Loading...
HomeMy WebLinkAboutFile Documents.29 Grey Talon Ct.0033-2024-BROF (6)CM'?1`1`1 |^s |a`\\a=\o^ Ctf C)we^s Cbr^wj OouK.ialoc Gti;tc,Ci`re\ C.a lor leo.r opt |Layat S\^Jruts\" `m~ke^rtcJLs Lstl\lt`o^ oF uT-zs-ptoitele u^thquow*. c)utcr.S£¥~?w5 .___~,_¥ ..qu- -L A-- _ i 12.6-1 C, un`s , €€t2.16-1 : c>kel8c_ SLmi7le ; C)vC^Sc:LttGLr* Oo*RE ^3C~ Sk ~8uL1 0 uen €tlf GrtS:.=±€ -Eave -Hip Wall .,:#>£7v,'i Rake Valley I- Pitchchange- Ridge - Step - Unlabelecl 05/09/2024 SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen Municipal Code. Pursuant to Sec.26.104.050, any permit or approval issued in error or otherwise not in conformity with the requirements of this Title, shall be void. Similarly, any permit or approval issued in reliance upon or as a result of, a materially false statement or representation made in the process of obtaining the permit or development approval shall, likewise, be void. Any person having received a void or voidable permit or approval shall not be relieved from having to comply with all applicable terms and conditions of this Title and the City shall not be estopped from fully enforcing same. Snow stops required at all locations where roofs could shed snow onto walkways, stairs, alleys, decks, exits, utilities and meters, emergency escape and rescue opening window wells, or adjacent properties - Ordinance 1, 2023.11/08/2023 linzhid MID-ROOF AND FINAL ROOF INSPECTIONS REQUIRED TO RECEIVE A LETTER OF COMPLETENESS Mid-Roof Inspection REQUIRED After your roof permit is issued, and you have started work, you must request a mid-roof inspection. Inspectors will verify your Class A assembly on site. You will request inspection directly on SalesForce. Final Roof Inspection REQUIRED Once roof work is complete, you must request a final roof inspection. Inspectors will inspect snow guards and heat tape (if applicable). NOTE: If there is heat tape present, a final roof inspection cannot be requested until the sub-electrical permit is applied for as both final inspections will occur simultaneously. The products were evaluated for the following properties:  External Fire Exposure (ANSI/UL790, ASTM E108)  Wind Resistance (ASTM D3161; ASTM D7158)  Physical Properties ( ICC-ES AC438) 3. REFERENCED DOCUMENTS  ANSI/UL790 Eighth Edition, (ASTM E108), Standard Test Methods for Fire Tests of Roof Coverings  ASTM D3161-13, Standard Test Method for Wind-Resistance of Steep Slope Roofing Products (Fan-Induced Method)  ASTM D7158-11, Standard Test Method for Wind Resistance of Asphalt Shingles (Uplift Force/Uplift Resistance Method)  UL Subject 2375, Outline of Investigation for Hip and Ridge Shingles (UL Fire and Wind Tests)  ICC-ES Acceptance Criteria for Alternative Asphalt Roofing Shingles (AC438), Dated March 2012 4. USES OWENS CORNING asphalt shingles described in this report are alternatives to asphalt shingles complying with Section 1507.2.5 of the 2015, 2012, 2009 and 2006 IBC and Section R905.2.4 of the 2015, 2012, 2009, and 2006 IRC, and are Class A roof coverings for new and existing roofs. 5. PRODUCT DESCRIPTION OWENS CORNING asphalt shingles are roof covering materials complying with the following properties when installed as described in this report. The products are three-tab shingles, laminated shingles and hip & ridge shingles. The products are available in standard and metric sizes. Fire Classification: OWENS CORNING asphalt shingles covered under this Report have been tested for fire classification Class A in accordance with UL790 (ASTM E108). Shingles tested in accordance with UL790 (ASTM E108) qualify for use under Section 1505.1 of the 2015, 2012, 2009 and 2006 IBC and Section R902.1 of the 2015, 2012, 2009 and 2006 IRC. Wind Resistance: OWENS CORNING asphalt shingles covered under this Report have been tested for wind resistance in accordance with ASTM D3161 or ASTM D7158. Shingles tested in accordance with ASTM D3161 are classified as Class F or Class A and qualify for use under the exception to Section 1507.2.8.1 of the 2015 IBC, Section 1507.2.7.1 of the 2012, 2009 and 2006 IBC, or the exception to Section R905.2.4.1 of the 2015, 2012, 2009 and 2006 IRC. Shingles tested in accordance with ASTM D7158 are classified as Class H and qualify for use in locations as shown in Table 1504.1.1 of the 2015 IBC, Table 1507.2.7.1 of the 2012 and 2009 IBC or Table R905.2.4.1 of the 2015, 2012 and 2009 IRC, where the maximum basic wind speed is 150 mph (67 m/s) or less with exposure category of B or C (ASCE 7) and a maximum building height of 60 feet (18.3 m). Installation must be in accordance with Section 1507.2.7 of the 2015, 2012, 2009 and 2006 IBC or Section R905.2.6 of the 2015, 2012, 2009 and 2006 IRC, as applicable. Physical Properties: OWENS CORNING asphalt shingles covered under this Report have been tested for physical properties in accordance with AC 438. Shingles tested in accordance with AC438 qualify as an alternative roof covering for use under Section 1507.2.5 of the 2015, 2012, 2009 and 2006 IBC or Section R905.2.4 of the 2015, 2012, 2009 and 2006 IRC. When installed in new construction in accordance with this report and the OWENS CORNING installation instructions, the shingles are a Class A fire classification roof covering. When the shingles are installed over existing roof coverings, the fire classification is maintained. Page 2 of 30 UL Evaluation Report UL ER2453-02 Issued: April 5, 2017 Visit UL’s On-Line Certifications Directory: www.ul.com/erdirectory for current status of Report. UL Category Code: ULEZ CSI MasterFormat® DIVISION: 07 00 00 – THERMAL AND MOISTURE PROTECTION Sub-level 2: 07 30 00 – Steep Slope Roofing Sub-level 3: 07 31 00 – Shingles and Shakes Sub-level 4: 07 31 13 – Asphalt Shingles COMPANY: OWENS CORNING ONE OWENS CORNING PKY TOLEDO, OH 43659 (419) 248-7060 http://www.owenscorning.com/ 1. SUBJECT: Asphalt Shingles CLASSIC®, SUPREME®, DURATION® PREMIUM, TRUDEFINITION® DURATION®, TRUDEFINITION® DURATION ® STORM™, TRUDEFINITION® DURATION® MAX™, TRUDEFINITION® OAKRIDGE®, OAKRIDGE®, WOODCREST®, WOODMOOR®, TRUDEFINITION® WEATHERGUARD® HP, BERKSHIRE®, DEVONSHIRE™, WOODSTART® STARTER SHINGLE, STARTER STRIP PLUS, STARTER STRIP SHINGLE, AND TRI BUILT STARTER STRIP BERKSHIRE® HIP & RIDGE SHINGLES, HIGH RIDGE HIP & RIDGE SHINGLES WITH SEALANT, RIZERIDGE® HIP & RIDGE SHINGLES WITH SEALANT, WEATHERGUARD® HP HIP & RIDGE SHINGLES, PROEDGE®, DURARIDGE™ HIP & RIDGE SHINGLES AND PROEDGE® STORM® HIP & RIDGE SHINGLES 2. SCOPE OF EVALUATION  2015, 2012, 2009, and 2006 International Building Code ® (IBC)  2015, 2012, 2009, and 2006 International Residential Code ® (IRC)  ICC ES Acceptance Criteria for Quality Documentation (AC10), Dated December 2012  ICC ES Acceptance Criteria for Alternative Asphalt Roofing Shingles (AC438), Dated March 2012 |^s |a`\\a=\o^ Ctf C)we^s Cbr^wj OouK.ialoc Gti;tc,Ci`re\ C.a lor leo.r opt |Layat S\^Jruts\" `m~ke^rtcJLs Lstl\lt`o^ oF uT-zs-ptoitele u^thquow*...qu- -L A-- _ 1 C, un`s , €€t2.16-1 : NOTE: You many not substitute roofing components/products that stray from the approved and issued ESR/QAI report without Building department approval. Class A assemblies are tested and listed with the specific roof products called out in the associated documentation. Installers shall follow all manufacturer's installation instructions for Class A roof assembly. ROOF ASSEMBLY No work on heat tape is permitted under this scope NOTE: If existing (if any) heat tape is touched or reinstalled, a sub-electrical permit and heat tape controls are required