HomeMy WebLinkAboutFile Documents.434 E Main St.0090-2023-BRES (2) ADDRESS: '3"/,E / O 3' PERMIT NUMBER:
COMMUNITY DEVELOPMENT 'DEPARTMENT
ZONING COMPLIANCE VERIFIFATION POLICY CITY OF ASPEN
Applicability:All development projects must comply with the City's zoning regulations, including height and
location, and are subject to periodic inspection during construction and a final inspection prior to project
completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen
shall verify height and/or location compliance thrlpugh submission of a survey report.
Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one
foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance
through this method.
In addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/
duplex development or other projects where coMpliance may be in question. Independent of this policy, all
projects must comply with all applicable zoning limitations.
The Zoning Officer will inform the applicant during building permit review if verification will be required.
However, circumstances may require zoning compliance verification of a project which is already underway.
Timing: Height verification should be accomplished at a point of construction when enough roof structure is in
place to accurately measure the structure yet earlly enough in the process to still make changes if the structure
is too tall. Location verification should be accomplished at a point of construction when the final exterior of the
structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer
with the Zoning Officer regarding the timing of z ning compliance verification.Applicants are encouraged to
perform their own verification during constructi n to ensure the building is progressing to plan, including the
height and location of foundation forms prior to oncrete pours.
Survey Report: A Colorado Professional Land Sur eyor shall describe and depict the height and location of a
structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set.The
City's Zoning Officer can assist in determining wh�ch elements of the structure should be measured and if natural
or finished grade should be used.
The report shall include the following informatio :
1-A brief cover letter with the building permit nu ber, name of the project, name of the owner and general
contractor, with a written description of the mea urement methods including date(s) of measurement.
2-For location verification: A plan drawing showing property boundaries, permitted setbacks, building envelope
(if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all
exterior veneer or other exterior treatments), and the location and dimension of each observed measurement.
3-For height verification: Elevation drawing(s) showing the natural or finished grade of the property, maximum
permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior
sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles,
or other veneer treatments orornamentation), and the location and dimension of each observed r, Sout xrd ' `
Additional roof plans showing location of measurements may be necessary.
07/17/7ri2
CITY OF ASPEN November2022 427 RIO GRANDE PL I ASPEN, CO 8�,�1\1.1J
1 '3UILDING DEPARTMENT
' x � / ,
PERMIT NUMBER: ADDRESS: �r/�/1 � � � -.�
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY CITY oF ASPEN,
1
4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/
elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items
unique to the project.
5-The report shall include a written description or drawing notes of the benchmarks or control points used to
establish property boundaries, setbacks, building location, building height,and grades for each measurement.
6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in
the approved building permit set.
7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who
conducted the field measurements certifying that the field measurements areaccurately represented.
Review and Acceptance of Report:The Zoning O .cer shall review the report(s) and either confirm the project
conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets
the zoning limitations for the property or shall de ermine which elements of the project are not in compliance.
The Zoning Officer may request additional inform tion to verify zoning compliance, which may include but is not
limited to additional survey work or a site visit.
All drawings of the survey report must correlate ith representations in the approved building permit set for
acceptance. Modifications to field conditions or amendments to the building permit may be required.
A determination of non-compliance shall result i the issuance of a correction notice and possible work
stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the
construction process to minimize disruption to the construction schedule.
Acknowledgment:
I (contractor name) /46NMA I J/j 7�� /understand this policy. I agree that this project will
comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of
the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this
project complies with all applica zoning limitations.
Contractor Signature: `" /
Date: 0
• 1 u /f I //7(119
%( CITY OF ASPEN November2022 427 RIO GRANDE PL I ASPEN, CO Eg. ,1 I
'BUILDING DEPARTMENT
, 1
ADDRESS: /J`y 1%RXI/ o, PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
ASBESTOS VERIFICATION AND CHECKLIST CITY OF ASPEN
ASBESTOS INFORMATION
,
Asbestos is a known human carcinogen and is an airborne hazard.Once airborne,asbestos fibers can stay suspended in the air for days,
weeks,or even months before settling out of the air.The fibers can easily become airborne again from a minor disturbance like turning
I.
on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos
hazards that could expose people to asbestos in the future, long after the renovation activity occurred.The airborne asbestos fiber
concentrations resulting from disturbances may result in a ignificant exposure to the current and future occupants of the home.
The 1989"ban"on asbestos-containing materials is com only misunderstood. In fact, in 1991 the U.S. Fifth Circuit Court of appeals
vacated much of the so-called"Asbestos Ban and Phaseout Rule"and remanded it to the EPA.Thus, much of the original 1989 EPA ban
on the U.S. manufacturing, importation, processing,or dist ibution in commerce of many asbestos-containing product categories was
set aside and DID NOT TAKE EFFECT.Therefore,ALL demolition, remodel or renovation projects must determine if disturbed material
above the trigger levels contains asbestos. •
ASBESTOS-CHIECKLIST
' Fs❑No
esidential: Will you be removing more than 32 sq ft, 50 linear feet (e.g., pipe insulation), or the volume
equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel —examples are drywall,
linoleum, ceiling tiles, roofing materials, etc.?
❑Yes❑No
Commercial: Will you be removing more than 16 sq ft, 260 linear feet (e.g., pipe insulation), or the volume
equivalent of a 55-gallon drum of any material b sides concrete, wood, bricks, or steel—examples are drywall,
linoleum, carpet, carpet adhesives, ceiling tiles, r ofing materials, etc.?
If the answer is YES to any of the above,you wil need an asbestos test before you can receive a building and/
or demolition permit.You will also need to pro ide plans indicating areas to be demolished and determine if a
CO state demolition license is required. A state ertified asbestos inspector must do this test and the test report
must be submitted with the building permit appl cation. If the building has asbestos, a state certified asbestos
abatement firm must remove it. After removal,t e abatement firm must provide a letter to the Building
Department stating that all the asbestos has bee removed and that the air is clean.This letter must be received
BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state.
co.us/ap/asbestos/index.html for certified asbes os inspectors and abatement companies. ALWAYS ask for proof
of current state certification.)
If you are demolishing the building, you must s bmit a demolition permit app with the CDPHE in addition to the
Aspen permit app. This form may be found at h ps://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE:
A copy of this demolition permit app must be su mitted with the initial building permit application. When the
CDPHE approves the app, their issued permit mc.st be given to the Aspen Building Dept before we issue our
permit.
I hereby certify that the above information is true and complete. {
Owner XI� /KJ/c/ Phone # 0/' '/ /7 L601)
Applicant (print name) *A /V/V 41 Phone# q / T 7
Applicant Signature — Date .`� c' �()
Please contact the Building Department at buildingsupport@aspen.gov at any time if you have tf'sEL t
asbestos, interpreting your test results, or other matters. (17/1 7/9
CITY OF ASPEN November2022 427 RIO GRANDE PL I ASPEN, CO §4,N,I.J3
1JILDING DEPARTMENT
ADDRESS: // / 4' 243 PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT _
VALUATION AFFIDAVIT CITY OF ASPEN
AFFIDAVIT POLICY
All applications for a building permit within the City of Aspen are required to include a certification of
compliance with building permit valuation requir ments. The certification must be signed by the property
owner or authorized representative. The followi g certification shall accompany the application for a permit.
I, the property owner or authorized agent, under tand and certify as follows:
City of Aspen Ordinance No. 40, Series of 2016 a opts the 2015 International Residential Code (IRC) and
International Building Code (IBC) with certain am ndments. These codes define building valuation as follows:
R108.3 Building permit valuations. Building per it valuation shall include total value of the work for which a
permit is being issued, such as electrical, gas, me hanical, plumbing equipment, and other permanent systems,
including materials and labor.
109.3 Building permit valuations.The applicant r a permit shall provide an estimated permit value at time
of application. Permit valuations shall include tot I value of work, including materials and labor, for which the
permit is being issued, such as electrical, gas, me hanical, plumbing equipment and permanent systems. If, in
the opinion of the building official,the valuatio is underestimated on the application, the permit shall be
denied, unless the applicant can show detailed e timates to meet the approval of the building official. Final
building permit valuation shall be set by the buil ing official.
City policy indicates that permit valuation includ s materials and labor for the structure and mechanical,
electrical, plumbing and gas, fire sprinkler and el vator systems and equipment. Permanent systems such as
audio visual, lighting and HVAC controls are inclu ed in the total as are expenses directly related to construction
such as equipment rental and contractor fees. Fi ish materials such as paint, floor coverings, tile, cabinets and
counter tops are included in the permit valuatio total.
Costs such as architectural and engineering desi n fees, landscaping and planting, tap fees, development
mitigation fees, trash removal, and cleaning are of included.
I
I certify that the permit valuation entered on the permit application for this property complies with the above
valuation requirements. I understand that this document is a public document.
Owner Signature: Date:
Owner Printed Name:
or,
Authorized Agent Signature: /// /1 ,.. -------Eitatsr—Authorized Agent Printed Name: R1Z--- 9(�,/ /41 /4IR Fr./FR/Er
n7/17/9(19-4
CITY OF ASPEN November2022 427 RIO GRANDE PL I ASPEN, CO $,3ri�1r,
` 1UILDING DEPARTMENT