Loading...
HomeMy WebLinkAboutFile Documents.555 E Durant Ave.0092-2022-BRES (12) KURTZ & ASSOCIATES,INC. STRUCTURAL CONSULTANTS 5012 County Road 154 Phone (970) 945 6305 Glenwood Springs, CO 81601 MEMORANDUM To: CITY of ASPEN June 21, 2022 Attn: Community Development: Building, Planning,Zoning Copy: Osage, Inc. D I1ll1: Attn: John Patrick [ 12/O5/2O22 IP Re: Residential Remodel: Unit 3C North of Nell FORCOMCUMPLIANCE 555 East Durant Street, Aspen, CO. justinh Our office has reviewed plans for the proposed remodel project at the noted third and fourth floor North of Nell units. Our office has provided structural design services for a number of projects at the North of Nell building. Most recently was the 2021 remodel of Unit 2B. Most significantly was a 2009 maintenance project which involved a replacement roof and new guard rails for the exterior decks. We have completed a review of interior demolition plans and remodel plans for the noted unit (Architectural `Permit Set' (June 16, 2022)by Thunderbowl Architects. Based upon our understanding of the building's structural framing, the present architectural proposal does not impact the building's framing systems in any negative manner. Consequently, it is my professional opinion that the proposed project can safely proceed with appropriate safety protocol measures and structural inspection services. Note that the structural framing system is based upon structural steel frames (Steel column and beam lines) spaced at approximately 19 feet on center and wood sawn 2 x 12 rafters and floor joists spanning frame to frame. For a majority of the building the steel framing runs east-to-west (along the length of the building) and the rafters and floor joists span north-to-south. During the demolition and de-construction phase the contractor should take care to leave all structural steel elements in place and undamaged. Any modification to the relatively long span 2 x 12 framing will require structural analysis. Our office recommends that we perform a structural inspection of the exposed framing during the demolition and deconstruction phase. Given the age of the building and the relatively long joists and rafters, individual joists and rafters may require rein- forcement. During the remodel phase any plumbing or HVAC work which impacts the framing systems should be evaluated by our office. Please call if you have any questions. Brian Kurtz P.E. v�• JAY/� Kurtz& Assoc., Inc. v.��� 's'�� 18744 RECEIVED • -2 •'•••......•• ; , 06' 07/28/2022 rog&e � ASPEN BUILDING DEPARTMENT