Loading...
HomeMy WebLinkAboutFile Documents.205 S Mill St.0049-2023-BCOM (6)SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen Municipal Code. Pursuant to Sec.26.104.050, any permit or approval issued in error or otherwise not in conformity with the requirements of this Title, shall be void. Similarly, any permit or approval issued in reliance upon or as a result of, a materially false statement or representation made in the process of obtaining the permit or development approval shall, likewise, be void. Any person having received a void or voidable permit or approval shall not be relieved from having to comply with all applicable terms and conditions of this Title and the City shall not be estopped from fully enforcing same. SPECIAL INSPECTION REQUIRED: -Structural steel welding: Field & Shop -High strength bolting -Epoxy anchors -Intumescent paint -Spray applied fire resistive materials -Permanent micropiles -Penetration Firestopping Special inspection is required per 2021 IBC section 1704. Inspector to verify that copy of agreement for inspection program to be on the job site prior to performing any inspections. A copy of all Special Inspector field reports to be on the job site for inspectors' review if requested. Failure to comply may result in denial of inspection. 09/28/2023 justinh 2021 IBC 601 Fire Resistive Requirements for Type of Construction: ____ Primary Structural Frame: ____hr (columns, beams, girders, etc) Exterior Bearing Walls: ____hr Interior Bearing Walls: ____hr Floors/Ceilings: ____hr Roof : ____hr Unless noted otherwise for occupancy separation or fire separation distance. VA 1 1 1 1 1 Anchorage points complying with ANSI/ASSE Z359.1 required for work within 10' of roof edge where guards complying with IBC 1015.6 are not provided. APPLICATION ACCEPTED DATE: 2023-09-21 PERMIT NUMBER: 0049-2023-BCOM COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT COVERSHEET PROPERTY INFORMATION ADDRESS: 205 S MILL ST 3 UNIT: PARCEL ID: 273707338004 LEGAL DESCRIPTION: CITY AND TOWNSITE OF ASPEN OWNER: MILL STREET PLAZA ASSOC LLC PERMIT CONTRACTOR: DESCRIPTION OF WORK REMOVE EXIST ONMI ANTENNAS FROM EXIST BALLAST ANTENNA FRAMES & ANTENNA MOUNTS. INSTALL (1) NEW ANTENNAS TO RELOCATED BALLAST FRAME. INSTALL (2) REMOTE RADIO HEADS, (1) RELOCATED RADIO HEAD AND (1) NEW OVER VOLTAGE PROTECTOR TO THE RELOCATED BALLAST FROM UNDER THE NEW ANTENNAS. RELOCATE EXISTING EQUIPMENT TO (2) NEW EQUIPMENT CABINETS ON NEW ROOFTOP STEEL PLATFORM. NEW ROOFTOP ACCESS LADDER MOUNTED TO S OF THE BUILDING IN THE ALLEYWAY USE OF BUILDING Commercial FIRE SPRINKLER REQUIRED? No CLASS OF WORK Commercial FIRE SPRINKLER TYPE BUILDING TYPE (IRC) REQUIRED SPECIAL INSPECTIONS High-Strength Bolting;Structural Steel Welding CONSTRUCTION TYPE VA ENERGY CODE COMPLIANCE OCCUPANCY GROUP (IBC) B WORK CHANGES BUILDING FOOTPRINT? No CODE EDITIONS Other TOTAL SPA SQ.FT. OTHER CODE EDITIONS 2021 TOTAL SNOWMELT SQ.FT. HISTORIC PROPERTY? No TOTAL POOL SQ.FT. FIRE SPRINKLER EXISTING? RE V I E W E D F O R CO M P L I A N C E 10 / 1 7 / 2 0 2 3 s t u a r t h BY H P C Mike Otegui mikeo@oteguieng.com02/07/2024 Ashley Christensen - owner agent Ashley Christensen 02/07/2024 achristensen@csainet.com Justin Hahn 2/8/24 justin.hahn@aspen.govJustin Hahn Digitally signed by Justin Hahn DN: C=US, E=justin.hahn@aspen.gov, O=City of Aspen, OU=Building Department, CN=Justin Hahn Reason: I have reviewed this document Date: 2024.02.08 08:34:09-07'00'