HomeMy WebLinkAboutFile Documents.1039 E Cooper Ave.0127-2020-BRES (14) Zoning Informal Comments
2020-12-30
Alison Foto Agley
From: Sophie Varga <sophie.varga@services.cityofaspen.com>
Sent: Wednesday, December 30, 2020 4:54 PM
To: Alison Foto Agley
Cc: lauren.litchet@cityofaspen.com
Subject: 1039 E Cooper Unit 30-A - 0127-2020-BRES
Good afternoon Alison,
I have been reviewing this permit for zoning. I spoke with Garrett about the disparity between the exterior scope
reviewed during land use review and what was submitted for permit. He has approved the new scope of work- no new
land use case is required.
removed
A few items that I believe can be resolved via red-lining:
1)The floor area sheet doesn't appear to be measuring floor area to the exterior face of the wall.The fireplace is also
not shown as being counted. Since there is no change to floor area I propose to remove the sheet entirely.
2)The demolition calculations were only calculated for one wall. Demolition calculations are based off of the entire
structure. Since the demolition area is so minor, I am fine with simply stating the area to be removed. If you could please
provide the square footage of the demolition on the roof I can note the total square footage.
For the time being I will close my review as re-review needed. N
shown on D2.3
Sophie Varga
Zoning Enforcement Officer
Community Development
130 S. Galena St.
Aspen, CO 81611
p: 970.429.2778
Notice and Disclaimer:
This message is intended only for the individual or entity to which it is addressed and may contain information that is
confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply
to the sender that you have received the message in error and then delete it. Further,the information or opinions
contained in this email are advisory in nature only and are not binding on the City of Aspen. If applicable,the
information and opinions contained in the email are based on current zoning, which is subject to change in the future,
and upon factual representations that may or may not be accurate. The opinions and information contained herein do
not create a legal or vested right or any claim of detrimental reliance.
RECEIVED
1 02/19/2021
ASPEN
BUILDING DEPARTMENT