Loading...
HomeMy WebLinkAboutFile Documents.1039 E Cooper Ave.0127-2020-BRES (19) EVOLVE STRUCTURAL DESIGN 1040 MAIN STREET • CARBONDALE,CO 81623 • (970)510-0773 www.evolvestruct.com November 12, 2020 Alison Agley Rowland+Broughton 500 W Main Street Aspen, Colorado 81611 RE: Baldwin Remodel 1039 East Cooper Avenue, Unit 30, Aspen, CO 81611 Alison, We have reviewed the preliminary existing, demo, and proposed drawings associated with the Baldwin Remodel at 1039 East Cooper Avenue in Aspen, Colorado. Once demolition can begin,the interior wall and ceiling finishes shall be at least partially removed to allow observation of the existing structural system. We shall be contacted to perform a site observation of the exposed structure to determine the structural implications of the proposed remodel and any necessary structural revisions. This shall be done prior to proceeding with the removal or modification of any framing members. The structural modification to this unit will require an analysis of both the gravity and lateral systems of the affected structural elements. The analysis will trace the gravity and lateral loads paths through the building, possibly affecting areas of the building outside of Unit 30. If reinforcement of the structure is required, some possible structural solutions include steel moment frames, additional beams and columns, wall sheathing, and holdown straps. If structural reinforcement or modification is necessary, we can provide a structural letter or plans and details as required, signed and sealed by a Professional Engineer licensed in the State of Colorado,for submittal to the Building Department. Thank you for engaging our firm for your project. Should you have any further questions regarding this matter, please feel free to contact our office. We look forward to assisting you in completing your project. Sincerely, Evolve Structural Design LLC ..\\\\\\\N III Dustin Wheatley P.E. c5 4 ph Mrofr.. ��i�10 1 Project Engineer y �? io 55448 ; f 31/4 11/12/2020 RECEIVED 11/19/2020 ASPEN BUILDING DEPARTMENT