HomeMy WebLinkAboutFile Documents.107 Thunderbowl Ln.0096-2022-BRES (8)SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
It should be known that this review shall
not relieve the applicant of their
responsibility to comply with the
requirements of the City of Aspen
Municipal Code. Pursuant to
Sec.26.104.050, any permit or approval
issued in error or otherwise not in
conformity with the requirements of this
Title, shall be void. Similarly, any permit
or approval issued in reliance upon or
as a result of, a materially false
statement or representation made in
the process of obtaining the permit or
development approval shall, likewise,
be void. Any person having received a
void or voidable permit or approval
shall not be relieved from having to
comply with all applicable terms and
conditions of this Title and the City shall
not be estopped from fully enforcing
same.
luisp
08/16/2022ZONING
427 Rio Grande Place, Aspen, CO 81611
(970) 920.5090
www.aspen.gov
NOTICE OF EXEMPTION AND AUTHORIZATION TO APPLY FOR LAND USE/
BUILDING PERMITS DURING THE EFFECTIVE TERM OF ORDINANCE #27,
SERIES OF 2021 AND ORDINANCE #6, SERIES OF 2022
Property Address:
Parcel ID Number:
Property Owner:
Representative/email:
Scope o f Work (Provide narrative here and a separate pdf which is a succinct and
clear set of supporting documents, to be attached to this form as Exhibit A, such as
Letters of Completeness, Resolutions, Development Orders, Land Use Case
numbers, Building Permit numbers etc. If the representation being made is that the
work does not involve dimensional changes prohibited by the moratorium provide
existing and proposed calculations, floor Plans and and elevations to be attached:
___________________________________________________________________
___________________________________________________________________
Due to the circumstances noted below, the above referenced project as defined by
the Scope of Work is exempt from the application of Ordinance #27, Series of 2021
and Ordinance #6, Series of 2022, and is authorized to pursue a land use review
and/or building permit review during the effective terms of Ordinance #27, Series of
2021 and Ordinance #6, Series of 2022, ordinances which generally place a
moratorium on residential development. This authorization does not guarantee
issuance of a building permit or approval of any land use application. The applicant
must submit complete information and pursue all authorized approvals in a timely
fashion, adhering to all deadlines for submission, terms of Vested Rights,
response times required to maintain an active building permit, and all other Land Use
Code and Building Code requirements in effect as of December 8, 2021. Any
amendments and or additional approvals not addressed or identified in the
application, may be subject to Ordinance #27, Series of 2021 or Ordinance #6, Series
of 2022.
The project described above is permitted to proceed with land use review because
(check all that apply):
Expansion of existing deck.
107 Thunderbowl Lane
273514212003
107 THUNDERBOWL H3 LLC
kyle.donath@bgadaspen.com
07/06/2022
□A land use application for a Development Order or Notice of Approval was
submitted to the Community Development Department prior to final passage of
the ordinance on December 8, 2021, and was subsequently deemed to be
complete by the Community Development Department Director.
□The land use application is seeking a Development Order or Notice of Approval
for a project consisting of 100% Af fordable Housing as that term is defined at
§26.104.100 of the Aspen Municipal Code, or as may be deemed necessary for
the issuance of Certificates of Affordable Housing for a 100% Affordable Housing
project, or as determined by the Community Development Director.
□The land use application involves Voluntary AspenModern designation
processes that meet the requirements of Section 26.415.025.C and
26.415.030.
□The land use application or administrative request may be necessary to issue
exempt building permits as described below, and as determined by the
Community Development Director.
The project described above is permitted to submit for building permit review
because (check all that apply):
□A building permit application was submitted to the Community Development
Department prior to final passage of the ordinance on December 8, 2021, and
was subsequently deemed to be c omplete by the Chief Building Official.
□It is a building permit for a project that will not increase the gross square
footage of development, Net leasable area, or Net livable area of any building
and does not m eet the definition of demolition.
□It is a building permit for a project that will not increase the Height of any
building. This includes additions to or replacement of mechanical equipment or
energy eff iciency systems pursuant to height exemptions as set f orth at
§26.575.020 of the Aspen Municipal Code, or as determined by the Community
Development Director.
□It is a building permit for commercial and lodge development as stand-alone
uses on a parcel or property.
□The project has received or is eligible to receive a Development Order or
Notice of Approval on the effective date of this ordinance.
□It is a building perm it for 100% affordable housing projects as that term is
defined at §26.104.100 of the Aspen Municipal Code.
□It is a building permit for demolition or repair of non-habitable structures.
Issued on ___________________, 20___, this certificate is valid through the
effective date of Ordinance #27, Series of 2021 and Ordinance #6, Series of 2022, or
any Ordinance which supersedes a provision of these ordinances in a manner which
is relevant to the Scope of Work. A copy of this certificate is required when applying
for any land use review or building permit. This Notice is not a Development Order
or Administrative Determination that is subject to appeal.
___________________________________
Phillip Supino
Community Development Director
Disclaimer: This exemption is given based on the information provided by the applicant. If changes are
made, or the scope, after a more detailed review, is found to be subject to Ordinance 27, 2021 or
Ordinance #6, Series of 2022, the exemption may be revoked.
Exhibit A: Floor plans and elevations representing scope of work
Planning Director, for
n
n
n
22May 4
07/06/2022
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ'S
All snowmelt systems shall meet the following:
- Any portions in the Right of Way must be on a separate zone. A ROW permit
and Permanent Encroachment License are required.
- R10 insulation shall be installed under the area to be snowmelted or R5 insulation
shall be installed under the slab edges. (Ordinance 11 Series 2011)
- Automatic controls installed for system shut off when pavement temperature is above
50°F and no precipitation is falling. (2015 IECC R403.9 and C403.2.4.5)
- Automatic or manual controls installed for system shut off when outdoor temperature
is above 40°F. (2015 IECC R403.9 and C403.2.3.5)
- Inspection by testing hydrostatically at 1.5 times max system design pressure, but not
less than 100psi, for 15 minutes. (2015 IMC 1208.1)
0096-2022-BRES
107 THUNDERBOWL H3 LLC
107 THUNDERBOWL LN
273514212003
09/14/2022
linzhid