Loading...
HomeMy WebLinkAboutFile Documents.855 Chatfield Rd.0072-2020-BRES (16)1. ALL SUBMERGED SUCTION OUTLETS MUST BE ANSI/APSP-16 2011, "APSP 7" CERTIFIED. CONTRACTOR IS RESPONSIBLE FOR CONFIRMING ALL SUBMERGED SUCTION OUTLETS ARE FULLY COMPLIANT WITH ANSI/APASP-16 2011, "APSP 7" AND PROVIDING ALL NECESSARY DOCUMENTATION. INCLUDING, DRAIN COVERS, PUMP DESIGN AND SUCTION VELOCITIES. 2. UNLESS SPECIFICALLY NOTED OTHERWISE, ALL POOL PIPE, FITTINGS AND VALVES SHALL BE TYPE 1, SCHEDULE 40 PVC PER ASTM D1785 & NSF 14 OR NSF 61-G LISTED AS SUITABLE FOR POTABLE WATER. • USE WELD-ON P-70 PRIMER • USE WELD-ON 711 SOLVENT GLUE 3. PIPING TO & FROM POOL HEATER OR HEAT EXCHANGER TO BE CPVC PIPE & FITTINGS. ALL CPVC PIPE & FITTINGS MUST COMPLY WITH ASTM D2846. 4. PIPE ROUTING SHALL BE COORDINATED WITH OTHER TRADES TO AVOID CONFLICTS. 5. POOL PIPING TO BE INSTALLED TO MINIMIZE TOTAL DYNAMIC HEAD PRESSURE. 6. ALL POOL PIPING MUST BE PRESSURE TESTED (MIN. 25 PSI) FOR AT LEAST 24 HRS. PRIOR TO CONCEALING. DROP PRESSURE TO 10 PSI WHEN CONCEALING AND/OR APPLYING SHOTCRETE TO ENSURE PIPES DO NOT GET COMPROMISED DURING PROCESS. 7. REFER TO GEOTECHNICAL REPORT FOR ADDITIONAL EARTHWORK, UNDERDRAIN & BACKFILL REQUIREMENTS, ETC. 8. POOL DECK DRAINAGE IS BY OTHERS REFER TO PLUMBING/LANDSCAPE DRAWINGS. 9. FLEXIBLE HOSE/PIPE IS NOT ACCEPTABLE. 10. PIPING MUST HAVE ADEQUATE FREEZE PROTECTION WHEN APPLICABLE. 11. ALL PIPING SHALL CONFORM TO 2015 UPC/IPC (UNIFORM PLUMBING CODE/INTERNATIONAL PLUMBING CODE -RESOLUTION 144-2016). 12. ALL PIPING WITHIN POOL EQUIPMENT ROOM MUST BE RUN OVER HEAD. PIPING INSTALLED ON FLOORS TO CREATE TRIPPING HAZARDS WILL NOT BE ACCEPTABLE. 1.ALL WIRING TO CONFORM TO THE APPLICABLE EDITION OF THE 2017 NATIONAL ELECTRICAL CODE (NEC) AND STATE/COUNTY/CITY ELECTRICAL CODES. 2.THE POOL/SPA STRUCTURES, POOL/SPA DECKS, POOL/SPA EQUIPMENT, EMBEDS, AND ALL OTHER APPLICABLE ITEMS HEREIN SHALL BE GROUNDED & BONDED PER NEC SECTION 680. SPECIAL INSPECTION: ALL BONDING MUST BE INSPECTED AS REQUIRED BY THE AUTHORITY HAVING JURISDICTION PRIOR TO PLACEMENT OF ANY CONCRETE. 3. ALL CONDUIT, BONDING & GROUNDING INSTALLED BY LICENSED ELECTRICAL CONTRACTOR. 4. ALL CONDUIT INTEGRAL TO THE POOL/SPA STRUCTURE MUST BE WATERTIGHT I.E. LIGHT & SENSOR CONDUITS. 5.ALL MOTORS MUST BE GFCI PROTECTED AS REQUIRED BY NEC. 6.CONTRACTOR TO COORDINATE & VERIFY WITH SHOP DRAWINGS PROVIDED BY THE POOL & SPA MANUFACTURE. 7.WIRING FOR LINE VOLTAGE IS NOT PERMITTED UNDER THE POOL/SPA OR WITHIN 5 FEET HORIZONTALLY OF THE POOL/SPA WALL. 8.POOL/SPA SERVICE RECEPTACLES MUST BE 30 AMPERES, INSTALLED AT LEAST 6 FEET FROM THE WATERS EDGE AND HAVE GFCI PROTECTION. 9.ALL SWITCHES, TIMERS, BUTTONS, ETC. MUST BE AT LEAST 5 FEET HORIZONTALLY FROM THE WATERS EDGE. 10.AN EQUIPOTENTIAL BONDING GRID MUST EXTEND 3 FEET HORIZONTALLY BEYOND THE WATERS EDGE OF THE POOL/SPA AS REQUIRED BY NEC SECTION 680.26 11.A MINIMUM CONDUCTIVE SURFACE OF 9 SQ IN. MUST BE INSTALLED IN CONTACT WITH THE POOL/SPA WATER. THIS WATER BOND IS PERMITTED TO CONSIST OF METAL PARTS THAT REQUIRE TO BE BONDED IN NEC 680.26(B). 1.REFER TO PLUMBING PLANS (IF AVAILABLE); PLUMBING/MECHANICAL CONTRACTOR TO PROVIDE; • FLOOR DRAINAGE IN POOL EQUIPMENT ROOM/VAULT • DRAINAGE IN AUTO COVER BOX(ES) • ALL PIPING, VALVES, SENSORS, PUMPS, ETC. REQUIRED FOR HEAT EXCHANGERS. • ALL REQUIRED FRESH AIR INTAKE & VENTING IN POOL EQUIPMENT ROOM/VAULT. • ALL REQUIRED EXHAUST VENTING FOR POOL/SPA HEATERS • FRESH WATER SUPPLY LINE W/ BACKFLOW PREVENTION FOR POOL/SPA AUTO FILL SYSTEM. 2. ALL PLUMBING SHALL BE INSTALLED BY LICENSED CONTRACTOR AND PER ALL APPLICABLE CODE REQUIREMENTS. PC POOL CONTRACTOR MC MECHANICAL CONTRACTOR EC ELECTRICAL CONTRACTOR FM PG CG VG FLOW METER SIGHT GLASS DIAL VALVE LEVER OPERATED BUTTERFLY VALVE CHECK VALVE SOLENOID VALVE LIQUID FILLED PRESSURE GAUGE FLEXIBLE PIPE CONNECTION LIQUID FILLED COMPOUND GAUGE LIQUID FILLED VACUUM GAUGE THERMOMETER HIGH LIMIT SWITCH BALL VALVE SV T FLX HL BLV BTV CV SG DV HB HOSE BIB (BY MC) GFCI GFCI 30 AMPRE SERVICE OUTLET (BY EC) GC GENERAL CONTRACTOR # # SECTION DETAIL CL CENTER LINE HORZ BREAK LINE VERT BREAK LINE LA LANDSCAPE ARCHITECT 1.CONTRACTOR SHALL VERIFY ALL WORK IS IN COMPLIANCE WITH THE 2015 INTERNATIONAL BUILDING CODE & ALL APPLICABLE CODES REFERENCED WITHIN. 2.GENERAL CONTRACTOR & POOL CONTRACTOR ARE BOTH RESPONSIBLE FOR VERIFYING ALL WORK HEREIN CONFORMS TO THE PROJECT GEOTECHNICAL REPORT. PROJECT GEOTECHNICAL ENGINEER MUST PERFORM AN OPEN HOLE OBSERVATION ONCE THE POOL HAS BEEN FULLY EXCAVATED TO VERIFY SOIL CONDITIONS. 3.CONTRACTOR MUST VERIFY THE LOCATION OF ANY EXISTING BUILDING FOUNDATIONS AND UNDERGROUND UTILITIES PRIOR TO EXCAVATING FOR POOL/SPA CONSTRUCTION. ANY ADJACENT BUILDING FOOTINGS SHALL BE AT OR BELOW THE BOTTOM OF THE POOL SHELL AND AT A DISTANCE SPECIFIED BY THE BUILDING STRUCTURAL ENGINEER (ANY FOOTING WITHIN 3FT OF POOL/SPA SHELL MUST BE VERIFIED BY BUILDING STRUCTURAL ENGINEER). 4.ALL DIMENSIONS AND DETAILS HEREIN MUST BE REVIEWED AND APPROVED BY PROJECT ARCHITECT AND CONTRACTOR OF RECORD FOR CONFORMITY TO ALL APPLICABLE BUILDING CODES AND CONTRACTIBILITY. CONTRACTOR OF RECORD IS RESPONSIBLE FOR MANAGING THE CONSTRUCTION AND VERIFYING ALL WORK IS COMPLETED PER THESE PLANS AND DETAILS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR OF RECORD TO REPORT ANY DISCREPANCIES TO COLORADO POOL DESIGNS. 5.STEEL REINFORCING FOR THE POOL/SPA STRUCTURES SHALL BE ASTM GRADE 60 AND IN ACCORDANCE WITH THE ACI DETAILING MANUAL OF STANDARD PRACTICE. UNLESS SPECIFICALLY NOTED OTHERWISE, STEEL REINFORCEMENT SHALL BE INSTALLED PER CHAPTER 25 AND SECTION 26.6 OF ACI 318-14. 6.ALL STEEL REINFORCING SPLICES & DOWEL PROJECTIONS SHALL BE LAPPED BY A MINIMUM 42 BAR DIAMETERS AS FOLLOWS (WHICHEVER IS GREATER) AND SHALL NOT EVER BE LESS THAN 24": SIZE MIN. OVERLAP #3-#5 32 INCHES #6-#7 48 INCHES 7.UNLESS SPECIFICALLY NOTED OTHERWISE, INSTALL REBAR IN CENTER OF WALLS & SLABS. 8.CONCRETE SHALL BE PNEUMATICALLY APPLIED MORTAR "SHOTCRETE" CLASSED AS GRADE "A" CONCRETE SUBJECT TO LOCAL CODE REGULATIONS AND ACI 506.2-13 SHOTCRETE SPECIFICATIONS. POOL & SPA STRUCTURES ARE TO BE CONSTRUCTED MONOLITHICALLY; COLD JOINTS ARE NOT PERMITTED. SPECIAL INSPECTIONS: 1. AQUATIC CONSULTANT AND/OR PROJECT STRUCTURAL ENGINEER OF RECORD MUST INSPECT ALL POOL/SPA REBAR PRIOR TO PLACEMENT OF ANY CONCRETE. 2. GENERAL CONTRACTOR IS RESPONSIBLE FOR OBTAINING THIRD PARTY TESTING OF POOL CONCRETE AND PROVIDE 7 DAY, 14 DAY & 28 DAY BREAK TEST RESULTS TO COLORADO POOL DESIGNS. 9.SHOTCRETE SHALL BE TYPE II CEMENT COMPOSED OF: • 8 1/2 SACKS OF CEMENT • 30% PEA GRAVEL • 70% SAND • AIR ENTRAINMENT: 8% PRIOR TO PUMPING WITH +/-1.5 TOLERANCE • 2-5 OZ. OF WATER REDUCING ADMIXTURE • 10% WATER • 2"-4" SLUMP (FOR SHORT DISTANCES) • 4,500 PSI MIN. COMPRESSIVE STRENGTH AFTER 28 DAYS 10.COLD WEATHER CONDITIONS: WHEN AMBIENT AIR TEMPERATURE IS BELOW 40 DEGREES FAHRENHEIT DURING THE PLACEMENT OF CONCRETE, CONTRACTOR MUST FOLLOW ACI 306R PROVISIONS. 11.HOT WEATHER CONDITIONS: WHEN AMBIENT AIR TEMPERATURES EXCEED 90 DEGREES FAHRENHEIT DURING THE PLACEMENT OF CONCRETE, CONTRACTOR MUST FOLLOW ACI 305 PROVISIONS. 12.CURING: A. PROTECT FRESHLY PLACED SHOTCRETE FROM PREMATURE DRYING AND EXCESSIVE COLD OR HOT TEMPERATURES. B. START INITIAL CURING AS SOON AS FREE WATER HAS DISAPPEARED FROM SHOTCRETE SURFACE AFTER PLACING AND FINISHING. C. CURING EXPOSED SURFACES: CURE SHOTECRETE BY ONE OF THE FOLLOWING METHODS: 1. MOISTURE CURING: KEEP SURFACES CONTINUOUSLY MOIST FOR AT LEAST SEVEN DAYS WITH WATER, CONTINUOUS WATER-FOG SPRAY, WATER-SATURATED ABSORPTIVE COVERS, OR MOISTURE-RETAINING COVERS (LAP & SEAL SIDES AND ENDS OF COVERS). 2. CURING COMPOUND: APPLY CURING COMPOUND UNIFORMLY IN CONTINUOUS OPERATION BY POWER SPRAY ACCORDING TO MANUFACTURERS WRITTEN INSTRUCTIONS. RECOAT AREAS SUBJECT TO HEAVY RAINFALL WITHIN THREE HOURS AFTER INITIAL APPLICATION. MAINTAIN CONTINUITY OF COATING AND REPAIR DAMAGE DURING CURING PERIOD. a. APPLY CURING COMPOUND TO NATURAL OR GUN-FINISHED SHOTCRETE AT A RATE OF 1 GAL/100 SF. D. CURING FORMED SURFACES: CURE FORMED SHOTCRETE SURFACES BY MOIST CURING WITH FORMS IN PLACE FOR FULL CURING PERIOD OR UNTIL FORMS ARE REMOVED. IF FORMS ARE REMOVED, CONTINUE CURING BY METHODS SPECIFIED ABOVE, AS APPLICABLE. 13. THE STRUCTURAL DESIGN SHOWN HEREIN IS BASED ON THE CONCRETE STRUCTURES BEING BACKFILLED WITH AND SUPPORTED ON UNIFORM AND SUITABLE SOIL FOR ALL AREAS OF POOL AND SPAS (TO AVOID DIFFERENTIAL SETTLEMENT AND CRACKING OF THE CONCRETE SHELL, ESPECIALLY NEAR DESCENDING SLOPES AND SLAB/SPA ELEVATION CHANGES). AVOID PLACING ANY CHANGES/TRANSITIONS IN SOIL BEARING STRATUM UNDER THE POOL AND/OR SPA FOOTPRINTS. IF THE CONTRACTOR OR CLIENT OBSERVE ANY CONDITIONS OF SOIL DISCONTINUITY DURING THE EXCAVATION, PLEASE CONTACT THE PROJECT GEOTECHNICAL ENGINEER AND COLORADO POOL DESIGNS FOR FURTHER DIRECTION. 14.FOR POOL STRUCTURES THAT REQUIRE BACKFILLING OPERATIONS, BACKFILL SHALL NOT BE PLACED FOR A MIN. OF 7 DAYS OR UNTIL THE CONCRETE HAS REACHED 75% OF ITS 28-DAY STRENGTH (WHICHEVER IS LONGER DURATION). 15.CONTRACTOR MUST INSTALL A MIN. 1/2 INCH EXPANSION JOINT BETWEEN POOL WALLS AND CONCRETE DECK. EXPANSION JOINT TO BE FINISHED WITH A CONTINUOUS BEAD OF POLYURETHANE MARINE GRADE SEALANT, 3M 5200 OR EQUAL. 95 SF IN-GROUND SPA SPA SIDE CONTROLLER SPA EQUIPMENT VAULT RE: 4/PL1.1 SPA AUTO COVER SWITCH, COORDINATE W/ GC 1. THESE DRAWINGS REPRESENT THE DESIGN INTENT TO ACCOMMODATE THE OWNER'S REQUIRED PROGRAMMING. THE CONTRACTOR SHALL NOT MAKE ASSUMPTIONS, ANY DISCREPANCIES WITHIN THESE DOCUMENTS OR SPECIFICATIONS MUST BE PRESENTED TO THE ARCHITECT/OWNER FOR CLARIFICATION. 2. CONTRACTOR WILL BE FULLY RESPONSIBLE FOR DEVIATING FROM THE CONSTRUCTION DOCUMENTS. INCLUDING, BUT NOT LIMITED TO, ALL SUBMERGED SUCTION OUTLETS. 3. POOL CONTRACTOR MUST CONFIRM THE POOL CONFIGURATION SHALL MEET PUBLISHED STANDARDS OF THE DEPARTMENT OF HEALTH AND SWIMMING POOL REGULATIONS. 4. CONTRACTOR MUST REVIEW CONSTRUCTION DOCUMENTS FROM ALL OTHER TRADES INVOLVED IN THE PROJECT AND COORDINATE AS NEEDED TO DELIVER A FULLY FUNCTIONAL END PRODUCT. 5. DECK SHALL BE NON SLIP FINISH, SLOPE DECK TOWARDS DECK DRAINS A MINIMUM 2 INCHES PER 10 FEET OR TO GRADE. POOL DECK & DECK DRAINAGE BY OTHERS. 6. END PRODUCT MUST CONFORM TO ALL APPLICABLE HEALTH & BUILDING CODES. 7. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL REQUIRED PERMITS & INSPECTIONS.SCALE: ISSUE DATE: DRAWN BY: PROJECT #: SHEET #: SHEET TITLE: DA T E TI T L E / P U R P O S E NO . 3. 2 5 . 2 0 2 1 10 0 % C D S E T 13301 W. 43rd Drive Suite #10 Golden, Colorado 80403 Phone: 720.693.8146 2. 2 8 . 2 0 2 2 RE V I S I O N 2 As indicated CPD 3/25/2021 1221 PROJECT SITE PLAN & NOTES PL1.0 85 5 C h a t f i e d R o a d As p e n , C o l o r a d o 8 1 6 1 1 CH A T F I E L D V I E W S P A NO SCALE3SPA PIPING NOTES NO SCALE4SPA ELECTRICAL NOTES NO SCALE5SPA MECHANICAL NOTES NO SCALE7SPA SYMBOLS KEY NO SCALE6SPA STRUCTURAL NOTES 3/16" = 1'-0"1 SPA SITE PLAN NO SCALE2GENERAL NOTES 08/05/2022