HomeMy WebLinkAboutFile Documents.855 Chatfield Rd.0072-2020-BRES (19)BEDROOM #2
108
BEDROOM #1
106
BATH
107
BATH
109
MUD ROOM
102
LINK
101
GARAGE
100
HALL
104
ENTRY
110
GYM / BEDROOM
111
FLEX / MASSAGE /
CLOSET
112
BATH
113
WINDOW
WELL
CHUTE
CU-4CU-3CU-2CU-1
METERS ELECTRICALGAS
85
5
C
h
a
t
f
i
e
l
d
R
o
a
d
LS-3.0
north
scale:
1/8" = 1' - 0"
e
l
e
m
e
n
t
s
Snowmelt Layout
Ch
a
t
f
i
e
l
d
V
i
e
w
As
p
e
n
,
C
o
l
o
r
a
d
o
8
1
6
1
1
concrete autocourt/drive
entry
spa terrace
st
e
p
spa area
111 SF
NOTES:
Snowmelt total = 3100 SF
Spa total = 111 SF
~03.15.2020 SD
~06.02.2020 DD
~06.26.2020 permit
spa deck
st
e
p
~12.28.2020 permit re-submittal
~02.18.2021 CD Set 100%
snowmelted area in
ROW 386 SF
snowmelted area at
entry and driveway -
2291 SF
snowmelted area
at spa - 423 SF
~08.06.2021 revised
08/06/2021
External Energy Use Approved
RREMP CREMP
PERMIT #:_______________DATE:________
SNOWMELT:_____________________________
POOL: _____________________________
SPA: _____________________________
OFFSET:________________________________
REMP SHEET: __________________________
REVIEWED BY: _________________________
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
MINIMUM BOILER AFUE: _________________
X
0072-2020-BRES 8/6/21
3100
111
97.7
18.87 kw PV
DAM
08/06/2021
08/06/2021
denism
UP
DN
GDCBA
GYM / BEDROOM
111
BATH
113
FLEX / MASSAGE /
CLOSET
112
ELEVATOR
000
104B
000B
111B
MUD ROOM
102BEDROOM #1
106
BATH
107
BATH
109
BEDROOM #2
108
ENTRY
110
105
106
107A
107B
107C
109C
108B
109A
113A
113C
110A
110B
E
108A
LINEN
105
113B
109B
GARAGE
100
102B
HALL
104 PWD
103
HF
LINK
101
100A 100B
WOOD
WOOD
TILE
TILE
TILE
WOOD
WOOD
TILE
TILE
EP-01
101
102A
102C
004E
004F
104A
103A
103B
RZ
4C
200 SF
RZ
4B
55 SF
RZ
4D
60 SF
RZ
4A
265 SF
RZ
3B
205 SF
RZ
3A
705 SF
RZ
5A
635 SF
RZ
5B
210 SF
RZ
5C
155 SF
SEE PAGE M3.3 FOR CONTINUATION
OF SNOWMELT.
1004 SF
SZ
1
423 SF
SZ
4 SEE PAGE M3.3 FOR CONTINUATION
OF SNOWMELT.
RM
4
RM
3
SM
1
SM
4
T
T
T
T
T
1287 SF
SZ
2
SM
2
S
S
S
S
S
SHEET DETAIL NOTES:
ROUTE 3 4" HWS/R UP TO RM-6.
CONNECT 1 1 4" SMS/R TO SM-1.
CONNECT 1" HWS/R TO RM-3.
CONNECT 3 4" HWS/R TO RM-4.
ROUTE 1" HWS/R UP TO RM-7.
CONNECT 1 1 4" SMS/R TO SM-2.
CONNECT 1" SMS/R TO SM-4.
ROUTE 1" HWS/R DN.
CONNECT 1" HWS/R TO RM-5.
CONNECT 1" SMS/R TO SM-3.
GENERAL NOTES:
1.OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, AND
STRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THE
STRUCTURAL ENGINEER.
2.ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDE
A FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY.
3.ALL MECHANICAL PIPING SHOWN DASHED SHALL BE LOCATED BELOW
THE FLOOR DECK.
4.VERIFY FINAL LOCATIONS OF ALL MANIFOLDS WITH THE G.C. CONTACT
ENGINEER IF MANIFOLDS MOVE MORE THAN 10' FROM LOCATIONS
SHOWN ON PLANS.
5.LOCATION OF ALL THERMOSTATS AND FLOOR SENSORS ARE
APPROXIMATE, COORDINATE EXACT LOCATIONS WITH THE ARCHITECT.
LOCATE FLOOR SENSORS EQUIDISTANT BETWEEN RADIANT LOOPS, AND
DO NOT LOCATE WHERE THEY MAY LIKELY BE COVERED BY FUTURE
RUGS OR FURNITURE.
6.ALL PIPING SIZED FOR TYPE L COPPER. CONTACT ENGINEER FOR ANY
CHANGE TO PEX FOR NECESSARY PIPE SIZING AND/OR PUMP CHANGES.
7.INSULATE ALL PIPE LEADERS PASSING THROUGH ADJACENT ZONES.
1
2
3
4
5
6
7
8
1
2
3
4
1" HWS/R
5
6
7
8
RM
5
9
9
SM
3 10
10
S
S
S
T
RZ-4A
RZ-4B
RZ-3A
RZ-5A
FC-3
RZ-4C
RZ-4D
FC-2
RZ-5B
RZ-5C
FC-1
RZ-3B
S
S
S
1
1
1
of
ww
w
.
a
e
c
-
v
a
i
l
.
c
o
m
a
PO
B
o
x
8
4
8
9
,
4
0
8
0
1
U
S
H
w
y
6
&
2
4
,
S
t
e
2
1
4
,
A
v
o
n
,
C
o
l
o
r
a
d
o
,
8
1
6
2
0
Me
c
h
a
n
i
c
a
l
,
E
l
e
c
t
r
i
c
a
l
&
L
i
g
h
t
i
n
g
D
e
s
i
g
n
S
e
r
v
i
c
e
s
Ar
c
h
i
t
e
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
C
o
n
s
u
l
t
a
n
t
s
Te
l
e
p
h
o
n
e
:
9
7
0
-
7
4
8
-
8
5
2
0
ce
Drawn By:Checked By:
DATE:ISSUE:
AEC PROJECT #:
85
5
C
H
A
T
F
I
E
L
D
R
O
A
D
AS
P
E
N
,
C
O
L
O
R
A
D
O
19102.00
An
O
f
f
i
c
e
w
i
t
h
L
E
E
D
™
A
c
c
r
e
d
i
t
e
d
P
r
o
f
e
s
s
i
o
n
a
l
s
03-24-20 DUCT PROGRESS
04-03-20 DUCT PROGRESS
05-01-20 ROOF DRAINS
06-26-20 PERMIT
02-18-21 100% CD SET
07-30-21 M&P REV 1
DPF TOC
1st FLOOR
MECHANICAL
PIPING
PLAN
SCALE 1/4" = 1'-0"
M-106
7 13
NORTH
1st FLOOR MECHANICAL PIPING PLAN
SCALE: 1/4" = 1'0"
08/06/2021
08/05/2022
denism
WINDOW
WELL
CHUTE
CU-4CU-3CU-2CU-1
METERS ELECTRICALGAS
S
ELEVATORELEVATOR
W/D
ELEVATOR
CHUTE
TI
L
E
D
B
E
N
C
H
TI
L
E
D
BE
N
C
H
TILED BENCH
YOGA MAT
BENCH
TV
NI
C
H
E
S
2
3
5
GDCBA
4
E
1
6
HF
CH
A
T
F
I
E
L
D
R
O
A
D
1004 SF
SZ
1
423 SF
SZ
4
1287 SF
SZ
2
SZ
3
386 SF
GENERAL NOTES:
1.OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, AND
STRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THE
STRUCTURAL ENGINEER.
2.ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDE
A FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY.
3.ALL MECHANICAL PIPING SHOWN DASHED SHALL BE LOCATED BELOW
THE FLOOR DECK.
4.VERIFY FINAL LOCATIONS OF ALL MANIFOLDS WITH THE G.C. CONTACT
ENGINEER IF MANIFOLDS MOVE MORE THAN 10' FROM LOCATIONS
SHOWN ON PLANS.
5.LOCATION OF ALL THERMOSTATS AND FLOOR SENSORS ARE
APPROXIMATE, COORDINATE EXACT LOCATIONS WITH THE ARCHITECT.
LOCATE FLOOR SENSORS EQUIDISTANT BETWEEN RADIANT LOOPS, AND
DO NOT LOCATE WHERE THEY MAY LIKELY BE COVERED BY FUTURE
RUGS OR FURNITURE.
6.ALL PIPING SIZED FOR TYPE L COPPER. CONTACT ENGINEER FOR ANY
CHANGE TO PEX FOR NECESSARY PIPE SIZING AND/OR PUMP CHANGES.
7.INSULATE ALL PIPE LEADERS PASSING THROUGH ADJACENT ZONES.
S
SNOW & ICE SENSOR INTERLOCKED WITH
SNOWMELT CONTROLLER. LOCATE BETWEEN
TUBING LOOPS & ENSURE SENSOR IS NOT
LOCATED UNDER OVERHANG OR OTHERWISE
SHIELDED FROM SNOW ACCUMULATION.
REFERENCE PIPING PLANS FOR MANIFOLD
LOCATIONS
1
1
of
ww
w
.
a
e
c
-
v
a
i
l
.
c
o
m
a
PO
B
o
x
8
4
8
9
,
4
0
8
0
1
U
S
H
w
y
6
&
2
4
,
S
t
e
2
1
4
,
A
v
o
n
,
C
o
l
o
r
a
d
o
,
8
1
6
2
0
Me
c
h
a
n
i
c
a
l
,
E
l
e
c
t
r
i
c
a
l
&
L
i
g
h
t
i
n
g
D
e
s
i
g
n
S
e
r
v
i
c
e
s
Ar
c
h
i
t
e
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
C
o
n
s
u
l
t
a
n
t
s
Te
l
e
p
h
o
n
e
:
9
7
0
-
7
4
8
-
8
5
2
0
ce
Drawn By:Checked By:
DATE:ISSUE:
AEC PROJECT #:
85
5
C
H
A
T
F
I
E
L
D
R
O
A
D
AS
P
E
N
,
C
O
L
O
R
A
D
O
19102.00
An
O
f
f
i
c
e
w
i
t
h
L
E
E
D
™
A
c
c
r
e
d
i
t
e
d
P
r
o
f
e
s
s
i
o
n
a
l
s
03-24-20 DUCT PROGRESS
04-03-20 DUCT PROGRESS
05-01-20 ROOF DRAINS
06-26-20 PERMIT
02-18-21 100% CD SET
07-30-21 M&P REV 1
DPF TOC
SITE
PLAN
SNOWMELT
SCALE 1/4" = 1'-0"
M-108
9 13
NORTH
SITE PLAN SNOWMELT
SCALE: 1/4" = 1'0"
08/06/2021
08/05/2022
denism
1
of
ww
w
.
a
e
c
-
v
a
i
l
.
c
o
m
a
PO
B
o
x
8
4
8
9
,
4
0
8
0
1
U
S
H
w
y
6
&
2
4
,
S
t
e
2
1
4
,
A
v
o
n
,
C
o
l
o
r
a
d
o
,
8
1
6
2
0
Me
c
h
a
n
i
c
a
l
,
E
l
e
c
t
r
i
c
a
l
&
L
i
g
h
t
i
n
g
D
e
s
i
g
n
S
e
r
v
i
c
e
s
Ar
c
h
i
t
e
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
C
o
n
s
u
l
t
a
n
t
s
Te
l
e
p
h
o
n
e
:
9
7
0
-
7
4
8
-
8
5
2
0
ce
Drawn By:Checked By:
DATE:ISSUE:
AEC PROJECT #:
85
5
C
H
A
T
F
I
E
L
D
R
O
A
D
AS
P
E
N
,
C
O
L
O
R
A
D
O
19102.00
An
O
f
f
i
c
e
w
i
t
h
L
E
E
D
™
A
c
c
r
e
d
i
t
e
d
P
r
o
f
e
s
s
i
o
n
a
l
s
03-24-20 DUCT PROGRESS
04-03-20 DUCT PROGRESS
05-01-20 ROOF DRAINS
06-26-20 PERMIT
02-18-21 100% CD SET
07-30-21 M&P REV 1
DPF TOC
MECHANICAL
SCHEDULES
M-602
11 13
08/06/2021
08/05/2022
denism