HomeMy WebLinkAboutFile Documents.626 S Galena St.0140-2021-BRES (23) Permit Detail Edit Clone [Permit Form[IPrintApplicabon 1LetOer [View GIS Map I Send Email[f Create Permit Fee Update BB project IC
Number 0140-2021-13RES Record Type Building[Change] Field Plan Set Must Be Printed In Color �1►�
Address 626 S GALENA ST owner RESIDENTIAL REFERENCES FROM 2015 IBC
0 Emmy Garrigus[Change] `' /
Original Number 21-2781 status Permit Review CV/CS=crawl space ventilation sec.1203.4. 18"x 24"access required
1209.1 1',',I
Type Building Reason for Cancel or comps. EE=emergency escape required sec 1030 Ir
Review Fail EU=enclosed usable space under stairs shall be 1-hr construction or stair
Applicant CHRIS MADIGAN Aspen Internal? No enclosure rating.No access from stair enclosure.Va"gypsum permitted for CITY. OF ASPEN
Account MADIGAN&COMPANY Required Bond Amount stairs inside a single dwelling unit.1011.7.3. CITY OF
Project Total Available Bond Amount RV=roof and rafter ventilation required 1203.2 ASPEN
A=Attic Access 20"x 30"1209.2
Land Use Planning Application Bluebeam Project Id 144323-306 SA=smoke alarm(NFPA 72)required sec 907.2.11 0140-2021-BRES
Permit Contractor HPC-ZON-EH-UTIL Review CO=carbon monoxide detector req.per Aspen Municipal Code 8.15 PERMIT NO
SG=safetyglazingrequired 2406 • These plans mugs e�ept at the
sec
Valid Business License on HPC-ZON-EH-UTIL Review-2building site or inspection
Account V=mechanical ventilation required sec 1203.1&IMC 403(bath fans and OWNER
whole house ventilation) MOnkafSh delays may occur.Construction
Imported Eng Review Eng-CMP Rev.UIi Rev. GR=guards,42"min ht,4"max opening.Guards within dwelling unit 36"min • . shall conform to these plans.All
Required Submissions Parks-Prkng-San Review San Rev. ht sec 1015 changes shall be approved by
Documents Resubmitted Conditional Inspections HR=handrails 34"-38"ht sec 1014 ADDRESS.626 S.Galena ing official.
Approved Covid-19 Plan 1 Conditional Final Insp Eng-Wtr Final,ljtil Final.San Final. DS=Draft stopping/fire blocking 718
RD=Roof drainage 1503.4
STC=Sound transmission class not less than 50 at dwelling separations,sec SEPARATE PERMITS ARE
PARCEL ID •
0 Action Items 1207 273718290003
SI=Stairway Illumination 1205.4 __ _ REQUIRED FOR ELECTRICAL,
PD=protect against decay,sec 2304.12 PLUMBING,
FIRE SPRINKLERNWORK OR
►Queue Score REFERENCES FROM 2015 IMC
DE=clothes dryer exhaust,sec 504.Makeup air req'd if over 200 CFM SMOKE ALARMS AND
v Dates AS=access and service space for maintenance req'd,sec 306 CARBON MONOXIDE
New Application Date 9/62021 TCO Issuance Date MA=make up air required if hood exhausts greater than 400 CFM,sec 505.2 DETECTORS REQUIRED
ET=exhausts terminate 3'from prop line and openings,10'from intakes, THROUGHOUT DWELLING
Application Complete Date 11/15/2021 Close/CO Issuance Date 501.3.1 UNIT PER CITY OF ASPEN
Application Accepted Date 11/15/2021 Expiration Date IT=intake openings 10'from lot line&contaminant sources(vents,streets), General Electrical Requirements MUNICIPAL CODE 8.15
Issue Date Override Expiration Date 401.4 Any areas affected by the renovation must be brought up to the current
D=fasten and seal all ductwork per 603.9
Last Activity Date REFERENCES FROM 2015 IFGC electrical code including:
DV=direct vent req'd,sec 303.3 tamperproof receptacles(NEC 406.12),
Basic Information CA=combustion air not taken from bedrooms,bathrooms or ground-fault circuit interrupter protection(NEC 210.8), I It should be known that this review shall
v storage sec 303.3 arc-fault protection(NEC 210.12), not relieve the applicant of their
Description Interior^finishes"remodel of and existing townhome and census Code 434 R-Remodel only.no new Sq Ft i OD=outdoor appliances must be listed for outdoor use,sec 303.6 receptacle spacing(NEC 210.52)etc. responsibility to comply with the
1-1 replacement of windows per approved RDS plans for REFERENCES FROM 2015 IECC requirements of the City of Aspen
the complex Rooms and bathrooms remain in same F=new or replacement fenestration shall not exceed 0.28 U-factor,NFRC Municipal Code.Pursuant to
location.localized rework of plumbing and electrical to Sec.26.104.050,any permit or approval
abet required,Ordinance 40,2016
make new finishes work.New lighting replaced 1:1 with issued in error or otherwise not in
some additions.drywall will remain were possible L=75%of lamps in permanently installed lights must be high efficacy,sec
including ceilings.Stairway to be reframed Addition of R404.1 conformity with the requirements of this
HVAC wall mounted spill system SE=Continuous air barrier required;all exterior joints,cracks,and holes to be Title,shall be void.Similarly,any permit
Use of Building Multi-Family Interior Remodel Only ,/ caulked,gasketed,sealed,table R402.4.1.1 or approval issued in reliance upon or
REFERENCES FROM 2014 NEC as a result of,a materially false
use Class Residential EP=electric panel'happy space'30"x36"x78",not in storage,sec 110.26 statement or representation made in
the process of obtaining the permit or
Class of Work Alteration development approval shall,likewise,
Permit Comments be void.Any person having received a
SPECIAL INSPECTION REQUIRED: void or voidable permit or approval
shall not be relieved from having to
v Job Location -Structural steel welding:Field&Shop READ THIS OR FAIL YOUR INSPECTION! comply with all applicable terms and
Address 626 S GALENA ST.ASPEN:273718290003 Lot -High strength bolting conditions of this Title and the City shall
-Epoxy anchors not be estopped from fully enforcing
Site Address Display on Map Legal Description Subdivision:GALENA PLACE TOWNHOMES Unit:3 -Intumescent paint Furred&Dropped Ceilings,Soffits,and Walls same.
Historic Property? No Eden Address -Spray applied fire resistive materials 20015 IBC 803.13
Historic District? No Primary Owner -Permanent micropiles This applies to the attachment of finishes or furring to any
Special inspection is required per 2015 IBC section 1704.Inspector to verify that copy of assemblies that are required to be either fire-rated or REVIEWED BY ZONING
v HPC-PlanningZoningDetails agreement forins inspectionprogram to be on the'ob sitepriorto performing anyinspections. non-combustible and is separate from the fire-rated
g p p g p assemblyrequirement. 01/11/2022 kylas
Zone District L HOAlCovenant HOA/Covenanl Approval Not Required A copy of all Special Inspector field reports to be on the job site for inspectors'review if
requested.Failure to comply may result in denial of inspection. It should be known that this review shall
Is There an ADU? No HPC Certificate of No %
Walls,Ceilings&Soffits:If furred 1inches or not relieve the applicant of their
Appropriateness?
less,do one of the following: responsibility to comply with the
ADU Sq Ft Work Involves a Land use No requirements of the City of Aspen.The
Approval? 4.Fill spaces with Class A material. review and approval by the City is
Deed Restricted? No Located in a PD? No 5.Fill spaces with inorganic or non-combustible material. offered only to assist the applicant's
#of Dwellings 2 Adds/Changes Floor Area? No 6.Fire block 8 feet in all directions. understanding of the applicable Land
— Use Code requirements.The issuance
Category of Zoning Fee Residential Occupancy or Use Change? No Dwelling Separation Required-2015 IBC of a permit based on construction
Zoning Work Level Minor Zoning Fee Work Affects Exterior of No -708 Fire Partitions,711 Horizontal Assemblies: Walls:If set out(furred)greater than 1 s/a inches, documents and other data shall not
Building?J Walls and floor/ceilings separating dwelling units shall have a fire-resistance do one of the following: prevent the City of Aspen from
rating of at least 1 hour.Walls shall extend from the top of the floor assembly 4.Use a Class A finish material(such as drywall). requiring the correction of errors in the
v Building Project Details below to the underside of the floor or roof slab or deck above or to the 5.Use non-combustible framing. construction documents and other
data.
Valuation S2.500.000 00 Lot Size Sq.Ft. 6,666 fire-resistance-rated floor/ceiling assembly above. 6.Protect both sides with fire sprinklers. —
-714:Penetrations must be protected by a through-penetration firestop
Reason for Valuation Change Soil Disturbance Sq Ft 0 system.Recessed fixtures shall not reduce the required fire resistance by use Ceilings&Soffits:If dropped(furred)greater
Unit Sq.Ft. 3,105 Affected Area Sq Ft 0 of a listed fixture,a listed firehood,or a drywall assembly meeting the required than 1 a/a inches:
Building Footprint Sq Ft 0 Existing Hardscape Footprint Sq 0 fire resistance.Exhaust fans require ceiling radiation damper.
Ft -1207 Sound Transmission:Separating walls and floor/ceilings shall have an Framing members,hangers,and other assembly rieVIED
Sq Ft of Building Work Area 3.105 Existing Hardscape%of Lot 0% STC rating of at least 50.Floor/ceilings shall have an IIC rating of at least 50. members must be non-combustible. You may notuse wood.
Building Fire Area Sq Ft Con Mit Sq Ft Total 3,106 — In Type III and V construction only,you may use fire 31/2 02 2
retardant treated wood or nnn-c,nmbustible framing.
Utility Review Sq.Ft. 0 Utility Review Sq Ft Total 0
%of Interior being Altered 24% 7 r-- �/I 7 imp
New Sq.Ft 0 _� _� l�',�� cnnn
►Scope of Work Details 75%of lamps in permanently �I
hig light fixtures shall
highh efficacy
cy-IECC R404.1 P11rDROPPED[ELM
v Building Description °"®"'"° '
Code Editions 2009 IBC Required Special Inspections
Other Code Editions Energy Code Compliance
Building Type(IRC) Townhouse Total Snowmelt Sq Ft
Construction Type VA Total Spa Sq Ft
Occupancy Group R-2 Total Pool Sq Ft
Occupancy Load Amount of Onsite Renewable
Generation?
Fire Sprinkler Existing? No CO Description
Fire Sprinkler Required? No Basement
Fire Sprinkler Type 1st Floor
Fire Alarms Installed? 2nd Floor
#Wood Fireplaces 3rd Floor
#Gas Log Fireplaces Additional
#Gas Appliances Open Text Field For Comments
#of Onsite Parking Spaces
CITY OF ASPEN
SPECIAL INSPECTION AND TESTING AGREEMENT
This form is required for projects needing special inspection and/or testing per Chapter 17 of the International
Building Code(IBC). 626 S Galena 0140-2021-BRES
Project Address: Permit Number:
BEFORE A PERMIT CAN BE ISSUED: The owner,or the design professional in responsible charge,acting as
the owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing
Schedule,including the required acknowledgments.A pre-construction conference with the parties involved may be
required to review the special-inspection requirements and procedures.
APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for
which they provide special inspections. Special inspectors shall be approved by the building department prior to
performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for
pre-qualification. Special inspectors shall display approved identification,as stipulated by the building official,
when performing the function of special inspector.
Special inspection and testing shall meet the minimum requirements of the International Building Code Section
1704.The following conditions are also applicable:
A. Special Inspector Responsibilities:
1. Signify presence at job site.Special inspectors should notify contractor personnel of their
presence and responsibilities at the job site.If required by the building official,they shall sign in
on the appropriate form posted with the building permit.
2. Observe assigned work.The special inspector shall observe assigned work for conformance with
the building department approved(stamped)design drawings,specifications,and applicable
workmanship provisions of the International Building Code.Architect\engineer-reviewed shop
drawings may be used only as an aid to inspection.
For continuous special-inspection,the special inspector shall be on site at all times observing the
work requiring special inspection.Periodic inspections,if any,must have prior approval based on
a separate written plan reviewed and approved by the building department and the engineer or
architect of record.
3. Report nonconforming items.The special inspector shall bring nonconforming items to the
immediate attention of the contractor and note all such items in the daily report.If any item is not
resolved in a timely manner or is about to be incorporated in the work,the special inspector shall
immediately notify the building department by telephone or in person,notify the engineer or
architect,and post a discrepancy notice.
4. Provide timely reports.The special inspector shall complete written inspection reports for each
inspection visit and provide the reports on a timely basis determined by the building official. The
special inspector or inspection agency shall furnish these reports directly to the building official,
engineer or architect of record,and others as designated. [IBC Sec. 1704.1.2] These reports should
be organized on a daily format and may be submitted weekly at the option of the building official.
These reports should include:
a. Description of daily inspections and tests made with applicable locations,
b. Listing of nonconforming items,
c. Report on how nonconforming items were resolved or unresolved as applicable,
d. Itemized changes authorized by the architect,engineer,and building official if
not included in nonconforming items
5. Provide Final Inspection Report.The special inspector shall submit a written final report
documenting required special inspections and correction of any discrepancies noted in the
inspections prior to the final building inspection.
rti
03/29/2022 Iv
FOROM lMPLIhNCE
130 South Galena Street Aspen,CO 81611-19 7 5 I P:970.920.5000 I F:970.920.5197 I cityofaspen.com jimp
B. Owner Responsibilities:
1. The project owner,an agent of the owner,or the design professional in responsible charge acting
as the owner's agent,is responsible for employing special-inspection services. The special
inspector/agency shall not be in the employ of the contractor,subcontractor or material supplier.
[IBC Sec 1704.1]In case of an owner/contractor,the special inspector\agency shall be employed
as specified by the building official.
C. Design Professional in Responsible Charge Responsibilities:
Design Professional in Responsible Charge definition:An individual who is registered or licensed to practice their
respective design profession as defined by the statutory requirements of the professional registration laws of the state or
jurisdiction in which the project is to be constructed;who is engaged by the owner to review and coordinate certain
aspects of the project,as determined by the building official,for compatibility with the design of the building or
structure.
1. Prepare statement of special inspections.The registered design professional in responsible
charge shall prepare a statement of special inspections in accordance with IBC Section 1705 for
submittal by the applicant.The statement of special inspections shall identify the following:
a. The materials,systems,components and work required to have special inspection or
testing by the building official or by the registered design professional responsible for
each portion of the work.
b. The type and extent of each special inspection.
c. The type and extent of each test.
d. For each type of special inspection,identification as to whether it will be continuous
special inspection or periodic special inspection.
D. Contractor Responsibilities:
1. Notify the special inspector.The contractor is responsible for notifying the special inspector or
agency regarding individual inspections for items listed on the attached schedule and as noted on
the building department approved plans.Adequate notice shall be provided so the special inspector
has time to become familiar with the project.
2. Provide access to approved plans.The contractor is responsible for providing the special
inspector access to approved plans.
3. Retain special inspection records.Upon request,the contractor is also responsible for retaining,
at the job site,all special inspection records completed by the special inspector.
E. Inspection of Fabricators:
1. Fabrication of structural assemblies and members.Where fabrication of structural load-bearing
members and assemblies is being performed on the premises of a fabricator's shop,IBC Section
1704.2 shall require special inspection of the fabricated items.
2. Fabrication and implementation procedures.The special inspector shall verify that the
fabricator maintains detailed fabrication and quality control procedures that provide a basis for
inspection control of the workmanship and the fabricator's ability to conform to approved
construction documents and reference standards.The special inspector shall review the procedures
for completeness and adequacy relative to code requirements for fabricator's scope of work.
F. Approved Fabricator Responsibilities:
1. Fabrication exempt inspections. Special inspections are not required where work is done on the
premise of a fabricator registered and approved to perform such work without special inspection.
If work is done on site that requires special inspection, special inspection will be required.
2. Approval of fabricator.Approval shall be based upon review of the fabricator's written
procedural and quality control manuals and periodic auditing of fabrication practices by an
approved special inspection agency.
3. Completion of fabrication.Upon completion of fabrication,the approved fabricator shall submit
certificate of compliance to the building official stating that the work was performed in accordance
with the approved construction documents.
REVAREVE
03/29/2022
130 South Galena Street Aspen,CO 81611-1975 I p:970.920.5000 I F:970.920.5197 I cityofaspen.com limp
G. Building Department Responsibilities:
1. Approve special-inspection program.The building department shall approve all special
inspectors and special-inspection requirements.
2. Enforce special inspection.Work requiring special inspection and the building inspector shall
monitor the performance of special inspectors.His/Her approval,in addition to that of the special
inspector,must be obtained prior to placement of concrete,covering of structural steel,or other
similar materials.
3. Review inspection reports.The building official should review special-inspection progress and
final reports.
4. Perform final inspection.The building official should perform the final inspection and approval
for a project[IBC Sec. 109.3.1] after the final special-inspection report has been reviewed and
approved.
Project Address: 626 S Galena Permit Number: 0140-2021-BRES
ACKNOWLEDGMENTS
I have read and agree to comply with the conditions of this agreement.
Special Inspection Signature Printed Name Date Email
Agency***
Owner* Signature Printed Name Date Email
Design Professional in Signature Printed Name Date Email
Responsible Charge**
Madigan+Company Chris Madigan 3-25-2022 chris@madiganco.co
Contractor Signature Printed Name Date Email
Approved Signature Printed Name Date Email
Fabricator***
Peak Architectural Metals Daniel Capehart 25 March 2022 dan@peakmetalsco.com
Inspected Signature Printed Name Date Email
Fabricator***
City of Aspen Building Jim Pomeroy 3/28/22 jim.pomeroy@aspen.gov
Department: Signature Printed Name Date Email
*See a list of who may sign as the owner on page 2.
**The Design Professional in Responsible Charge is not required to sign if they perform the duties as described in item C above.
***Either the Approved Fabricator or Inspected Fabricator must sign.If all work is performed in the shop of an Approved Fabricator,the Special
Inspection Agency signature is not required(no field work).
REVAREVE
03/29/2022 11)
13o South Galena Street Aspen,CO 81611-1975 I P:970.920.5000 I F:970.920.5197 I cityofaspen.com jimp
t.. Ruddier.Department Responsibilities:
I. Approve special-inspection progratn. The building department shall approve all spacial
.stspectors and special-insertion requirements.
Z. Enforce special inspection.Work requiring special inspection rind the huddling Inspector shall
attun:tor the per:urrn_nce of specaa:inspectors.Hisl icr approval,in addition to that of the special
inspector,most be obtained prier to placentertt of concrete,covering of structural Steel_or other
similar materials_
3- Review Inspection reports`The building official siuxtid review special-inspection progress an::
lima:reports.
4. Perform final inspection.The buiidins official should perform the final inspection and approval
to a project?IBC Sec. 1129.3,1 J after the final special-tnspection report has been reviewed and
reproved.
Project.4ddrass: 626 S Galena Permit?lumber.
AClt NOWLEDC.MF_NNTS
^ 1 have read a.0 _• -•to comply with the coudioms%of this agrocment.
264
:/'
-3. 2,-7-, ,,...- p.,..,...4is-s(t..(-___.;
SpexltlN Linn_ S 1 f fas_tc, j Email l W • C-49Y 1
()wive _
()wivePrinted Name Date Finnan f bvias r
----� �,Jl1c
Design Professional its tgn _ 471R Z nt Pr:n•.cd Name Date 1-xnar1 &e .
pub „.....
ic Charge'• -
Ccrvar:y Mallon Chris Madigan 3-25-2022 chris@i'matheance.co
'_untrtr or Signature Printed,Name Date Email -- -
Approved Signature Printed Name Date Email -
Fabricator"' []
Oa Paul A ehtmcsu T`T'��s USW* Daniel Capehart 25 Mat ears danApeakmetalsco.cor i
l�kd Signature Printed Name Date Email — -
I abricatar•••
City of Aspen Suiidir
Department- Signature Printed Name Dale Email ——
'Seca Itst of woo may says a Inc uwna on page 2.
•'f br LMtge 1 nzfawamd in itepearabk Chariot n nut maim*su sign of Mary perform the tames as lies«sitod m non C above
•••I.:nor the Apprumt4 Fsbnca tee in het:w d t sbri mug sip if all work rs performed en the sbap of an Af pro ai Fah-icamt.Inc Speesa.
L4oatsin ALttray uaoasitt is ant rs cuid fin&AI Mule t
r03/29/2022 IV
PORCOOtat titifiliCE
3 imp