Loading...
HomeMy WebLinkAboutFile Documents.855 Chatfield Rd.0072-2020-BRES (19)BEDROOM #2 108 BEDROOM #1 106 BATH 107 BATH 109 MUD ROOM 102 LINK 101 GARAGE 100 HALL 104 ENTRY 110 GYM / BEDROOM 111 FLEX / MASSAGE / CLOSET 112 BATH 113 WINDOW WELL CHUTE CU-4CU-3CU-2CU-1 METERS ELECTRICALGAS 85 5 C h a t f i e l d R o a d LS-3.0 north scale: 1/8" = 1' - 0" e l e m e n t s Snowmelt Layout Ch a t f i e l d V i e w As p e n , C o l o r a d o 8 1 6 1 1 concrete autocourt/drive entry spa terrace st e p spa area 111 SF NOTES: Snowmelt total = 3100 SF Spa total = 111 SF ~03.15.2020 SD ~06.02.2020 DD ~06.26.2020 permit spa deck st e p ~12.28.2020 permit re-submittal ~02.18.2021 CD Set 100% snowmelted area in ROW 386 SF snowmelted area at entry and driveway - 2291 SF snowmelted area at spa - 423 SF ~08.06.2021 revised 08/06/2021 External Energy Use Approved RREMP CREMP PERMIT #:_______________DATE:________ SNOWMELT:_____________________________ POOL: _____________________________ SPA: _____________________________ OFFSET:________________________________ REMP SHEET: __________________________ REVIEWED BY: _________________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) MINIMUM BOILER AFUE: _________________ X 0072-2020-BRES 8/6/21 3100 111 97.7 18.87 kw PV DAM 08/06/2021 08/06/2021 denism UP DN GDCBA GYM / BEDROOM 111 BATH 113 FLEX / MASSAGE / CLOSET 112 ELEVATOR 000 104B 000B 111B MUD ROOM 102BEDROOM #1 106 BATH 107 BATH 109 BEDROOM #2 108 ENTRY 110 105 106 107A 107B 107C 109C 108B 109A 113A 113C 110A 110B E 108A LINEN 105 113B 109B GARAGE 100 102B HALL 104 PWD 103 HF LINK 101 100A 100B WOOD WOOD TILE TILE TILE WOOD WOOD TILE TILE EP-01 101 102A 102C 004E 004F 104A 103A 103B RZ 4C 200 SF RZ 4B 55 SF RZ 4D 60 SF RZ 4A 265 SF RZ 3B 205 SF RZ 3A 705 SF RZ 5A 635 SF RZ 5B 210 SF RZ 5C 155 SF SEE PAGE M3.3 FOR CONTINUATION OF SNOWMELT. 1004 SF SZ 1 423 SF SZ 4 SEE PAGE M3.3 FOR CONTINUATION OF SNOWMELT. RM 4 RM 3 SM 1 SM 4 T T T T T 1287 SF SZ 2 SM 2 S S S S S SHEET DETAIL NOTES: ROUTE 3 4" HWS/R UP TO RM-6. CONNECT 1 1 4" SMS/R TO SM-1. CONNECT 1" HWS/R TO RM-3. CONNECT 3 4" HWS/R TO RM-4. ROUTE 1" HWS/R UP TO RM-7. CONNECT 1 1 4" SMS/R TO SM-2. CONNECT 1" SMS/R TO SM-4. ROUTE 1" HWS/R DN. CONNECT 1" HWS/R TO RM-5. CONNECT 1" SMS/R TO SM-3. GENERAL NOTES: 1.OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, AND STRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THE STRUCTURAL ENGINEER. 2.ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDE A FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY. 3.ALL MECHANICAL PIPING SHOWN DASHED SHALL BE LOCATED BELOW THE FLOOR DECK. 4.VERIFY FINAL LOCATIONS OF ALL MANIFOLDS WITH THE G.C. CONTACT ENGINEER IF MANIFOLDS MOVE MORE THAN 10' FROM LOCATIONS SHOWN ON PLANS. 5.LOCATION OF ALL THERMOSTATS AND FLOOR SENSORS ARE APPROXIMATE, COORDINATE EXACT LOCATIONS WITH THE ARCHITECT. LOCATE FLOOR SENSORS EQUIDISTANT BETWEEN RADIANT LOOPS, AND DO NOT LOCATE WHERE THEY MAY LIKELY BE COVERED BY FUTURE RUGS OR FURNITURE. 6.ALL PIPING SIZED FOR TYPE L COPPER. CONTACT ENGINEER FOR ANY CHANGE TO PEX FOR NECESSARY PIPE SIZING AND/OR PUMP CHANGES. 7.INSULATE ALL PIPE LEADERS PASSING THROUGH ADJACENT ZONES. 1 2 3 4 5 6 7 8 1 2 3 4 1" HWS/R 5 6 7 8 RM 5 9 9 SM 3 10 10 S S S T RZ-4A RZ-4B RZ-3A RZ-5A FC-3 RZ-4C RZ-4D FC-2 RZ-5B RZ-5C FC-1 RZ-3B S S S 1 1 1 of ww w . a e c - v a i l . c o m a PO B o x 8 4 8 9 , 4 0 8 0 1 U S H w y 6 & 2 4 , S t e 2 1 4 , A v o n , C o l o r a d o , 8 1 6 2 0 Me c h a n i c a l , E l e c t r i c a l & L i g h t i n g D e s i g n S e r v i c e s Ar c h i t e c t u r a l E n g i n e e r i n g C o n s u l t a n t s Te l e p h o n e : 9 7 0 - 7 4 8 - 8 5 2 0 ce Drawn By:Checked By: DATE:ISSUE: AEC PROJECT #: 85 5 C H A T F I E L D R O A D AS P E N , C O L O R A D O 19102.00 An O f f i c e w i t h L E E D ™ A c c r e d i t e d P r o f e s s i o n a l s 03-24-20 DUCT PROGRESS 04-03-20 DUCT PROGRESS 05-01-20 ROOF DRAINS 06-26-20 PERMIT 02-18-21 100% CD SET 07-30-21 M&P REV 1 DPF TOC 1st FLOOR MECHANICAL PIPING PLAN SCALE 1/4" = 1'-0" M-106 7 13 NORTH 1st FLOOR MECHANICAL PIPING PLAN SCALE: 1/4" = 1'0" 08/06/2021 08/05/2022 denism WINDOW WELL CHUTE CU-4CU-3CU-2CU-1 METERS ELECTRICALGAS S ELEVATORELEVATOR W/D ELEVATOR CHUTE TI L E D B E N C H TI L E D BE N C H TILED BENCH YOGA MAT BENCH TV NI C H E S 2 3 5 GDCBA 4 E 1 6 HF CH A T F I E L D R O A D 1004 SF SZ 1 423 SF SZ 4 1287 SF SZ 2 SZ 3 386 SF GENERAL NOTES: 1.OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, AND STRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THE STRUCTURAL ENGINEER. 2.ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDE A FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY. 3.ALL MECHANICAL PIPING SHOWN DASHED SHALL BE LOCATED BELOW THE FLOOR DECK. 4.VERIFY FINAL LOCATIONS OF ALL MANIFOLDS WITH THE G.C. CONTACT ENGINEER IF MANIFOLDS MOVE MORE THAN 10' FROM LOCATIONS SHOWN ON PLANS. 5.LOCATION OF ALL THERMOSTATS AND FLOOR SENSORS ARE APPROXIMATE, COORDINATE EXACT LOCATIONS WITH THE ARCHITECT. LOCATE FLOOR SENSORS EQUIDISTANT BETWEEN RADIANT LOOPS, AND DO NOT LOCATE WHERE THEY MAY LIKELY BE COVERED BY FUTURE RUGS OR FURNITURE. 6.ALL PIPING SIZED FOR TYPE L COPPER. CONTACT ENGINEER FOR ANY CHANGE TO PEX FOR NECESSARY PIPE SIZING AND/OR PUMP CHANGES. 7.INSULATE ALL PIPE LEADERS PASSING THROUGH ADJACENT ZONES. S SNOW & ICE SENSOR INTERLOCKED WITH SNOWMELT CONTROLLER. LOCATE BETWEEN TUBING LOOPS & ENSURE SENSOR IS NOT LOCATED UNDER OVERHANG OR OTHERWISE SHIELDED FROM SNOW ACCUMULATION. REFERENCE PIPING PLANS FOR MANIFOLD LOCATIONS 1 1 of ww w . a e c - v a i l . c o m a PO B o x 8 4 8 9 , 4 0 8 0 1 U S H w y 6 & 2 4 , S t e 2 1 4 , A v o n , C o l o r a d o , 8 1 6 2 0 Me c h a n i c a l , E l e c t r i c a l & L i g h t i n g D e s i g n S e r v i c e s Ar c h i t e c t u r a l E n g i n e e r i n g C o n s u l t a n t s Te l e p h o n e : 9 7 0 - 7 4 8 - 8 5 2 0 ce Drawn By:Checked By: DATE:ISSUE: AEC PROJECT #: 85 5 C H A T F I E L D R O A D AS P E N , C O L O R A D O 19102.00 An O f f i c e w i t h L E E D ™ A c c r e d i t e d P r o f e s s i o n a l s 03-24-20 DUCT PROGRESS 04-03-20 DUCT PROGRESS 05-01-20 ROOF DRAINS 06-26-20 PERMIT 02-18-21 100% CD SET 07-30-21 M&P REV 1 DPF TOC SITE PLAN SNOWMELT SCALE 1/4" = 1'-0" M-108 9 13 NORTH SITE PLAN SNOWMELT SCALE: 1/4" = 1'0" 08/06/2021 08/05/2022 denism 1 of ww w . a e c - v a i l . c o m a PO B o x 8 4 8 9 , 4 0 8 0 1 U S H w y 6 & 2 4 , S t e 2 1 4 , A v o n , C o l o r a d o , 8 1 6 2 0 Me c h a n i c a l , E l e c t r i c a l & L i g h t i n g D e s i g n S e r v i c e s Ar c h i t e c t u r a l E n g i n e e r i n g C o n s u l t a n t s Te l e p h o n e : 9 7 0 - 7 4 8 - 8 5 2 0 ce Drawn By:Checked By: DATE:ISSUE: AEC PROJECT #: 85 5 C H A T F I E L D R O A D AS P E N , C O L O R A D O 19102.00 An O f f i c e w i t h L E E D ™ A c c r e d i t e d P r o f e s s i o n a l s 03-24-20 DUCT PROGRESS 04-03-20 DUCT PROGRESS 05-01-20 ROOF DRAINS 06-26-20 PERMIT 02-18-21 100% CD SET 07-30-21 M&P REV 1 DPF TOC MECHANICAL SCHEDULES M-602 11 13 08/06/2021 08/05/2022 denism