STRUCTURAL DESIGN 1040 MAIN STREET I CARBONDALE,CO 81623 I (970)510-0773 evolvestruct.com
April 17, 2024
Chris Hendrickson c/o: Kara Thompson, AIA
Hendrickson Construction Forum Phi Architecture
210 AABC, Unit KK 715 W Main Street, #204
Aspen, Colorado Aspen, Colorado
chris@hendricksoninc.com kthompson@forumphi.com
RE: As-Built Installation of Hurricane Ties
523 Walnut Street Addition,Aspen, Colorado
ESD Project Number: 21.017C
Dear Chris,
As requested,this letter is to provide you with documentation regarding the hurricane ties that were installed at
the project note above.
The Simpson H2.5T clips as called out in detail B/S2.004 of the structural drawings may be replaced with
HGA10 hurricane ties assuming the following:
• The number and spacing of the ties are installed as specified on S2.004.
• All other framing is as called out on S2.004.
Feel free to reach out if you need anything further regarding this matter.
Sincerely, Reviewed By:
Evolve Structural Design LLC
Gf)' *p REG'•
"• : R VV. ,9
Heidi Hendricks E.I. Oliver Rice P.E. U W
Project Manager Senior Engineer
7451
i,04-21-2024 • ' '
ce•.•„ .,��,�tl
•......
"ASS/ONA1.ti,