Loading...
HomeMy WebLinkAboutFile Documents.434 E Main St.0090-2023-BRES (10) ' Project Address: 434 EAST MAIN ff203 Owner Name: KAREN JORDAN Reviewer: '�/i ' Applicant Name. MICHAEL MCNAMARA Owner Address: 9CAMDEN CT NEWPORT COAST CA 92657 Date of Final Inspection: ,`.,/, Applicant Email: MACCONTRACrOR@HOTMAIL.COM Owner Phone: 949-275-6868 \1 \,/ Applicant Phone: 970-618-0341 Proposed Domestic Tap Size: 3/4" LAST SPREADSHEET UPDATE( 3/10/2020 Date: 7/1/2023 Proposed Fire Suppression Tap Size: 2" Type of Work Interior Remodel Existing ECUs(located on water bill): CITY OF ASPEN Building Permit No. Account Number(located on water bill): Definitions ECU Rate Proposed Fixture Count(include Total Proposed ECU Final Fixture Count Total Final ECU all existing fixtures) Bedrooms A room with a closet 0.10 1 0.1 _ 0 1st Full Bathroom/Living Unit Includes tub/shower,toilet,lay 0.36 0 _ 0 2nd Full Bathroom/Living Unit Includes tub/shower,toilet,lay 0.24 0 0 Toilets/Urinals Not included in 1st or 2nd bath 0.05 0 0 Lays Not included in 1st or 2nd bath 0.02 0 0 Tub only/Tub&shower/Shower Stall Not included in 1st or 2nd bath 0.05 0 0 Oversized Tub 0.02 0 0 Whirlpool Upgrade 0.05 0 0 Steam shower Upgrade 0.03 0 0 Kitchen Cook surface,refrigerator&sink 0.25 1 0.25 0 Dishwasher 0.10 1 0.1 0 Disposal 0.05 1 0.05 0 Additional Sink/Pot Filler 0.05 0 0 Bar/Hand Sink 0.05 0 0 Kitchen Efficiency/Kitchenette Does not include a cook surface 0.15 0 0 Stand Alone Ice Machine _ 0.05 0 0 Washer _ 0.10 1 0.1 0 Utility Sink _ 0.05 0 0 1st Hose Bib _ 0.20 0 0 2nd Hose Bib 0.10 0 0 Additional Hose Bib 0.05 0 0 Drip Landscaping(4 of emitters) 0.001/Drip Emitter 0.001 0 0 Sprinkler System Landscaping(sf) Spray system-0.01 ECU/100sf _ 0.01 0 0 Hot tub/jacuzzi(gal) per 100 gal-with jets _ 0.02 0 0 Pool(gal) per 1,000 gal-year round use _ 0.02 0 0 Water Softener _ 0.02 0 0 0 0 L 0 0 0 0 Line Size Minimum ECU Check 1 Total Proposed ECU 1.00 Total Final ECU 0.00 Service Area Mr INSPECTOR NOTES: Service Area Fee Munis Account Record Governing Existing ECUs Substantial or Insubstantial Remodel Substantial Net ECUs for REVIEW UCP 1.00 RECEIVE- 07/17/2023 ASPEN BUILDING DEPARTMENT