- Hand Tools Tape measure complete or substitute components. Keep appliance dry. Level Framing material WARNING!Risk of Fire, Explosion or Electric Shock! Manometer Framing square DO NOT use this appliance if any part has been under Voltmeter Electric drill and bits (1/4 in.) water. Call a qualified service technician to inspect the Plumb line Safety glasses/Gloves appliance and to replace any part of the control system and/or gas control which has been under water. Wrenches Reciprocating saw 1/4 in. nut driver • Carefully remove the appliance and components from the packaging. Non-corrosive leak check solution • The vent system components and decorative barrier 1/2 - 3/4 in. length, #6 or#8 Self-drilling screws fronts may be shipped in separate packages. Caulking material (300°F minimum continuous exposure rating) • If packaged separately, the media, refractory, and/or optional log kits must be installed. • Report to your dealer any parts damaged in shipment, particularly the condition of the glass. • This product is factory-equipped with an IntelliFire Touch® remote control,which was paired to the appliance at the factory. This specific remote control needs to remain with the contents of the manual bag. Do not install batteries in the remote control until performing the final appliance setup and checklist. Hearth&Home Technologies disclaims any responsibility for, and the warranty will be voided by, the following actions: • Installation and use of any damaged appliance or vent system component. • Modification of the appliance or vent system. • Installation other than as instructed by Hearth & Home Technologies. • Improper positioning of the logs/media (as applicable)or the glass assembly. • Installation and/or use of any component part not approved by Hearth&Home Technologies. RECEIVED 06/12/2023 10 Heat&Glo • MEZZO36-C/ST-C, MEZZ048-C/ST-C, MEZZO60-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev.N •APEN BUILDING DEPARTMENT 3 Framing and Clearances A. Appliance/Decorative Barrier Front Dimension Diagrams Dimensions are actual appliance dimensions. Use for reference only. For framing dimensions and clearances refer to Section 5. HEAT MANAGEMENT SYSTEMS KNOCKOUTS IMPORTANT:Must use appropriate knockout(s)for the selected Heat Management System. See Section 6. J Tlc •i ;^I � � I � O O /� H L T CENTERED ON APPLIANCE A / I __ IA 1 A n V iriE u Q E • t T 110 —t— ilm =7 . . t i_ .i. 1 .1. S R 1 1 GAS ACCESS ELECTRICAL ACCESS MEZZO36-C MEZZO48-C MEZZ036-C MEZZO48-C Location Location Inches Millimeters Inches Millimeters Inches Millimeters Inches Millimeters A 49-1/2 1257 61-1/2 1562 L 8 203 8 203 B 39-1/4 997 51-1/8 1299 M 18-5/8 473 18-5/8 473 C 15-5/8 397 15-5/8 397 N 41-3/4 1061 41-3/4 1061 D 42-1/2 1080 42-1/2 1080 0 2-3/8 60 2-3/8 60 E 4 102 4 102 P 8-9/16 218 8-9/16 218 F 8-9/16 218 8-9/16 218 Q 24-1/2 622 24-1/2 622 G 63 1600 63 1600 R 7-1/4 184 7-1/4 184 H 8-9/16 218 8-9/16 218 S 8-7/8 225 8-7/8 225 I 1 25 1 25 T 2-3/4 70 2-3/4 70 J 46-3/16 1173 58 1473 U 23-3/4 603 23-3/4 603 K 17-1/8 435 17-1/8 435 V 36-5/8 930 36-5/8 930 RECEIVED Figure 3.1 Appliance Dimensions-MEZZO36-C,MEZZO48-C 0 6/12/2 0 2 3 Heat&Glo • MEZZO36-C/ST-C,MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N AMEN11 3UILDING DEPARTMENT HEAT MANAGEMENT SYSTEMS KNOCKOUTS IMPORTANT:Must use appropriate knockout(s)for the selected Heat Management System. See S ction 6. I J > T —f M K O O ��I y 0L T CENTERED ON APPLIANCE III.s.,,,. ` AEi ' 1 o o G D • • N C lJ Q . . E i _ 1R ° _ _ • • • v v °( )1.). v i7 . .. v T °q° P I� \ F k— ELECTRICAL ACCESS GAS ACCESS MEZZO60-C MEZZO72-C MEZZO60-C MEZZO72-C Location Location Inches Millimeters Inches Millimeters Inches Millimeters Inches Millimeters A 74 1880 86 2184 L 8 203 8 203 B 63-1/8 1603 75-1/8 1908 M 18-5/8 473 18-5/8 473 C 15-5/8 397 15-5/8 397 N 47-3/4 1213 47-3/4 1213 D 48-1/2 1232 48-1/2 1232 0 2-3/8 60 2-3/8 60 E 4 102 4 102 P 8-9/16 218 8-9/16 218 F 8-9/16 218 8-9/16 218 Q 24-1/2 622 24-1/2 622 G 63 1600 75 1905 R 7-1/4 184 N/A N/A H 8-9/16 218 8-9/16 218 S 8-7/8 225 8-7/8 225 I 1 25 1 25 T 2-3/4 70 2-3/4 70 J 70 1778 82 2083 U 23-3/4 603 23-3/4 603 K 17-1/8 435 17-1/8 435 V 36-1/2 927 36-1/2 _ 927 i FrVj • Figure 3.2 Appliance Dimensions-MEZZO60-C,MEZZO72-C 0 6/12/2 0 2 3 12 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N •ASK_N BUILDING DEPARTMENT HEAT MANAGEMENT SYSTEMS KNOCKOUTS IMPORTANT:Must use appropriate knockout(s)for the selected Heat Management System. See Section 6. J '� T -1-7 • . --: -t- M KH.- • O (� • • I,.\• . \ ,„., H vk .if ik-, CENTERED ON APPLIANCE I A r B 1 A V N T C . U Q E . . 1\v t 7 . ? . • . . r GAS ACCESS ELECTRICAL ACCESS MEZZO36ST-C MEZZO48ST-C MEZZO36ST-C MEZZO48ST-C Location Location Inches Millimeters Inches Millimeters Inches Millimeters Inches Millimeters A 50 1270 62 1575 L 8 203 8 203 B 39-1/4 997 51-1/8 1299 M 18-1/8 460 18-1/8 460 C 15-5/8 397 15-5/8 397 N 41-3/4 1061 41-3/4 1061 D 42-1/2 1080 42-1/2 1080 0 2-3/8 60 2-3/8 60 E 4 102 4 102 P 8-9/16 218 8-9/16 218 F 8-9/16 218 8-9/16 218 Q 24-1/2 622 24-1/2 622 G 63 1600 63 1600 R 7-1/4 184 7-1/4 184 H 8-9/16 218 8-9/16 218 S 8-7/8 225 8-7/8 225 I 1/2 13 1/2 13 T 2-3/4 70 2-3/4 70 J 46-3/16 1173 58 1473 U 23-3/4 603 23-3/4 603 K 17-1/8 435 17-1/8 435 V 36-1/2 927 36-1/2 927 REc.4.1E 't, . Figure 3.3 Appliance Dimensions-MEZZO36ST-C,MEZZO48ST-C 0 6/12/2 0 2 3 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C, MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N ,62EN13 UILDING DEPARTMENT HEAT MANAGEMENT SYSTEMS KNOCKOUTS IMPORTANT:Must use appropriate knockout(s)for the selected Heat Management System. See Section 6. < J > M K IfCOI V W 1s 1 H CENTERED ON APPLIANCE al GAS ACCESS B > A II A e • a D I il=7=7= G V Q II I T4 . � O ni � � � �.� .� o � 9 . •• • p 4. S R I� i YI . . • o�-•Y. . 'I �. . . ° . 1�!. tHPI`-+ `I — F1-e— GAS A CESS ELECTRICAL ACCESS MEZZO6OST-C MEZZO72ST-C MEZZO6OST-C MEZZO72ST-C Location Location Inches Millimeters Inches Millimeters Inches Millimeters Inches Millimeters A 74 1880 86 2184 L 8 203 8 203 B 63-1/8 1603 75-1/8 1908 M 18-1/4 464 18-1/4 464 C 15-5/8 397 15-5/8 397 N 47-3/4 1213 47-3/4 1213 D 48-1/2 1232 48-1/2 1232 O 2-3/8 60 2-3/8 60 E 4 102 4 102 P 8-9/16 218 8-9/16 218 F 8-9/16 218 8-9/16 218 Q 24-1/2 622 24-1/2 622 G 63 1600 75 1905 R 7-1/4 184 N/A N/A H 8-9/16 218 8-9/16 218 S 8-7/8 225 8-7/8 225 I 1/2 13 1/2 13 T 2-3/4 70 2-3/4 70 J 70 1778 82 2083 U 23-3/4 603 23-3/4 603 K 17-1/4 438 17-1/4 438 V 36-1/2 927 36-1/2 927 RECEIVED Figure 3.4 Appliance Dimensions-MEZZO6OST-C,MEZZO72ST-C 0 6/12/2 0 2 3 14 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N •ASREN BUILDING DEPARTMENT LOFT FORGE Decorative Barrier Front IMPORTANT! This fireplace requires an installed decorative barrier front to prevent direct contact with the hot viewing glass. DO NOT operate the fireplace with the barrier removed. Decorative barrier front must be ordered at time of fireplace purchase. If decorative barrier front is not present, contact dealer. Note: See Section 10 for hearth, mantel and finishing requirements. o o . 0 0 Barrier Mesh: Integral to E F A Decorative Barrier Front 0 0 vlf L 0 0 • I k c B 4 D MEZZO36-C MEZZO48-C MEZZO60-C Location MEZZO36ST-C MEZZO48ST-C MEZZO6OST-C Inches Millimeters Inches Millimeters Inches Millimeters A 26-1/4 667 26-1/4 667 26-1/4 667 B 7-1/8 181 7-1/8 181 7-1/8 181 C 36-3/4 933 48-3/4 1238 60-3/4 1543 D 42-3/4 1086 54-3/4 1391 66-3/4 1695 E 13 330 13 330 13 330 F 19 483 19 483 19 483 The Loft Forge decorative barrier front has an installed depth of 3/4 in. (19 mm), measured from the front of the non-combustible finishing material to the front of the ������ decorative barrier front. Figure 3.5 Loft Forge(Overlap Fit)Decorative Barrier Front Dimensions 0 6/12/2 0 2 3 Heat&Glo • MEZZ036-C/ST-C,MEZZ048-C/ST-C, MEZZ060-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev.N AfiliEN15 3UILDING DEPARTMENT QUATTRO DECORATIVE BARRIER FRONT IMPORTANT! This fireplace requires an installed decorative barrier front to prevent direct contact with the hot viewing glass. DO NOT operate the fireplace with the barrier removed. Decorative barrier front must be ordered at time of fireplace purchase. If decorative barrier front is not present, contact dealer. Note: See Section 10 for hearth, mantel and finishing requirements. • • • t : ,-,-,- ( t 1 A Barrier Mesh: Integral to E F Decorative Barrier Front ri- i r. . i, 1/ . • • 14 -< G > < C > B < D > MEZZO36-C MEZZO48-C MEZZO60-C Location MEZZO36ST-C MEZZO48ST-C MEZZO6OST-C Inches Millimeters Inches Millimeters Inches Millimeters A 27-1/4 692 27-1/4 692 27-1/4 692 B 5-7/8 149 5-7/8 149 5-7/8 149 C 36-7/16 926 48-9/16 1234 60-9/16 1538 D 45-5/8 1159 57-1/8 1451 69-1/8 1756 E 12-1/2 318 12-1/2 318 12-1/2 318 F 21-3/8 543 21-3/8 543 21-3/8 543 G 29-1/8 740 40-1/2 1029 52-1/2 1334 The Quattro decorative barrier front has an installed depth of 2-1/8 in. (54 mm), measured from the front of the non-combustible finishing material to the front of the decoratiftECEIVE barrier front. Figure 3.6 Quattro(Overlap Fit)Decorative Barrier Front Dimensions 0 6/12/2 0 2 3 16 Heat&Glo • MEZZ036-C/ST-C, MEZZ048-C/ST-C, MEZZO60-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev. N •ASEN BUILDING DEPARTMENT CLEAN FACE TRIM DECORATIVE BARRIER FRONT IMPORTANT! This fireplace requires an installed decorative barrier front to prevent direct contact with the hot viewing glass. DO NOT operate the fireplace with the barrier removed. Decorative barrier front must be ordered at time of fireplace purchase. If decorative barrier front is not present, contact dealer. Note: See Section 10 for hearth, mantel and finishing requirements. < A > G 1 . . • A ^o^er r, .r .r, A I A * : ••• Barrier Mesh: Integral to H Decorative Barrier Front B L .Iiiiiiti . iiiiii. J , . . [ r . D > i` E MEZZO36-C MEZZO48-C MEZZO60-C MEZZO72-C Location MEZZO36ST-C MEZZO48ST-C MEZZO6OST-C MEZZO72ST-C Inches Millimeters Inches Millimeters Inches Millimeters Inches Millimeters A 39 991 51 1295 63 1600 75 1905 B 16-3/4 425 16-3/4 425 16-3/4 425 16-3/4 425 C 13-1/8 333 13-1/8 333 13-1/8 333 13-1/8 333 D 37-3/16 945 49-3/16 1249 61-3/16 1554 73-3/16 1859 E 40-5/16 1024 52-5/16 1329 64-5/16 1634 76-5/16 1938 F 24 610 24 610 24 610 24 610 G 5/8 16 5/8 16 5/8 16 5/8 16 H 25 635 25 635 25 635 25 635 RECEIVED Figure 3.7 Clean Face Trim Front(Inside Fit)Decorative Barrier Front Dimensions 0 6/12/2 C 2 3 Heat&Glo • MEZZO36-C/ST-C,MEZZ048-C/ST-C, MEZZ060-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev. N ASS2ENi7 3UILDING DEPARTMENT B. Appliance Location and Clearances to NOTICE: Illustrations reflect typical installations and are Combustibles FOR DESIGN PURPOSES ONLY. Illustrations/diagrams are not drawn to scale.Actual installation may vary due to When selecting a location for the appliance it is important individual design preference. to consider the required clearances to walls and allow suf- ficient clearance for heat management systems venting. See Figure 3.8 and Figure 3.9. WARNING! Risk of Fire or Burns! Provide adequate clearance around air openings and for service access. Due to high temperatures, the appliance should be located out of traffic and away from furniture and draperies. n ( E G la Y 00 ,, 001 A 1 B '1 0 -0 G->- A 0 B 0 C 4- D \ Refer to Section 10 for hearth, mantel and wall projection information. If a Heat Management System will be installed,refer to Section 6.B for information. H ( IA 0 A 18 in.(457 mm)required when Passive Heat Side Discharge Kit is installed. Refer to the Passive 14 BSI Heat kit instructions for more information. . 00 '.\ 00 . F v Model A B C D E F G H Inches 62-1/2 48-1/4 88-1/8 24-1/2 18-3/4 1 50 M EZZO36-C Millimeters 1588 1226 2238 622 476 25 1270 Inches 70-3/4 60-1/4 100-3/8 See 28-1/2 18-3/4 1 62 M EZZO48-C Millimeters 1797 1530 2550 Section 724 476 25 1575 Inches 79-1/2 72-1/4 112-3/8 10, Figure 31-3/4 18-3/4 1 74 MEZZO60-C — 10.17 and Millimeters 2019 1835 2854 10.18. 807 476 25 1880 Inches 88 84-1/4 124-3/8 35-1/4 18-3/4 1 86 _ IvED MEZZO72-C u Millimeters 2235 2140 3159 895 476 25 2184 _r Figure 3.8 Appliance Locations: MEZZO Single-Sided Models 0 6/12/2 0 2 3 18 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N •ASREN BUILDING DEPARTMENT NOTICE: This See-Through appliance is NOT designed or approved for an indoor/outdoor application. A T C FE —) FE 0 0 .©'. ° MODEL A B C D E Inches 48-1/4 17-1/8 48 1/2 1 M EZZO36ST-C Millimeters 1226 435 1219 13 25 Inches 60-1/4 17-1/8 48 1/2 1 M EZZO48ST-C Millimeters 1530 435 1219 13 25 Inches 72-1/4 17-1/8 48 1/2 1 MEZZO6OST-C Millimeters 1835 435 1219 13 25 Inches 84-1/4 17-1/8 48 1/2 1 M EZZO72ST-C Millimeters 2140 435 1219 13 25 Figure 3.9 Appliance Locations: MEZZO See-Through Models RECEIVED 06/12/2023 Heat&Glo • MEZZO36-C/ST-C,MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N +A•BI ENig BUILDING DEPARTMENT _j A -c_ c'4;NG C 1I, F . E I►� A K _L, . . :,• . , '-c- NOTE: Header MUST be installed ° D on end as shown in diagram. j APPLIANCE MAY BE INSTALLED \ OFF OF FLOOR**" NOTE: E&K dimensions will change if Passive Heat option is installed. Reference the instructions included with the Passive Heat Kit for dimensions. MINIMUM FRAMING DIMENSIONS* A B C D E F G**** MEZZO36-C Rough Rough Rough Rough Opening Opening Opening Opening Clearance Combustible Combustible (Vent Pipe) (Height) (Depth) (Width) to Ceiling Floor Flooring Inches 10 42 18-1/4 48-1/4 31 0 0 Millimeters 254 1067 464 1226 787 0 0 MINIMUM FRAMING DIMENSIONS* H I J K MEZZO36-C Behind Sides of Front of Appliance Appliance Appliance Clearance to Ceiling Inches 1 1 48 55-1/2 Millimeters 25 25 1219 1410 MINIMUM FRAMING DIMENSIONS* A B C D E F G**** MEZZO48-C Rough Rough Rough Rough Opening Opening Opening Opening Clearance Combustible Combustible (Vent Pipe) (Height) (Depth) (Width) to Ceiling Floor Flooring Inches 10 42 18-1/4 60-1/4 31 0 0 Millimeters 254 1067 464 1530 787 0 0 MINIMUM FRAMING DIMENSIONS* H I J K MEZZO48-C Behind Sides of Front of Appliance Appliance Appliance Clearance to Ceiling Inches 1 1 48 55-1/2 Millimeters 25 25 1219 1410 * =Adjust framing dimensions for interior sheathing (such as sheetrock) **= Header depth not to exceed 3-1/2 inches. RECEIVED ***= If appliance is installed off of floor, maintain required clearances to combustibles. Construct platform in accordance with local building codes ****= For installations with vinyl flooring, see Section 3.E. 4 Figure 3.10 Clearances to Combustibles-MEZZO36-C,MEZZO48-C, 0 6/12/2 02 3 20 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N •ASEN BUILDING DEPARTMENT _ 4 A III►; �j � • IIII ���<.NO III III II • III F •/ E _I�` „,,,,, . K • • utfi...1k-.....,.� �� �j ,� NOTE: Header MUST be installed .0 � i I1 It .1-` on end as shown in diagram. 14)' APPLIANCE MAY BE INSTALLED OFF OF FLOOR*** NOTE: E&K dimensions will change if Passive Heat option is installed. Reference the instructions included with the Passive Heat Kit for dimensions. MINIMUM FRAMING DIMENSIONS* A B C D E F G**** MEZZO60-C Rough Rough Rough Rough Opening Opening Opening Opening Clearance Combustible Combustible (Vent Pipe) (Height) (Depth) (Width) to Ceiling Floor Flooring Inches 10 48 18-1/4 72-1/4 31 0 0 Millimeters 254 1219 464 1835 787 0 0 MINIMUM FRAMING DIMENSIONS* H I J K MEZZO60-C Behind Sides of Front of Clearance Appliance Appliance Appliance to Ceiling Inches 1 1 48 55-1/2 Millimeters 25 25 1219 1410 MINIMUM FRAMING DIMENSIONS* A B C D E F G**** MEZZO72-C Rough Rough Rough Rough Opening Opening Opening Opening Clearance Combustible Combustible (Vent Pipe) (Height) (Depth) (Width) to Ceiling Floor Flooring Inches 10 48 18-1/4 84-1/4 31 0 0 Millimeters 254 1219 464 2140 787 0 0 MINIMUM FRAMING DIMENSIONS* H I J K MEZZO72-C Behind Sides of Front of Clearance to Appliance Appliance Appliance Ceiling Inches 1 1 48 55-1/2 Millimeters 25 25 1219 1410 * =Adjust framing dimensions for interior sheathing (such as sheetrock) **= Header depth not to exceed 3-1/2 inches. ***= If appliance is installed off of floor, maintain required clearances to combustibles. RECEIVE Construct platform in accordance with local building codes RECEIVED ****= For installations with vinyl flooring, see Section 3.E. 4 Figure 3.11 Clearances to Combustibles-MEZZO60-C,MEZZO72-C 0 6/12/2 0 2 3 Heat&Glo • MEZZ036-C/ST-C,MEZZ048-C/ST-C, MEZZ060-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev.N ASSFIEN21 3UILDING DEPARTMENT E=MEASUREMENT FROM TOP I \tea A rlIllk00000i0000004HTORJ=MEASUREMENT FROM <7> • BOTTOM OF FIREPLACE TO CEILING 10 HEADER DEPTH** HEADER DEPTH** F E oT �/ 4 \ .. , ! I I , ,A ....."......„....._'\,,,,, . H . 1 y j /LB NOTE: Header MUST be installed 4°� on end as shown in diagram. I 44) ® D <9°1% •4 APPLIANCE MAY BE INSTALLED OFF OF FLOOR*** NOTE: E&J dimensions will change if Passive Heat option is installed. Reference the instructions included with the Passive Heat Kit for dimensions. MINIMUM FRAMING DIMENSIONS* A B C D E F G**** Rough Rough Rough Rough Combus Clearance Combustible Opening t Pipe) (Heiglng ht) Opening Opening (Depth) (Width) l e to Ceiling Flooring Floor in. 10 42 17 48-1/4 31 0 0 M EZZO36ST-C mm 254 1067 432 1226 787 0 0 in. 10 42 17 60-1/4 31 0 0 M EZZO48ST-C mm 254 1067 432 1530 787 0 0 MINIMUM FRAMING DIMENSIONS* H I J Sides of Front or Rear of Clearance Appliance Appliance to Ceiling in. 1 48 55-1/2 M EZZO36ST-C mm 25 1219 1410 in. 1 48 55-1/2 M EZZO48ST-C mm 25 1219 1410 * =Adjust framing dimensions for interior sheathing (such as sheetrock) **= Header depth not to exceed 3-1/2 inches. ***= If appliance is installed off of floor, maintain required clearances to combustibles. RECEIVED Construct platform in accordance with local building codes. RECEIVED ****= For installations with vinyl flooring, see Section 3.E. 4 Figure 3.12 Clearances to Combustibles-MEZZO36ST-C,MEZZO48ST-C 0 6/12/2 0 2 3 22 Heat&Glo • MEZZ036-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N •ASREN BUILDING DEPARTMENT E=MEASUREMENT FROM TOP OF FIREPLACE OPENING A 11 TO CEILING <7› Y' \ J=MEASUREMENT FROM • BOTTOM OF FIREPLACE 0 'll / • TO CEILING II • IHEADER A1111 ---- igoolo DEPTH** HEADER r DEPTH*' F -•--I,, 4 1 C G**** : l' '�� NOTE: Header MUST be installed ��, . S1on end as shown in diagram. �I' 0 • D /°1 I ® I . 4. APPLIANCE MAY BE INSTALLED OFF OF FLOOR*** NOTE: E&J dimensions will change if Passive Heat option is installed. Reference the instructions included with the Passive Heat Kit for dimensions. MINIMUM FRAMING DIMENSIONS* A B C D E F G**** Rough Rough Rough Rough Clearance Combustible Combustible Opening Opening Opening Opening to Ceiling Floor Flooring (Vent Pipe) (Height) (Depth) (Width) in. 10 48 17 72-1/4 31 0 0 MEZZO6OST-C mm 254 1219 432 1835 787 0 0 in. 10 48 17 84-1/4 31 0 0 MEZZO72ST-C mm 254 1219 432 2140 787 0 0 MINIMUM FRAMING DIMENSIONS* H I J K Sides of Front or Clearance Clearance to Chase Ceiling Appliance Rear of to Ceiling (Passive Heat Front&Side Only) Appliance in. 1 48 55-1/2 74-1/2 MEZZO6OST-C mm 25 1219 1410 1892 in. 1 48 55-1/2 94 MEZZO72ST-C — mm 25 1219 1410 2388 * =Adjust framing dimensions for interior sheathing (such as sheetrock) **= Header depth not to exceed 3-1/2 inches. ***= If appliance is installed off of floor, maintain required clearances to combustibles. RECEIVED Construct platform in accordance with local building codes. RECEIVED ****= For installations with vinyl flooring, see Section 3.E. 4 Figure 3.13 Clearances to Combustibles-MEZZO6OST-C,MEZZO72ST-C 0 6/12/2 0 2 3 Heat&Glo • MEZZO36-C/ST-C,MEZZ048-C/ST-C, MEZZ060-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N ASS,12'EN23 3UILDING DEPARTMENT Framing Dimensions - Passive Heat Front Discharge (PH-FRT) Single-Sided or See-Through Front Discharge: Air conveyed into the room through one front discharge slot. \ C CHASE DETAIL 1.1/2 IN.(2 X 4 FRAMING) \�\ 1\I y l ROOM CEILING 4 2 IN.MIN. \\� 1 ,� I� T CHASE CEILING(REQUIRED) '!-' A 1/2 IN.X 1/2 IN. F \ '- WIRE MESH** WIRE MESH** ry DISCHARGE OPENING E D WARNING!Risk of Fire! Wire mesh required on bottom IVE HEAT , .'. 'L H144 . 1i,, : , B of discharge opening when discharge opening is greater 11 \\ than 3 inches. Secure mesh to top of framing. oC�s APPLIANCE MAY BE INSTALLED OFF OF FLOOR FRONT DISCHARGE MINIMUM FRAMING DIMENSIONS A TRIM KIT* NO TRIM B C D E F (PHTRIM) KIT** Clearance Clearance Minimum Minimum Minimum to Top of from Bottom Width of Clearance Height of Discharge Height of Clearance Discharge of Appliance Opening Discharge to Discharge Opening to Bottom of Appliance Opening Framing Opening Opening to from Bottom Discharge of Appliance Opening Ceiling MEZZO36-C Inches 3-1/2 2 48 36-1/2 74-1/2 72-1/2 51-1/2 MEZZ036ST-C millimeters 89 51 1219 927 1892 1842 1308 MEZZ048-C Inches 3-1/2 2 48 48-1/2 74-1/2 72-1/2 51-1/2 MEZZO48ST-C millimeters 89 51 1219 1232 1892 1842 1308 MEZZ060-C Inches 3-1/2 2 48 60-1/2 74-1/2 72-1/2 51-1/2 MEZZO6OST-C millimeters 89 51 1219 1537 1892 1842 1308 MEZZO72-C Inches 3-1/2 2 67-1/2 72-1/2 94 92 71 MEZZO72ST-C millimeters 89 51 1715 1842 2388 2337 1803 * Measurement for Trim Kit=3-1/2 in. +additional finishing material thickness. Figure 3.15 shows vent cov �r�`e iE1VED ** Measurement for without trim kit=2 in.+additional finishing material thickness. III °:, If discharge opening is greater than 3 inches,wire mesh is required. Figure 3.14 Passive Heat Front Discharge Framing Dimensions with Clean Face Finish or Trim Kit 0 6/12/2 0 2 3 24 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N •APEN BUILDING DEPARTMENT Passive Heat Front Discharge (PH-FRT) Trim Kit Vent Cover Dimensions t Af- C y vif < B > < D > FRONT DISCHARGE FRAMING DIMENSIONS A B C D Inside Height Inside Width Outside Height Outside Width Inches 2-9/16 36-1/2 5-5/8 38-3/8 PHTRIM-36C millimeters 65 927 143 975 Inches 2-9/16 48-1/2 5-5/8 50-3/8 PHTRIM-48C millimeters 65 1232 143 1280 Inches 2-9/16 60-1/2 5-5/8 62-3/8 PHTRIM-60C millimeters 65 1537 143 1585 Inches 2-9/16 72-1/2 5-5/8 74-3/8 PHTRIM-72C millimeters 65 1842 143 1889 RECEIVpD Figure 3.15 Passive Heat Front Discharge-Vent Cover Dimensions 0 6/12/2 0 2 3 Heat&Glo • MEZZ036-C/ST-C,MEZZ048-C/ST-C, MEZZ060-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev.N Af1EN25 3UILDING DEPARTMENT Framing Dimensions - Passive Heat Side Discharge (PH-SIDE) Single-Sided or See-Through Side Discharge: Air conveyed into the room through two discharge registers, one on each side of appliance. E = NON-COMBUSTIBLE ZONE CHASE DETAIL (BOTH SIDES) /B 1-1/2 IN.(2 X 4 FRAMING) �/ CHASE CEILING ZONE 4 , -. / . ROOM CEILING Nr CHASE CEILING(REQUIRED) / I%* ' DISCHARGE OPENING V/ ///l=PASSIVE HEAT DISCHARGE OPENING A AA F WARNING!Risk of Fire!DO NOT place combustible �° objects or combustible materials in non-combustible C zone. Appliance and combustible materials will overheat. • • • • /r s 4 APPLIANCE MAY BE INSTALLED OFF OF FLOOR SIDE DISCHARGE FRAMING DIMENSIONS A B C D E F Minimum Clearance Minimum Minimum Height of Width of Bottom of Clearance Minimum Clearance Discharge discharge Appliance Bottom of Clearance to Appliance Opening Opening to Bottom of Appliance Combustible Opening to Discharge to Ceiling Materials Ceiling Opening MEZZO36-C Inches 12-1/4 8-3/4 62-3/4 76-1/2 18 52 MEZZO36ST-C millimeters 311 222 1594 1943 457 1321 MEZZO48-C Inches 12-1/4 8-3/4 62-3/4 76-1/2 18 52 MEZZO48ST-C millimeters 311 222 1594 1943 457 1321 MEZZ060 C Inches 12-1/4 8-3/4 51-1/2 76-1/2 18 52 MEZZO6OST-C millimeters 311 222 62-3/4 1943 457 1321 MEZZO72-C Inches 12-1/4 8-3/4 81-1/4 95 18 70-1/2 MEZZO72ST-C millimeters 311 222 2064 2413 457 1791 I - - Figure 3.16 Passive Heat Side Discharge Framing Dimensions 0 6/12/2 U2 3 26 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N -AFrEEN BUILDING DEPARTMENT Framing Dimensions - Passive Heat Open Top Discharge Single-Sided or See-Through Open Top Discharge: Both sides and the top are open allowing air to be conveyed into the room. WARNING! Risk of Fire! Wire mesh required on bottom of discharge opening when discharge opening is greater than 3 inches. Secure mesh to top of framing. k C ,.• , i A A A D B 1111111111 v v U-1 H I .I 1 I SI 1 I I-A I-ri h-U J . OPEN TOP DISCHARGE MINIMUM FRAMING DIMENSIONS A* B C D Minimum Minimum Height of Clearance Width of Discharge Clearance Discharge Opening to Framing Opening Appliance Opening to Ceiling MEZZO36-C Inches 2 48 36-1/2 50 MEZZ036ST-C millimeters 51 1219 927 1270 MEZZO48-C Inches 2 48 48-1/2 50 MEZZO48ST-C millimeters 51 1219 1232 1270 MEZZO60 C Inches 2 48 60-1/2 50 MEZZO6OST-C millimeters 51 1219 1537 1270 MEZZO72-C Inches 2 67-1/2 72-1/2 69-1/2 MEZZO72ST-C millimeters 51 1715 1842 1765 *Wire mesh required for front discharge or open top discharge passive heat installations with discharge RECEIVED opening of 3 inches or greater. Figure 3.17 Passive Heat Minimum Framing Dimensions Open Top Discharge 0 6/12/2 0 2 3 Heat&Glo • MEZZO36-C/ST-C,MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N AS1 EN27 3UILDING DEPARTMENT Framing Dimensions-Ducted Passive Heat Front Discharge(PHFR-MCE)Single-Sided or See-Through Clearances to Combustibles Ducted Passive Heat Front Discharge Ducted Passive Heat Kit (PHFR-MCE) Single-Sided or See-Through B 411 fit. I '1 ::ItotI4lo N%, !� \ A ` � ° D E C :P%i% 11< ' ' IiI MINIMUM FRAMING DIMENSIONS FRONT DISCHARGE Ducted A B C D E F G MODEL Passive Heat Height of Width of Clearance Clearance Clearance 2 X 4 Kit Discharge Discharge Opening to Opening to Bottom of Appliance Framing Studs Opening Opening Framing Ceiling to Ceiling MEZZO36-C in. 6 38-3/4 50-1/2 53-1/2 78 3-1/2 MEZZ036ST-C PHFR-MCE-36 mm 152 984 1283 1359 1981 89 MEZZO48-C in. 6 50-7/8 50-1/2 53-1/2 78 3-1/2 MEZZ048ST-C PHFR-MCE-48 16 inches mm 152 1292 1283 1359 1981 (406 mm) 89 MEZZO60-C in. 6 62-3/4 50-1/2 53-1/2 78 on center 3-1/2 MEZZ060ST-C PHFR-MCE-60 mm 152 1594 1283 1359 1981 89 MEZZO72-C in. 6 74-3/4 50-1/2 72 96-1/2 3-1 MEZZ072ST-C PHFR-MCE-72 i' mm 152 1899 1283 1829 2451 ,ii-,`,. 89 `..' ,_''. ' Figure 3.18 Clearances to Combustibles-Ducted Passive Heat Front Discharge 0 6/12/2 0 2 3 28 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N -AFrEEN BUILDING DEPARTMENT Framing Dimensions-Ducted Passive Heat Side Discharge(PHSI-MCE)Single-Sided or See-Through Clearances to Combustibles Ducted Passive Heat Side Discharge (PHSI-MCE) Single-Sided or See-Through B F 0i I A E \• C D • Vs. Note: Not for use with 60 inch and 72 inch models. MINIMUM FRAMING DIMENSIONS SIDE DISCHARGE A B C D E F Ducted Height of Width of Clearance Clearance Clearance MODEL Passive Heat Discharge Discharge Opening to Opening to Bottom of Appliance 2 X 4 Studs Kit Opening Opening Framing Ceiling to Ceiling MEZZO36-C in. 16 10-3/16 50 52 76-1/2 3-1/2 MEZZO36ST-C mm 406 259 1270 1321 1943 89 PHSI-MCE MEZZO48-C in. 16 10-3/16 50 52 76-1/2 1 r MEZZO48ST-C mm 406 259 1270 1321 1943 I'-, ,I� "VED Figure 3.19 Clearances to Combustibles-Ducted Passive Heat Side Discharge 0 6/12/2 0 2 3 Heat&Glo • MEZZO36-C/ST-C,MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N AS2EN29 BUILDING DEPARTMENT C. Constructing the Appliance Chase Note: Figure 3.10 and Figure 3.11 show the fireplace installed NOTICE:Install appliance on hard metal or wood surfaces on the floor. However, this fireplace can be elevated off the extending full width and depth. DO NOT install directly on floor provided that the fireplace is properly supported by framing carpeting, vinyl, or any combustible material other than materials and the ceiling clearances are maintained. wood. WARNING! Risk of Fire! Maintain specified air space clearances to appliance and vent pipe: • Insulation and other materials must be secured to prevent accidental contact. • The chase must be properly blocked to prevent blown insulation or other combustibles from entering and making contact with fireplace or chimney. • Failure to maintain airspace may cause overheating and a fire. �A A chase is a vertical box-like structure built to enclose the gas appliance and/or its vent system. In cooler climates the vent should be enclosed inside the chase. NOTICE: Treatment of ceiling firestops and wall shield A 3 IN.MIN. �7 B* firestops and construction of the chase may vary with the I 1 r�00 type of building. These instructions are not substitutes — 8 for the requirements of local building codes. Therefore, X- you MUST check local building codes to determine the MEZZO36=70 IN. _ requirements to these steps. MEZZ048=70 IN. MEZZ060=70 IN. NOTICE:Where required by code,install only sprinkler MEZZO72=82 IN. heads with a sprinkler activation temperature classified as Extra High. • Sprinklers inside of chase: Keep sprinkler head away from vent and chimney. . • Heat Management applications: Maintain 36 inches of clearance to openings from which heat is discharged such as convection slots, passive heat registers, heat zone registers, etc. Refer to Section 6.8 for Heat Management options allowed for this appliance. Chases should be constructed and insulated in the same REQUIRED MINIMUM OFF TOP MEZZ036=18 IN. manner as the thermal envelope of the home based on MEZZO48=18 IN. the code requirements for that climate zone to prevent air MEZZ060=18 IN. MEZZ072=30 IN. leakage and draft problems. The chase is an extension of the buildingthermal envelope. *NOTE: If overhang"A"is less than 2 p inches,clearance from top of termination cap to bottom of overhang"B"MUST be a To further prevent drafts and air leakage, the wall shield minimum of4inches. If A is two inches and ceiling firestops should be sealed with caulk or foil or greater,see Figure 4.4,"Minimum Clearances for Termination." tape with a minimum of 300 °F continuous exposure rating to seal gaps. Gas line holes and other openings Figure 3.20 Exterior Chase-Minimum Height Requirements should be sealed with caulk or foil tape with a minimum of 300°F continuous exposure rating or stuffed with unfaced insulation. If the appliance is being installed on a cement sur- face, a layer of plywood may be placed underneath to pre- vent conducting cold up into the room. Minimum height requirements for an exterior chase on a top-vented appliance are shown in Figure 3.20. Reference Figure 4.5 for additional clearances. � RE EIVE 06/12/2023 30 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev. N •APEN BUILDING DEPARTMENT D. Floor Protection NOTICE:Install appliance on hard metal or wood surfaces extending full width and depth. DO NOT install directly on carpeting, vinyl, tile or any combustible material other than wood. WARNING! Risk of Fire! Maintain specified air space clearances to appliance and vent pipe: • Insulation and other materials must be secured to prevent accidental contact. • The chase must be properly blocked to prevent blown ., insulation or other combustibles from entering and making contact with fireplace or chimney. • Failure to maintain airspace could cause overheating ? and fire. '? , �,h/N qOp Elevated Hearth Systems 4/44cF OThy��H Some hearth systems will elevate the appliance off the 1/41z floor at a given dimension. The elevation will also have to be added to the following: Wall penetration referenced in Figure 5.2 (Wall penetration) and Rough Opening Height (header height) referenced in Figure 3.10-3.13. Figure 3.21 Vinyl Flooring Recommendations Note: Finished floor thickness should also be considered when determining installation dimensions. 4 E. Vinyl Flooring Vinyl flooring is sensitive to heat. To avoid damage to the vinyl flooring, a 12 inch minimum x 12 inch minimum hearth is recommended when using vinyl flooring up to the wall. See Figure 3.21. If no hearth is used, it is recommended to provide a minimum of 30 inches of clearance in front of the appliance to the vinyl flooring OR the bottom of the appliance should be raised a minimum • of 24 inches off of the floor to allow the vinyl flooring to be installed up to the wall. NOTICE: Clearances that do not meet the minimum guidelines could result in damage or buckling to the vinyl flooring and is done at the installer's risk. Hearth and Home Technologies does not recommend VINYL adhesive based vinyl flooring products due to thermal 24 IN. MIN. expansion during operation. Floating style flooring can be used, but will reach temperatures up to to 110 °F (based on ambient temperature of 70 °F). Consult the manufacturer's flooring specifications to ensure compatibility. Figure 3.22 Vinyl Flooring Recommendations RECEIVED 06/12/2023 Heat&Glo • MEZZO36-C/ST-C,MEZZO48-C/ST-C, MEZZ060-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N ASKN31 3UILDING DEPARTMENT 4 Termination Location and Vent Information A. Approved Pipe B. Vent Termination Minimum Clearances WARNING!Risk of Fire, Delayed Ignition orAsphyxi- ation. This appliance requires a separate vent. DO NOT vent to a pipe serving any other appliance. Fire Risk. This appliance is only approved for use with Hearth & Maintain vent clearance to combustibles as Home Technologies DVP venting systems. Refer to Sec- specified. tion 12.A for vent component information and dimensions. • DO NOT pack air space with insulation or other Only use listed decorative termination caps/shrouds with materials. Hearth & Home Technologies approved venting systems. Failure to keep insulation or other materials away DO NOT mix pipe, fittings or joining methods from differ- from vent pipe could cause overheating and fire. ent manufacturers. HORIZONTAL The pipe is tested to be run inside an enclosed wall. MiiM OVERHANG - There is no requirement for inspection openings at each joint within the wall. 2FT. 20 INCHESMIN. VERTICAL MIN. WALL LOWEST DISCHARGE OPENING GAS DIRECT VENT TERMINATION CAP ®1 X ROOF PITCH IS X/12 I H(MIN.)-MINIMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING Roof Pitch H(Min.)Ft Flat to 6/12 1.0* Over 6/12 to 7/12 1.25* Over 7/12 to 8/12 1.5* Over 8/12 to 9/12 2.0* Over 9/12 to 10/12 2.5* Over 10/12 to 11/12 3.25 Over 11/12 to 12/12 4.0 Over 12/12 to 14/12 5.0 Over 14/12 to 16/12 6.0 Over 16/12 to 18/12 7.0 Over 18/12 to 20/12 7.5 Over 20/12 to 21/12 8.0 H minimum may vary depending on regional snowfall. Refer to local codes. Figure 4.1 Minimum Height From Roof to Lowest Discharge Opening RECEIVED 06/12/2023 32 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N •APEN BUILDING DEPARTMENT A B OVERHANG 6 in.(minimum)up to 20 in. 18 in.minimum 152 mm/508 mm 457 mm 20 in.and over 0 in.minimum Wood or Fuel Oil ivzTermination Cap A 1 B ' i C WALL A*— **Gas Termination I �"'' Cap v r HOT " If using decorative cap cover(s),this distance may need to be increased. Refer to the installation instructions supplied with the decorative cap cover. i "" If two gas terminations are present,they may be level(B=0 inches) provided A is a minimum of 6 inches. E E Figure 4.2 Staggered Termination Caps C and E dimensions are defined in Figure 4.5. CAUTION! Risk of Burns! Termination caps are HOT, consider proximity to doors, traffic areas or where people Figure 4.4 Measure Horizontal and Vertical Termination may pass or gather (sidewalk, deck, patio, etc.). Listed Clearance to Trapezoid Portion of Cap cap shields available. Contact your dealer. • Local codes or regulations may require different clearances. • Hearth&Home Technologies assumes no responsibility for the improper performance of the appliance when the venting system does not meet these requirements. • Vinyl protection kits are suggested for use with vinyl siding. • Measure horizontal and vertical termination cap clearances as noted in Figure 4.3 and Figure 4.4. H=Measure Horizontal Distances from H H V=Measure Vertical Distances from V HA ��• IAAII• GLeN°34Ge ^R .� �. • Figure 4.3 RECEIVED 06/12/2023 Heat&Glo • MEZZO36-C/ST-C,MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N A61 EN33 BUILDING DEPARTMENT C. Vent Terminal Clearances // Fr =AREA WHERE TERMINAL IS NOT PERMITTED %0 O =AIR SUPPLY INLET lig lc ypi� I n I =VENT TERMINAL L // 0 K Electrical K 0 j,,, r.�w�. I"' Service ' 1 0 D ••o 01 ' A um .L. 0 - . �0�A 1 10 M !!I IH 0 El C 1 ii/. IA �/ o q'H p o A U.S.A.Installations: In accordance with the current ANSI Z223.1/NFPA 54, National Fuel Gas Code. Canadian Installations: In accordance with the current CSA B149.1, Natural Gas and Propane Installation Code. U.S.A. CANADA A Clearance above grade,veranda, porch, deck, or balcony 12 in. (305 mm) 12 in. (305 mm) B Clearance to window or door that may be opened, or to permanently closed window U.S.A.: = 12 in. min. (305 mm min.) CANADA: = 12 in. min. (305 mm min.) Clearance below unventilated soffit 18 in. (457 mm) 18 in. (457 mm) C Clearance below ventilated soffit 18 in. (457 mm) 18 in. (457 mm) Clearance below any vinyl soffits and electrical service 30 in. (762 mm) 30 in. (762 mm) D Clearance to outside corner 6 in. (152 mm) 6 in. (152 mm) E Clearance to inside corner 6 in. (152 mm) 6 in. (152 mm) F Not to be installed above a gas meter/regulator assembly within 3 feet horizontally from 3 ft(914 mm) 3 ft(914 mm) the center-line of the regulator G Clearance to gas service regulator vent outlet 3 ft(914 mm) 3 ft(914 mm) H Clearance to non-mechanical air supply inlet to building or the combustion air inlet to 9 in. 12 in. any other appliance termination (mechanical or non-mechanical) (229 mm min.) (305 mm min.) Clearance to a mechanical (powered)air supply inlet I ***(All mechanical air intakes within 10 feet of a horizontal termination cap must be 3 ft(914 mm)*** 6 ft(1.8 m) a minimum of 3 feet below termination.) On public property: clearance above paved sidewalk or a paved driveway. 7 ft (2.1 m) 7 ft(2.1 m)** J **(A vent shall not terminate directly above a sidewalk or paved driveway which is located between two single family dwellings and serves both dwellings.) Clearance from sides of electrical service 6 in. (152 mm) 6 in. (152 mm) K Location of the vent termination must not interfere with access to the electrical service. Clearance above electrical service 12 in. (305 mm) 12 in. (305 mm) L Location of the vent termination must not interfere with access to the electrical service. Clearance under veranda,porch,deck,balcony or overhang *(Permitted only if veranda, porch, deck, or balcony is fully open on a minimum of 18 in. (457 mm) 18 in. (457 mm * M two sides beneath the floor.) RECEI n Vinyl or composite overhang 42 in. (1067 mm) 42 in. (1067 mm) LLdd'' 06/12/2023 Figure 4.5 Minimum Clearances for Termination 34 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N •AMEN BUILDING DEPARTMENT D. Use of Elbows __ _ _ _ Diagonal runs have both vertical and horizontal vent as- �� K pects when calculating the effects. Use the rise for the vertical aspect and the run for the horizontal aspect. See Figure 4.6. Y Two 45° elbows may be used in place of one 90° elbow. On 45° runs, one foot of diagonal is equal to 8-1/2 inch (216 mm) horizontal run and 8-1/2 inch (216 mm)vertical run. A length of straight pipe is allowed between two 45° I — jr_ elbows. See Figure 4.6. I I Figure 4.7 shows the vertical and horizontal offsets for X k DVP elbows. 1 Vent X Y A _ / Type Inches Millimeters Inches Millimeters DVP 6-5/8 168 16-1/2 419 \ J/ 4VERTICAL ' I\ /' •:' 1 RUN X r �l HORIZONTAL * I imaim DVP Effective Length Rise/Run Pipe Inches Millimeters Inches Millimeters DVP4 4 102 2-3/4 70 _ X DVP6 6 152 4-1/4 108 Vent Type Inches Millimeters DVP12 12 305 8-1/2 216 DVP 16-1/4 413 DVP24 24 610 17 432 _ DVP36 36 914 25-1/2 648 Figure 4.7 Vertical and Horizontal Offset for DVP Elbows DVP48 48 1219 34 864 DVP6A 3 to 6 76 to 152 2-1/8-4-1/4 54-108 DVP12A 3 to 12 76 to 305 2-1/8-8-1/2 54-216 Figure 4.6 RECEIVED 06/12/2023 Heat&Glo • MEZZO36-C/ST-C,MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N A61EN35 BUILDING DEPARTMENT E. Vent Diagrams Measuring Standards: General Rules: Vertical and horizontal measurements listed in the vent • SUBTRACT 3 ft from the total H measurement for each diagrams and clearances for termination were made 90°elbow installed horizontally. using the following standards: • SUBTRACT 1-1/2 ft from the total H measurement for • Pipe measurements are shown using the effective length each 45°elbow installed horizontally. of pipe. See Section 12.A(Figure 12.1), for information on effective length of pipe components. • A maximum of three 90°elbows(or six 45°elbows)may • Horizontal terminations are measured to the outside be used in any vent configuration. Some elbows may be installed horizontally. See Figure 4.12 and Figure 4.19. mounting surface (flange of termination cap). See Figure 4.9. • Elbows may be placed back to back anywhere in the • Vertical terminations are measured to top of last section system. of pipe. See Figure 4.10. • Any 90°elbow may be replaced with two back to back • Horizontal pipe installed level with no rise. 45°elbows. • When penetrating a combustible wall, a wall shield firestop must be installed. • When penetrating a combustible ceiling,a ceiling firestop must be installed. • Horizontal runs of vent do not require vertical rise; horizontal runs may be level. 1, \ • Horizontal termination cap should have a 1/4 inch downward slant to allow any moisture in cap to be • released. See Figure 4.8. /•'�'�`'' .' • • I MEASURE TO SHADED SURFACE pO� (OUTSIDE MOUNTING SURFACE) L � I ���� Figure 4.9 Measure to Outside Mounting Surface A I I 1/4 in.max. I �` (6 mm) W I _ .. • IAI 11111 I L I I1II1I� I I low a :o ,�. L - I Figure 4.8 RECEI D Figure 4.10 Measure to Top of Last Section of Pj,ge6/12/2 02 3 36 Heat&Glo • MEZZ036-C/ST-C, MEZZ048-C/ST-C, MEZZ060-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev. N •AMEN BUILDING DEPARTMENT Fire Risk. Explosion Risk. A WARNING 6 Do NOT pack insulation or other combustibles between ceiling firestops. • ALWAYS maintain specified clearances around venting and firestop systems. • Install wall shield and ceiling firestops as specified. A* Failure to keep insulation or other material away from vent pipe could cause fire. Top Vent - Horizontal Termination Venting with 1 elbow WARNING!Risk of Fire! DO NOT attach elbow directly to the appliance. • The MEZZO36-C/MEZZO36ST-C, MEZZO48-C/MEZZO48ST-C and MEZZO60-C/MEZZO6OST-C require a minimum of 18 inches of vertical venting before attaching any elbow to the appliance. • The MEZZO72-C/MEZZO72ST-C requires a minimum of 30 inches of vertical venting before attaching any elbow to the appliance. MEZZO36-C, MEZZO48-C, MEZZO60-C Note: Use DVP Series V1 Minimum H1 Maximum components only. 1-1/2 ft. 457 mm 1-1/2 ft. 457 mm (iv 2-1/2 ft. 762 mm 6 ft. 1.8 m 3-1/2 ft. 1.1 m 9 ft. 2.7 m 5ft. 1.5m 12ft. 3.7m 6 ft. 1.8 m 15 ft. 4.6 m 7 ft. 2.1 m 18 ft. 5.5 m • ,�.` H 1 8 ft. 2.4m 21 ft. 6.4m / /. \` iii. I s�/ v, 9 ft. 2.7 m 24 ft. 7.3 m 1141.® 1 Vi + Hi =63ft. (19.2m) Maximum �m•v� ,� H1 =24 ft. (7.3 m)Maximum I O MEZZO36ST-C, MEZZO48ST-C, MEZZO6OST-C 4����� V, Minimum Hi Maximum O 1-1/2 ft. 457 mm 3 ft. 914 mm ��; 2-1/2 ft. 762 mm 6 ft. 1.8 m I/ 3-1/2 ft. 1.1 m 9 ft. 2.7 m �. I ! 5 ft. 1.5 m 12 ft. 3.7 m <.' ! 6ft. 1.8m 15ft. 4.6m • 7ft. 2.1 m 18ft. 5.5m • ' 8 ft. 2.4 m 21 ft. 6.4 m • 9 ft. 2.7 m 24 ft. 7.3 m . • I V1 + Hi =63 ft. (19.2m)Maximum • a . H1 =24 ft. (7.3 m) Maximum `;, '' MEZZO72-C MEZZO72ST-C V1 Minimum H1 Maximum V1 Minimum Hi Maximum 2-1/2 ft. 762 mm 1-1/2 ft. 457 mm_ 2-1/2 ft. 762 mm 3-1/2 ft. 1.1 m 3-1/2 ft. 1.1 m 6ft. 1.8 m 3-1/2 ft. 1.1 m 6ft. 1.8 m 4-1/2 ft. 1.4 m 9 ft. 2.7 m 4-1/2 ft. 1.4 m 9 ft. 2.7 m 6ft. 1.8m 12ft. 3.7m 6ft. 1.8m 12ft. 3.7m 7 ft. 2.1 m 15 ft. 4.6 m 7ft. 2.1 m 15 ft. 4.6 m 8 ft. 2.4 m 18 ft. 5.5 m 8 ft. 2.4 m 18 ft. 5.5 m 9 ft. 2.7 m 21 ft. 6.4 m 9 ft. 2.7 m 21 ft. 6.4 m 10ft. 3.0m 24ft. 7.3m 10ft. 3.0m 244, ' 7.3'rn V1 + Hi =63 ft. (19.2 m)Maximum V1 + Hi =63 ft. (19.2 m) Maximum H1 =24 ft. (7.3 m) Maximum H1 =24 ft. (7.3m)i 3 iA /2 0 2 3 Figure 4.11 Heat&Glo • MEZZO36-C/ST-C,MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N AB,1EN37 ,3UILDING DEPARTMENT Top Vent - Horizontal Termination Venting with 2 elbows WARNING!Risk of Fire! DO NOT attach elbow directly to the appliance. • The MEZZO36-C/MEZZO36ST-C, MEZZO48-C/MEZZO48ST-C and MEZZO60-C/MEZZO6OST-C require a minimum of 18 inches of vertical venting before attaching any elbow to the appliance. • The MEZZO72-C/MEZZO72ST-C requires a minimum of 30 inches of vertical venting before attaching any elbow to the appliance. MEZZ036-C, MEZZ048-C, MEZZ060-C Note: Use DVP Series MEZZ072-C components only. V1 Minimum H1+ H2 Maximum V1 Minimum Hi+ H2 Maximum 1-1/2 ft. 457 mm 1-1/2 ft. 457 mm 2-1/2 ft. 762 mm 1-1/2 ft. 457 mm 2-1/2 ft. 762 mm 6 ft. 1.8 m 3-1/2 ft. 1.1 m 6 ft. 1.8 m 3-1/2 ft. 1.1 m 9 ft. 2.7 m 4-1/2 ft. 1.4 m 9 ft. 2.7 m 5 ft. 1.5 m 12 ft. 3.7 m 6 ft. 1.8 m 12 ft. 3.7 m 6 ft. 1.8 m 15 ft. 4.6 m 7ft. 2.1 m 15 ft. 4.6 m 7 ft. 2.1 m 18 ft. 5.5 m 8 ft. 2.4 m 18 ft. 5.5 m 8 ft. 2.4 m 21 ft. 6.4 m 9 ft. 2.7 m 21 ft. 6.4 m 9 ft. 2.7 m 24 ft. 7.3 m 10 ft. 3.0 m 24 ft. 7.3 m V1 + Hi+ H2=63 ft. (19.2 m)Maximum V + Hi+Hz=63 ft. (19.2 m)Maximum Hi + H2=24 ft. (7.3 m)Maximum H + HZ=24 ft. (7.3 m)Maximum MEZZO36ST-C, MEZZO48ST-C, MEZZ072ST-C MEZZO6OST-C V1 Minimum H1+ H2 Maximum Vi Minimum Hi+ H2 Maximum 1-1/2 ft. 457 mm 3 ft. 914 mm 2 1/2 ft. 762 mm 3-1/2 ft. 1.1 m 2-1/2 ft. 762 mm 6 ft. 1.8 m 3-1/2 ft. 1.1 m 6ft. 1.8 m 3-1/2 ft. 1.1 m 9 ft. 2.7 m 4-1/2 ft. 1.4 m 9 ft. 2.7 m 5ft. 1.5m 12ft. 3.7m Eft. 1.8m 12ft. 3.7m 6 ft. 1.8 m 15 ft. 4.6 m 7ft. 2.1 m 15 ft. 4.6 m 7 ft. 2.1 m 18 ft. 5.5 m 8ft. 2.4 m 18 ft. 5.5 m 8 ft. 2.4 m 21 ft. 6.4 m 9 ft. 2.7 m 21 ft. 6.4 m 9 ft. 2.7 m 24 ft. 7.3 m 10 ft. 3.0 m 24 ft. 7.3 m V1 + Hi+H2=63 ft. (19.2 m)Maximum V + H +Hz=63 ft. (19.2 m) Maximum H + H2=24 ft. (7.3 m)Maximum Hi + H2=24 ft. (7.3 m) Maximum 44 r 0 ii ., 7. Hz j \\� H1 Si Vl i1 o o INSTALLED ' \ HORIZONTALLY • o 111 1/1 RECEIVED Figure4.12 . • • 06/12/2023 38 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N •APEN BUILDING DEPARTMENT Top Vent - Horizontal Termination WARNING!Risk of Fire! Venting with 3 Elbows DO NOT attach elbow directly to the appliance. • The MEZZO36-C/MEZZO36ST-C, MEZZO48-C/MEZZO48ST-C and MEZZO60-C/MEZZO6OST-C require a minimum of 18 inches of vertical venting before attaching any elbow to the appliance. • The MEZZO72-C/MEZZO72ST-C requires a minimum of 30 inches of vertical venting before attaching any elbow to the appliance. MEZZO36-C, MEZZO48-C, MEZZO60-C Note: Use DVP Series I MEZZO72-C components only. V1 +V2 Minimum Hi.H2 Maximum V1 +V2 Minimum Hi+ H2 Maximum 1-1/2 ft. 457 mm 1-1/2 ft. 457 mm 2-1/2 ft. 762 mm 1-1/2 ft. 457 mm 2-1/2 ft. 762 mm 6ft. 1.8 m 3-1/2 ft. 1.1 m 6ft. 1.8 m 3-1/2 ft. 1.1 m 9 ft. 2.7 m 4-1/2 ft. 1.4 m 9 ft. 2.7 m 5 ft. 1.5 m 12 ft. 3.7 m 6 ft. 1.8m 12 ft. 3.7 m 6 ft. 1.8 m 15 ft. 4.6 m 7ft. 2.1 m 15 ft. 4.6 m 7 ft. 2.1 m 18 ft. 5.5 m 8 ft. 2.4 m 18 ft. 5.5 m 8 ft. 2.4 m 21 ft. 6.4 m 9 ft. 2.7 m 21 ft. 6.4 m 9 ft. 2.7 m 24 ft. 7.3 m 10 ft. 3.0 m 24 ft. 7.3 m V1+V2+ H,+ H2=63 ft. (19.2 m) Maximum V, +V2+ H,+H2=63 ft. (19.2 m)Maximum Hi + H2=24 ft. (7.3 m) Maximum H + H2=24 ft. (7.3 m)Maximum MEZZO36ST-C, MEZZO48ST-C, MEZZO6OST-C MEZZO72ST-C V1 +V2 Minimum Hi.H2 Maximum V1 +V2 Minimum Hi+ H2 Maximum 1-1/2 ft. 457 mm 3 ft. 914 mm 2-1/2 ft. 762 mm 3-1/2 ft. 1.1 m 2-1/2 ft. 762 mm 6 ft. 1.8 m 3-1/2 ft. 1.1 m 6ft. 1.8 m 3-1/2 ft. 1.1 m 9 ft. 2.7 m 4-1/2 ft. 1.4 m 9 ft. 2.7 m 5 ft. 1.5 m 12 ft. 3.7 m 6ft. 1.8m 12ft. 3.7m 6 ft. 1.8 m 15 ft. 4.6 m 7ft. 2.1 m 15 ft. 4.6 m 7ft. 2.1 m 18ft. 5.5m 8ft. 2.4m 18 ft. 5.5m 8 ft. 2.4 m 21 ft. 6.4 m 9 ft. 2.7 m 21 ft. 6.4 m 9 ft. 2.7 m 24 ft. 7.3 m 10 ft. 3.0 m 24 ft. 7.3 m Vi+V2+ Hi+ H2=63 ft. (19.2 m) Maximum I V1 +V2+ Hi+H2=63 ft. (19.2 m)Maximum H + H2=24 ft. (7.3 m) Maximum -� I Hi + H2=24 ft. (7.3 m)Maximum 114 IF -\ A if ..., R1 o 111 1 ii, !i.:. %iro '' ''''%% ,,,. -1 i l RECEIVED Figure 4.13 .• P 06/12/2023 • Heat&Glo • MEZZO36-C/ST-C,MEZZ048-C/ST-C, MEZZO60-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev.N A6FIEN3g BUILDING DEPARTMENT Top Vent - Vertical Termination No Elbows V= 2-1/2 ft Min. (762 mm), 50 ft. Max. (15.2 m) Note: If installing a vertical vent/termination off the top of the appliance,the optional exhaust restrictor may be needed. Note: Use DVP Series components only. elto O I V 14 CD I 0 O ,,_,,,,s,„ . •• ,, c, 1,,ss ., ,, 1 . . ,. . 1 ' • . . . of ! �! ,� RECEIVED Figure 4.14 Vertical Vent Maximum 0 6/12/2 0 2 3 40 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N •APEN BUILDING DEPARTMENT Exhaust restrictor Instructions • Exhaust restrictors are recommended for these vertically PILOT terminated products which have excessive draft. Exhaust restrictors will compensate for high draft, and restore vi- HOLES sual flame height. If the vent configuration has a total vertical of 20-50 feet, the included exhaust restrictor may ° be needed. ff-1111:P-0 Exhaust restrictor: MEZZO36-C, MEZZO48-C, EXHAUSTMEZZO60-C, MEZZO72-C RESTRICTOR �1. Locate the two ilot holes in the inside firebox cham-ber as shown in Figure 4.15. 2. Break the flue restrictor into two pieces. Do this by ° bending the part back and forth until it breaks. See Figure 4.16. ° rfi 3. The setting for MEZZ036-C, MEZZ048-C, MEZ- �Z060-C and MEZZO72-C is a 2.5 inch setting, or •2-2. Align the holes marked "2" on the numbered exhaust restrictor piece with the hole on the other , exhaust restrictor piece. See Figure 4.17. Align the exhaust restrictor pieces with the pilot holes in the Figure 4.15 Exhaust�� Restrictor inner firebox chamber. Use two 1/2 inch self-piercing screws to secure vent restrictor to firebox heat shield. 4. In some applications, such as those where the fire- place is elevated off the floor, the exhaust restrictoro 00000 may be painted, but painting is not required. NOTICE: Before painting, contact your dealer for information on the appropriate high temperature paint. BREAK HERE Exhaust restrictor: MEZZO36ST-C, MEZZO48ST-C MEZZO6OST-C, MEZZO72ST-C1. Break the flue restrictor into two pieces. Do this by Jo0o0obending the part back and forth until it breaks. See Figure 4.16. Note: The MEZZO36ST-C, MEZZO48ST-C, MEZ- Figure 4.16 Break the Exhaust Restrictor ZO6OST-C, and MEZZO72ST-C do not have pilot holes for the exhaust restrictor in the firebox chamber. 2. The setting for MEZZO36ST-C, MEZZO48ST-C, MEZ- o 0 0 0 012345ZO6OST-C, and MEZZO72ST-C is a 2.5 inch setting, or 2-2. Align the holes marked "2" on the numbered exhaust restrictor piece with the hole on the other ex- haust restrictor piece. See Figure 4.17. Center the exhaust restrictor on the vent and secure in place with two 1/2 inch self-piercing screws. sETTINc 3. In some applications, such as those where the fire- place is elevated off the floor, the exhaust restrictor may be painted, but painting is not required. 2 3 4 5IVNOTICE: Before painting, contact your dealer for o0000information on the appropriate high temperature paint. , EP)Figure 4.17 Set the Exhaust Restrictor 6/1' /12/2 0 2 3 Heat&Glo • MEZZ036-C/ST-C,MEZZ048-C/ST-C, MEZZ060-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev. N AS2EN41 3UILDING DEPARTMENT Top Vent - Vertical Termination Venting with 2 elbows WARNING!Risk of Fire! DO NOT attach elbow directly to the appliance. • The MEZZO36-C/MEZZO36ST-C, MEZZO48-C/MEZZO48ST-C and MEZZO60-C/MEZZO6OST-C require a minimum of 18 inches of vertical venting before attaching any elbow to the appliance. • The MEZZO72-C/MEZZO72ST-C requires a minimum of 30 inches of vertical venting before attaching any elbow to the appliance. MEZZ036-C, MEZZ048-C, MEZZ060-C Note: Use DVP Series MEZZ072-C, MEZZ072ST-C MEZZ036ST-C, MEZZ048ST-C, MEZZO6OST-C components only. V7 +VZ Minimum H Maximum V1 +V2 Minimum H Maximum 2-1/2 ft. 762 mm 4 ft. 1.2 m 1-1/2 ft. 457 mm 4 ft. 1.2 m 3-1/2 ft. 1.1 m 9 ft. 2.7 m 2-1/2 ft. 762 mm 9 ft. 2.7 m 4-1/2 ft. 1.4 m 12 ft. 3.7 m 3-1/2 ft. 1.1 m 12 ft. 3.7 m 6 ft. 1.8 m 15 ft. 4.6 m 5 ft. 1.5 m 15 ft. 4.6 m V + Ht+V2=63 ft. (19.2m) Maximum Vt + Hi+V2=63 ft. (19.2 m)Maximum HTotal=23 ft. (7.1 m) Maximum HTota!=23 ft. (7.1 m)Maximum �I II II V2 - ckl 0 --0,..... `� \`' H 400 l' ;1 CD ‘ii • o 4110 �� 1/ • .. I I RECEIVED . . Figure4.18 . . : 270°' 06/12/2023 42 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N •APEN BUILDING DEPARTMENT Top Vent - Vertical Termination Venting with 3 elbows WARNING!Risk of Fire! DO NOT attach elbow directly to the appliance. • The MEZZO36-C/MEZZO36ST-C, MEZZO48-C/MEZZO48ST-C and MEZZO60/MEZZO6OST-C require a minimum of 18 inches of vertical venting before attaching any elbow to the appliance. • The MEZZO72-C/MEZZO72ST-C requires a minimum of 30 inches of vertical venting before attaching any elbow to the appliance. MEZZO36-C, MEZZO36ST-C Note: Use DVP Series MEZZ072-C, MEZZ072ST-C MEZZ048-C, MEZZO48ST-C components only. MEZZ060-C, MEZZO6OST-C V1 +V2 Minimum Hi + H2 Maximum V, +V2 Minimum H, + H2 Maximum 2-1/2 ft. 762 mm 4 ft. 1.2 m 1-1/2 ft. 457 mm 4ft. 1.2 m — 4ft. 1.2 m 9ft. 2.7 m 3 ft. 914 mm 9 ft. 2.7 m 5ft. 1.5m 12ft. 3.7m 4 ft. 1.2 m 12 ft. CD ft. 1.8 m 15 ft. 4.6 m 3.7 m 5ft. 1.5m 15ft. 4.6m 11110 V +VZ+ H + H2=63 ft. (19.2 m)Maximum V1 +V2+ Hi+ H2=63 ft. (19.2 m)Maximum _i� H + H2=23 ft. (7.1 m) Maximum Hi+ HZ=23 ft. (7.1 m)Maximum V2 '1f r H - cill Al 1 # ---'-- , H2 i. era* ,.,;:i INSTALLED I � Vi HORIZONTALLY 11 o O O ".. 4444444444 Ed , .0, Figure4.19 06/12/2023 Heat&Glo • MEZZO36-C/ST-C,MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N MIKN43 3UILDING DEPARTMENT 5 Vent Clearances and Vent Framing A. Vent Clearances to Combustibles WARNING! Risk of Fire! Maintain air space clearance to vent. DO NOT pack insulation or other combustibles: • Between ceiling firestops • Between wall shield firestops • Around vent system Failure to keep insulation or other material away from vent pipe could cause overheating and fire. Note:Heat shields MUST overlap by a minimum of 1-1/2 in.(38 mm). •DVP heat shield-designed to be used on a wall 4 in.to 7-1/4 in. (102 mm to 184 mm)thick. •If wall thickness is less than 4 in.the existing heat shields must be field trimmed. If wall thickness is greater than 7-1/4 in. a DVP-HSM-B will be required. (DVP Pipe Shown) Heat 3 in.(76 mm) 3 in.(76 mm) Shield top clearance* top clearance X—� Heat /� 7 Shield 1 in.(25 mm) clearance around\\ L — vertical sections - - in.(25 mm) 1 - Wall clearance I Shield bottom&sides Firestop WALL Figure 5.1 Horizontal Venting Clearances To Combustible Materials RECEIVED 06/12/2023 44 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N •APEN BUILDING DEPARTMENT B. Wall Penetration Framing/Firestops DO NOT PACK VENT FRAMING HOLE WITH INSULATION Combustible Wall Penetration OR OTHER MATERIAL. Whenever a combustible wall is penetrated, you must r frame a hole for the wall shield firestop(s).The wall shield ( (�l� �O firestop maintains minimum clearances and prevents cold 1�\ air infiltration. 12 in. O I`I • The opening must be framed on all four sides using the loin. same size framing materials as those used in the wall %111 B 1000 construction. 1` 1 . •• j • SLP pipe-A wall shield firestop must be placed on each side of an interior wall. A minimum 1-1/2 in. (38 mm) p overlap of attached heat shields must be maintained. ` • DVP pipe-A wall shield firestop is required on one side i _iiii1Juulr!J_ only on interior walls. If your local inspector requires a wall shield firestop on both sides, then both wall shield firestops must have a heat shield (refer to Section 12.A.)attached to them. MODEL A* B • See Section 7.F.for information for regarding the instal- MEZZO36-C 64 in. 63 in. lation of a horizontal termination cap. M C ME ZZO48-ZZ048-C Non-Combustible Wall Penetration MEZZO48ST-C MEZZO60-C 1.63 m 1.60 m If the hole being penetrated is surrounded by non-com- MEZZO6OST-C bustible materials such as concrete, a hole with diameter 76 in. 75 in. one inch greater than the pipe is acceptable. MEZZO72-C _ MEZZO72ST-C 1.93 m 1.90 m Whenever a non-combustible wall is penetrated, the wall _ shield firestop is only required on one side and no heat shield is necessary. * Shows center of vent framing hole for top venting.The center of the hole is one (1)in. (25.4 mm)above the center of the horizontal vent pipe. Note: Measurements for MEZZO36-C/MEZZO48-C and MEZZO60-C were taken with an 18 inch vertical section of pipe directly off the top of appliance. Measurements for MEZZO72-C were taken with an 30 inch vertical section of pipe directly off the top of appliance. Note: Center of the horizontal vent pipe to the vertical measuring surface of a trap cap is 5 inches(127 mm). Figure 5.2 Wall Penetration RECEIVED 06/12/2023 Heat&Glo • MEZZO36-C/ST-C,MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N ABREN45 3UILDING DEPARTMENT C. Ceiling Firestop/Floor Penetra- tion Framing WARNING!Risk of Fire!DO NOT pack insu- lation around the vent. Maintain clearances to vent to prevent overheating. A ceiling firestop MUST be used between ATTIC ABOVE floors and attics. • DVP pipe only - Frame an opening 10 in. by 10 in. (254 mm by 254 mm) whenever A the vent penetrates a ceiling/floor (see Figure 5.3). • Frame the area with the same sized lumber as used in ceiling/floor joist. -• The ceiling firestop may be installed above or below the ceiling joists when installed with an attic insulation shield. It must be under joists A between floors that are not insulated. Refer to Figure 5.4. • Secure with two fasteners on each side. I [PIPE A DVP 10 in.(254 mm) D. Install Attic Insulation Shield `I/, WARNING! Fire Risk. The use of an attic ` , shield is required to prevent loose materials or insulation from contacting the vent causing overheating and a fire. • The International Fuel Gas Code requires an ° attic shield constructed of 26 gauge minimum • steel that extends at least 2 in. (51 mm)above insulation. y ° ' • Attic insulation shields must meet specified clearances to combustible materials and be • secured in place. • An attic insulation shield kit is available from Figure 5.3 Installing Ceiling Firestop Hearth & Home Technologies. Contact your dealer to order. Install attic insulation shield according to instructions included with kit. INSTALL ATTIC INSULATION SHIELDS BEFORE OR AFTER INSTALLATION OF VENT SYSTEM T T 1 � 1 CEILING FIRESTOP CEILING FIRESTOP INSTALLED BELOW CEILING INSTALLED ABOVE CEILING Figure 5.4 Installing the Attic Shield RECEIVED 06/12/2023 46 Heat&Glo • MEZZ036-C/ST-C, MEZZ048-C/ST-C, MEZZO60-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev. N •APEN BUILDING DEPARTMENT 6 Appliance Preparation CAUTION! Risk of Cuts, Abrasions or Flying Debris. Wear protective gloves and safety glasses during LOCATION FOR INSTALLATION OF installation. Sheet metal edges are sharp. '> FIBERGLASS ROPE RING A. Top Standoff Preparation 1. Rotate the four(4)top standoffs up into vertical position. 60 and 72 only: Push the standoff support tab on each • standoff toward the center of the appliance and fasten •• /d1^h it in place using the supplied screw and pilot hole. See �i Figure 6.1. ° :- STA'NDOFFS STANDOFFS - DOWN • • I • • 1111.1.11"r" • , i • •off. - -� Figure 6.2 Location of Fiberglass Rope Ring Standoff Shipping Position Standoff Installation Position Figure 6.1 Standoffs Shown in Vertical Position , ' (See-Through Appliance Shown) i 2. Place a vent section on the starting collar. ‘1,,,- 9'�ii .,,� , ram I, WARNING!Risk of Fire! DO NOT attach elbow directly ' ' 1, to the appliance. - • The MEZZO36-C/MEZZO36ST-C, MEZZO48-C/ - -r--.- MEZZO48ST-C and MEZZO60-C/MEZZO6OST--C require a minimum of 18 inches of vertical venting before attaching any elbow to the appliance. • The MEZZO72-C/MEZZO72ST-C requires a minimum of GASKET /ROPE RING 30 inches of vertical venting before attaching any elbow ; to the appliance. Figure 6.3 Fiberglass Rope Ring Installed 4.Place the 1/8 inch thick, square fiberglass gasket over the initial vent section. 5.Place the fiberglass rope ring over the gasket. Ensure both the gasket and the rope ring are seated on the top of the appliance. See Figure 6.2 and Figure 6.3. RECEIVED 06/12/2023 Heat&Glo • MEZZO36-C/ST-C,MEZZO48-C/ST-C, MEZZ060-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N AS2EN47 3UILDING DEPARTMENT B. Prepare For Heat Management WARNING! Risk of Fire! DO NOT block passive heat registers! Overheating of appliance and combustible Introduction materials will occur. An optional heat management system allows the heat from the appliance to be redirected as desired. WARNING! Risk of Fire! DO NOT remove heat An optional heat management system must be installed by management knockout unless a heat management a qualified service technician at the time of the appliance System will be connected at that location. Overheating of installation. Follow the instructions shipped with the kit for appliance and combustible materials will occur. installation and operation. NOTICE: Additional clearances are required for heat PASSIVE HEAT,HEAT-OUT-GAS* G OR HEAT-ZONE-GAS" management systems installations. Provisions must be of PASSIVE HEAT ONLY made in advance to ensure fit within the framing. ! DO • Determine the heat management system(s)that will be • • PASSIVE HEAT g Y \ ) HEAT-OUT-GAS*OR installed. O '> HEAT-ZONE-GAS* • Remove the appropriate knockout(s). • Remove insulation plug(s). ;fl • Center the duct collar around the exposed hole and attach it to the appliance. See Figure 6.5. ;� Note: Do this BEFORE final positioning of the appliance. • Determine the location for the air register/fan housing ��� . assembly. • •, • Reference the appropriate instructions included with the • °® heat management system kit for the remaining installation . Steps. *Note: Remove only one of the outside knockouts if installing the HEAT-OUT-GAS or HEAT-ZONE-GAS. The other knockout is removed only if another heat management system is installed. Optional Heat Management Systems are: • HEAT-ZONE°-GAS: The heat is diverted into an Figure 6.4 adjacent room. Heat-Zone-Gas Adapter Kit(HZLIN-ADP) • HEAT-OUT-GAS: The heat is diverted outside the home/building. The HZLIN-ADP adapter kit is required for use with the • Passive Heat(PH-FRT, PH-SIDE): The heat is vented Heat-Zone-Gas Kit and is necessary when the optional into the room in which the appliance is installed Heat-Zone-Gas Kit is installed on the MEZZO-C models. through a discharge opening(s). See Figure 6.5. 1 • Ducted Passive Heat (PHFR-MCE, PHSI-MCE) The heat is ducted into the room in which the appliance is installed through a discharge opening(s) using an insulated ducting system. PHSI-MCE side discharge & available only for 36 and 48 inch sized appliances. The MEZZO-C models may utilize two Heat Management • O En - Systems, but not all are compatible. • 'a Approved combinations are: (I) • HEAT-OUT-GAS: May be used with one HEAT-ZONE- • GAS or one of the Passive Heat options (PH-FRT, PH- SIDE, PHFR-MCE, PHSI-MCE). • HEAT-ZONE-GAS: May be used with one HEAT-ZONE- ' • GAS, one of the Passive Heat options (PH-FRT, PH- • SIDE, PHFR-MCE, PHSI-MCE), or one additional HEAT-ZONE-GAS. • Passive Heat (PH-FRT, PH-SIDE, PHFR-MCE, PHSI- • ���� MCE): May be used with HEAT-ZONE-GAS or one off/ '`�� HEAT-OUT-GAS. The dedicated knockouts must be �06/12/2Q23 used only as indicated in Figure 6.4. Figure 6.5 Heat-Zone-Gas Linear Adapter Collar 48 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N •AMEN BUILDING DEPARTMENT C. Securing and Leveling the Appliance Securing and Leveling the Appliance Setting the Fireplace into the Framing A WARNING The left and right nailing tabs were designed as a means to ensure the fireplace is mounted flush with the framing Risk of Fire! materials. See Figures 6.6-6.8. Prevent contact with: 1. The shipping flanges protrude further out from the ap- • Sagging or loose insulation pliance than the side standoffs. The shipping flange • Insulation backing or plastic may be bent upward or broken off in order to place the appliance into position in the framing. • Framing and other combustible materials 2. Bend out all nailing tabs. The see-through model will have eight nailing tabs. The single-sided model will DO NOT remove standoffs or notch the framing have four nailing tabs. around the appliance standoffs. 3. Screw each nailing tab to the adjoining framing Failure to maintain air space clearance could material. Ensure that the one inch air space clearance cause overheating and fire. is maintained on the sides and back of the fireplace. Block openings into the chase to prevent entry See Figures 3.8-3.12 for framing and clearance details. of blown-in insulation. Make sure insulation and other materials are secured. 1 IN t I�_�11 OFF The diagram shows how to properly position and secure the appliance. See Figure 6.8. Nailing tabs are provided NAILS�1G NAILING to secure the appliance to the framing members. TAM TAB • Bend out nailing tabs on each side. • Place the appliance into position. \it • Keep nailing tabs flush with the framing. ow • Level the appliance from side to side and front to back. 111111011, • Shim the appliance as necessary. It is acceptable to use wood shims underneath the appliance. • • Secure the appliance to the framing by using nails or screws through the nailing tabs. Use a minimum of one fastener per nailing tab. ‘ iseloo• • Optional: Secure the appliance to the floor by inserting two screws through the pilot holes at the bottom of the «_ appliance. Some figures in manual show the fireplace installed on the SHIPPING SHIPPIN' floor. However, this fireplace can be elevated off the floor FLANGE 4 FLANGE' provided that the fireplace is properly supported by framing -` ,, materials and the ceiling clearances are maintained. Figure 6.6 Nailing Tabs Figure 6.7 Nailing Tabs Shipping Position Installation Position RECEIVED 06/12/2023 Heat&Glo • MEZZO36-C/ST-C,MEZZ048-C/ST-C, MEZZ060-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev. N MIKN4g 3UILDING DEPARTMENT o D. Installing Non-Combustible Facing Material 0 0 0 o WARNING! Risk of Fire! o • Follow these instructions exactly. • Facing materials must be installed properly to prevent fire. • No materials may be substituted without authorization C o by Hearth &Home Technologies. 0 0 0 • Remove protective cardboard sleeve from non- '��'' o combustible facing pieces, which are included with the O C \ appliance. • : \ C.\ • Install non-combustible facing material to the appliance ���, �. using the 1-1/4 inch screws supplied in the manual bag \ , �` �'. assembly. There may be extra screws included. 1� • Attach top board to the framing members with regular Alpilio. . sheetrock screws or nails. See Figure 6.9. NAILING TABS I •Attach left and right side pieces to framing members with BOTH SIDES regular sheetrock screws or nails. • Use a wet or dry towel or soft brush to remove dust or dirt from facing material. • See Section 10 for finishing materials guidelines. Figure 6.8 Proper Positioning and Securing of an Appliance o o 0 0 o 0 O o 0 0 o O ii. 9 rj • [1 Figure 6.9 Install Factory-Included Non-Combustible Facing Material RECEIVED 06/12/2023 50 Heat&Glo • MEZZO36-C/ST-C, MEZZ048-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N •APEN BUILDING DEPARTMENT 7 Venting A. Assemble Vent Sections (DVP Pipe Only) Assemble Pipe Sections Per Figure 7.2: WARNING! Risk of Fire or Explosion! Vent sections MUST be installed correctly. Improperly installed vent • Start the inner pipe on the lanced end of section A into sections could leak or cause appliance to overheat. the flared end of section B. • Start the outer pipe of section A over the outer pipe of Attach Vent to the Firebox Assembly section B. Note: The end of the pipe sections with the lanced tabs • Once both vents sections are started, push firmly until will face toward the appliance. all lanced tabs lock into place. Attach the first pipe section to the starting collar: • Lightly tug on the pipe to confirm the tabs have locked. • Lanced pipe end of the starting collar. It is acceptable to use screws no longer than 1/2 in. (13 • Inner pipe over inner collar. mm)to hold outer pipe sections together. If predrilling holes, • Push the pipe section until all lanced tabs snap in place. DO NOT penetrate inner pipe. • Lightly tug on pipe to confirm it has locked. For 90°and 45°elbows that are changing the vent direction from horizontal to vertical,one screw minimum should be put Requirement for Commercial, Multi-family(Multi-level ex- in the outer flue at the horizontal elbow joint to prevent the ceeding two stories),or High-Rise Applications elbow from rotating. Use screws no longer than 1/2 in. (13 mm).If predrilling screw holes,DO NOT penetrate inner pipe. WARNING!Risk of Fire or Explosion!DO NOT break silicone seals on slip sections. Use care when remov- ing termination cap from slip pipe. If slip section seals I are broken during removal of the termination cap, vent could leak. All outer pipe joints must be sealed using one of the meth- fr' t �i \:\ • ods below, including the slip section that connects directly I /� I to the horizontal termination cap. • Apply a bead of silicone sealant(300°F minimum con- tinuous exposure rating) inside the female outer pipe joint prior to joining sections. See Figure 7.1 OR Apply a bead of silicone sealant(300°F minimum con- tinuous exposure rating) to the outside of connecting _ _ joint after joining sections OR Apply aluminum foil tape (300°F minimum continuous Figure 7.1 High Temperature Silicone Sealant exposure rating)to the outside of connecting joint after joining sections. On horizontal pipe runs, it is recom- mended that the tape seam is positioned on the bottom side of the vent pipe. '#A A Lances • Only outer pipes need to be sealed.All unit collar, pipe, - - slip section, elbow and cap outer flues shall be sealed A in this manner, unless otherwise stated. Figure 7.2 Figure 7.3 RECEIVED 06/12/2023 Heat&Glo • MEZZO36-C/ST-C,MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N A'B1EN51 3UILDING DEPARTMENT Note: Make sure that the seams are not aligned to prevent B. Assemble Slip Sections unintentional disconnection. • Slide the inner flue of the slip section into the inner flue of the pipe section and the outer flue of the slip section over the outer flue of the pipe section. See Figure 7.5. 117 • Slide together to the desired length. • CORRECT Nam- - - 0" Pilot hole i -- Figure 7.5 Slip Section Pilot Holes Ie • Maintain a 1-1/2 in. (38 mm) overlap between the slip section and the pipe section. Figure 7.4 Seams INCORRECT • Secure the pipe and slip section with two screws no longer than 1/2 in. (13 mm), using the pilot holes in the NOTICE: When installing a vent system with an HRC slip section. See Figure 7.6. termination cap, all pipe system joints shall be sealed using a high temperature silicone sealant(300°F minimum continuous exposure rating). • Apply a bead of silicone sealant (300 °F minimum • ' continuous exposure rating)inside the female outer pipe joint prior to joining sections. - • • Only outer pipes are sealed, sealing the inner flue is not required. • All unit collar, pipe, slip section, elbow and cap outer flues shall be sealed. • Figure 7.6 Screws into Slip Section • Continue adding pipe as necessary following instructions in "Assembling Pipe Sections." NOTICE: If slip section is too long, the inner and outer flues of the slip section can be cut to the desired length. RECEIVED 06/12/2023 52 Heat&Glo • MEZZO36-C/ST-C, MEZZ048-C/ST-C, MEZZO60-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev. N •AFrEEN BUILDING DEPARTMENT C. Secure the Vent Sections D. Disassemble Vent Sections WARNING! Risk of Fire, Explosion or Asphyxiation! • Rotate either section (see Figure 7.9) so the seams on Improper support could allow vent to sag and separate. both pipe sections are aligned as shown in Figure 7.10. Use vent run supports and connect vent sections per in- • Pull carefully to separate the pieces of pipe. stallation instructions. DO NOT allow vent to sag below connection point to appliance. • Vertical runs originating off the top of the appliance,with ,r,..,lm, no offsets, must be supported every 8 feet(2.44 m)after the maximum allowed 25 feet (7.62 m) of unsupported rise. 1 2!• li • Vertical runs originating off the rear of the appliance, or Art _-'"'41 after any elbow,must be supported every 8 feet(2.44 m). it li • Horizontal runs must be supported every 5 feet(1.52 m). Milk, 41 • Vent supports or plumbers strap (spaced 120° apart) i may be used to support vent sections. See Figures 7.7 and 7.8. • Wall shield firestops may be used to provide horizontal support to vent sections. Figure 7.9 Rotate Seams for Disassembly • SLP ceiling firestops have tabs that may be used to provide vertical support. 120° !Ill tis (Th • ........ , _ _ ,...0.0 Figure 7.10 Align and Disassemble Vent Sections Figure 7.7 Securing Vertical Pipe Sections 120° Figure 7.8 Securing Horizontal Pipe Sections RECEIVED 06/12/2023 Heat&Glo • MEZZ036-C/ST-C,MEZZ048-C/ST-C, MEZZ060-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev.N A61 EN53 BUILDING DEPARTMENT E. Vertical Termination Requirements Assemble and Install Storm Collar Install and Seal Metal Roof Flashing CAUTION! Risk of Cuts, Abrasions or Flying Debris. Wear protective gloves and safety glasses during instal- • See minimum vent heights for various pitched roofs lation. Sheet metal edges are sharp. (Section 4, Figure 4.1) to determine the length of pipe to extend through the roof. • Slide the storm collar onto the exposed pipe section and align brackets. • Slide the roof flashing over the pipe sections extending • Insert a bolt(provided)through the brackets and install through the roof as shown in Figure 7.13. nut. Do not completely tighten. • Use an elastomeric or silicone sealant with a minimum of 150°F temperature rating to seal the metal roof flashing. Note: When installing a silicone or EPDM pipe flashing boot on a metal roof, it is recommended to put a bead of 100% silicone sealant where the boot contacts the vent pipe to prevent the entry of water. Follow the manufacturer's recom- mendations when installing the boot. Climate regions with I ijoillit, - . - frequent temperatures below-50°F(-45.6°C)should use a ,1111 4 silicone flashing boot. fr NOTICE:Failure to properly seal the roof flashing and pipe seams could permit entry of water. • Seal the gap between the roof flashing and the outside Figure 7.12 Insert Bolt into Brackets diameter of the pipe. • Seal the perimeter of the flashing where it contacts the roof surface. See Figure 7.11. • Slide the assembled storm collar down the pipe section • Seal the exposed pipe section seams that are located until it rests on the roof flashing. See Figure 7.12. above the roof. • Tighten nut and make sure the collar is tight against the pipe section. • Seal around the top of the storm collar.See Figure 7.13. t'l d it SEAL A/ ) , .. ,, )1 0 ' Figure 7.11 1116111e. - j • RECEIVED 06/12/2023 54 Heat&Glo • MEZZ036-C/ST-C, MEZZ048-C/ST-C, MEZZO60-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev. N •AFrEEN BUILDING DEPARTMENT Install Vertical Termination Cap F. Horizontal Termination Requirements • Attach the vertical termination cap by sliding the inner Heat Shield Requirements for Horizontal collar of the cap into the inner flue of the pipe section Termination while placing the outer collar of the cap over the outer flue of the pipe section. WARNING!Risk of Fire!To prevent overheating and fire, • Secure the cap by driving three self-tapping screws heat shields must extend through the entire wall thick- (supplied) through the pilot holes in the outer collar of ness. the cap into the outer flue of the pipe. See Figure 7.13. • DO NOT remove the heat shields attached to the wall shield firestop and the horizontal termination cap (shown in Figure 7.14). TERMINATION CAP • Heat shields must overlap 1-1/2 in. (38 mm) mini- mum. There are two sections of the heat shield. One section is factory-attached to the wall shield firestop. The other section is factory-attached to the cap. See Figure 7.14. If the wall thickness does not allow the required 1-1/2 in. (38 mm) heat shield overlap when installed, an extended heat shield must be used. • If the wall thickness is less than 4 in./102 mm (DVP) or 4-3/8 in./ 111 mm (SLP), the heat shields on the cap and wall shield firestop must be trimmed. A minimum (1 OF 3) 1-1/2 in. (38 mm)overlap MUST be maintained. SCREWS STORM • Use an extended heat shield if the finished wall thickness COLLAR is greater than 7-1/4 in. (184 mm). <-2r • The extended heat shield may need to be cut to length SEAL maintaining sufficient length for a 1-1/2 in. (38 mm) overlap between heat shields. • Attach the extended heat shield to either of the existing heat shields using the screws supplied with the extended heat shield. Refer to vent components diagrams in the back of this manual. 11111111 • Rest the small leg on the extended heat shield on top of the pipe section to properly space it from the pipe section. Important Notice: Heat shields may not be field constructed. RECEIVED 06/12/2023 Heat&Glo • MEZZO36-C/ST-C,MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N MIKN55 BUILDING DEPARTMENT Install Horizontal Termination Cap (DVP and SLP Pipe) HEAT SHIELD OR HEAT SHIELD WARNING! Risk of Fire! The telescoping flue section of EXTENDED 1-1/2 IN.(38 MM)MIN. p g HEAT SHIELD OVERLAP the termination cap MUST be used when connecting vent. WFIRESTOPD • 1-1/2 (38 mm) minimum overlap of flue telescoping • section is required. Failure to maintain overlap could cause overheating III I(�/�/�j'll and fire. SLIP SECTION > CAN BE EXTENDED __ --- • Vent termination must not be recessed in the wall.Siding " 1 may be brought to the edge of the cap base. r i INNER VENT • Flash and seal as appropriate for siding material at OUTER VENT SHEATHING outside edges of cap. INTERIOR EXTERIOR • When installing a horizontal termination cap, follow the cap location guidelines as prescribed by current ANSI Z223.1 and CAN/CGA-B149 installation codes Figure 7.14 Venting Through the Wall and refer to Section 4 of this manual. CAUTION! Risk of Burns! Local codes may require in- stallation of a cap shield to prevent anything or anyone from touching the hot cap. NOTICE: For certain exposures which require superior resistance to wind-driven rain penetration, a flashing kit and HRC caps are available. When penetrating a brick wall, a brick extension kit is available for framing the brick. Note: When using termination caps with factory-supplied heat shield attached, no additional wall shield firestop is required on the exterior side of a combustible wall. RECEIVED 06/12/2023 56 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N •APEN BUILDING DEPARTMENT 8 Electrical Information A. General Information WARNING!Risk of Shock!DO NOT wire 110-120 VAC to the ignition module or to the appliance wall switch. (IPI) Incorrect wiring will damage controls. NOTICE: This appliance must be electrically wired and grounded in accordance with local codes or, in the absence of local codes, with National Electric Code ANSI/NFPA 70-latest edition or the Canadian Electric Code CSA C22.1. • Wire the appliance circuit using a minimum 14-2 AWG with ground to unswitched 110-120 VAC.This is required for proper operation of the appliance(IntelliFire® ignition). • A 110-120 VAC circuit for this product must be protected with ground-fault circuit interrupter protection, in compliance with the applicable electrical codes, when it is installed in locations such as in bathrooms or near sinks. • Low voltage and 110-120 VAC voltage cannot be shared within the same wall box. • In some instances,the spark ignition of the fireplace may cause intermittent, non-damaging, interference during the lighting sequence with a TV plugged into the same circuit. It is recommended that the fireplace and TV use different circuits to mitigate the interference potential. If interference is occurring on the same circuit, the use of surge protectors may help alleviate the interference. RECEIVED 06/12/2023 Heat&Glo • MEZZ036-C/ST-C,MEZZ048-C/ST-C, MEZZ060-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev. N A6HN57 3UILDING DEPARTMENT Junction Box Installation 5. Route the wire through the strain relief in the outer WARNING! Risk of Shock! Label all wires prior to dis- wrap and up through the cutout located on the metal connection when servicing controls. Wiring errors can tray under the junction box. cause improper and dangerous operation. Verify proper 6. Make the connection inside the junction box to the 110- operation after servicing. 120V wire. Connect green to the ground nut, black to 1. Remove bottom panel by removing two screws. Screw black, and white to white. locations are shown in Figure 8.1. After removing two 7. To reattach the junction box, insert one end of the screws, gently lift the panel and pull forward, avoiding junction box in the slot provided and securely screw the contact with the non-combustible board if possible. other end of the junction box to the control tray panel. 2. Remove insulation. 8. Reinstall component heat shield and insulation. 3. Remove screws on left and right sides of component CAUTION!Risk of Overheating!Component heat shield heat shield and lift it out of the control cavity. See Figure MUST be installed before operating appliance. Electrical 8.3 for location of component heat shield screws. components will be damaged. 4. Remove the one screw that secures the junction box to the control tray panel. See Figure 8.2. In the event that the junction box may need to be ac- cessed or installed after finish methods have been ap- ' , - plied, access is possible by removing the bottom glass shield. •I III I 0.. Electrical Service and Repair WARNING! Risk of Shock! Label all wires prior to dis- ° ! connection when servicing controls. Wiring errors could `N o _. °• cause improper and dangerous operation. Verify proper i I I ' operation after servicing. • �M����" ., ed wire with WARNING!Risk of Shock!Replace damaged� I p ` • type 105°C rated wire. Wire must have high temperature BOTTOM PANEL SCREW LOCATIONS s � o . insulation. Figure 8.1 Bottom Panel Location \ IT it. r S a 3 2 'I 1_ —411PIL! Ills III HOT Figure 8.2 Junction Box Detail COMPONENT INSULATION---*. (Behind Component Heat Shield) RESET SWITCH - PROPANE ONLY COMPONENT HEAT SHIELD BATTERY ECM _y TRAY LED DIMMER St R€ (, imi ` - _ II s„ Si . .„ —�►�_ J*Of* BOX �l LED POWER SUPPLY Figure 8.3 Valve Cavity(Lower Access Panel Removed) 06 12 2023 58 Heat&Glo • MEZZ036-C/ST-C, MEZZ048-C/ST-C, MEZZ060-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev.N •AMEN BUILDING DEPARTMENT B. Wiring Requirements Accessories Requirements IntelliFire Touch Ignition System Wiring • This appliance ships standard with a remote control. • Wire the appliance junction box to 110-120 VAC for Wiring for optional Hearth&Home Technologies approved proper operation of the appliance. accessories should be done now to avoid reconstruction. WARNING!Risk of Shock or Explosion!DO NOT wire Follow instructions that come with those accessories. IPI controlled appliance junction box to a switched circuit. The junction box, control module, LED power supply Incorrect wiring will override IPI safety lockout. and wall switch receiver can be accessed by removing • Refer to Figure 8.4 IntelliFire Touch(IPI)Wiring Diagram. the bottom glass shield and component heat shield. The decorative barrier front must be removed to access these • This appliance is equipped with an IntelliFire control valve components. See Figure 8.4. which operates on a 6 volt system. CAUTION!Risk of Overheating!Component heat shield MUST be installed before operating appliance. Electrical NOTICE: Batteries should only be used as a power components will be damaged. source in the event of an emergency power outage. CAUTION!Risk of Overheating!DO NOT remove com- Batteries should not be used as a primary long-term power ponent insulation from top of component heat shield. source. Batteries tend to corrode over time. When using Electrical components will be damaged. batteries as a power source, the 6 volt transformer must be unplugged from the receptacle. Do not store batteries in the battery pack when the appliance is powered by the 6 volt transformer connected to permanent electrical service. RECEIVED 06/12/2023 Heat&Glo • MEZZO36-C/ST-C,MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N ASHN5g BUILDING DEPARTMENT 6 VAC TRANSFORMER FLAME I IFT-RC400 SENSE IGNITER 1 REMOTE i I CONTROL PROPANE ONLY RESET SWITCH WIRE I JUNCTION BOX 1 1 2550-135 110-120 VAC ,, g 11� ; T 11 �I�,"-FM I JUMPER WIRE I SEE DETAIL A iiii RESET SWITCH . . 2206-298 I - 3 I IbdI I a I I DETAIL A JUMPER WIRE P- '_� .i, TO JUNCTION I Ca ^ o I BOX 110-120 VAC n Lill III ■ III .„a, III 2 ■ I III ® III I i I I ill 0 m Hh I I III ® Ill I RF MODULE I n m ,, I I ,, � I I I I -' I .—/Oo I BLUE h Ir RED I I WHITE II BLACK ` BLACK II ORANGE (PILOT) 4' DIMMER �� 7Ilii11111) liiiGREEN BLKTO (MAIN) ` RED m R LED JUNCTION APOWER SUPPLYBOX 110VAC LED LIGHT TRAY(36 INCH MODELS) B O O b b® e b b b b RED BLK LED LIGHT TRAY(48 INCH MODELS) 6V DC e 8 8 8 8 ® e a 8 8 ID e e e 8 e 8 ®i BATTERY PACK BROWN LED LIGHT TRAY (60 INCH MODELS) k D 0 0 0 0 ® 0 0 0 0 0 LED LIGHT TRAY (72 INCH MODELS) eeaae ® eaeaae eeaae ® eeeaa ® RECEIVED _ _ Figure 8.4 IntelliFire Touch Wiring Diagram 0 6/12/2 0 2 3 60 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N .A PEN BUILDING DEPARTMENT 9 Gas Information A. Fuel Conversion Note: Have the gas supply line installed in accordance with • Make sure the appliance is compatible with available gas local codes, if any. If not, follow ANSI Z223.1. Installation types. should be done by a qualified installer approved and/or licensed as required by the locality. (In the Commonwealth • Conversions must be made by a qualified service of Massachusetts installation must be performed by a technician using Hearth&Home Technologies specified licensed plumber or gas fitter). and approved parts. Note:A listed (and Commonwealth of Massachusetts ap- B. Gas Pressure proved) 1/2 in. (13 mm) T-handle manual shut-off valve and flexible gas connector are connected to the 1/2 in. (13 A WARNING mm) control valve inlet. A • If substituting for these components,please consult Fire • Risk. local codes for compliance. Risk of Fire! Risk of Explosion! Incorrect pressure will damage valve. C. Gas Service Access • Isolate gas supply piping BEFORE pressure testing gas line at test pressures above 1/2 Note: This appliance does include a manual gas shutoff psig.1* valve that is located in the valve compartment.This manual • Close the manual shutoff valve BEFORE gas shutoff valve is accessible for service by removing pressure testing gas line at test pressures the decorative barrier front and the bottom glass shield. equal to or less than 1/2 psig. The valve is most accessible if it is located forward in the control cavity of the appliance. Depending upon local code, an additional manual gas • Optimum appliance performance requires proper input shutoff, in a readily accessible area may be required and pressures. located upstream from the appliance. • Gas line sizing requirements will be determined in ANSI The bottom panel is removable if finishing material is not Z223.1 National Fuel Gas Code in the USA and CAN/ installed. See Figure 9.2. CGA B149 in Canada. • Pressure requirements when in operation are: Gas Pressure Natural Gas Propane -4I Minimum inlet pressure 5.0 in.w.c. 11.0 in.w.c. • Maximum inlet pressure 10.0 in.w.c. 13.0 in.w.c. Manifold pressure 3.5 in.w.c. 10.0 in.w.c. • Verifyinletpressures. Verifyminimumpressures when , � - a \� other household gas appliances are operating. .O'.roM,A\ • q4,4 • Install regulator upstream of valve if line pressure is � , . greater than 1/2 psig. . BOTTOM PANEL SCREW LOCATIONS ' > ' • Valve pressure taps are accessible by removing the p 0 . decorative barrier front and the bottom glass shield. . ' • Figure 9.2 Bottom Glass Shield and Bottom Panel Location VALVE PRESSURE TAPS If the finishing materials have been installed around the AA -- appliance opening, proceed as follows: J —�✓In 1. Remove bottom glass shield. .'. s r' �;y ` 2. Remove screws on left and right sides of component "' . • ! .I ' 7 heat shield and lift it out of the control cavit . ': 4.44, =�'�`- - " • CAUTION!Risk of Overheating!Comr�•' t i D _� MUST be installed before operating appliance. Electrical Figure 9.1 Valve Pressure Taps components will be damaged. 0 6/12/2 0 2 3 Heat&Glo • MEZZO36-C/ST-C,MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N AS EN61 3UILDING DEPARTMENT 3. Unplug the 6V transformer from the junction box. • - This will turn the power off to the appliance. 1 . 4. Turn the gas shutoff handle to the "OFF" position to I shut off the gas supply. R• mennommoner- --- iiiiiiiAim If additional access is needed, proceed as follows: L 5. Remove glass assembly from appliance by unlatch- ing the top spring latches from the glass frame and lifting glass frame assembly out of the bottom brack- et. 6. Remove interior media and refractory from the appli- N.,\,. %, • _ ance if already installed. ,....i 7. Remove the media tray. It is attached to the interior a ' firebox bottom with eight screws. See Figure 9.3. . 8. Remove the two screws that attach the pilot to the , burner. Figure 9.4 Gas and Electrical Access-Remove Glass Window 9. Remove the four screws securing the burner to the firebox sides and disengage burner from orifice. Re- "`"""` ""` move burner. See Figure 9.3. 10. Remove the eight screws that secure the glass window. Remove the glass window. Handle with care. See Figure 9.4. 11. Remove light tray from appliance by lifting up and out . , .__._[_ - - through the bottom glass opening. ] . z t. -PILOT SHIELD t P� II imi =-a n .-4— MEDIA TRAY -tort-tor,. d . I GAS VALVE GAS ACCESS � :- �''" BURNER 36 �r - Figure 9.5 Gas Fitting Access with Bottom Glass Shield Removed 1 E 14,C •, BURNER 48 r I ,, ;C `F BURNER 60 r , y �/� BURNER 72 "°-. 4. � RECEIVED Figure 9.3 Media Tray with Burner and Pilot Shield 0 6/12/2 0 2 3 62 Heat&Glo • MEZZ036-C/ST-C, MEZZ048-C/ST-C, MEZZO60-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev. N •APEN BUILDING DEPARTMENT D. Gas Connection E. High Altitude Installations • Refer to Section 3 for location of gas line access in NOTICE:If the heating value of the gas has been reduced, appliance. these rules do not apply. Check with your local gas utility • Gas line may be run through the left side of appliance. or authorities having jurisdiction. • The gap between supply piping and gas access hole When installing above 2000 feet elevation: may be sealed with caulk or aluminum foil tape with a • In the USA: Reduce input rate 4% for each 1000 feet minimum of 300°F continuous exposure rating or stuffed above 2000 feet. with non-combustible,unfaced insulation to prevent cold • In CANADA: Input ratings are certified without a air infiltration. reduction of input rate for elevations up to 4500 feet • Ensure that gas line does not come in contact with outer (1370 m)above sea level. Please consult provincial and/ wrap of the appliance. Follow local codes. or local authorities having jurisdiction for installations at • Pipe incoming gas line into valve compartment. elevations above 4500 feet(1370 m). • Connect incoming gas line to the 1/2 in. (13 mm) NPT Check with your local gas utility to determine proper connection on manual shutoff valve. orifice size. WARNING! Risk of Fire or Explosion! Support control when attaching pipe to prevent bending gas line. WARNING! Risk of Fire or Explosion! Gas build-up during line purge could ignite. • A small amount of air will be in the gas supply lines. • Ensure adequate ventilation. • Ensure there are no ignition sources such as sparks or open flames. Light the appliance. It will take a short time for air to purge from lines. When purging is complete the appliance will light and operate normally. WARNING! Risk of Fire, Explosion or Asphyxiation! Check all fittings and connections with a non-corrosive commercially available leak-check solution. DO NOT use open flame. Fittings and connections could have loos- ened during shipping and handling. RECEIVED 06/12/2023 Heat&Glo • MEZZO36-C/ST-C,MEZZ048-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N ASH N63 BUILDING DEPARTMENT F. Air Shutter Setting Air Shutter Settings WARNING! Risk of Explosion or Delayed Ignition! MEZZO36-C Improperly adjusted air shutter could cause soot buildup. MEZZO36ST-C NC Propane M EZZO48-C NOTICE: If sooting occurs, provide more air by opening MEZZo48ST-C the air shutter. Standard Standard Air shutter settings may be adjusted by a qualified install- GLASS RKRACTORYT Opening= Opening= er at the time of installation. The air shutter is set at the 3/16 in. Full Open factory for minimum vertical vent run.Adjust air shutter for LOG KIT 1/4 in. Full Open longer vertical runs. See Figure 9.6. Air shutter settings should be adjusted by a qualified ser- MEZZ06o-C vice technician at the time of installation. The air shut- MEZZO6OST-C NG Propane ter is set at the factory for a typical horizontal termination Standard Standard through a 2 X 6 wall. See Figure 4.11 TopVent- Horizon- GLASS REFRACTORY 9 9 Opening= Opening= tal Termination With One Elbow. KIT 3/8 in. Full Open • Refer to Gas Service Access instructions in Section 9.0 LOG KIT 3/8 in. Full Open to access the air shutter. • Loosen the 1/4 in. screw. MEZZ072-C • Twist shutter to adjust. MEZZO72ST-C NG Propane • Shutter may be open for longer horizontal vent runs. GLASS REFRACTORY Standard Standard Opening= Opening= • Do not close the air shutter more than 1/16 in.for NG or KIT 1/2 in. Full Open 1/4 in. for propane. LOG KIT 1/2 in. Full Open • Tighten the screw. Shutter Setting Verification/Flame Appearance • After 15 minutes, the flames will be a yellow/blue mix. The front flames may be blue at this time. - • After 30 minutes, the flames should be yellow with - some blue flames near the burner ports. ° ° ,4I� l • After 1 hour, the flame will be at its maximum maturity. ��// NOTICE: Flames should not appear orange or stretch ` '414 \ to the top of the firebox. If flames are dark orange with ` ���.�. , . dark, smoky tips, provide more primary air to the burner � � '\ 9 by opening the air shutter accordingly. �\ �� : .I: DETAIL ,,� ,447,40,,,,,,.„ ,„ v77 RECEIVD Figure 9.6 Air Shutter Location 06/12/2023 64 Heat&Glo • MEZZO36-C/ST-C, MEZZ048-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N •AMEN BUILDING DEPARTMENT I0 Finishing A. Facing Material Finishing Instructions It is important to follow the framing and finishing instruc- A WARNING tions to ensure proper placement of fireplace into the sur- rounding framing/finishing materials. Risk of Fire! Wall sheathing materials 1/2 in. thick are specified in DO NOT apply combustible materials beyond the min- this installation manual to properly align with the factory- imum clearances. Comply with all minimum clearanc- included non-combustible material. es to combustibles as specified in this manual. Ma- WARNING!Risk of Fire!Factory-included non-combus- terials overlapping into non-combustible zones could tible board MUST be installed. DO NOT remove or cover ignite and will interfere with air flow through decora- it with combustible material, such as: tive barrier fronts. • Drywall(gypsum board) • Metal front of appliance may be covered with non- • Plywood combustible materials only, excluding lower cover panel. See Figure 10.1. • Materials that do not meet the ASTM E 136 Non-com- bustibility standard(below). • Facing and/or finishing materials must not interfere with air flow through decorative barrier fronts, removal Removal of installed, non-combustible board and/or use of decorative barrier fronts or access for service. of materials not meeting the ASTM E 136 standard could cause fire. • Facing and/or finishing materials must never overhang into the glass opening. Non-Combustible Materials Specification • Observe all clearances when applying combustible Material which will not ignite and burn. Such materials are materials. those consisting entirely of steel, iron, brick,tile, concrete, • Seal gaps between the finished wall and appliance slate, glass or plasters, or any combination thereof. top and sides using a 300°F minimum sealant. Refer Materials that are reported as passing ASTM E 136, to Figure 10.1. Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750°C. NOTICE: Surface temperatures around the appliance WARNING! Risk of Fire! Maintain specified air space will become warm while the appliance is in operation. clearances to combustibles. Inadequate air space could Ensure finishing materials used for all surfaces(floor, walls, cause overheating and fire. mantels, etc.) will withstand temperatures up to 190°F. 4 If using vinyl flooring, refer to Section 3.E. Finishing Materials NOTICE:The maximum finishing material not only includes WARNING! Risk of Fire! Comply with all minimum clear- the decorative finish materials (marble, tile, slate, etc) but ances to combustibles as specified.Framing closer than the also the thin set, lath, and adhesive used to attach the minimums listed must be constructed entirely of noncom- decorative finish material. bustible materials(i.e., steel studs, concrete board, etc.). NOTICE: Hearth & Home Technologies recommends using multiple pieces of decorative finish material around Splatter Guard the opening of the appliance to reduce the chances of The splatter guard is a piece of corrugated material the material cracking. A single piece of decorative finish used to protect the appliance during the installation material (such as marble or granite) is more susceptible process before finishing work on the whole hearth to cracking due to uneven heating and cooling which is complete. A splatter guard is factory-installed on causes temperature differentials within the material itself. MEZZO-C models. Splatter guards must be removed The use of multiple pieces will reduce the temperature before appliance is fired. differentials in each piece and reduce the likelihood of WARNING!Risk of Fire!Remove the splatter guard be- cracks. In addition to using multiple pieces of decorative fore lighting the appliance. Shut off gas to the appliance finish material, the installation of the Passive Heat optional when the splatter guard is in place to prevent accidental heat management system will also reduce the chances of operation. cracking. RECEIVED 06/12/2023 Heat&Glo • MEZZ036-C/ST-C,MEZZ048-C/ST-C, MEZZ060-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N AB1 EN65 BUILDING DEPARTMENT B. Drywall Installation The appliance is designed to mate with 1/2 in. wall Introduction sheathing materials such as drywall, plywood, wood composites, or non-combustible materials. If the desired finished fireplace installation does not uti- lize non-combustible finishing materials (such as tile, To ensure good adhesion of drywall compounds and marble, stone, etc.), special attention must be paid to the tape, thoroughly clean the non-combustible board and installation of drywall/gypsum wallboard to the side joints surrounding drywall to remove dust. The non-combusti- of the non-combustible board to minimize potential devel- opment of cracking and paint discoloration. Hearth and Home Technologies has tested the following methods Filling and Finishing Seams and materials and therefore recommends the following 1. Step 1: Fill all gaps and joints between the non- steps for the best drywall performance. combustible board pieces and the drywall with a Attaching Non-Combustible Board general purpose chemically setting joint compound When finishing the wall around the fireplace, it is critical such as Durabond®45 Joint Compound manufactured that wall sheathing be fastened properly. Wall sheathing by USG(Sheetrock®brand), recommended by Hearth fasteners, such as screws or nails, are not permitted in & Home Technologies. Use a drywall knife to firmly some locations. See Figure 10.1. press the joint compound into all gaps. See Figure 10.1. Allow these joints to dry. It is acceptable to pre-drill holes and use self-tapped 2. Step 2: All joints are to be taped with fiberglass mesh screws in the factory-included non-combustible board tape 1 7/8" minimum width, and embedded with which may be used to lathe (a backer for tile, marble, Setting-Type joint compound,such as with Durabond® etc.). Screws being installed through the installed non- Joint Compound manufactured by USG (Sheetrock® combustible board should be self-tapping type with a brand), or equivalent. Allow these joints to dry. maximum length of 2 inches. See Figure 10.1. 3. Step 3: Depending on the technique used in steps When installing finish material on the lower cover panel, 1 and 2, two to three finishing coats are required to DO NOT drill or install screws longer than 3/4 of an inch. provide a smooth and durable finish. Hearth and Screws longer than 3/4 of an inch could penetrate the Home Technologies recommends a lightweight or all- lower cover panel causing damage to components or purpose compound. Allow each coat to properly cure. penetrate the gas line. See Figure 10.1. Allow the finishing coat(s) to cure for 24 hours before WARNING! Risk of Fire! DO NOT use screws longer operating appliance. than two inches when attaching finishing materials to in- stalled non-combustible material. Screws longer than two inches will compromise clearance and could cause over- WARNING! Risk of Fire! DO NOT apply combustible heating and fire. materials beyond the minimum clearances. Comply with WARNING! Risk of Fire, Explosion or Asphyxiation! all minimum clearances to combustibles as specified in DO NOT use screws more than 3/4 of an inch long on this manual. Materials overlapping into non-combustible lower cover panel. Longer screws may penetrate gas line zones could ignite and will interfere with air flow through or damage valve or electrical components. decorative barrier fronts. WARNING!Risk of Fire!DO NOT install drywall or other • combustible materials directly onto the installed non- combustible board. Overlapping materials could ignite. MAXIMUM SCREW LENGTH=2 INCHES (INSTALLED NON-COMBUSTIBLE BOARD) NON-COMBUSTIBLE MATERIAL ONLY IN THIS AREA • /010 Painting If desired finishing includes a painted wall, a high-quality 2 IN. 100% acrylic latex paint with a high-quality latex primer base coat are recommended around the appliance to limit discoloration. Oil-based or standard acrylic paints may be more prone to discoloration due to heat exposure. I MAXIMUM SCREW LENGTH=3/4 INCH �. (LOWER COVER PANEL) V A=NO FASTENERS IN THIS AREA Note: It is acceptable to use a high temperature silicone RECEIVED sealant to adhere drywall to lower cover panel. Figure 10.1 Screw Length Requirements 0 6/12/2 02 3 66 Heat&Glo • MEZZ036-C/ST-C, MEZZ048-C/ST-C, MEZZ060-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev.N •APEN BUILDING DEPARTMENT Drywall Joint-Crack Prevention and Repair Finishing - Hearth Drywall joints around the fireplace will be affected by ex- See Inside Fit or Overlap Method sections to determine posure to elevated temperatures, along with other envi- the necessary requirements for installation of a non- ronmental, structural factors due to new construction, and combustible hearth for this model. Only hearths made of methods used to install and finish the drywall. If a crack non-combustible materials are allowed. does emerge adjacent to the fireplace, it can be perma- nently repaired by filling it with a paintable latex caulk, Decorative facing material thickness is measured from followed by repainting. the face of the installed non-combustible board. See Some movement of the screws used to secure the non- Figure 10.2 and Figure 10.3. combustible board to the appliance/surround framing is The fronts for this appliance are compatible with non- expected. If a blemish begins to show over a screw head, combustible materials. See Figure 10.2 and Figure 10.3. sand the surface to remove the blemish and repaint. Refer to Section 1.E and 1.F of this manual for definitions and qualifications of non-combustible and combustible WARNING! Risk of Fire! Maintain specified air space materials. clearances to combustibles. Inadequate air space could Specific requirements for each method of installation are cause overheating and fire. described in this section. WARNING!Risk of Fire! Maintain specified air space Installation of finishing materials can be accomplished clearances to combustibles. Failure to comply with by either the "overlap" or "inside-fit" method, depending these instructions may cause a fire or cause the appli- on what type of decorative barrier front is to be installed. ance to overheat. See Figure 10.2 and 10.3. Overlap fit decorative barrier fronts include the Quattro and Loft Forge. The Clean NOTICE: The location of the Passive Heat discharge Face Trim Front (CFT) can be either an inside fit or an opening could allow for venting and other construction overlap fit. See Table 1. materials to be visible. It is acceptable to paint the vent pipe and other construction materials using a high temperature paint with a minimum of 300°F continuous exposure rating. Hearth & Home Technologies recommends using black 1/2 IN.THICK WALL touch up paint(part number TUP-GBK-12) available from SHEATHING your Hearth & Home Technologies dealer. — — Facing Material • Facing and/or finishing materials must not interfere with air flow through decorative barrier fronts. - - NON-COMBUSTIBLE • Facing and/or finishing materials must never overhang FINISHING MATERIAL Into the glass opening. OVERLAP FIT=0-1 IN.THICK INSIDE FIT=1-4 IN.THICK • Observe all clearances when applying combustible materials. ° _ FINISHING GUARDS BOTTOM FINISHING 'TEMPLATE • • Figure 10.2 Finishing and Facing Materials-Single-Sided Models RECEIVED 06/12/2023 Heat&Glo • MEZZO36-C/ST-C,MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N AB1EN67 3UILDING DEPARTMENT Decorative Barrier Front Finishing Method Material Thickness Trim Ring Included & Not Used (Option #1) Inside Fit 1-4 inches Clean Face Trim (CFT) Included & Used (Option#2) Overlap Fit 0-1 inch Included & Used Quattro/Loft Forge Overlap Fit 0-1 inch Not included Table 1 1/2 IN.THICK E WALL SHEATHING NON-COMBUSTIBLE-- < NON-COMBUSTIBLE FINISHING MATERIAL 1/2 IN. FINISHING MATERIAL OVERLAP FIT=0-1 IN.THICK INSTALLED OVERLAP FIT=0-1 IN.THICK INSIDE FIT=1-4 IN.THICK NON-COMBUSTIBLE STISLE INSIDE FIT=1-4 IN.THICK / D \/ IAI ■ ° I iD`` a • / \ FINISHING FINISHING GUARDS GUARDS • \ '' . . BOTTOM FINISHING TEMPLATE (Control side only) • ° •o� ° Figure 10.3 Finishing Materials-See-Through Models RECEIVED 06/12/2023 68 Heat&Glo • MEZZ036-C/ST-C, MEZZ048-C/ST-C, MEZZ060-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev.N •APEN BUILDING DEPARTMENT C. Decorative Barrier Fronts Note: When a Clean Face Trim decorative barrier front WARNING! Risk of Burns!A decorative barrier front is is installed, the rectangular holes in bottom access panel required for this model. DO NOT operate this appliance will be covered. without a decorative barrier front in place. NOTICE: This one inch maximum not only includes the Only decorative barrier fronts certified for use with this ap- decorative finish materials(marble, tile, slate, etc)but also pliance model may be used. Contact your dealer fora list the thin set,lath and adhesive used to attach the decorative of decorative barrier fronts that may be used. finish material. 1. Remove bottom finishing template from bottom access Note: See appliance Owner's Manual for TV mounting panel. Verify that factory-installed finishing guards are guidelines. installed to ensure finishing material does not extend into the fireplace opening. See Figure 10.2 and 10.3. The decorative barrier fronts approved for use with this appliance have been designed to be installed by two 2. The non-combustible finish material, 0-1 inch thick, methods: Overlap Fit or Inside Fit. Before beginning the should be installed up to the fireplace opening on all installation, it is important to determine which method will four sides, including the bottom access panel, cover- be used. ing the eight rectangular holes. Refer to Figure 10.4 for minimum finished opening dimensions. Clean Face Trim Front (CFT) WARNING!Risk of Fire!DO NOT apply finishing mate- rial beyond the finishing guard. Appliance will overheat if Overlap Fit (0-1 Inch Thick Finishing Method) finishing material extends into appliance opening. NOTICE: Decorative barrier front will not fit properly if Non-Combustible Finish Materials finishing material is applied beyond the finishing guard. 3. Follow Overlap Fit section of the instructions provided WARNING! Risk of Fire! DO NOT apply combustible with decorative barrier front. materials beyond the minimum clearances. Comply with all minimum clearances to combustibles as specified in this manual. Overlapping materials could ignite. Decorative Barrier Front Finishing Method Material Thickness Trim Ring Clean Face Trim (CFT) Overlap Fit 0-1 inch Included & Used 39-1/8 IN.MEZZ036-C/MEZZ036ST-C 51-1/8 IN.MEZZ048-C/MEZZ048ST-C o 63-1/8 IN.MEZZ060-C/MEZZO6OST-C ' 75-1/8 IN.M EZZ072-C/M EZZ072ST-C 15-3/4 IN. FIREPLACE VIEWING AREA . • - tl I I I • I I I I lam• • • RECEIVED 06/12/2023 Figure 10.4 Minimum Finished Opening Dimensions-Clean Face Trim Front Method Heat&Glo • MEZZO36-C/ST-C,MEZZ048-C/ST-C, MEZZ060-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N ABFIEN6g BUILDING DEPARTMENT Clean Face Trim Front (CFT) With Decorative Trim Ring: (Option #2) Inside Fit(1-4 Inches Thick Finishing Method) The trim ring, which is included with the CFT front, will be installed and used as a finishing template. It will be left exposed. Non-Combustible Finish Materials 1. Remove finishing template from bottom access panel. WARNING! Risk of Fire! DO NOT apply combustible 2. Remove top and bottom finishing guards. materials beyond the minimum clearances. Comply with all minimum clearances to combustibles as specified in 3. Install trim ring (included with CFT decorative barrier this manual. Overlapping materials could ignite. front). Push trim ring completely into the opening. 4. Place trim ring into position and install the four shoul- Note: When a Clean Face Trim decorative barrier front der bolts through the trim ring as shown in Figure 10.6. is installed, the rectangular holes in bottom access panel Install the screw as shown in Figure 10.5. will be covered. Finishing materials may be installed up to the trim ring but NOTICE: This four inch maximum not only includes the must not extend beyond it. See Figure 10.7. decorative finish materials(marble, tile, slate, etc)but also NOTICE:It is recommended that high temperature silicone the thin set,lath and adhesive used to attach the decorative sealant(500°F minimum continuous exposure rating) be finish material. used to adhere the trim ring to the finishing material. There are two options for this method of finishing: WARNING! Risk of Fire!DO NOT apply finishing mate- CFT Finishing Method Trim Ring rial beyond the trim ring. Appliance will overheat if finish- Included & Not Used ing material extends into appliance opening. (Option #1) Inside Fit Included & Used (Option #2) Without Decorative Trim Ring: (Option #1) 1111\‘111k: Note: You will not use the trim ring,which is shipped with the CFT front, for this application. 1. Remove bottom finishing template from bottom access panel. Verify that factory-installed finishing guards are go 1 installed to ensure finishing material does not extend .�,�� into the fireplace opening. See Figures 10.2 and 10.3. ow 4 ' lift!'2. The non-combustible finish material, 1-4 inches thick, Figure 10.5 Install Trim Ring should be installed up to the fireplace opening on all four sides, including the bottom access panel, cover- III ing the eight rectangular holes. Refer to Figure 10.4. WARNING!Risk of Fire!DO NOT apply finishing mate- OP rial beyond the finishing guard. Appliance will overheat if - finishing material extends into appliance opening. ,/i. ) NOTICE: Decorative barrier front will not fit properly if finishing material is applied beyond the finishing guard. - II 11000 • II 3. Follow Inside Fit section of the instructions provided - with decorative barrier front. ` � WARNING!Risk of Fire! c < ��` • If a Clean Face Trim (CFT) front has been installed and \ , i� is to be replaced with a Quattro or Loft Forge decorative SHOULDER NN.41 BOLTS(4) \.. barrier front, the finishing material MUST be removed to BOTTOM PANEL reveal the eight rectangular holes on the bottom access BOTTOM GLASS SHIELD panel. �' __ BOTTOM FINISHING TEMPLATE ` .I' 0. 20 • • Overheating and fire could occur. RECTANGULAR HOLE I I. 'al ',.; �+r"' : • ;23 Figure 10.6 Install Shoulder Bolts 70 Heat&Glo • MEZZ036-C/ST-C, MEZZ048-C/ST-C, MEZZ060-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev. N •APEN BUILDING DEPARTMENT Finishing -Raised Hearth in Front of Appliance A non-combustible hearth may be installed in front of the appliance only if the inside fit finishing method with CFT TRIM RING INSTALLED decorative barrier fronts is used. 1 ..I --- ""'"' ' 1. Non-combustible hearth material may be placed up to the bottom edge of the trim ring. The hearth may be a maximum of twelve inches in depth. II L CFT FRONTS ONLY FINISF TO THIS EDGE OF TRIM RING F lr r IFINISH TO THIS EDGE • III Mili • •I 0 • • CFT FRONTS ONLY TRIM RING NONi COMBUSTIBLE HEARTH < 12 IN.MAX —* Figure 10.7 Non-Combustible Finish Material Diagram for 1-4 Inch Thick Inside Fit Method Using Trim Ring (Option#2) Figure 10.8 Finishing and Facing Materials-Inside Fit CFT Decorative Barrier Front Only RECEIVED 06/12/2023 Heat&Glo • MEZZO36-C/ST-C,MEZZ048-C/ST-C, MEZZ060-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N +A'BI EN71 3UILDING DEPARTMENT Quattro and Loft Forge Decorative Barrier Front Overlap Fit (0-1 Inch Thick Finishing Material Only) Non-Combustible Finish Materials Decorative Barrier Front Finishing Method Material Thickness Trim Ring Quattro/Loft Forge Overlap Fit 0-1 inch Not included WARNING! Risk of Fire! DO NOT cover rectangular WARNING! Risk of Fire! DO NOT apply finishing mate- holes on bottom access panel when installing overlap rial beyond the top finishing guard and the bottom finish- fronts. ing template. Appliance will overheat if finishing material WARNING! Risk of Fire! DO NOT apply combustible extends into appliance opening. materials beyond the minimum clearances. Comply with 1. Follow instructions provided with decorative barrier all minimum clearances to combustibles as specified in front for installation. this manual. Overlapping materials could ignite. NOTICE:If one inch maximum finishing material thickness NOTICE: Decorative barrier front will not fit properly if is exceeded, the decorative barrier front will not fit. This finishing material is applied beyond the finishing guard. one inch maximum not only includes the decorative finish materials(marble, tile, slate, etc)but also the thin set, lath and adhesive used to attach the decorative finish material. The non-combustible finishing material, 0-1 inch thick, should be installed up to the fireplace opening on the top and sides. Use the factory-installed top finishing guard to ensure the finishing material does not extend into the fireplace open- ing. Non-combustible finishing material should be installed on the bottom up to the bottom finishing template. See Figure 10.9. Do not cover the eight rectangular holes on the bottom access panel. See Figure 10.10 for minimum finished opening dimensions. 0 • 0 • 0 • BOTTOM FINISHING TEMPLATE • • L L BOTTOM PANEL =I = RECTANGULAR ACCESS HOLES RECEIVED _ _ DO NOT COVER Figure 10.9 Non-Combustible Finishing Material Diagram for 0-1 Inch Thick Overlap Fit Method(Quattro/Forge) 0 6/12/2 02 3 72 Heat&Glo • MEZZ036-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZ072-C/ST-C Installation Manual • 2600-980 Rev. N •APEN BUILDING DEPARTMENT WARNING! Risk of Fire! DO NOT apply combustible materials beyond the minimum clearances. Comply with all minimum clearances to combustibles as specified in this manual. Overlapping materials could ignite. 0 0 0 39-1/8 IN.MEZZ036-CIMEZZ036ST-C 51-1/8IN.MEZZ0.48-CIMEZZ048ST-C > ° • • • 63-118 IN.MEZZ060-CIMEZZO6OST-C �1 . 17-1/4 IN. FIREPLACE VIEWING AREA • mmilao .I • II 11 1 I I • I I I I I Imo. • • Figure 10.10 Minimum Finished Opening Dimensions-Overlap Fit Method(Quattro and Loft Forge Decorative Barrier Fronts Only) RECEIVED 06/12/2023 Heat&Glo • MEZZO36-C/ST-C,MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N ABI EN73 BUILDING DEPARTMENT D. Mantel and Wall Projections Note:All measurements in inches. WARNING! Risk of Fire! Comply with all minimum clear- MAX. ances to combustibles as specified. Framing closer than the 6I Al minimums listed must be constructed entirely of noncom- 31 A bustible materials(i.e., steel studs, concrete board, etc.) A If the Passive Heat kit will be installed, see Figure 10.19 for details regarding clearances to combustibles in addi- tion to the requirements for Combustible and Non-Com- bustible Mantel diagrams and the Mantel Leg/Wall Pro- 30 jection diagrams (Figure 10.11-Figure 10.18). I 2' 24 Note: For non-combustible fireplace finish material (marble, stone, etc)specifications refer to Section 10.A. ° o � TOP OF APPLIANCEOPENING ° c v v r C 0— MEASUREMENT FROM TOP EDGE OPENING Measurement from top edge opening Figure 10.11 Location of Appliance Opening m to bottom of appliance=24-1/2 IN. Note: Minimum distance from top edge opening to ceiling can be found in the Framing and Clearances section 3.B. Figure 10.13 Minimum Vertical and Maximum Horizontal Dimensions of Combustibles-MEZZO60-C, Combustible Mantels MEZZO6OST-C,MEZZO72-C and MEZZO72ST-C MAX. 121 91 Note: All measurements in inches. s� T 31 A MAX. 1I A A 16 29 — I 26 6 23 A 20 5 18 • A 4 18 3 11 —p 2 10 t 9 v v ° 1 8 MEASUREMENT FROM C TOP EDGE OPENING . = 6 MEASUREMENTS FROM TOP EDGE Measurement from top edge opening OF THE APPLIANCE OPENING to bottom of appliance=24-1/2 IN. Note:All measurements in inches. Measurement from top edge of opening to bottom of appliance=24-1/2 IN. Figure 10.14 Minimum Vertical and Maximum Hdrizo nt l ` '' ' '" Figure 10.12 Minimum Vertical and Maximum Horizontal Dimensions of Combustibles-Passive Heat Kit Dimensions of Combustibles-MEZZO36-C, Installed(All Sizes) 0 6/12/2 0 2 3 MEZZO36ST-C,MEZZO48-C and MEZZO48ST-C 74 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N •APEN BUILDING DEPARTMENT Non-Combustible Mantels OVERLAP FIT (QUATTRO/LOFT FORGE) INSIDE FIT (CFT) Note:All measurements in inches. Note:All measurements in inches. MAX. MAX. 16 A 16 A 7 6 A 18 A 6 5 A I 5 3 4 A 18 11 A 11 �n 2 10 g 10 g ral 4 1 1 8 v v v v El • -•MEASUREMENTS FROM TOP EDGE ° v v v OF THE APPLIANCE OPENING MEASUREMENTS FROM TOP EDGE OF THE APPLIANCE OPENING Measurement from top edge of opening to bottom of appliance=24-1/2 IN. Measurement from top edge of opening to bottom of appliance=24-1/2 IN. Figure 10.15 Minimum Vertical and Maximum Horizontal Figure 10.16 Minimum Vertical and Maximum Horizontal Dimensions of Non-Combustibles-Overlap Fit Dimensions of Non-Combustibles-Inside Fit Finishing Finishing Mantel Legs Or Wall Projections Extending Past The Face Of The Fireplace(Combustible or Non-Combustible) 0 0 TOP VIEW TOP VIEW 4-1/2 IN. 7 IN. MINIMUM 3 FT. MAXIMUM MINIMUM UNLIMITED FIREPLACE OPENING — FIREPLACE OPENING See Appliance Dimension Diagram-Dimension B See Appliance Dimension Diagram-Dimension B Figure 3.1 (MEZZO36-C, MEZZO48-C) Figure 3.1 (MEZZO36-C, MEZZO48-C) Figure 3.2(MEZZO60-C, MEZZO72-C) Figure 3.2 (MEZZO60-C, MEZZO72-C) Figure 3.3(MEZZO36ST-C, MEZZO48ST-C) Figure 3.3 (MEZZO36ST-C, MEZZO48ST-C) Figure 3.4(MEZZO6OST-C, MEZZO72ST-C) Figure 3.4(MEZZO6OST-C, MEZZO72ST-C) RECEIVE Figure 10.18 Mantel Leg or Wall Projections �� Figure 10.17 Mantel Leg or Wall Projections (Acceptable on both sides of opening) (Acceptable on both sides of opening) 0 6/12/2 0 2 3 Heat&Glo • MEZZO36-C/ST-C,MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N tA'BEEN75 3UILDING DEPARTMENT Clearances with Passive Heat Optional Heat Management System Figure 10.19 shows the required clearances for appliance, ceiling finishing material and framing members. Ensure all clearances are maintained. Good Faith Guidelines for TV Installations Above a MEZZO-C Fireplace with Passive Heat Option (Single-Sided Appliance Shown) WARNING! Risk of Fire! Wire mesh required on bottom of discharge opening when discharge opening is greater than 3 inches. Secure wire mesh to top of framing. 1-1/2 IN.(2 X 4 FRAMING) ROOM CEILING 2 IN.MIN. CHASE CEILING-SEE FIGURES 3.14&3.16 Required for non-ducted front and side 4 IN.MIN. 1/2 IN.X 1/2 IN. discharge passive heat installations. WIRE MESH* V WIRE MESH* =PASSIVE HEAT DISCHARGE OPENING 2 X 4 FRAMING 2X4OR2X6 TV—* FRAMING FIREPLACE OPENING �5Z 12 IN.MIN. • p • `IY A • Measurement from top edge ' • of opening to bottom of • • appliance=24-1/2 IN. *Wire mesh required for front discharge or open top discharge passive heat installations with discharge opening of 3 inches or greater. RECEIVD Figure 10.19 Clearances with Passive Heat Optional Heat Management System Installed 0 6/12/2 02 3 76 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N •AMEN BUILDING DEPARTMENT 11 Appliance Setup A. Fixed Glass Assembly Removal and Re- B. Remove the Shipping Materials/Install placement Bottom Glass Shield WARNING! Risk of Asphyxiation! Handle fixed glass Remove shipping materials from inside or underneath assembly with care. Inspect the gasket to ensure it is the firebox. Verify all components are with the fireplace. undamaged and inspect the glass for cracks, chips or Unwrap the bottom glass shield and replace in the same scratches. location as shown in Figure 11.2. • DO NOT strike, slam or scratch glass- • DO NOT operate fireplace with glass removed, cracked, o , _ broken or scratched. • Replace as a complete assembly. Removing Fixed Glass Assembly • 1. Remove the decorative barrier front from fireplace and • set aside on work surface. 2. Remove bottom glass shield. See Figure 11.2. • e 3. Locate the glass latches that are on the upper edge of oT To4f ei the glass frame of the appliance. See Figure 11.1. -Us. 4. Use both index fingers to release the glass clips. s6,/F4o , 5. Allow glass to tilt forward. Grasp glass on the upper • •return lip of glass frame and lift up and out. The glass • should lift easily out of the bottom retaining lip. 0 Replacing Fixed Glass Assembly • 1. Locate retaining lip on lower front face of firebox. — Figure 11.2 Bottom Glass Shield Location 2. Place glass assembly into retaining lip end. Tilt top of glass assembly toward fireplace. 3. Assure proper left to right placement of glass and CAUTION!Risk of Overheating!DO NOT remove com- engage all four spring latches. ponent insulation from top of component heat shield. 4. Replace bottom glass shield and decorative barrier Electrical components will be damaged. front. e - a GLASS CLIPS • 4';`. ` ` wr p!t'4 .•r I _ :� COMP• [�T ;�� - 11, i i Figure 11.3 Component Insulation Location a •• RECEIVED BOTTOM RETAINING LIP 0 6/12/2 0 2 3 Figure 11.1 Fixed Glass Assembly Heat&Glo • MEZZO36-C/ST-C,MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N ,A IKN77 BUILDING DEPARTMENT C. Clean the Appliance D. Install Glass Refractory Panels Clean/vacuum any sawdust that may have accumulated CAUTION!Risk of Cuts or Abrasions. Wear protective inside the firebox or underneath in the control cavity. gloves and safety glasses during installation. NOTICE: Handle refractory panels with care. Refractory Optional Passive Heat Kit Installations Only: may chip or crack if dropped or impacted. WARNING!Risk of Fire!Remove all debris and objects from firebox top and appliance top before operating the Glass Panel Instructions appliance. See-Through Models: See Section B Inspect for and remove all debris that may have A. Single-Sided Models accumulated or objects that may have been placed on 1. Set back glass panel, labeled A in Figure 1, into firebox the firebox top and appliance top during the installation on top of the two back glass spacer blocks, with the process. All debris and objects must be removed prior to smooth side of the glass facing outward. Position the operation of the appliance. Firebox top and appliance top retaining bracket inside appliance as shown in Figure are shown in Figure 11.4. 3. Line up the hole in the heat shield with the hole closest to the bend in the bracket and secure in place APPLIANCE TOP with a screw. See Figure 2 and Figure 3. 2. Bend the hand bend on the bracket down 90 degrees. FIREBOX TOP See Figure 4. 3. Install side glass brackets by pushing up on the corner ----�. of the top heat shield and use two self-tapping screws „��r �— • to secure the bracket to the firebox. See Figure 5. us. 4. Install the left side panel, labelled "B" in Figure 1, by sliding it into place from the front. While installing, press the panel firmly against the firebox side. 5. Bend the tab on the glass bracket toward the side glass panel until a 1/16 inch- 1/8 inch gap is created between 11 the tab and the side glass panel. See Figure 6. 6. Repeat for other side. Figure 11.4 B. See-Through Models: 1. Set left side glass panel, labeled B in Figure 1, into firebox with the smooth side facing outward. 2. Bend the hand bend on the bracket down 90 degrees. See Figure 4. 3. Install side glass brackets using one self-tapping screw to secure the bracket to the firebox. See Figure 7. 4. Bend the tab on the glass bracket toward the side glass panel until a 1/16 inch-1/8 inch gap is created between the tab and the side glass panel. See Figure 6. 5. Figure 7 shows retaining bracket installed. Repeat for other side. RECEIVED 06/12/2023 78 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N •APEN BUILDING DEPARTMENT / - B A* C RETAINI,N'G BRACKET i-44 1! ,. • 0: *Back panel used in single-sided models ' Figure 1 Placement of Glass Panels GLASS SPACER BLOCKS (2) Figure 5 Retaining Bracket Installation-Side Panel \ I _ — — _=. r �_ — — i - �� `��- �� s- + _ Ili .11111W -.mom INNIMb - ..111nr. ,v, . walla UMW MI.& '4( GAP = Figure 2 Glass Spacer Block Location -Back 1/16 IN. - 1/8 IN. • .. ii 11; • 711-1-1__ % _ . Figure 6 Gap Between Tab and Side Glass Panel: 1/16 IN.-1/8 IN. Figure 3 Retaining Bracket Installation-Back fl - HAND BEND TAB % AZ • %/ + , { 23 Figure 4 Retaining Bracket-Side Panel Figure 7 Retaining Bracket Installation-See-Throug Models Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C, MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N ABEEN7g 11ILDING DEPARTMENT E. Install Media H. Install Decorative Barrier Front Media kits are available for use with the MEZZO WARNING!Risk of Fire!Install ONLY decorative barrier models. Install glass media or stone media according to fronts approved by Hearth & Home Technologies. Unap- instructions included with the media kit. proved decorative barrier fronts could cause fireplace to overheat. F. Install Log Set (Optional) IMPORTANT! This fireplace requires an installed decorative barrier front to prevent direct contact with An optional log set is available for use with the MEZZO the hot viewing glass. DO NOT operate the fireplace models. Install the log set per instructions included with kit. with the barrier removed. Contact your dealer or Hearth & Home Technologies if the barrier is not present or help is needed to properly install one. G. IntelliFire Touch® Control System Setup For more information refer to the instructions supplied with • Detailed instructions for electrical wiring and your decorative barrier front. connections are provided in Section 8. • Determine if this appliance is equipped with a Module Reset Switch. See Section 8. Verify this switch is in the ON position. • Verify that the 3-Position switch on the IFT-ECM is switched to the REMOTE position. Detailed Operating Instructions for the IFT-ECM are provided in Section 3.K of the Owner's Manual. TOP VIEW ■ O3 POSITION SWITCH F---1 E0 1 � _ 0 Plotai® o00 ISO Isom 3 = LPt n7 LED INDICATOR Figure 11.5 IFT-ECM This appliance is factory-equipped with an IntelliFire Touch remote control. The remote was paired to the fireplace and tested at the factory. It does not need to be paired again, unless an accessory kit will be added at the time of installation. If no additional accessory will be added, simply follow steps one through seven below. 1. If installed, remove batteries from remote. 2. Verify that the new appliance has power and secure electrical connections. 3. Adjust the ECM selector switch to `REMOTE' mode. 4. Switch the master reset switch to 'ON' (if equipped). 5. Wait to verify LED indicator on the ECM stops flashing. 6. Install batteries in the RC400 remote. 7. The RC400 remote will automatically pair to the appliance as pre-set at the factory. RECEIVED 06/12/2023 80 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N •APEN BUILDING DEPARTMENT 12 Reference Materials A. Vent Components Diagrams ^ I Pipe Effective Length , Inches Millimeters 10-1/2 in. Effective DVP4 4 102 (267 mm) ow�\\,\ 45° Height/Length DVP6 6 152 I DVP12 12 305 4-7/8 in. �� DVP24 24 610 (124 mm) I of o i I DVP36 36 914 10-7/8 in. ► (276 mm) DVP Pipe(see chart) DVP48 48 1219 DVP6A 3 to 6 76 to 152 DVP45(45°Elbow) DVP12A 3 to 12 76 to 305 11-318 in. 20-3/4 in. (289 mm) (527 mm) _ A I I - 10 in. 4— 1 in. (254 mm) (25 mm) Tab-1 in. 177-318 in. 4. (25.4 mm) (187 mm) am �� 1-1/4 in.(32 mm) 10 in. Finished Height:19-3/4 in./502 mm (254 mm) 14_9-114 in. UNIV-AS2(Attic Insulation Shield) (235 mm) 1/2 in. TYP < 13-114 in. (13 mm) (337 mm) DVP9OST(90°Elbow) 10 in. 1-1/2 in. DVP-FS(Ceiling Firestop) (254 mm)--).1 — 1 (38 mm) UP * 1 5 in. 12 in. (127 mm) (305 mm) 2 � A >" 12 in. of _01 1 in. (305 mm) .4_(25 m.m) DVP-HVS(Vent Support) A A / I I i i + + i 8 in. i i (203 mm) t 14 in. (\°5- ----- L (356 mm) i i 141N. 201N. (356 MM) \ / (508 MM) \ / Y -- Y ° bin. 14 IN. *I (152 mm) (356 MM) 14 121N. I \ / I (305 MM) DVP-WS(Wall Shield Firestop) DVP-RDS ROOF DECK INSULATION SHIELD RECEIVE( Figure 12.1 DVP Vent Components 0 6/12/2 0 2 3 Heat&Glo • MEZZO36-C/ST-C,MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N AS1 EN81 BUILDING DEPARTMENT A. Vent Components Diagrams (continued) Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm).The heat shield is designed to be used on a wall 4 in.to 7-1/4 in.(102 mm to 184 mm)thick. If wall thickness is less than 4 in. (102 mm)the existing heat shields must be field trimmed. If wall thickness is greater than 7-1/4 in. (184 mm)a DVP-HSM-B will be required. 8 in. (203 mm) I Heat A I Shield FiaTot 15-1/8 in. 1 1I. (127mm)(384 mm) IITT Center of the horizontal vent pipe to j- -0 the vertical measuring surface. i I. _ V . o , >I k` 12 in. Term Cap Minimum Maximum Max (305 mm) Effective Effective Length Effective Length Length 3-1/8 in. 4-5/8 in. Trap1 DVP-TRAP 79 mm 117 mm Horizontal Termination Cap 5-3/8 in. 9-3/8 in. Trap2 137 mm 238 mm L ' J �8• • a E D IO r _._ q �B. 0 . . J EAR ID. DVP-TRAP1 DVP-TRAP2 r al i • . , ,,.. a., 1: 1 .,. . -_ ➢_. D.I. , ➢B,. DVP-TRAPKI DVP-TRAPK2 es i1HI l DVP-HPC1 DVP-HPC2 RECEIVED Figure 12.2 DVP Vent Components 0 6/12/2 0 2 3 82 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N -ASPEN BUILDING DEPARTMENT A. Vent Components Diagrams (continued) 31 in.. (787 mm) 13-1/4 in. (337 mm) 24-5/8 in. (625 mm) 24-5/8 in. 27-1/2 in. (625 mm) (699 mm) 13-1/4 in. 337 mm) RF6 RF12 Roof Flashing Roof Flashing 11-7/8 in. 5 in. b (302 mm) (127 mm) 7 IN. \ t— • (178 mm) — 7 IN. 7\ (178 mm) 4-151161N. 13-7/8 in. (1 mm) (352 mm) 14 121N. 7/81N. f , (305 mm) (22 mm) —* F1/21N. / (13 mm) TRAP-VSS DVP-BEK2 Vinyl Siding Shield DVP-HPC Cap Brick Extension 11-5/8 in. \ (295 mm) LEE U4,, ,,_ off® m 12-1/8 in. __ 1 f 1/8in (308 mm) - -- �J�J • 1 k 5-3/4 in..1 I � DVP-TRAPFL (146 mm) COOL-ADDM Flashing Cap Shield 13-7/8 in. 9-1/2 in. (352 mm) (241 mm) H H< >1 h. 60 in. 660 mm 14 in. (356 mm) i*4$ oo oo 1 DVP-HSM-B DRC-RADIUS Extended Heat Shield Cap Shield RECEIVED Figure 12.3 DVP Vent Components 0 6/12/2 02 3 Heat&Glo • MEZZO36-C/ST-C,MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N A61EN83 BUILDING DEPARTMENT A. Vent Components Diagrams (continued) 7-3/8 in. —* (187 mm) EI 1-1/2 in. ,� ■ LJ ■ (38 mm)—* ±il _ 12 in. 14 in. II 17-3/4 in. I�305 mm -I (356 mm) (451 mm) �` T 184 in. in. (184 mm) 152 mm 12-1/2 in. 1� ' � � � � (318 mm) IiiiiiiJ_Iiiiid11111 � 5-1/4 in. 12 in. !-- (133 mm) I, (305 mm) . DVP-TB1 111 DVP-TVHW Basement Vent Cap VerticalTermination Cap(Highwind) Aa 16-7/8 in. 'Il ■ 14 in. HOT (429 mm) 110 (356 mm) II 12 in. (305 mm) 7-1/8 in. 12-1/8 in. (181 mm) -11-(314 mm) ..................r; 8-3/4 in. 11 1 (222 mm) 1 II IL 1-5/8 in. (41 mm) DVP-HPC High Performance Cap 8-1/8 in. 13 in. (206 mm) (330 mm) Effective Length t ' 5-3/4 to 8-3/8 in. 5-1/2 in. 8-3/8 in. \ 146to213mm 140mm 213mm I 3°h- 15 in. MI (Th. (381 mm) _ - =t 267 mm II n 10-7/8 276 mmin. r ` , it DVP-HRC-SS DVP-HRC-ZC-SS RECEIVED Figure 12.4 DVP Vent Components 0 6/12/2 C 2 3 84 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N •ASREN BUILDING DEPARTMENT A. Vent Components Diagrams (continued) DECORATIVE TERMINATIONS/SHROUDS Only use listed decorative termination caps/shrouds with 7.38 N. Hearth & Home Technologies approved venting systems. 187mm This applies to both DVP and SLP venting systems. z s ° ° ' Decorative Terminations Caps/Shrouds I■ 17-718 IN. • r��° 14 N 454 mm DTO 134 ..�" 356mm DT0146 DTS134 i ° DTS 146 < 12 IN. > e LDS33 305mm LDS46 SLP-TB1 1I LDS-BV Basement Vent Cap '° HpTf Figure 12.5 Vent Components TOP VIEW Required Wire Harness and PVV-SLEEVE Lengths Available Part Number 10 ft. PV Wire Harness PVI-WH10 20 ft. PV Wire Harness PVI-WH2O 40 ft. PV Wire Harness PVI-WH40 13-11/16 IN. 60 ft. PV Wire Harness PVI-WH60 \�111110 1-3/4 IN. 80 ft. PV Wire Harness PVI-WH80 \,--4 N. 100 ft. PV Wire Harness PVI-WH100 Description Part Number I SIDE VIEW -i- A 12 in. Wire Harness Sleeve PVV-SLEEVE-12 48 in. Wire Harness Sleeve PVV-SLEEVE-48 &::\ 13-5/8 IN. — � 3-11161N. + 5- /8 1N. mmi lil / 1 012-1/8IN. ► PVV-SLP Vertical Power Vent Note: A wire harness is required to power the PVV-SLP and connect it to the appliance. It is ordered separately from the PVV-SLP. Contact your dealer to order. Note: The PVV-SLEEVE-12 and/or PVV-SLEEVE-48 is required to be installed with the PVV-SLP. It is ordered separately from the PVV-SLP. Contact your dealer to order. Figure 12.6 PVV-SLP Vent Components 0 6/12/2 0 2 3 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C, MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N , B1 EN85 JILDING DEPARTMENT 13-5/s IN. Optional Wire Harness EFFECTIVE LENGTH 346m\4 DESCRIPTION PART NUMBER 32 IN.(813 mm)MIN. 351N.(889 mm)MAX.," 1 �� 10 FT PV Wire Harness PVI-WH 10 14/� • 1,1120 FT PV Wire Harness PVI-WH2O v1 _ 40 FT PV Wire Harness PVI-WH40 I12.1/2 IN., 318mm 60 FT PV Wire Harness PVI-WH60 ! _80 FT PV Wire Harness PVI-WH80) 100 FT PV Wire Harness PVI-WH100 ` 527 mm Note: Wire harnesses required to power the PVI-SLP-B PVI-SLP-B connect to the appliance and are ordered separately from Power Vent Inline PVI-SLP-B. Contact your dealer to order. Note: SLP-LPC, SL-2DVP and DVP-2SL components must be accompanied by a PVI-SLP-B. - 161N. 406 mm 4.112 IN. 151N.—I 114 mm— (381 mm) J 9.3/16IN_� (233 mm) I - t 13-5/8 IN. 16.11116 IN. 16-11116 IN. (346 mm) 424 mm (424 mm) - ,,t, I. ... , i 4-12.1121N� SLP-LPC (318mm) SLP Low Profile Cap (Approved for use with PVI-SLP-B only) 6-11/16 in. 3-15/16 in. 6-3/8 in. 4-3/16 in. W169 mm) I —*I I4—(101 mm) 163 mm 14-106 mm 3-15/16 in. 3-13///1fi IIIIIIIIIIIIIIIIIIIIIIII (101 mm) 4 in. 4-5/8 in.' (97 mm) � 102 mm - - 1171mm —� 5-1/16 in. 8-1/8 in 5-1/16 in. 8 in. (128 mm) (203 mm) 206 mm 128 mm SL-2DVP DVP-2SL Adapter Adapter RECEIVED Figure 12.7 PVI-SLP-B Vent Components 0 6/12/2 0 2 3 86 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N -ASPEN BUILDING DEPARTMENT A. Vent Components Diagrams (continued) Top View • I 611/4IN. 1y9mm 1-1/2 IN. 38 mm Front View Side View 2-1/4 IN. 15-1/2 IN. 57 mm 14—394mm y • 4 3/4 IN. g IN. • 121 mm 14 IN. i 9-1/2 IN. 356 mm 203 mm 241 mm i • •HOW _,.5-1/4 IN.F A -135 mm 11-1/2IN. 4-3/8IN— �101N.� 292 mm 112 mm 254 mm 2-1/4 IN. 57 mm PVLP-SLP Power Vent Low Profile Note: Wire harnesses required to power the PVLP-SLP connect to the appliance and are ordered separately from PVLP-SLP. Contact your dealer to order. Note: A PVLP-HS heat shield is available and sold separately. Use if the PVLP-SLP is installed in a high traffic area. Required Wire Harness DESCRIPTION PART NUMBER 10 FT PV Wire Harness rPVI-WH10 I 20 FT PV Wire Harness PVI-WH2O �p�p 40 FT PV Wire Harness PVI-WH40 000000980 60 FT PV Wire Harness PVI-WH60 000000'0° 80 FT PV Wire Harness PVI-WH80 0000 100 FT PV Wire Harness PVI-WH100 PVLP-BEK PVLP-HS Heat Shield Brick Kit RECEIVED Figure 12.8 PVLP-SLP Vent Components 0 6/12/2 0 2 3 Heat&Glo • MEZZO36-C/ST-C,MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev. N ASS2EN87 ,3UILDING DEPARTMENT B. Accessories Optional Heat Management Systems Kits Install approved accessories per instructions included After a qualified service technician has installed the heat with accessories. Contact your dealer for a list of ap- management system, follow the instructions supplied with proved accessories. the kit for operation. Contact your dealer if you have WARNING!Risk of Fire and Electric Shock!Use ONLY questions. Hearth & Home Technologies-approved optional acces- Note: Optional heat management systems kit must be sories with this appliance. Using non-listed accessories installed while the top of the appliance is accessible. could result in a safety hazard and will void the warranty. • Preparation for installation of Heat-Zone-Gas, HEAT- OUT-GAS or Passive Heat is discussed in Section 6.B. Remote Controls, Wall Controls and Wall Switches Follow the instructions supplied with the control installed to operate your fireplace: For safety: • Install a switch lock or a wall/remote control with child protection lockout feature. • Keep remote controls out of reach of children. See your dealer if you have questions. Heat&Glo, a brand of Hearth& Home Technologies 7571 215th Street West, Lakeville, MN 55044 www.heatnglo.com Please contact your Heat & Glo dealer with any questions or concerns. For the location of your nearest Heat & Glo dealer, RECEIVED please visit www.heatnglo.com. 06/12/2023 Printed in U.S.A.- Copyright 2021 88 Heat&Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C,MEZZO72-C/ST-C Installation Manual • 2600-980 Rev.N •APEN BUILDING DEPARTMENT