HomeMy WebLinkAboutFile Documents.215 N Garmisch St.0019-2023-BREP (13) Building_1_215 N Garmisch_0019-2023-BREP
90. Architectural_215 N Garmisch_20230403.pdf(4)
Checkmark: Unchecked Show compliance with the stair
/ Author:jimp illumination requirements of 2021 IBC
Show compliance with the stair File Name: 90.Architectural_215 N Garmisch_20230403.pdf
illumination requirements of — — 1008.2.1. Note,this standard has
2021 IBC 1008.2.1. Note,this
standard has changed,and changed, and needs to now be 10 foot
needs to now be 10 foot
candles for stairs and landings. I candles for stairs and landings.
/ II PLEASE SEE REVISED
DETAIL AT 2/A1.4
Checkmark: Unchecked
Author:jimp the top extension of this rail must be
File Name: 90.Architectural_215 N Garmisch_20230403.pdf horizontal revise
..
??,-l 11:% ,.-0-
_ __EE_ PLEASE SEE 90.PHOTOMETRIC
�' ='==-= YELLOW BRICK SCHOOL-230606
° Checkmark: Unchecked Show compliance with the stair
Author:jimp
4y _ _ illumination requirements of 2021 IBC
' Show compliance with the stair File Name: 90.Architectural_215 N Garmisch_20230403.pdf
illumination requirements of 1008.2.1. Note,this standard has
2021 IBC 1008.2.1. Note,this
standard has changed,and changed, and needs to now be 10 foot
needs to now be 10 foot
candles for stairs and landings. candles for stairs and landings.
\ PLEASE SEE 90.PHOTOMETRIC -
YELLOW BRICK SCHOOL-230606
Checkmark: Unchecked The V extention must begin at the end of
® Author:jimp
--_ File Name: 90.Architectural_215 N Garmisch_20230403.pdf the ramp revise for compliance.
ow
r-
PLEASE SEE REVISED
DETAIL AT 2&3/A1.5