Loading...
HomeMy WebLinkAboutFile Documents.855 Chatfield Rd.0072-2020-BRES (54)C8 UTILITIES RO A R I N G F O R K E N G I N E E R I N G 59 2 H I G H W A Y 1 3 3 CA R B O N D A L E C O L O R A D O , 8 1 6 2 3 PH : ( 9 7 0 ) 3 4 0 - 4 1 3 0 F : ( 8 6 6 ) 8 7 6 - 5 8 7 3 CHECKED BY: # DE S C R I P T I O N DA T E DR A W N B Y CONSTRUCTION DRAWN BY: JOB #: Of 16 TOTAL PAGES 85 5 C H A T F I E L D R O A D AS P E N , C O 8 1 6 1 1 2019-57 FOR JKE, MBW, TRS RBG 1 PE R M I T S E T 12 . 2 1 . 2 0 2 0 JK E 2 CO M M E N T R E S P O N S E S 12 . 2 3 . 2 0 2 0 TR S 3 CI V I L A S I - 1 08 . 1 6 . 2 0 2 1 MB W Reviewed by Engineering 09/09/2021 2:50:33 PM "It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen. The review and approval by the City is offered only to assist the applicant's understanding of the applicable Engineering requirements." The issuance of a permit based on construction documents and other data shall not prevent the City of Aspen from requiring the correction of errors in the construction documents and other data.