HomeMy WebLinkAboutFile Documents.1039 E Cooper Ave.0127-2020-BRES (7) DATE: MASTER PERMIT: PERMIT NUMBER:
•
COMMUNITY DEVELOPMENT DEPARTMENT ��
HO
BUILDING PERMIT APPLICATION 41.
` CITY OF ASPE N
PROPERTY INFORMATION
1
ADDRESS 1039 E. COOPER AVE UNIT#30A PARCEL ID# 273707342043
TRACT CHATEAU ROARING FORK Unit:30-A
LOT BLOCK OR SUBDIVISION
OWNER NAME HUCKELBUTT HOUSE LLC CELL(972)693-2910 EMAIL jim.baldwin@kdrp.com
BEST CONTACT Leslie Cope/Adam Cook CELL(970)544-9006 EMAIL Icope@rowlandbroughton.com
NAME
PROJECT DETAILS (READ DEFINITIONS BELOW) COMPLETIONMUSE T
COMPLETED IN ITS ENTIRETY
1
DESCRIPTON OF
WORK INIDETAIL Interior renovation: new finishes, fixtures and minimal wall moves. New windows on south and east
side of exterior and 3 new skylights.
PROJECT 500,000 Use of Building Class of Work Fixture Counts Important Review Triggers
VALUATION
❑ Commerical ❑ New 2 Toilets,Bidets Major Engineering Review
SQFTOF EMulti-Family 0 Addition ° Bathtub •Projects involving less than 50%
WUORKIAREA 1110 SF 0 Single Family ❑■ Alteration 3 Lavatory(Wash Basin) hardscape area and work affecting
O Mixed-Use 0 Repair 2 Shower 75%or greater of unit sq ft
1110 SF 3Kitchen Sink(+Disposal) •Projects involving greater than
UNIT SQ FT 0 0 I F R 1 Dishwasher 50%hardscape area and work
LOT SIZE N/A 0 Tenant Finish ° Laundry Bar,Utility Sink affecting 50%or greater of unit
(SQ FT) Will there be 0 Demolition 1 Clothes Washer sq ft
503FTOFSOIL N/A any roof/wall ❑ Change Order ° Floor Sink •Projects involving 1,000+sq ft of
DI TURBANCE penetrations? 0 o Floor Drain soil disturbance area
❑■ Yes iWater Heater(Pan Req)
NEW SQ FT N/A 0 No ° #Gas Outlets Water Efficient Landscaping
° Water Treatment •Projects that trigger a major
BUILDING N/A Other engineering review
FOOTPRINT NOTICE: This permit becomes null and void if work •Projects involving interior
or construction authorized is not commenced within no change to fixture counts
HARDSCAPE N/A 180 days,or if construction or work is suspended or alterations affecting 50%or more
AREA abandoned for a period of 180 days at any time after of exisiting gross square footage
ZONE N/A work is commenced.
DISTRICT •. i
Project Valuation:Cost of project as defined in Valuation Affadavit.
Sq Ft of Building Work Area:Total square footage of interior area undergoing change or reconfiguration.
O Unit Sq Ft:Gross square footage, not FAR,of permitted unit.
H Lot Size:Total surveyed square footage of property. APPROVALS
Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbed Reviewing Needs Reviewer Date
Z New Sq Ft:Total added square footage for additions to net livable or net leasable space. Department Review Sign-Off Approved
w Building Footprint:Grade floor square footage of the permitted structure. PC
0 Hardscape Area:Square footage of impervious lot surface.
Zone District:Underlying zone district of permitted parcel. Zoning
HPC
Building TF 2/25/2021
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Fire
Building Building Engineering
Review Permit Fee Parks Impact
CMP
Engineering Zoning School Lands Water
Review Review(50%) Dedication Stormwater
Zoning CMP(50%) TDM Impact Sanitation
Review(50%)
Energy Code REMP Pedestrian Env. Health
Review Payment Amenity Parks
CMP(50%) GIS Housing Cash in Lieu Landscape
City
Use
Parks Review Tax Water Tap Efficiency
Approved
County Use To Issue
Utility Review Tax Sanitation
Issuance
( CITY OF ASPEN January Z1/i�/1u U
130 S. GALENA ST ASPEN, CO 81611�