HomeMy WebLinkAboutFile Documents.855 Chatfield Rd.0072-2020-BRES (41)PROJECT ADDRESS:
Parcel ID #: Permit Number:
CONTACT INFORMATION :
Owner:
Name:City:Aspen
Address:State:CO
Email:Zip Code:81611
Phone: Cell Phone:
Owner's Representative :
Name:City:
Address:State:
Email:Zip Code:
Phone: Cell Phone:
`
A.RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM
Sheets showing snowmelt, pool, spa, and solar/GSHP information:
Do you have snowmelt or a spa that has been exempted by the buiding official?
Hydro Snowmelt Electric Snowmelt Pool Spa
Existing
To be Demoed
Existing to Remain 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft
New (non-exempt)3100.00 sqft 111.00 sqft
New (exempt)
Total New 3100.00 sqft 0.00 sqft 0.00 sqft 111.00 sqft
Total on site 3100.00 sqft 0.00 sqft 0.00 sqft 111.00 sqft
Total Snowmelt on site
Boiler Efficiency 98.0%100%98.0%98.0%
Mitigation Payment -$ 19,934.69$
Total Payment for Mitigation:127,485.71$
B.ON-SITE RENEWABLE CREDITS
Supplemental System REMP Credit
Use PV Worksheet Photovoltaic System 129,518.00$
Use Thermal Worksheet Hot Water Panels -$
Use GSHP Cert Ground Source Heat Pump -$
Other Approved System -$
Total Mitigation Credits:129,518.00$
Onsite Renewable Offsets:How many KiloWatts of PV (solar electric) would I need? 18.57
or How many square feet of SHW (solar hot water) would I need?567.49
R-REMP Payment:-$
Amount Previously Paid on This Permit:
-$
Refund (includes minus $750):-$
C. PREPARED BY:Date:3/16/2021
Print Name:
Signature:
Phone & EMail:
REVIEWED:Date:
2015 IECC RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM
City of Aspen Version 11.3 UpdAted deCember 13, 2017
855 Chatfield Rd
273502402006
S2 Architects
Joseph@S2architects.com
TOTAL R-REMP PAYMENT:
S2 Architects
3100.00 sqft
Joseph Spears, AIA
$107,551.02
215 S. Monarch Suite G-102
joseph@s2architects.com
970-544-4856
Yes (enter sqft below on the exempt row)No
03/16/2021DAM3/16/21
0072-2020-BRES
Parcel ID #:
Collector
Aspect,
Degress from
True South
Collector Tilt,
Degrees From
Horizontal
Solar
Orientation
Adjustment
Factor
DC side capacity
(kW)
Inverter capacity
(kW)
kW for
credit
kW Mitigation
Credit
Collector Group 1 0 5 93.20%23.2 20.242 20.242 18.87 kWCollector Group 2 87.00%.0 0.00 kWCollector Group 3 87.00%0 0.00 kWCollector Group 4 87.00%0 0.00 kWCollector Group 5 87.00%0 0.00 kWCollector Group 6 87.00%0 0.00 kWCollector Group 7 87.00%0 0.00 kWCollector Group 8 87.00%0 0.00 kWCollector Group 9 87.00%0 0.00 kWCollector Group 10 87.00%0 0.00 kWCollector Group 11 87.00%0 0.00 kWCollector Group 12 87.00%0 0.00 kWCollector Group 13 87.00%0 0.00 kWCollector Group 14 87.00%0 0.00 kWCollector Group 15 87.00%0 0.00 kWCollector Group 16 87.00%0 0.00 kWCollector Group 17 87.00%0 0.00 kWCollector Group 18 87.00%0 0.00 kWCollector Group 19 87.00%0 0.00 kWCollector Group 20 87.00%0 0.00 kW
Total:18.87 kW
$ Mitigation Credit:129,518.00$
Instructions:
1)
2)
3)DC side capacity is the total labled panel output kW in a group.
4)Inverter capacity is the recommended input power in kW of your inverter(s).
5)
6)
7)
8)
PREPARED BY:Date:3/16/2021
Print Name:
Signature:
Phone & EMail:
REVIEWED:Date:
PV WORKSHEET
City of Aspen Version 11.3 UpdAted deCember 13, 2017
Permit Number:
Enter the aspect and tilt for each group. The solar orientation adjustment factor is automatically
calculated.
PROJECT ADDRESS:
The mitigation credit will be automatically entered into your RREMP or CREMP form. If your project has both RREMP and
CREMP, it will automatically divide the credits up, with priority given to mitigating the CREMP payment.
Determine how many collector groups you have. Groups are used to differentiate between collectors
(panels) with different tilts, aspects, sizing, or inverters. If all your collectors are installed similarily, you
might have just one group.
Joseph Spears, AIA
Joseph@S2architects.com
The kW mitigation credit is totalled and multiplied by $6865.32/kW to get the $ Mitigation Credit
You will be given credit for the lesser of the labeled panel output or the inverter.
The kW for credit is multiplied by the solar orientation adjustment factor to get kW mitigation credit.
03/16/2021
DAM 3/16/21
855 CHATFIELD ROAD
0072-2020-BRES