Loading...
HomeMy WebLinkAboutFile Documents.855 Chatfield Rd.0072-2020-BRES (43)The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 03/01/2021 ALL OUTDOOR LIGHTING MUST COMPLY WITH THE CITY OF ASPEN LIGHTING CODE SECTION 26.575.150 External Energy Use Approved RREMP CREMP PERMIT #:_______________DATE:________ SNOWMELT:_____________________________ POOL: _____________________________ SPA: _____________________________ OFFSET:________________________________ REMP SHEET: __________________________ REVIEWED BY: _________________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) MINIMUM BOILER AFUE: _________________ FIRE SPRINKLERS REQUIRED SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 0072-2020-BRES CHATFIELD LLC 855 CHATFIELD REScheck Software Version 4.7.1 Compliance Certificate Project Energy Code:2015 IECC Location:Aspen, Colorado Construction Type:Single-family Project Type:New Construction Conditioned Floor Area:6,980 ft2 Glazing Area 53% Climate Zone:7 (9922 HDD) Permit Date: Construction Site: 855 Chatfield Rd Aspen, CO 81611 Owner/Agent: S2 Architects 215 S. Monarch Suite G-102 Aspen, CO 81611 Designer/Contractor: Dan Findley AEC 40801 US-6 #214 Avon, CO 81620 Permit Number: Compliance: Passes using UA trade-off 2.3% Better Than Code Maximum UA:1586 Your UA:1549 The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Compliance: Envelope Assemblies Assembly Gross Area or Perimeter Cavity R-Value Cont. R-Value U-Factor UA East wall: Wood Frame, 16" o.c.1,608 38.0 6.0 0.032 29 Window 1: Metal Frame:Double Pane with Low-E 591 0.320 189 Door 1: Glass 106 0.320 34 North wall: Wood Frame, 16" o.c.1,347 38.0 6.0 0.032 30 Window 2: Metal Frame:Double Pane with Low-E 405 0.320 130 South Wall: Wood Frame, 16" o.c.1,192 38.0 6.0 0.032 19 Window 3: Metal Frame with Thermal Break:Double Pane with Low-E 611 0.320 196 West Wall: Wood Frame, 16" o.c.2,097 38.0 6.0 0.032 22 Window 4: Metal Frame with Thermal Break:Double Pane with Low-E 353 0.320 113 Door 2: Glass 1,058 0.320 339 Flat roof: Flat Ceiling or Scissor Truss 3,703 19.0 30.0 0.020 74 Basement Wall 1: Solid Concrete or Masonry Wall height: 9.0' Depth below grade: 9.0' Insulation depth: 9.0' 2,136 0.0 15.0 0.041 80 Window 5: Metal Frame:Double Pane with Low-E 176 0.320 56 30 0.0 0.0 0.625 19 Project Title: Data filename: P:\Current Projects\19102.00 - 855 Chatfield Road\Calculations\19102-855 Chatfield Road.rck Page 1 of 2 02/19/21Report date: 03/08/2021 Assembly Gross Area or Perimeter Cavity R-Value Cont. R-Value U-Factor UA Basement Wall 5 at Den Door: Solid Concrete or Masonry Wall height: 1.0' Depth below grade: 0.0' Insulation depth: 0.0' 17 0.0 0.0 0.625 11 Basement Wall 5 at entry: Solid Concrete or Masonry Wall height: 0.3' Depth below grade: 0.0' Insulation depth: 0.0' 12 0.0 0.0 0.625 8 Floor 1: Slab-On-Grade:Heated Insulation depth: 4.0' 292 10.0 0.684 200 Name - Title Signature Date Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2015 IECC requirements in REScheck Version 4.7.1 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Project Title: Data filename: P:\Current Projects\19102.00 - 855 Chatfield Road\Calculations\19102-855 Chatfield Road.rck Page 2 of 2 02/19/21Report date: Dan Findley - Mechanical Engineer 02/19/2021 03/08/2021 0072-2020-BRES 3/8/21 2750 111 DAM 97.7 x 18.87kw PV See change order 0028-2023-BCHO for updated REMP info These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK SPECIAL INSPECTION AND TESTING AGREEMENT To permit applicants of project requiring special inspection and\or testing per Section 1704 of the International Building Code (IBC). Project Address: __________________________________ Permit Number:______________________ BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing Schedule, including the required acknowledgments. A pre-construction conference with the parties involved may be required to review the special-inspection requirements and procedures. APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for which they provide special inspections. Special inspectors shall be approved by the building department prior to performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for pre-qualification. Special inspectors shall display approved identification, as stipulated by the building official, when performing the function of special inspector. Special inspection and testing shall meet the minimum requirements of the International Building Code Section 1704. The following conditions are also applicable: A. Duties and Responsibilities of the Special Inspector 1. Signify presence at job site. Special inspectors should notify contractor personnel of their presence and responsibilities at the job site. If required by the building official, they shall sign in on the appropriate form posted with the building permit. Observe assigned work. The special inspector shall observe assigned work for conformance with the building department approved (stamped) design drawings, specifications, and applicable workmanship provisions of the International Building Code. Architect\engineer-reviewed shop drawings may be used only as an aid to inspection. For continuous special-inspection, the special inspector shall be on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval based on a separate written plan reviewed and approved by the building department and the engineer or architect of record. 3. Report nonconforming items. The special inspector shall bring nonconforming items to the immediate attention of the contractor and note all such items in the daily report. If any item is not resolved in a timely manner or is about to be incorporated in the work, the special inspector shall immediately notify the building department by telephone or in person, notify the engineer or architect, and post a discrepancy notice. Provide timely reports. The special inspector shall complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the building official. The special inspector or inspection agency shall furnish these reports directly to the building official, engineer or architect of record, and others as designated. [IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be submitted weekly at the option of the building official. These reports should include: a. Description of daily inspections and tests made with applicable locations, b. Listing of nonconforming items, c. Report on how nonconforming items were resolved or unresolved as applicable, d. Itemized changes authorized by the architect, engineer, and building official if not included in nonconforming items. 2. 4. 1 855 CHATFIELD ROAD 0072-2020-BRES 5. Provide Final Inspection Report. The special inspector shall submit a written final report documenting required special inspections and correction of any discrepancies noted in the inspections prior to the final building inspection. B. Owner Responsibilities. The project owner, the engineer or architect or record, or an agent of the owner is responsible for employing special-inspection services. The special inspector\agency shall not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In case of an owner\contractor, the special inspector\agency shall be employed as specified by the building official. C. Engineer or Architect of Record Responsibilities 1. Prepare special inspection program. The engineer or architect of record shall list the items for which special inspection is required; and shall indicate any items for which the IBC or the building official approves periodic inspection and the frequency of such inspections. Respond to field discrepancies. The engineer or architect of record shall respond to uncorrected field discrepancies in design, material, or workmanship observed by the special inspector. Review shop drawings and submit design changes. The engineer or architect of record shall acknowledge and review for conformance with the construction drawings those shop drawings that may detail structural information, shall submit to the building official and to the special-inspection agency written documentation of any verbally authorized deviations from the approved construction documents, and shall submit revised documents for building official approval as required. 2. 3. D. Contractor Responsibilities 1. Notify the special inspector. The contractor is responsible for notifying the special inspector or agency regarding individual inspections for items listed on the attached schedule and as noted on the building department approved plans. Adequate notice shall be provided so the special inspector has time to become familiar with the project. Provide access to approved plans. The contractor is responsible for providing the special inspector access to approved plans. Retain special inspection records. Upon request, the contractor is also responsible for retaining, at the job site, all special inspection records completed by the special inspector. 2. 3. E. Inspection of Fabricators 1. Fabrication of structural assemblies and members. Where fabrication of structural load-bearing members and assemblies is being performed on the premises of a fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated items. Fabrication and implementation procedures. The special inspector shall verify that the fabricator maintains detailed fabrication and quality control procedures that provide a basis for inspection control of the workmanship and the fabricator’s ability to conform to approved construction documents and reference standards. The special inspector shall review the procedures for completeness and adequacy relative to code requirements for fabricator’s scope of work. 2. F. Approved Fabricator Responsibilities 1. Fabrication exempt inspections. Special inspections are not required where work is done on the premise of a fabricator registered and approved to perform such work without special inspection. 2 03/08/2021 DENIS MURRAY 3/8/21 SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 FIRE SPRINKLERS REQUIRED $70.00 Drywall 4/1/2021 4/9/2021 Pitkin By Cody Archuleta at 10:14 am, Mar 18, 2021 By Cody Archuleta at 10:14 am, Mar 18, 2021 X 162808478 / $60 162839404 / $10 By Cody Archuleta at 10:15 am, Mar 18, 2021 These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 3'-0" 3 ' - 0 " 3'-0" 3 ' - 0 " © 2 0 1 8 C O N U N D R U M T E C H N O L O G I E S T H E I N F O R M A T I O N A N D D E S I G N I N T E N T C O N T A I N E D O N T H I S D O C U M E N T I S T H E P R O P E R T Y O F C O N U N D R U M T E C H N O L O G I E S , L L C . N O P A R T O F T H I S I N F O R M A T I O N M A Y B E U S E D W I T H O U T T H E P R I O R W R I T T E N P E R M I S S I O N O F C O N U N D R U M T E C H N O L O G I E S , L L C . C O N U N D R U M T E C H N O L O G I E S S H A L L R E T A I N A L L C O M M O N L A W S T A T U T O R Y A N D O T H E R R E S E R V E D R I G H T S , I N C L U D I N G C O P Y R I G H T T H E R E T O . C H A T F I E L D V I E W 8 5 5 C H A T F I E L D R D A S P E N C O L O R A D O DENVER OFFICE: 5735 W. 6TH AVE. LAKEWOOD, CO 80214 VAIL OFFICE: 910 NOTTINGHAM RD. SUITE N1 AVON, CO 81620 ASPEN OFFICE: 135 W. MAIN ST. SUITE F ASPEN, CO 81611 PHONE: 970-688-5261 FAX: 866-308-9290 DESIGN@CONUNDRUMTECHNOLOGIES.COM REVISIONS DATEISSUE DESCRIPTION SOLAR ROOF PLAN SRP1.0C 3.11.2101 SOLAR ROOF PLAN C1.0 SOLAR PV SYSTEM 58 QTY SOLARIA POWERXT-400R-PM-AC 23.2 KW SYSTEM SIZE 20.242 KW INVERTER MAX OUTPUT 180 DEG AZIMUTH 5 DEGREE TILT - UNIRAC RM5 03/16/2021 03/16/2021 denism