HomeMy WebLinkAboutFile Documents.107 Thunderbowl Ln.0096-2022-BRES (4) 2015 IECC RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM
CITY OF ASPEN VT,RS1ON 11,5 UPDATED MAY 14, 2021
PROJECT ADDRESS: 107 Thunderbowl Lane
Parcel ID#: 2735142120003 Permit Number: 22-2084
CONTACT INFORMATION :
Owner:
Name: 107 Thunderbowl H3 LLC City: Bernardsville
Address: 161 Peachcroft Drive State: New Jersey
Email: harrisonc.zg@gmail.com Zip Code: 07924
Phone: Cell Phone:
Owner's Representative:
Name: BG Architecture&Design City: Aspen
Address: 111 H Aspen Airport Business Center State: Colorado
Email: barry.gereb@bgadaspen.com Zip Code: 81611
Phone: (970)948-6709 Cell Phone:
A. RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM
Sheets showing snowmelt, pool,spa,and solar/GSHP information: SP1.0, CC1.0
Do you have snowmelt or a spa that has been exempted by the buiding official? 0 Yes(enter sqft below on the exempt row) ®No
Hydro Snowmelt Electric Snowmelt Pool Spa
Existing 156.00 sqft 93.00 sqft
To be Demoed 156.00 sqft 0.00 sqft
Existing to Remain 0.00 sqft 0.00 sqft 0.00 sqft 93.00 sqft
New(non-exempt) 246.00 sqft
New(exempt) 0.00 sqft
Total New 246.00 sqft 0.00 sqft I 0.00 sqft 0.00 sqft
Total on site 246.00 sqft 0.00 sqft 0.00 sqft 93.00 sqft
Total Snowmelt on site_ 246.00 sqft
Boiler Efficiency 92.8% I 100% 75.0% 92.8%
Mitigation Payment _ $3,297.41 $ - $ -
Total Payment for Mitigation: $ 3,297.41
B. ON-SITE RENEWABLE CREDITS
Supplemental System — REMP Credit
Use PV Worksheet Photovoltaic System $Use Thermal Worksheet Hot Water Panels $ -
Use GSHP Cert Ground Source Heat Pump $ -
Other Approved System $ -
Total Mitigation Credits: $ -
Onsite Renewable Offsets: How many Kilo Watts of PV(solar electric)would I need? 0.48
or How many square feet of SHW(solar hot water)would I need? 14.68
R-REMP Payment: $ 3,297.41
Amount Previously Paid on This Permit: $ -
I TOTAL R-REMP PAYMENT: $ 3,297.41
Refund: $C. PREPARED BY: Date: 7/6/2022
Print Name: Kyle Donath
Signature: /,Y.� ZB/2
Phone&EMail: (860)681-8881
REVIEWED: Date: R. F IVE ID
07/06/2022
ASPEN
BUILDING DEPARTMENT