Loading...
HomeMy WebLinkAboutFile Documents.13 E Water Pl.0008-2023-BREP (12) APPLICATION ACCEPTED DATE: 2023-03-29 PERMIT NUMBER: 0008-2023-RRFP Field Plan Set Must Be Printed In Color ,�10; � COMMUNITY DEVELOPMENT DEPARTMENT , , CITY OF ASPEN �/�'t� BUILDING PERMIT COVERSHEET ``��/ PERMIT NO 0008-2023-BREP CITY OF CITY OF ASPEN� OWNER ASPEN FABROCINI ROBERT • PROPERTY INFORMATION ADDRESS 13 E WATER PL UNIT ADDRESS 13 E WATER PL These plans musta apt at the • PARCEL ID: 273513204013 LEGAL DESCRIPTION: WATER PLANT AFFORDABLE PARCEL ID 273513204013 building site or inspection HOUSING delays may occur.Construction OWNER: FABROCINI ROBERT shall conform to these plans.All PERMIT CONTRACTOR: CITY OF ASPEN-ASSET MANAGEMENT changes shall be approved by Ifiliging official. DESCRIPTION OF WORK The slope between E Water Place and Castle Creek Road is progressively eroding.The patio of 13 E Water PI will SPECIAL INSPECTION REQUIRED: City Development Engineer's Comments 1.Encroachments:Any existing or planned encroachments into the public SEPARATE PERMITS ARE be removed and a 35'long x 30'deep micropile retaining wall will be installed spanning from the patio behind right-of-way,including temporary construction trailers and dumpsters,must be REQUIRED FOR ELECTRICAL, -Structural steel welding:Field&Shop applied for licensing at City Engineering(920-5080).Five days advance 13EWater re to the east edge of the back yard of 14E Water PI to remove to load from the existing boulder and Stormwater Management Considerations -High strength bolting notice is required to obtain a temporary encroachment license. PLUMBING,MECHANICAL,OR railroad tie retaining wall.The patio will be reset at the end of the project. Project Description g anchors q P ry FIRE SPRINKLER WORK �"""°" na"u.da -Epoxy 2.Right-of-way Permits:Approval of these plans by the City Building Dept.is The purpose of this project Is to alleviate the failing retainingwall on the south side of 13e14�" Prior and during construction,sediment ant an downhill side of the project will have silt fence or staked, paintprivateproperty Y 9 pP p P wa -Intumescent for work ononly.Design approvals for proposed work Waters Place by implementing t micro piling for slopestabilization.The proposed straw wattles to contain any sedimen[and minimize erosion and sediment transport. imp gpermanen gs propose S ra applied fire resistive materials (including landscaping)in the public right-of-way(ROW)must be obtained work includes installing It fence properties the downhill side of v project,construction of Construction vehicles lecoll accesseon.site via it or material pad to minimize sediment - e Y en SMOKE ALARMS AND list g proje tracking from vehicles out of the site.Any soil or material stockpiling will be surrounded on the -Permanent micropiles from City Engineering Dept(920-5080)and Parks Dept.(920-5120).A CARBON MONOXIDE temporary road between the two properties for access to the construction area,removing andpermit for work in the public right-of-way must be obtained from the City palletizing the from the existing t to make room for work[o be done,excavating downstream side with erosion logs or silt fence.Appropriate BMPs(Best Management pa g pavers gpaioga Practices)for stormwacer and erosion m;tigationare to be followed at all times. Engineering Dept.five days in advance of when the permit is needed. DETECTORS REQUIRED USE OF BUILDING Multi-Family FIRE SPRINKLER REQUIRED? 975 Sont area down 3 feet to make ready for micro piling operations,installing shoring system Special inspection is required per 20151BC 3.Mud,dirt and debris may not be tracked onto the adjacent public ROW, THROUGHOUT DWELLING [e prevent the terpo,ary,zd,o and an reclamation ciamatonnf the micropile are,resettin g otin tivese Inspection and Maintenance section 1704.Inspector to verify that copy of and the adjacent ROW must be clean at the end of eachworkday.Construct UNIT PER CITY OF ASPEN • removal of[hetemporary road,one redamanon of the disturbed area with topsoil,native seed P agreement for inspection program to be mud rack if needed.Tracks hauling demolished materialsmust becovered. MUNICIPAL CODE 8.15 mix and straw. The site will be inspected at least once every 14 calendar days and 24 hours before/after 4.Utilities in ROW:No utilityedestals,meters,or electric transformers can the job site prior to performing any P CLASS OF WORK Residential FIRE SPRINKLER TYPE forecasted storm events to determine SWMPaaaracyand effectroeness;proper installation, be installed in the public right-of-way.Provide utility easements on private Existing Site Conditions location,and condition of EPSC measures;and implementation of construction activity inspections A copy of all Special Inspeclo property as needed. ' - The project is located between 13 Waters Place and l4 Waters Place in Aspen,CO.The site is pollution prevention measures.An alternative of inspecting evens7calendar days regardless of field reports to be on the job site for 5.Certificate of Occupancy(CO)Inspection:Engineering CO Inspection REQUIRED SPECIAL currently land cover of site is comprised of an existing paver patio,trees, precipitation events or forecasts may also be used.Inspection and maintenance reports should inspectors'review if re nested.Failure to includes but is not limited to:(a)witnessing that all property corners Q cu h In win ll f it n t and k o site following eacspect d t a kept ion and made available to City of Aspen l mpee BUILDING TYPE IIRC) shrubs,and native grasses.The site generally slopes south towards the wall and the falls off be co comply may resul havemonuments,(b)drainage improvements were installed as approved,(c) IT should be known That This review shall INSPECTIONS towards Castle Creek. tstaff hese non request Any loss of sediment edamounte should be noted and kep act file with easements are documented,(d)no unapproved ROW encroachments exist, not relieve the applicant of their these reports,including date and estimated amount of sediment loss and what activities were and the ROW has been restored.Call 429-2750 to arrange CO inspection. responsibility to comply with the performed to ensure that sediment loss would not occur again. p Y pY Downstream/Receiving Waters 6.Snowmelt Driveways:(i)Snowmelt runoff from driveway cannot flow into requirements of the City of Aspen CONSTRUCTION TYPE ENERGY CODE COMPLIANCE Reviewed by Engineering street.A grate or Swale must intercept runoff before street.(ii)Snowmelt The immediate receiving waters is castle creek.The ultimate recemmg waters for the site is the Reviewed by Engine wing Municipal Code.Pursuant to Roaring fork Rrvec installation in the public ROW requires an encroach-merit permit. • 04/04/2023 12:42:00 PM 7.Drainage Issues:(i)Foundation drains cannot go to a drywall receiving Sec.26.104.050,any permit or approval WORK CHANGES BUILDING Pollution Prevention Measures ;; �„o he "It should be known that this review shall not other drainage flows.(ii)City must be notified of drainage plan changes.(iii) issued in error or otherwise not in OCCUPANCY GROUP(IBC) relieve the applicant of their responsibility to Plan approval assumes no ground water.If ground water is encountered,call conformity with the requirements of this FOOTPRINT? Potential pollution sources during construction may include machine fluids and fuels, the Senior Dev.Engineer at 920-5080.Call for an open hole inspection prior Title,shall be void.Similarly,anypermit comply with the requirements of the City of Y construction trash,items picked upon vehicles,and material trash.Trash will be controlled via to placement of the drywall. or approval issued in reliance upon or ons;te secure dumpsters during construction activity.Any machinery and vehicles are expected aeo,m.,e.aaa�.e.m. Aspen.The review and approval by the City is 8.No Loose Material Storage allowed in R.O.W. CODE EDITIONS 2015 IRC TOTAL SPA SQ-FT- to not be leaking,with any potential leaks controlled so as to not infiltrate either by a physical offered only to assist the applicant's 9.Neighbor Notification:For all excavation,the Contractor must comply with as a result of,a materially false block of the fluid,or immediate cleanup of spills with a construction spill kit.Materials and understanding of the applicable Engineering neighbor notification requirements per Section 3307 of the 2003 International statement or representation made in garbage are expected to be organized and cleaned up at the end of each work day, requirements."The issuance of a permit based Building Code(IBC) the process of obtaining the permit or maintainedsentanin neat pmerduring construction.Adepniate concrete washout area will be development approval shall,likewise, OTHER CODE EDITIONS TOTAL SNOWMELTSCIFT. present and maintained during construction.Appropriate storm water BMP's such as vehicle on construction documents and other data shall be void.Any person having received a tracking pads,silt fence,straw wattles,and inlet protection will be utilized until substantial not prevent the City of Aspen from requiring the vegetative regrowth occurs. correction of errors in the construction void or voidable permit or approval documents and other data. shall not be relieved from having to HISTORIC PROPERTY? NO TOTAL POOL SCUT. Timing of Construction Activity - comply with all applicable terms and Construction activities are expected to begin in the spring on 2023 and last approximately8 conditions of this Title and the City shall I weeks. RECEIVED RECEIVED not be estopped from fully enforcing same. FIRE SPRINKLER EXISTING? 03/29/2023 03/29/2023 ASPEN ASPEN BUILOINGOEPARTMENT BUILDINGDEPARTMENT 4// 4`I SO riMEWEI)) /p g, B. Owner Responsibilities:1. The project owner,an agent of the owner,or the design professional in responsible charge acting1�, as the owners agent,is responsible for employing special-inspection services.The special 14/2 02 3 1-1 CITY OF ASPEN hall not be in the era 1 f the contractor,subcontractor or material supplier. 1 G. Building Department Responsibilities: inspector/agency agency s p oy o PP ter 1. Approve special-inspection program.The building department shall approve all special IITOR000tGU1MPUANCE [IBC Sec 1704.1]In case of an owner/contractor,the special inspectorangency shall be employed inspectors and special-inspection requirements. linzhid SPECIAL INSPECTION AND TESTING AGREEMENT as specified by the building official. 2. Enforce special inspection.Work requiring special inspection and the building inspector shall C. Design Professional in Responsible Charge Responsibilities: This form is required for projects needing special inspection and/or testing per Chapter 17 of the International Design Professional in Responsible Charge definition:An individual who is registered or licensed to practice their monitor the performance of special inspectors.His/Her approval,in addition to that of the special Building Code(IBC). es active deli fession as def rid b the statutory is of the prof sional registration laws of the state or inspector,must be obtained prior to placement of concrete,covering of structural steel,or other 13 E.Water Place 0008-2023-B REP jurisdiction in which the project is to be constructed;his engaged by the owner to review and coordinate certain similar materials. Project Address: Permit Number: t of the 3. Review Ins action reports.The building official should reviewspecial-inspection e d aspec s project,as determined by the building official,for compatibility with the design of the building or P P g oprogress an BEFORE A PERMIT CAN BE ISSUED:The owner,or the design professional in responsible charge,acting as structure. final reports. the owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing 1. Prepare statement of special inspections.The registered design professional in responsible 4. Perform final inspection.The building official should perform the final inspection and approval Schedule,including the required acknowledgments.A pre-construction conference with the parties involved may be charge shall prepare a statement of special inspections in accordance with IBC Section 1705 for fora project[IBC Sec.109.3.1]after the final special-inspection report has been reviewed and required to review the special-inspection requirements and procedures. submittal by the applicant.The statement of special inspections shall identify the following: approved. APPROVAL OF SPECIAL INSPECTORS:Special inspectors mayhave no financial interest in the projects for The materials,systems,components and work required to have special inspection or P P pr j a testing by the building official or by the registered design professional responsible for which they provide special inspections.Special inspectors shall be approved by the building department prior to each portion of the work, performing any duties.Special inspectors shall submit their qualifications and are subject to personal interviews for b. The type and extent of each special inspection. pre-qualification.Special inspectors shall display approved identification,as stipulated by the building official, c. The type and extent of each test. 13 E.Water Place 0008-2023-BREP when performing the function of special inspector. d. For each type of special inspection,identification as to whether it will be continuous Project Address: Permit Number: Special inspection and testing shall meet the minimum requirements of the International Building Code Section special inspection or periodic special inspection. 1704.The following conditions are also applicable: D. Contractor Responsibilities: ACKNOWLEDGMENTS 1. Notify the special inspector.The contractor is responsible for notifying the special inspector or I have read and agree to comply with the conditions of this agreement. A. Special Inspector Responsibilities: agency regarding individual inspections for items listed on the attached schedule and as noted on 1. Signify presence at Job site.Special inspectors should notify contractor personnel of their the building department approved plans.Adequate notice shall be provided so the special inspector CTL Thom SOn Rya"R. _ e,o._ Ran Barbone 7/6/2023 marboneL�putnnmPepn.com presence and responsibilities at the job site.If required by the building official,they shall sign in has time to become familiar with the project. P carbon Y on the appropriate fore posted with the building permit. 2. Provide access to approved plans.The contractor is responsible for providing the special Special Inspection Signature Printed Name Date Email 2. Observe assigned work.The special inspector shall observe assigned work for conformance with inspector access to approved plans. Agency*** line p p line 3. Retain special inspection records.Upon request,the contractor is also responsible for retaining, Cif of Aspen building department approved(stamped)design drawings,specifications,and applicable at the job site,all special inspection records completed by the special inspector City asntaim =^m Ben Levenson 7/5/2023 ben.levenson fgmail.com workmanship provisions of the International Building Code.Architect\engineer-reviewed shop E. Inspection of Fabricators: Owner* Signature Printed Name Date Email drawings maybe used only as an aid to inspection. 1. Fabrication of structural assemblies and members.Where fabrication of structural load-bearing Richard r iBa ens neede a cennn Johnson =ao.. Rchard Johnson 7/6/2023 richard@rj-eng.net For continuous special-inspection,the special inspector shall be on site at all times observing the members and assemblies is being performed on the premises of a fabricator's shop,IBC Section work requiring special inspection.Periodic inspections,if any,must have prior approval based on 1704.2 shall require special inspection of the fabricated items. Design Professional in Signature Printed Name Date Email separato written 1reviewed and approved bythe buildingdepartment and the engineer2. Fabrication and implementation procedures.The special inspector shall verify that the Responsible Charge** _ a architect pan pprove p or fabricator maintains detailed fabrication and f trot d that de a basis for Cityof Aspen a.an P Evan Pletcher 7/5/2023 evan.pleteher architect of record. quality con procedures provide p le�'m (kgaspen.gov 3. Report nonconforming items.The special inspector shall brio nonconforming items to the inspection control of the workmanship and the fabricator's ability to conform to approved eP g P P g o g Contractor Signature Printed Name Date Email immediate attention of the contractor and note all such items in the daily report.If any item is not construction documents and reference standards.The special inspector shall review the procedures resolved in a timely manner or is about to be incorporated in the work,the special inspector shall for completeness and adequacy relative to code requirements for fabricator's scope of work. immediatelynotify the buildingdepartment bytelephone or inperson,n ti the en n engineer or F. Approved Fabricator Responsibilities: Approved Signature Printed Name Date Email o fy p rip notify gi a epic g architect,and post a discrepancy notice. 1. Fabrication exempt inspections.Special inspections are not required where work is done on the Fabricator*** 4. Provide timely reports.The special inspector shall complete written inspection reports for each premise of a fabricator registered and approved to perform such work without special inspection. Shaun _r inspection visit and provide the reports on a timely basis determined by the building official.The If work is done on site that requires special inspection,special inspection will be required. B&Y Drilling BrainardShaun Brainard 7/6/2023 Shaun@bydrillinginc.com special inspector or inspection agency shall famish these reports directly to the building official, 2. Approval of fabricator.Approval shall be based upon review of the fabricator's written Inspected Signature Printed Name Date Email engineer or architect of record,and others as designated.[IBC Sec.1704.1.2]These reports should procedural and quality control manuals and periodic auditing of fabrication practices by an Fabricator*** be organized on a daily format and may be submitted weekly at the option of the building official. approved special inspection agency. These reports should include: 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator shall submit City of Aspen Building a. Description of daily inspections and tests made with applicable locations, certificate of compliance to the building official stating that the work was performed in accordance Department: Signature Printed Name Date Email b. Listing of nonconforming items, with the approved construction documents. 'See a list of who may sign m dm owner on page 2. 9c. Report on how nonconforming items were resolved or unresolved as applicable, ••Toe resign Professional in Responsible Charge isnot required to sign ifthey perform the duties as descrxd in item C above. riteget�d11L"\d. Itemized changes authorized by the architect,engineer,and building official if ••*Either the Approved Fabricator or Inspected Fabricator must sign.If all work is performed in tie shop of an Approved Fabriwtoq tie Special �U not included in nonconforming items Inspection Agency signature is not required(no field work). luisp 5. Provide Final Inspection Report.The special inspector shall submit a written final report 04/03/2023 documenting required special inspections and correction of any discrepancies noted in the ZONING inspections prior to the final building inspection. ,3o South Galena Street Aspen,CO 81611-,975 I P:970920.5000 I P.970920.5197 I cityolaspen.com :3o South Galena Street Aspen.CO 81611/975 I P:970_920_5000 I F,970.920.5197 I cityotespen.com 130 South Galena Sweet Aspen,CO t:t11-1q75 I P:970.920.5000 I F,970.920.5197 I c,tyofaspen.,